Sur - Boq 4x Gt26 Ms - B

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 9

1500 MW

Oman
Rev.
B 03.12.2010
Chapt. DESIGNATION Number Rev.
Total Weight
Tonnes
MECHANICAL EQUIPMENT A 7285.1
1 GT Foundation Anchors/Baseplates A 26.0
2 Termal Block and Parts A 1539.8
3 Air Intake Manifold A 78.8
4 Exhaust Gas Diffusor A 296.2
5 Generator A 1495.5
6 A 39.1
7 A 190.0
8 A 103.5
9 Fuel Gas Equipment A 25.1
10 Fuel Oil Equipment A 70.4
11 Wash syst. Equipment, blower skid (GT cooling) A 61.0
12 GT Purge Block & Nitrogen Block Dual A 18.9
13 HP and LP Coolers (OTC) A 212.3
14 1500 m2 A
15 A 115.5
16 Air Intake Filter System A 860.0
17 Fogging System A 28.1
18 Enclosure & Accessories A 505.6
19 A 91.2
20 A 68.6
21 A 1459.5
A 327.4
22 GT Piping MS A 244.4
23 Supports A 32.2
24 Varios Parts for Piping System A 18.8
25 Insulation 4186 m A 32.0
26 Painting of Piping 1344 m2 A
A 36.3
27 Electrical Equipment A 36.3 B
A
7648.8
PARTICULAR TECHNICAL SPECIFICATIONS - DRAWINGS & BILLS OF QUANTITY
SUMMARY
ERECTION TECHNICAL DOCUMENT
Thermal Systems
Hangers f. HP & LP OTC
TOTAL WEIGHT GT- MECH. / PIPING / ELECTRICAL (Tonnes)
ELECTRICAL EQUIPMENT AND CONTROL CABLES
Recooler
PIPING
Podests and Ladders
Exhaust Stack
MECHANICAL EQUIPMENT, PIPING, ELECTRICAL EQUIPMENT
2 x KA26 - 2 MS DC
Insulation HP & LP Coolers ( OTC )
Fire protection system
Blower skid,lube oil purif., control valve block
Auxiliary block
GAS TURBINE ISLAND
ABCD
SUR
232992144.xls.ms_office 1/9 6/8/2014
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Accuracy
tolerance
Net
Weight
Total weight
SP Number of GT's for this project 4 Length Width Height Diameter
Possible
tolerance
on weight
Total for
Project
Documents
in Binder
Documents
in Tab
m m m m +/- 10% kg kg
1100 MB BoQ mechanical equipment (Bill of Quantity) 1 Spreadsheet 2-1 Tab 01
1101 MB General Arrangement MS Power Train Set Dual Fuel 1 see included documents 2-1 Tab 02
1101 MB General Instructions 1 see included documents 2-1 Tab 03
Special tools for Gas Turbine site erection 19,200
1101/ MBA Special tools for Gas Turbine site erection 1 Set, in tool cabinets 8.5 2.5 2.2 14,900 14,900 2-1 Tab 03
2101 / 21xx MBA Equipment & parts for flushing of Gas Turbine piping systems 1 Container handling only 6.1 2.5 2.6 2,500 2,500 2-1 Tab 03
61xx / 71xx MBA Tools & parts for Gas Turbine commissioning 1 Container handling only 6.1 2.5 2.6 1,800 1,800 2-1 Tab 03
GT Foundation Anchors/Baseplates 26,000
1111 MPA GT Foundation Anchors/Baseplates 4 Set prefab loose parts 3.1 1.9 1.4 6,500 26,000 2-1 Tab 04
Thermal Block and parts 1,539,800
1121 MBA Gas Turbine (Thermal Block delivered in one piece) 4 prefabricated 12.6 4.7 5.4 370,000 1,480,000 2-1 Tab 05
1121 MBA TB- Insulation Upper half. To be assembled on site. Supplier
Supervisor required.
4 prefab part, container or wooden boxes 0 2-1 Tab 05
1121 MBA Various material for TB delivered in one piece.
Total 5 crates: div. bolts, nuts, insulation material, coupling bolts,
assembly support, etc.
4 Set loose parts 3,200 12,800 2-1 Tab 05
1121 MBA SEV-FDS Dual fuel 4 prefab part 9.5 1.4 6.9 4,400 17,600 2-1 Tab 05
1121 MBA EV-FDS Dual fuel 4 prefab part 9.5 1.9 6.5 7,350 29,400 2-1 Tab 05
1121 MBA GT26: Thermal Bock SEI 1 2-1 Tab 05
Air Intake Manifold 78,800
1123 MBL Air Intake Manifold / Lower part 4 prefab 8.7 1.9 3.2 7,530 30,120 2-1 Tab 06
1123 MBL Air Intake Manifold / upper part 4 prefab 8.7 3.2 4.2 12,020 48,080 2-1 Tab 06
1123 MBL Loose Parts to Air Intake Manifold 4 Loose parts - - - 150 600 2-1 Tab 06
Exhaust Gas Diffusor 296,240
1124 MBR Exhaust Gas Diffusor 1 (delivered in one piece) 4 prefab 6.2 6.1 5.7 30,660 122,640 2-1 Tab 07
1124 MBR Cigar at front 4 prefab part 2.5 2.3 3.4 3,700 14,800 2-1 Tab 07
1124 MBR Loose Parts to Exhaust Gas Diffusor 1 4 Set loose parts 3.0 2.4 3.4 2,700 10,800 2-1 Tab 07
1124 MBR Flow Cross 4 prefab part 1.4 - - 2.2 in above in above 2-1 Tab 07
1124 MBR Exhaust Gas Diffusor#2 (4 parts) 4 delivered in 4 parts 6.5 6.9 6.9 0 0 2-1 Tab 07
1124 MBR Exhaust Gas Diffusor#2, Part 1 4 prefab parts 4.1 8.7 3.8 12,500 50,000 2-1 Tab 07
1124 MBR Exhaust Gas Diffusor#2, Part 2 4 prefab parts 2.6 7.2 3.8 6,700 26,800 2-1 Tab 07
1124 MBR Exhaust Gas Diffusor#2, Part 3 4 prefab parts 4.1 7.5 3.8 11,000 44,000 2-1 Tab 07
1124 MBR Exhaust Gas Diffusor#2, Part 4 4 prefab parts 2.6 7.2 3.8 5,500 22,000 2-1 Tab 07
1124 MBR Diffuser GT26 Supports 4 Set loose parts 3.0 1.2 0.7 1,100 4,400 2-1 Tab 07
1124 MBR Loose Parts to Exhaust Gas Diffusor 2 4 Set loose parts 4.0 0.8 0.5 200 800 2-1 Tab 07
1124 MBR NOX measuring cross (Measuring arm) 4 prefab loose parts 4.0 0.5 0.5 in above in above 2-1 Tab 07
EGD delivered with basic coating. Final coating to be applied on
site after assembly of the EGD. Paint to be provided by erection
contractor (according to project specific requirements)
basic coated surface 2-1 Tab 07
Equipment Dimensions Bid Instructions
not included in Total
Mechanical GT File: 232992144.xls.ms_office Page 2 of 9
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Accuracy
tolerance
Net
Weight
Total weight
SP Number of GT's for this project 4 Length Width Height Diameter
Possible
tolerance
on weight
Total for
Project
Documents
in Binder
Documents
in Tab
m m m m +/- 10% kg kg
Equipment Dimensions Bid Instructions
Generator 1,495,460
1131
MK. Generator delivered with basic coating. Final coating to be
applied on site after assembly of the Generator. Paint to be
provided by erection contractor (according to project specific
requirements)
basic coated surface
Generator 50WY23Z-124 1,495,460
1131 Generator (72 Slot) 4 pre-assembled 12.8 4.3 5.4 357,000 1,428,000 2-1 Tab 08
Stator casing top cover 4 prefabricated 8.6 3.9 1.9 12,100 48,400 2-1 Tab 08
1131 MKA Lifting Jacks (Blocks) for setting and alignment 1 set of 4 pcs. 2.0 1.2 0.8 1,500 1,500 2-1 Tab 08
1131 MKA Generator foundation Base Plates 4 set of loose parts 1.1 1.1 0.7 935 3,740 2-1 Tab 08
MKA Sikadur, Epoxy based grout for Foundation Baseplates 4 2 component 420 1,680 2-1 Tab 08
1131 MKA Seal frame to foundation air chamber 4 prefab, loose parts 950 3,800 2-1 Tab 08
1131 MKA Generator foundation Bolts, bottom bar layer 4 set 2.7 0.6 1.0 935 3,740 2-1 Tab 08
1131 MKA Generator Exciter Filter Boxes (2 boxes) 8 set prefab. Filters 2.4 1.2 1.1 250 2,000 2-1 Tab 08
1131 MKA Partition Walls and accessories for cooling air chamber, Nuts for
Anchor Bolts, guide blocks and bowl discs for Generator
anchoring
4 loose parts 2.0 0.5 0.6 280 1,120 2-1 Tab 08
1131 MKA Generator cooler connecting pieces, gaskets, bolts & nuts 4 loose parts 2.0 0.6 0.4 125 500 2-1 Tab 08
1131 MKA Instrumentation & Accessories, installation materials, conduits,
clamps, cables, round air filters, nameplates, bolts & nuts
4 set prefab loose parts 2.1 1.0 0.7 220 880 2-1 Tab 08
1131 MKA Paint, primer, varnish for touch up 4 loose parts 0.6 0.6 0.7 25 100 2-1 Tab 08
1131 / 1101 MKA Generator Rotor removing device, only supports 1 set loose parts 4.8 2.5 2.0 10,500 10,500
Blower Skid indoor (option generator) 9,200
1131 Blower Skid indoor 4 Skid 3.5 2.2 2.6 2,300 9,200 2-1 Tab 09
1131 (Accessoires to Blower Skid ) 4 Loose parts in above in above 2-1 Tab 09
Recooler 190,000
1132 Recooler to GT System (4 cooler block) 10 prefab 11.5 3.4 3.7 11,500 115,000 2-1 Tab 09
1132 Accessories to Recooler - Coolers 10 Set prefab loose parts 6,500 65,000 2-1 Tab 09
1132 Closed Cooling Water Skid 2 Skid 3.5 1.3 1.9 3,000 6,000 2-1 Tab 09
1132 Peak cooling system (for 4x4 cooler block) 2 pre-assembled 2,000 4,000 2-1 Tab 09
GT Auxiliary Block 103,484
1141 MBV01 GT Auxiliaries Block (MS) 4 Skid 12.2 3.0 4.2 25,871 103,484 2-1 Tab 09
1141 MBV01 Pressure accumulator 4 Loose parts in above in above 2-1 Tab 09
1141 MBV01 Ball Valve G2" 4 Loose parts in above in above 2-1 Tab 09
Lube Oil Purifier 2,320
1141 Lube Oil Purifier 4 Mobile Skid 2.0 0.8 2.1 580 2,320 2-1 Tab 09
GT Control Valve Block (Dual) 27,600
1142 MBX01 GT Control Valve Block (Dual) 4 Skid 8.3 2.1 3.1 6,900 27,600 2-1 Tab 09
1142 MBX01 Measuring Equipment to Control Valve Assembly to CV-block 4 Loose parts in above in above 2-1 Tab 09
1142 MBX01 Air Pressure Device with Case to CV-block 4 Loose parts in above in above 2-1 Tab 09
not included in Total
Mechanical GT File: 232992144.xls.ms_office Page 3 of 9
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Accuracy
tolerance
Net
Weight
Total weight
SP Number of GT's for this project 4 Length Width Height Diameter
Possible
tolerance
on weight
Total for
Project
Documents
in Binder
Documents
in Tab
m m m m +/- 10% kg kg
Equipment Dimensions Bid Instructions
Fuel Gas System Equipment 25,120
1143 MBP10 Fuel Gas Block 4 Skid 1.8 1.7 1.7 980 3,920 2-1 Tab 09
1143 MBP Fuel Gas Dust Filter Block 4 Skid 4.5 2.0 3.3 5,300 21,200 2-1 Tab 09
Fuel Oil System Equipment 70,400
1144/45 MBN/U Combined Pump Block 4 Skid 6.1 2.5 3.2 15,300 61,200 2-1 Tab 09
1144/45 MBN/U (Accessories to Combined Pump Block) 4 Loose parts in above in above 2-1 Tab 09
1145 Drain Tank 4 Skid 2.7 2.5 2.0 2,300 9,200 2-1 Tab 09
1145 Installation of Drain Tank 4 prefab loose parts in above in above 2-1 Tab 09
GT Wash System Equipment 2,960
1146/1101 MBA06 Wash Cart 4 Skid on wheels 2.2 1.4 1.9 740 2,960 2-1 Tab 09
Blower Skid (GT cooling, CMAS) 58,000
1147 MBH Blower Skid (Base frame with ventilators EGH and EBV-
tubes and fixing parts) redundant fans
4 Skid 6.8 2.9 3.4 9,200 36,800 2-1 Tab 09
1147 MBH Twin channel (Air duct to Blower Skid) redundant fans 4 prefab loose parts 7.0 2.9 2.9 5,300 21,200 2-1 Tab 09
GT Purge Block & Nitrogen Block Dual 18,880
1148 MBH02 Purging Block Dual 4 Skid 3.1 1.2 1.8 1,200 4,800 2-1 Tab 09
1148 MBH01 Nitrogen Block (N2 blocks) Dual 2-1 Tab 09
1148 MBH01 Lower sect. 4 prefab 1.9 2.1 1.6 2,000 8,000 2-1 Tab 09
1148 MBH01 Upper sect. 4 prefab 1.9 2.1 1.2 1,520 6,080 2-1 Tab 09
HP and LP Coolers 212,300
1152 MBH40 HP Cooler (OTC) 4 prefab 3.6 2.0 9.9 1.9 22,000 88,000 2-1 Tab 09
1152 MBH40 Insulation Material to HP OTC 4 Set loose parts 4.8 2.4 2.3 1,600 6,400 2-1 Tab 09
1152 MBH40 HP OTC insulated surface (total of 3 layers, 55m2 each) 12 loose parts appr. Total Thickness 200mm 55 m 660 m 2-1 Tab 09
1152 MBH40 Insulation mats/matresses to HP OTC 4 Set loose parts 800 in above 2-1 Tab 09
1152 MBH40 Insulation accessories to HP OTC (flat steel bar, bolts&nuts, fixations) 4 Set loose parts 200 in above 2-1 Tab 09
1152 MBH40 Insulation accessories to HP OTC (metal sheets) 55m2 4 Set prefab & loose parts 450 in above 2-1 Tab 09
1152 MBH40 Insulation erection material to HP OTC (rivets, steel wire, silicone) 4 Set loose parts 50 in above 2-1 Tab 09
1152 MBH30 LP Cooler (OTC) 4 prefab 3.6 2.7 9.7 3.0 27,700 110,800 2-1 Tab 09
1152 MBH30 Insulation Material to LP OTC 4 Set loose parts 5.2 2.4 2.3 1,775 7,100 2-1 Tab 09
1152 MBH30 LP OTC insulated surface (total of 3 layers, 70m2 each) 12 loose parts appr. Total Thickness 200mm 70 m 840 m 2-1 Tab 09
1152 MBH30 Insulation mats/matresses to LP OTC 4 Set loose parts 1,000 in above 2-1 Tab 09
1152 MBH30 Insulation accessories to LP OTC (flat steel bar, bolts&nuts, fixations) 4 Set loose parts 250 in above 2-1 Tab 09
1152 MBH30 Insulation accessories to LP OTC (metal sheets) 70m2 4 Set prefab & loose parts 500 in above 2-1 Tab 09
1152 MBH30 Insulation erection material to LP OTC (rivets, steel wire, silicone) 4 Set loose parts 50 in above 2-1 Tab 09
1152 MBH30+MBH40 Various inst. Material for HP & LP OTC 1 Set loose parts 700 700 2-1 Tab 09
Hangers and various inst. Material for HP & LP OTC 115,504
1152 MBH30 Hangers, pipe supports, shock absorber for HP & LP OTC 4 Set loose parts 1,320 5,280 2-1 Tab 09
1211 MBH30 Heating system for Once Trough Cooler (OTC) 4 Set loose parts 0.5 0.5 0.6 56 224 2-1 Tab 09
1152 (1101) MBH30 Lifting device for HP & LP OTC 4 prefab 2.9 0.4 0.8 1,000 4,000 2-1 Tab 09
1152 MBH30 Steel Structure and Loose Parts for HP & LP OTC 4 Set prefab loose parts 26,500 106,000 2-1 Tab 09
Mechanical GT File: 232992144.xls.ms_office Page 4 of 9
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Accuracy
tolerance
Net
Weight
Total weight
SP Number of GT's for this project 4 Length Width Height Diameter
Possible
tolerance
on weight
Total for
Project
Documents
in Binder
Documents
in Tab
m m m m +/- 10% kg kg
Equipment Dimensions Bid Instructions
Air Intake System 860,000
1211 MBL Air Intake Arrangement MS Typical 1 Document 2-1 Tab10
1211 MBL GT Air Intake System "pulse" with air compr. skid (800Kg)
(Pulse Filter Manufacturer R&M)
4 Set prefab & loose parts 31.4 23.3 13.9 171,800 687,200 2-1 Tab10
1211 MBL GT Air Intake System "pulse" Additional 3 Droplet Catcher
integrated installation
4 Set prefab & loose parts 11,700 46,800 2-1 Tab10
1211 MBL GT Air Intake System "pulse" Additional 4 Evaporative
Cooler
4 Set prefab & loose parts 1.9 31,500 126,000 2-1 Tab10
Fogging System 28,140
1211 MBL Fogging system Pump Skid 4 skid 4.7 2.4 2.7 6,000 24,000 2-1 Tab10
1211 Loose Parts to Fogging pump skid 4 set 2.3 0.8 1.5 410 1,640 2-1 Tab10
1211 Nozzle frame, piping 1 Set prefab loose parts 8.6 3.2 0.9 2,500 2,500 2-1 Tab10
Acoustical Enclosure 505,600
1221 MPB Enclosure (Indoor) MS 4 appr. Outside dimension 40.0 16.0 9.0 505,600 2-1 Tab11
1221 MPB Accessories to Enclosure - Steel parts, gratings, handrails,
ladders
4 Set prefab loose parts 49,750 in above 2-1 Tab11
1221 MPB Accessories to Enclosure - Wall and Roof panel 4 set prefab loose parts 35,350 in above 2-1 Tab11
1221 MPB Accessories to Enclosure - Fans, Fan-skids, Ducts & Supports,
bolts & nuts, various installation material
4 Set prefab loose parts 41,300 in above 2-1 Tab11
Leakage Test (Door Fan Test) to be performed 4
GT Platforms and Ladders 91,200
1241 MPG Podests and Ladders 4 prefab loose parts 22,800 91,200 2-1 Tab12
1241 Painting of Handrails on Podests and Ladders, MS, paint to be
provided by erection contractor(according to project specific
requirements)
4 galvanized surface
1 1/2" diameter
total length of handrails 900 m 3600 m 2-1 Tab12
GT Fire Protection System 68,576
5461 CYE/SGC/SGJ Fire detection, CO2 and WTR spray system 4 prefab loose parts, see attached documents 2,700 10,800 2-1 Tab 13
5461 CYE/SGC/SGJ CO2 Tank (skid) for two GT's MS 4 Skid & prefab parts 5.0 2.3 2.8 14,300 57,200 2-1 Tab 13
5461 CYE/SGC/SGJ Manual fire extinguisher (hand held) two GT's MS 48 prefabricated 0.6 0.3 10kg each 576 2-1 Tab 13
Exhaust Stack 1,459,486
1231 MBR Stack with Diverter Typical 4 prefab loose parts 18.0 11.0 40.0 292,571 1,170,286 2-1 Tab 14
1231 MBR Diverter Hydraulic Unit incl. Accessories 4 skid and set of parts 2.8 1.6 2.4 8,500 34,000 2-1 Tab 14
1231 MBR Transition Piece 4 prefab loose parts 15.7 6.2 32,300 129,200 2-1 Tab 14
1231 MBR Stack steel structure and platforms 4 prefab loose parts var var var 31,500 126,000 2-1 Tab 14
1231 MBR Painting of exhaust gas duct, stack, steelstructure (paint is
provided with stack material)
4 pre painted 850 m 3400.0 m 2-1 Tab 14
Returnable Transport steel frame parts (shpping frame) N/A 0
1121 MBA Gas Turbine (Thermal Block) GT26B2.2 complete 4 removable steel parts
1131 MKA Generator Stator WT21H-120 with Transport Covers 4 removable steel parts
1131 MKA Generator Stator WT21H-120 with Protection Covers 4 removable steel parts
1131 MKA Generator 50WY23Z-124 complete 4 removable steel parts
1141 MBV01 Auxiliaries Block 4 removable steel parts
7,285,070 Total weight for this project (Kg)
Mechanical GT File: 232992144.xls.ms_office Page 5 of 9
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Accuracy
tolerance
Net
Weight
Total weight
SP Number of GT's for this project 4 Length Width Height Diameter
Possible
tolerance
on weight
Total for
Project
Documents
in Binder
Documents in
Tab
m m m m +/- 10% kg kg
2100 MB. BoQ Piping (Bill of Quantity) 4 Spreadsheet 2-1 Tab 01
2100 Piping Arrangement 4 see included documents 2-2 Tab 02
General Instructions see included documents 2-3 Tab 03
GT Piping 244,400
2131/41/61 MBN/P/U Internal Piping, Dual Fuel 4 partially prefab 49,000 196,000 2-4 Tab 04
2131/41/61 MBN/P/U External Piping, Dual Fuel 4 partially prefab 6,800 27,200 2-4 Tab 04
2151 MBA Wash Water parts -Internal/ Wash Cart Off-line 4 partially prefab 300 1,200 2-4 Tab 04
2151 MBA Wash Cart Off-/On-line 4 partially prefab 300 1,200 2-4 Tab 04
2212 MKF Cooling Water Parts - External 4 partially prefab 2,100 8,400 2-4 Tab 04
Pipe Line Lists 4 partially prefab 2-4 Tab 04
MBE Fogging Nozzle Rack 4 prefab 9.0 6.0 0.4 2,200 8,800 2-4 Tab 04
MBE Fogging System Interconnection pipes 4 partially prefab 400 1,600 2-4 Tab 04
Supports 32,200
2131/41/61 MBN/P/U Internal Piping, Dual Fuel 4 prefab loose parts 6,000 24,000 2-4 Tab 05
2131/41/61 MBN/P/U External Piping, Dual Fuel 4 prefab loose parts 2,000 8,000 2-4 Tab 05
2151 MBA Wash Water Parts - Internal 4 prefab loose parts 50 200 2-4 Tab 05
Various Parts for Piping System 18,800
2100/2212 MB. Various Butterfly / Ball Valves 1"-3", Blow-off valves 4 set of valves 3,500 14,000 2-4 Tab 06
2100 MB. Miscellaneous items 4 set prefab parts 1,200 4,800 2-4 Tab 06
Insulation 0
2131/41/61 MBN/P/U Dual Fuel Piping system - Internal 4 prefab + loose parts see included documents 2-4 Tab 07
2131/41/61 MBN/P/U Fuel Gas (&Dual) system - External) 4 prefab + loose parts see included documents 2-4 Tab 07
Painting of Piping & Parts, value = sqm (m2) N/A 1344 m
2100 MB. Paint to be provided by erection contractor qty for below specified surface in square meters 2-4 Tab 08
2131/41/62 MBN/P/U Dual Fuel Parts - Internal 4 N/A 224 m 896 m 2-4 Tab 08
2131/41/63 MBN/P/U Dual Fuel Parts - External 4 N/A 112 m 448 m 2-4 Tab 08
Field Welds Scope N/A 3724 FW
2131/41/62 MBN/P/U Internal Piping, Dual Fuel 4 see included documents 730 FW 2920 FW 2-4 Tab 09
2131/41/62 MBN/P/U External Piping, Dual Fuel 4 see included documents 143 FW 572 FW 2-4 Tab 09
2131/41/62 MBN/P/U Dual Fuel Vent 4 see included documents 32 FW 128 FW 2-4 Tab 09
2100 MB. Ignition Gas 4 see included documents 10 FW 40 FW 2-4 Tab 09
2100 MB. Lube Oil Storage 4 see included documents 8 FW 32 FW 2-4 Tab 09
2100 MB. Wash Cart Off-/On-line 4 see included documents 8 FW 32 FW 2-4 Tab 09
Equipment Dimensions Bid Instructions
Piping GT File: 232992144.xls.ms_office Page 6 of 9
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Accuracy
tolerance
Net
Weight
Total weight
SP Number of GT's for this project 4 Length Width Height Diameter
Possible
tolerance
on weight
Total for
Project
Documents
in Binder
Documents in
Tab
m m m m +/- 10% kg kg
Equipment Dimensions Bid Instructions
NDT Testing N/A N/A N/A
2131/41/61 MBN/P/U Dual Fuel Parts - Internal 4 see included documents 2-4 Tab 10
2131/41/61 MBN/P/U Dual Fuel Parts - External 4 see included documents 2-4 Tab 10
2151 MBA Wash Water Parts - Internal 4 see included documents 2-4 Tab 10
Pressure Test N/A N/A N/A
2131/41/61 MBN/P/U Dual Fuel Parts - Internal & External 4 see included documents 2-4 Tab 10
Flushing of Systems N/A N/A N/A
2102 MBV Lube oil to be filled in to aux block 4 liquid to fill 26700 liter 106800 liter 2-4 Tab 11
2102 MBV Flushing Procedure for Lube Oil System 1 system to flush 2-4 Tab 11
2100 MB. Flushing Procedure for Power Oil System 1 system to flush 2-4 Tab 11
2100 MB. Flushing Procedure for Blow-off and Cooling Air Systems 1 system to flush 2-4 Tab 11
2100 MB. Flushing Procedure for NOx-Water, Fuel Oil 1 system to flush 2-4 Tab 11
2100 MB. Flushing Procedure for Fuel Gas System 1 system to flush 2-4 Tab 11
2100 MB. Flushing Procedure for Cooling Water 1 system to flush 2-4 Tab 11
2100 MB. Flushing Procedure for Off-/On-Line cleaning 1 system to flush 2-4 Tab 11
295,400 Total weight for this project (Kg)
Piping GT File: 232992144.xls.ms_office Page 7 of 9
abcd
Sur: 4 x GT26 MS Dual Indoor
Standard-BoQ
SITE
Package
KKS Item Description Qty. Degree of
Pre-assembly
Net Weight Total weight
Number of GT's for this project 4
Total for
Project
Documents
in Binder
Documents
in Tab
SP kg kg
3000/4000 BoQ electrical and instrumentation GT system (Bill of Quantity) 1 Spreadsheet 2-1 Tab 01
3000/4000 Gen. Arrang.Power Train Set Indoor Dual MS 1 see included documents 2-3 Tab 02
3000/4000 Gen. Arrang.Power Train Set Indoor Gas Only MS 1 see included documents 2-3 Tab 02
3000/4000 Gen. Arrang. Elect. Consumer and Junction Boxes MS 1 see included documents 2-3 Tab 02
3000/4000 Gen.Arrang. Embedded Cable Ducts and Pul Pits MS 1 see included documents 2-3 Tab 02
3000/4000 Gen. Arrang.Earthing Point and Cable Duct Stub MS 1 see included documents 2-3 Tab 02
Acoustic Enclosure (electrical) 11,600
1221 MPB Electrical parts to Enclosure - Control panel, Lighting fixtures,
Cables installation material Indoor MS
4 Set Mat. 2,900 11,600 2-3 Tab 04
Instrumentation of GT Block (I&C) 6,340
4112 MB. Thermal Block Instrumentation ( Thermocouple ) 4 Loose part in box 300 1,200 2-3 Tab 05
4112 MB. Control Panel MBA01GD010 4 Set Mat. Control Cubicle 650 2,600 2-3 Tab 05
4112 MB. Thermal Block Instrumentation ( accessories ) 4 Loose part in box 130 520 2-3 Tab 05
4112 MB. Thermal Block Instrumentation ( Junction Box & Rack) 4 Loose part in box 370 1,480 2-3 Tab 05
4112 MB. Thermal Block Instrumentation ( Support & Tube ) 4 Loose part in box 70 280 2-3 Tab 05
4112 MB. OTC Heating system 4 Loose part in box 65 260 2-3 Tab 05
Gas Detection of GT enclosure 872
3282 CYQ Gas Detection system Accessories 4 Loose part in box 180 720 2-3 Tab 06
3282 CYQ Gas Detection system Accessories ( pipe - tangas flow ) 4 Loose part in box 32 128 2-3 Tab 06
3282 CYQ Gas Detection system Accessories ( Test Equipment ) 4 Loose part in box 6 24 2-3 Tab 06
Fire Detection system in GT area 7,280
5461 CYE Control Panel CYE 4 Set Mat. Control Cubicle 316 1,264 2-3 Tab 07
5461 CYE Testing Tool 4 Loose part in box 12 48 2-3 Tab 07
5461 CYE Fire Detection Equipments 4 Loose part in box 122 488 2-3 Tab 07
5461 CYE Fire Detection Equipments Accessories 4 Loose part in box 920 3,680 2-3 Tab 07
5461 CYE Fire Seal System for 20m2 MS 4 Set Mat. 450 1,800 2-3 Tab 07
Installation of Generator (Electrical Part) 1,360
1132 MKA Generator Accessories 4 Loose part in box 340 1,360 2-3 Tab 08
Air Intake System (Electrical and Instrumentation) 8,000
1211 MBL Air Intake R&M 4 Loose part in box 2000 8,000 2-3
Steam Turbine MS Generator Instrumentation 840
Generator 50WY23Z-124 840 2-3 Tab 08
ST1731 MKA Generator Accessories 4 Loose part in box 210 840 2-3 Tab 08
36,292
Bid Instructions
Total weight for this project (kg)
Electrical and I&C GT File: 232992144.xls.ms_office Page 8 of 9
-
-
Contractor: Currency:
Pipe length
[m]
Elbow
[item]
Pair of
Flange
[item]
Fittings
[item]
Valve
[item]
MBA 273.1 80 5.8 2 1 1 10.8 14.7
273.1 90 3.3 1 1 2 7.8 11.1
400 406.4 90 1.9 2 1 6.4 11.8
508 40 4.1 3 4 1 2 20.1 37.1
508 120 0.9 1 2.9 6.8
508 170 1.7 2 2 1 10.2 27.2
700 711.2 40 1.9 2 1 8.9 22.1
813 100 9.9 2 1 3 19.9 63.3
813 190 1 3 11.2
MBH
60.3
90 10.5 6 13.5 10.2
60.3 100 10.9 12 2 2 20.9 17.1
65 73 100 0.5 1 1.5 1.3
100 114.3 60 7.9 8 3 4 21.3 15.7
135 141.3 60 1.8 6 4 4 14.6 12.0
168.3 30 5.9 5 3 12.9 9.2
168.3 60 8.6 12 8 8 34.2 31.0
168.3 150 0.5 1 2 3.5 5.1
219.1 40 6.1 4 3 1 16.1 15.1
219.1 130 21.2 4 27.2 40.9
219.1 150 11.3 2 4 18.3 29.8
250 273.1 40 21.6 5 4 2 35.1 38.9
273.1 60 4.7 1 1 5 12.2 15.1
273.1 70 6.5 2 1 5 15.5 20.1
273.1 80 19.7 12 6 8 51.7 70.3
300 323.9 120 1.4 2 2 6.4 11.3
350 355.6 70 12.5 3 1 7 26.5 41.2
355.6 150 11.6 2 2 4 21.6 44.5
450 457 120 9.7 8 4 4 33.7 73.8
500 508 130 1.2 1 7 10.2 24.6
600 610 80 15.8 6 3 6 42.8 103.5
700 711.2 130 12 2 1 4 23 70.1
MBP 100 114.3 30 0.5 2 2 4.1 2.2
150
168.3
30 60.2 24 4 7 90.4 64.8
168.3
60 6.2 5 2 2 14.2 12.9
168.3 120 21.4 21 4 5 47.2 60.5
1,047 m2
4,186 m2
32 t
Pos
LENGTH
[cm]
QUANTITY
[pcs]
ESTIMATED
MANHOURS
[Hrs]
INSTALLATION
UNIT RATE
[Unit Rate/m2]
ERECTION PRICE
1 98 10
2 98 4
3 98 3
4 98 2
5 98 3
7 98 2
7 98 1
8 98 1
9 98 4
10 98 4
11 98 4
38 pcs
152 pcs
0.664
1 x KA26-1
PIPING - GAS TURBINE
Thermal insulation for 1 UNIT
Date :
ABCD
Thermal Systems
ERECTION OF PIPING THERMAL INSULATION
GAS TURBINE
SUR
INSULATION
SURFACE for 1
UNIT
[m2]
LINE COMPONENTS
DN
[mm]
INSTALLATION
UNIT RATE
[Unit Rate/m2]
OD
[mm]
Author:
TOTAL EQUIVALENT INSULATION WEIGHT for All UNITS
ELEMENTARY
SYSTEM
200
250
EQUIVALENT
LENGTH for 1
UNIT
[m]
50
TOTAL INSULATION SURFACE for All UNITS
INSULATION
THICKNESS
[mm]
500
800
SEGMENT
LENGTH
[mm]
BENDING
RADIUS
[mm]
Description
ESTIMATED
MANHOURS
[Hrs]
TOTAL INSULATION SURFACE for 1 UNIT
150
ERECTION PRICE
PIPING - GAS TURBINE
INSULATION PROTECTION (ALUMINIUM CHECKERED PLATES) for 3 UNITS
MBH20BR001 220 350
MBH30BR010 350 550
MBH30BR010 490 750
MBH30BR020 350 550
MBH30BR020 490 750
MBH40BR035 145 250
250
MBP43BR010 205 300
MBA81BR010 300 450
MBA81BR030 300 450
TOTAL QUANTITY for 1 UNIT
TOTAL QUANTITY for All UNITS
TOTAL ESTIMATED WEIGHT for All UNITS
MBP41BR010 205 300
MBP42BR010 145
232992144.xls.ms_office 6/8/2014

You might also like