0% found this document useful (1 vote)
238 views30 pages

Downlink TBF Establishment Success Rate Optimization Manual

This document describes methods for collecting statistics and optimizing the downlink TBF establishment success rate in GSM BSS networks. It defines counters for successful and failed downlink TBF establishments and establishment attempts. It also outlines steps for checking different parts of the network like the Abis interface, assignment message delivery, air interface, and reasons for failed establishments like no response from MSs, unavailable resources, or parameter configuration issues.

Uploaded by

mrsajid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
238 views30 pages

Downlink TBF Establishment Success Rate Optimization Manual

This document describes methods for collecting statistics and optimizing the downlink TBF establishment success rate in GSM BSS networks. It defines counters for successful and failed downlink TBF establishments and establishment attempts. It also outlines steps for checking different parts of the network like the Abis interface, assignment message delivery, air interface, and reasons for failed establishments like no response from MSs, unavailable resources, or parameter configuration issues.

Uploaded by

mrsajid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 30

GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!

"#timi$ation Manual
Product Name
Product Version
GSM BSS Network Performance PS KPI
(Downlink TBF Establishment Success ate!
"#timi$ation Manual
Prepared by Date
Reviewed by Date
Reviewed by Date
Granted by Date
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
e%ision ecor&
Date Revision
version
Change Description Author
%&'()*)+ ,-'%-(. a*/#* Pa0e % of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
GSM BSS Network Performance PS KPI (Downlink TBF
Establishment Success ate! "#timi$ation Manual
Keywords
Downlink TBF' establishment success rate
Abstract
This manual mainl( &escribes the metho& of collectin) statistics about the &ownlink
TBF establishment success rate an& the metho&s of o#timi$in) the &ownlink TBF
establishment success rate*
List of abbreviations
Abbreviation u!! "pe!!ing
PD+, Packet Data +hannel
P+- Packet +ontrol -nit
MS Mobile Station
+.T +all .ualit( Test
KPI Ke( Performance In&e/
DT Dri%e Test
GPS General Packet a&io Ser%ice
EDGE Enhance& Data rates for GSM E%olution
%&'()*)+ ,-'%-(. a*/#* Pa0e 1 of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Contents
'2' 3ounter Definition2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222*
'2'2' Definition in the 3ase of No MS es#onse 2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222*
'2'2% Definition in the 3ase of No 45ailable esources 22222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222*
'2'21 Definition in the 3ase of No MS es#onse or No 45ailable esources 22222222222222222222222222222222222222222222222222222222222,
'2% Theor622222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222,
%2' Number of Successful Downlink TBF Establishments22222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222.
%2'2' Descri#tion2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222.
%2'2% Measurement Point222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222.
%2% Number of Faile7 Downlink TBF Establishments2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222228
%2%2' Descri#tion22222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222228
%2%2% Measurement Point2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'&
%21 Number of Downlink TBF Establishment 4ttem#ts2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'&
%212' Descri#tion22222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'&
%212% Measurement Point2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'&
12' 3heckin0 the 4bis 9ink222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'+
12% 3heckin0 the Deli5er6 of 4ssi0nment Messa0es222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'*
12%2' Faile7 Downlink TBF Establishments Due to "5erloa7e7 333:222222222222222222222222222222222222222222222222222222222222222222'*
12%2% Faile7 Downlink TBF Establishments Due to No 3hannel esources222222222222222222222222222222222222222222222222222222222222'*
121 3heckin0 the 4ir Interface22222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222'8
12( 3heckin0 Faile7 Downlink TBF Establishments Due to No es#onse from the MS22222222222222222222222222222222222222222222%&
12(2' Faile7 Downlink TBF Establishments Due to Im#ro#er Parameter 3onfi0urations2222222222222222222222222222222222222222%&
12(2% Faile7 Downlink TBF Establishments Due to Incorrect Information Elements in 4ssi0nment Messa0es222222%%
12(21 Faile7 Downlink TBF Establishments Due to Imbalance Between the ;#link an7 the Downlink222222222222222222%1
12(2( 3heckin0 the Fee7 S6stem2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222%(
12(2+ 3heckin0 the KPIs of the PS Fiel72222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222%(
(2' 3ase '- 9ow Success ate of Downlink TBF Establishment Due to Incorrect Fre<uenc6):o##in0 Parameter
Settin0s in 3$ech e#ublic2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222%+
(2% 3ase %- 9ow Success ate of Downlink TBF Establishment Due to No es#onses from MSs 4fter the P3; Is
;#0ra7e72222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222%.
%&'()*)+ ,-'%-(. a*/#* Pa0e ( of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
igures
Successful establishment of downlink TBF on the CCCH..............................................................9
Successful downlink TBF establishment on the PACCH................................................................9
Downlink TBF establishment attempts on the CCCH..................................................................11
Downlink TBF establishment attempts on the PACCH................................................................11
plink and downlink TBF establishment p!ocedu!e on the CCCH............................................1"
#$e!all anal%sis p!ocess...................................................................................................................1&
Anal%sis of the f!ame e!!o! !ate of the '(Abis inte!face is no!mal.............................................)*
Downlink packet assi+nment messa+e............................................................................................)*
,A -umebe! in the downlink packet assi+nment messa+e..........................................................).
F!e/uenc%(hoppin+ info!mation bein+ null in the S0 1" messa+e................................................)1
%&'()*)+ ,-'%-(. a*/#* Pa0e + of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
GSM BSS Network Performance PS KPI (Downlink TBF
Establishment Success ate! "#timi$ation Manual
1 #asic Princip!e
1.1 Counter Definition
The &efinition of the &ownlink TBF establishment success rate %aries with the
assessment item*
1.1.1 Definition in the Case of No $" Response
If the network si&e &eli%ers an assi)nment messa)e to a mobile station (MS! but fails
to recei%e the Pac%et Contro! Ac%now!edgement messa)e from the MS' the
number of faile& &ownlink TBF establishments &ue to MS no res#onse is a&&e& b(
one*
The &efinition of the &ownlink TBF establishment success rate is as follows0
Down!in% GPR" &# 'stab!ishment "uccess Rate 1 2 3 Number of ai!ed
Down!in% GPR" &# 'stab!ishments due to $" No Response4Number of
Down!in% GPR" &# 'stab!ishment Attempts
Down!in% 'GPR" &# 'stab!ishment "uccess Rate 1 2 3 Number of ai!ed
Down!in% 'GPR" &# 'stab!ishments due to $" No Response4Number of
Down!in% 'GPR" &# 'stab!ishment Attempts
1.1.) Definition in the Case of No Avai!ab!e Resources
If the &ownlink TBF establishment fails because the resources such as channels an&
TFIs at the network si&e are una%ailable' the number of faile& &ownlink TBF
establishments &ue to no channel is a&&e& b( one*
The &efinition of the &ownlink TBF establishment success rate is as follows0
Down!in% GPR" &# 'stab!ishment "uccess Rate 1 2 3 Number of ai!ed
Down!in% GPR" &# 'stab!ishments due to No Channe!4Number of Down!in%
GPR" &# 'stab!ishment Attempts
%&'()*)+ ,-'%-(. a*/#* Pa0e * of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Down!in% 'GPR" &# 'stab!ishment "uccess Rate 1 2 3 Number of ai!ed
Down!in% 'GPR" &# 'stab!ishments due to No Channe!4Number of Down!in%
'GPR" &# 'stab!ishment Attempts
1.1." Definition in the Case of No $" Response or No Avai!ab!e
Resources
If the &ownlink TBF establishment fails because the network si&e fails to recei%e the
Pac%et Contro! Ac%now!edgement messa)e from an MS or the resources at the
network si&e are una%ailable' the number of faile& &ownlink TBF establishments is
a&& b( one*
The &efinition of the &ownlink TBF establishment success rate is as follows0
Down!in% GPR" &# 'stab!ishment "uccess Rate 1 Number of "uccessfu!
Down!in% GPR" &# 'stab!ishments4Number of Down!in% GPR" &#
'stab!ishment Attempts
Down!in% 'GPR" &# 'stab!ishment "uccess Rate 1 Number of "uccessfu!
Down!in% 'GPR" &# 'stab!ishments4Number of Down!in% 'GPR" &#
'stab!ishment Attempts
1.) &heory
The &ownlink TBF establishment success rate shows the &ownlink access
#erformance an& is an im#ortant counter for assessin) the network* 5hen the
&ownlink TBF fails to be establishe&' the network si&e continues to tri))er the
establishment of the &ownlink TBF in a short time because the network si&e has
some &ata blocks that are not &eli%ere&* Therefore' the &ownlink TBF establishment
success rate is sli)htl( low in this case' but customer e/#erience is not affecte&*
%&'()*)+ ,-'%-(. a*/#* Pa0e , of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
) "igna!ing Procedure
).1 Number of "uccessfu! Down!in% &# 'stab!ishments
).1.1 Description
This counter #ro%i&es the number of successful &ownlink TBF establishments in a measurement
#erio&*
).1.) $easurement Point
Successful &ownlink TBF establishments in%ol%e the followin) as#ects0
'2 Successful &ownlink TBF establishment on the +++,
The network si&e initiates the &ownlink TBF establishment #roce&ure b( sen&in)
an ($$'D(A&' A""(GN$'N& messa)e with Startin) Time on the +++, to the
MS* 5hen the startin) time is reache&' the network si&e sen&s a P)LL(NG
messa)e to the MS to obtain a T6 %alue* The BS+ reser%es block resources for
the MS to res#on& with an assi)nment acknowle&)ement messa)e* If the
network si&e recei%es a Pac%et Contro! Ac%now!edgement messa)e from the
MS on the reser%e& block resources in the assi)ne& channel' it in&icates that the
&ownlink TBF is establishe&* In a&&ition' the network si&e can calculate the T6
%alue b( usin) the Pac%et Contro! Ac%now!edgement messa)e that is
recei%e&*
The followin) fi)ure shows the #roce&ure for establishin) &ownlink TBFs on the
+++,* Each time the network si&e recei%es a Pac%et Contro!
Ac%now!edgement messa)e (see measurement #oint 6!' the %alue of the
counter Number of "uccessfu! Down!in% &# 'stab!ishments is a&&e& b(
one*
%&'()*)+ ,-'%-(. a*/#* Pa0e . of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Fi+u!e 1.1 Successful establishment of &ownlink TBF on the +++,
M S Network
6
IMMEDI6TE 6SSIGNMENT (+++,!
P"77ING(BP!
P6+KET +ontrol 6cknowle&)ement
%2 Successful &ownlink TBF establishment on the P6++,
The network si&e can initiate the &ownlink TBF establishment #roce&ure b(
sen&in) a Pac%et down!in% assignment messa)e on the P6++, to the MS*
The messa)e contains the information about the block resources reser%e& b(
the network si&e for the MS to res#on& with an assi)nment acknowle&)ement
messa)e* If the network si&e recei%es a Pac%et Contro! Ac%now!edgement
messa)e from the MS on the reser%e& block resources in the assi)ne& channel'
it in&icates that the &ownlink TBF is establishe&*
Fi)ure 8*2 shows the #roce&ure for establishin) the &ownlink TBF on the
P6++,* Each time the network si&e recei%es a Pac%et Contro!
Ac%now!edgement messa)e corres#on&in) to a Pac%et down!in% assignment
messa)e (see measurement #oint 6!' the %alue of the counter Number of
"uccessfu! Down!in% &# 'stab!ishments is a&&e& b( one*
Fi+u!e ).1 Successful &ownlink TBF establishment on the P6++,
M S Network
6
Packet &ownlink assi)nment
P6+KET +ontrol 6cknowle&)ement
).) Number of ai!ed Down!in% &# 'stab!ishments
).).1 Description
This counter measures the number of faile& &ownlink TBF establishments in a
measurement #erio&*
%&'()*)+ ,-'%-(. a*/#* Pa0e 8 of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
).).) $easurement Point
Faile& &ownlink TBF establishments in%ol%e the followin) as#ects0
2* Faile& &ownlink TBF establishments &ue to no channel
If the BS+ recei%es a new &ownlink PD- re9uest from the SGSN but fails to
establish a &ownloa& TBF because channels are una%ailable' the %alue of Number
of ai!ed Down!in% &# 'stab!ishments due to No Channe! is a&&e& b( one*
8* Faile& &ownlink TBF establishments &ue to MS no res#onse
In the #roce&ure for establishin) a &ownlink TBF' the BS+ sen&s a P"77ING
messa)e on the +++, or sen&s a Pac%et down!in% assignment messa)e on the
P6++,' an& reser%es block resources for the MS to res#on& with an assi)nment
acknowle&)ement messa)e* If the BS+ &oes not recei%e a Pac%et Contro!
Ac%now!edgement messa)e from the MS on the reser%e& block resources' the BS+
sen&s the ($$'D(A&' A""(GN$'N& messa)es re#eate&l( until the ma/imum
number of retr( times is e/cee&e&* Each time the ma/imum number of retr(in) times
is e/cee&e&' the %alue of Number of ai!ed Down!in% &# 'stab!ishments due to
$" No Response is a&&e& b( one*
)." Number of Down!in% &# 'stab!ishment Attempts
).".1 Description
This counter measures the number of &ownlink TBF establishment attem#ts in a
measurement #erio&*
).".) $easurement Point
Downlink TBF establishment attem#ts in%ol%e the followin) as#ects0
'2 Downlink TBF establishment attem#ts on the +++,
The network attem#ts to establish the &ownlink TBF b( sen&in) the ($$'D(A&'
A""(GN$'N& messa)e at the sub3timeslot corres#on&in) to the +++, )rou#
to which the MS belon)s* Fi)ure shows the #roce&ure for the network si&e to
sen& the ($$'D(A&' A""(GN$'N& messa)e on the +++,* Each time the
network si&e sen&s an ($$'D(A&' A""(GN$'N& messa)e (see measurement
#oint 6!' the %alue of the counter Number of Down!in% &# 'stab!ishment
Attempts is a&&e& b( one*
%&'()*)+ ,-'%-(. a*/#* Pa0e '& of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Fi+u!e 1.1 Downlink TBF establishment attem#ts on the +++,*
M S Network
6
IMMEDI6TE 6SSIGNMENT
("n +++,!
%2 Downlink TBF establishment attem#ts on the P6++,
The network si&e can attem#t to establish the &ownlink TBF b( sen&in) a
PACK'& D)*NL(NK A""(GN$'N& messa)e to an MS &urin) the
transmission #rocess of the #re%ious u#link TBF or the release #rocess of the
current &ownlink TBF* Fi)ure 8*2 shows the #roce&ure for the network si&e to
sen& the PACK'& D)*NL(NK A""(GN$'N& messa)e on the P6++,* Each
time the network si&e sen&s a PACK'& D)*NL(NK A""(GN$'N& messa)e
(see measurement #oint 6!' the %alue of the counter Number of Down!in% &#
'stab!ishment Attempts is a&&e& b( one*
Fi+u!e ).1 Downlink TBF establishment attem#ts on the P6++,
M S Network
6
P6+KET D"5N7INK 6SSIGNMENT
%&'()*)+ ,-'%-(. a*/#* Pa0e '' of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
" Ana!ysis and )ptimi+ation $ethods
The #roce&ure for establishin) the &ownlink TBF on the +++, is as follows0
'2 The entit( at the network si&e initiates the &ownlink TBF establishment b(
usin) the &ownlink #acket assi)nment #roce&ure* The &ownlink #acket
assi)nment #roce&ure is tri))ere& b( a re9uest from u##er la(ers to transfer a
77+ PD-* Before transferrin) an 77+ PD-' the network si&e &etermines
whether the MS is in the Ready state* If the MS is in the Ready state' the
network si&e transfers an 77+ PD- to the BSS* 5hen recei%in) the 77+ PD-'
the BSS &eli%ers an ($$'D(A&' A""(GN$'N& messa)e* If the MS is in the
"tandby state' the network si&e sen&s a #a)in) messa)e to the BSS* The
network si&e sen&s the 77+ PD- onl( after recei%in) a #a)in) res#onse from
the BSS* The re9uest from u##er la(ers contains the #riorit(' inclu&in) the 7+
mo&e' D: #arameter (o#tional!' .oS scri#t file of the IMSI (o#tional!' an& MS
ra&io access ca#abilit( associate& with the #acket transfer (o#tional!* For such a
re9uest' the network si&e &etermines whether the MS is in #acket i&le mo&e or
#acket transfer mo&e* If the MS is in #acket i&le mo&e' the network si&e initiates
the &ownlink #acket assi)nment #roce&ure on the +++,* If the MS is in #acket
transfer mo&e' the network si&e initiates the &ownlink #acket assi)nment
#roce&ure on the P6++,*
%2 The network si&e selects an enco&in) scheme an& a##lies for ra&io resources
accor&in) to the resource occu#ation in the accesse& cell for establishin) the
&ownlink TBF* 6fter the a##lication is a##ro%e&' the network si&e assi)ns ra&io
resources to the &ownlink TBF an& counts the times the &ownlink TBF is starte&
at the network si&e an& at the MS si&e*
12 The network si&e &eli%ers an ($$'D(A&' A""(GN$'N& messa)e* If the MS is
in D: mo&e' the network si&e &eli%ers the messa)e in the P+, channel* If the
MS is in Non3D: mo&e' the network si&e &eli%ers the messa)e in the 6G+,
channel*
(2 5hen the MS recei%es the ($$'D(A&' A""(GN$'N& messa)e' ra&io
resources are assi)ne&* 6fter recei%in) the frame number in&icate& b( the TBF
Startin) Time (o#tional!' the MS accesses the assi)ne& channel' starts to listen
on the 7+ ra&io block of the &ownlink TBF' an& starts timer T;2<=*
+2 If the network si&e has the T6 %alue of the MS' the network si&e &irectl( trasfers
the T6 %alue to the MS b( sen&in) a Packet Power +ontrol4Timin) 6&%ance
messa)e after the Startin) Time of the &ownlink TBF is reache&* If the network
si&e &oes not ha%e the T6 %alue' the network si&e obtains the T6 %alue b(
sen&in) a PACK'& P)LL(NG R',-'"& messa)e after the &ownlink TBF is
starte&*
%&'()*)+ ,-'%-(. a*/#* Pa0e '% of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
*2 Before timer T;2<= times out' if the MS a&&resses the &ownlink 7+ ra&io block
in the assi)ne& channel accor&in) to the TFI fiel& an& the MS recei%es the
PACK'& P)LL(NG R',-'"& messa)e from the network si&e' the MS sen&s a
Pac%et Contro! Ac%now!edgement messa)e on the u#link ra&io block
corres#on&in) to the messa)e an& resets timer T;2<=* "therwise' the MS
notifies the u##er la(ers of the &ownlink TBF establishment failure*
,2 The network si&e obtains the T6 %alue of the MS b( usin) the %ali& Pac%et
Contro! Ac%now!edgement messa)e recei%e& on the reser%e& u#link 7+
ra&io block* In this case' the network si&e re)ar&s that the &ownlink TBF
establishment is successful* "therwise' the network si&e initiates the &ownlink
imme&iate assi)nment #roce&ure a)ain*
Fi+u!e ..1 -#link an& &ownlink TBF establishment #roce&ure on the +++,
MS
P+-
PD+,
IMMEDI6TE 6SSIGNMENT
+++,
77+ PD-
P6+KET P"77ING E.-EST
P6+KET +"NT"7 6+KN"57EDGMENT
PD+,
BTS
This section taske the u#link an& &ownlink TBF establishment on the +++, as an
e/am#le to &escribe the o#timi$ation i&eas about i&entif(in) the si)nalin) an& cells
where #roblems occur throu)hout the si)nalin) #roce&ure* In the &ownlink TBF
establishment #roce&ure' (ou can i&entif( #roblematic sin)alin) an& cells as follow0

+heckin) whether transmission #roblems occur in the 6bis links*

+heckin) whether the ($$'D(A&' A""(GN$'N& an& PACK'& P)LL(NG


R',-'"& messa)es are #ro#erl( sent to the BTS*

+heckin) whether the ($$'D(A&' A""(GN$'N& an& PACK'& P)LL(NG


R',-'"& messa)es are sent to MSs accor&in) to the air interface 9ualit(*

+heckin) whether MSs res#on& to P"77ING messa)es b( sen&in) Pac%et


Contro! Ac%now!edgement messa)es*
%&'()*)+ ,-'%-(. a*/#* Pa0e '1 of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Fi+u!e ..) "%erall anal(sis #rocess
6nal($e the cause of
&ownlink TBF
establishment failure
Start
+heck whether the status of
the 6bis link is normal
>es
+heck whether assi)nment
messa)es are sent normall(
+heck whether the &ownlink
air interface is normal
>es
+heck whether MSs
res#on& to 6SSIGNMENT
an& P"77ING messa)es
No
No
+heck whether the
#roblem is sol%e&
>es
+heck the transmission
+heck whether the
+++, is o%erloa&e&
+heck whether channels
are a%ailable
No
+heck whether the
&ownlink air interface
9ualit( is #oor
Perform the +.T test
No
+heck whether the
#arameter confi)urations
are correct
+heck whether the
im#ortance cells are
correct
>es
+heck whether the u#link
an& &ownlink are
balance&
+heck whether the fee&
s(stem is normal
+heck whether the
#arameters of the +S
fiel&
No
>es
En&
%&'()*)+ ,-'%-(. a*/#* Pa0e '( of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
".1 Chec%ing the Abis Lin%
Transmission #roblems such as out3of3s(nchroni$ation or intermittent 6bis interface
links ma( cause the failure to establish the &ownlink TBF*
>ou can &etermine the trasmission status of the 6bis interface b( calculatin) the
frame error rate of the G36bis interface as follows0
Frame error rate of the G36bis interface 1 (Number of Received Chec% 'rror &RA-
rames ? Number of Received )ut.of."ynchroni+ation &RA- rames!4(Number
of "ent Va!id &RA- rames ? Number of "ent 'mpty &RA- rames!
'2 Generall(' the frame error rate is e9ual to or lower than 2=e@A' that is' 242='===*
This in&icates one error frame in a channel e%er( four minutes on a%era)e* In
this case' (ou can infer that the link is of )oo& 9ualit(' an& the MS can transmit
&ata in a stable wa(*
%2 If the frame error rate is lower than 2=e3B' the 9ualit( of the transmission link is
#oor* In this case' one to three error frames occur in a channel e%er( minute on
a%era)e* Error frames are un#re&ictable* Therefore' affecte& MSs are likel( to
e/#erience low transmission rate' lon) transmission &ela(' or e%en
&isconnection*
12 If the frame error rate is hi)her than 2=e3B' the link becomes unstable* "ut3of3
s(nchroni$ation is likel( to occur an& the rate of out3of3s(nchroni$ation frame
)reatl( increases* In this case' MSs ma( be able to #erform &ata ser%ices that
re9uire onl( a small %olume' such as the hi)h3la(er si)nalin) an& certain 56P
ser%ices* Mass &ata transmission' such as FTP ser%ices' becomes &ifficult*
In actual runnin)' carriers are not able to &irectl( control lease& lines' such as
microwa%e satelites* Therefore' a frame error rate lower than A42=== is acce#table* If
(ou fin& that a transmission #roblem has occurre& because the frame error rate of a
cell sta(s hi)h for a lon) time' check the transmission line an& o#timi$e the network*
The followin) table lists the rela%ant KPIs*
KP( Ce!!.Leve!
Frame error rate of
the G36bis
interface
G36bis Measurement 3C Performance measurement of
BS+ #acket assi)nment 3C
Number of ecei%e& Normal T6- Frames
Number of ecei%e& "ut3of3S(nchroni$ation T6-
Frames
Number of ecei%e& +heck Error T6- Frames
Number of Sent Dali& T6- Frames
Number of Sent Em#t( T6- Frames
%&'()*)+ ,-'%-(. a*/#* Pa0e '+ of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Number of recei%e& frames 1 Number of Received Norma! &RA- rames ? Number of
Received )ut.of."ynchroni+ation &RA- rames ? Number of Received Chec% 'rror
&RA- rames ? Number of "ent 'mpty &RA- rames* In %ersions earlier than D<E+22'
Number of "ent 'mpty &RA- rames is not inclu&e& in the statistics about the number of
recei%e& frames* Therefore' when the frame error rate of the G36bis interface is calculate&' the
sum of Number of "ent Va!id &RA- rames an& Number of "ent 'mpty &RA- rames is
use& to in&icate the number of recei%e& frames* In the %ersion D<E+28' this #roblem is
sol%e& b( usin) the sum of Number of Received Norma! &RA- rames' Number of
Received )ut.of."ynchroni+ation &RA- rames' Number of Received Chec% 'rror &RA-
rames' an& Number of "ent 'mpty &RA- rames to in&icate the number of recei%e&
frames*
".) Chec%ing the De!ivery of Assignment $essages
".).1 ai!ed Down!in% &# 'stab!ishments Due to )ver!oaded
CCC/
If the +++, is o%erloa&e&' the ($$'D(A&' A""(GN$'N& messa)e sent on the
+++, ma( be &iscar&e&* 6s a result' the &ownlink TBF fails to be establishe&* >ou
can check whether the +++, is o%erloa&e& b( %iewin) flow control traffics* If the
+++, is o%erloa&e&' (ou can increase the loa& threshol& of the +++, to #re%ent
&ownlink TBF establishment failure &ue to flow control*
The followin) table lists the rele%ant counters*
Cause Ce!!.Leve!
"%erloa&e& +++, +all Measurement 3C Flow control measurement 3C
P6+KET +++, 7"6D IND Messa)es Sent on 6bis Interface
MSG 6BIS "DE7"6D (+++, "DE7"6D! Messa)es
Sent on 6bis Interface
MSG DE7 IND Messa)es Sent on 6bis Interface
".).) ai!ed Down!in% &# 'stab!ishments Due to No Channe!
Resources
/ardware au!t
Faults on har&ware such as the T: ma( affect the success rate of &ownlink TBF
establishment* Therefore' (ou shoul& check har&ware faults*
>ou can locate har&ware faults b( checkin) the traffic measurement relate& to the
har&ware faults*
%&'()*)+ ,-'%-(. a*/#* Pa0e '* of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Cause #"C.Leve! Ce!!.Leve!
E9ui#men
t faults
BS+ Measurement 3C 6ccess
Measurement 3C
T+, 6%ailabilit( #er BS+
+onfi)ure& T+,s #er BS+
6%ailable T+,s #er BS+
KPI Measurement 3C
T+, 6%ailabilit(
6%ailable T+,s
+onfi)ure& T+,s
T: Measurement 3C
6cti%ate& T:s in cell
6%ailable T:s in cell
(nsufficient Channe! Resources
Insufficient channel resources' which ma( cause con)estion' occur in the followin)
situations0
'2 The number of channels confi)ure& in a cell is small' an& the traffic of #acket
ser%ices is hea%(* 6s a result' MSs are multi#le/e& on the channels in the cell to
the ma/imum &e)ree* In this case' (ou nee& to a&& more static an& &(namic
channels* In a&&ition' (ou nee& to check the PS3&omain channel mana)ement
#arameters an& set PDC/ Down!in% $u!tip!e0 &hresho!d to E=' that is' the
ma/imum number of TBFs multi#le/e& on the &ownlink is ei)ht*
%2 +heck whether the #reem#tion of &(namic PD+,s b( +S ser%ices lea&s to the
insufficienc( of PD+,s* >ou can check the number of times of reclaimin)
&(namic PD+,s b( the BS+ an& the number of times of reclaimin) &(namic
PD+,s with loa&* If the numbers are )reat' (ou can infer that bus( +S ser%ices
#reem#t channel resources of PS ser%ices* 6s a result' (ou nee& to a&& static
PD+,s* >ou can also set Leve! of Preempting Dynamic Channe! to Contro!
channe!s cannot be preempted*
The followin) table &escribes the rele%ant #arameters*
Name Description "etting Princip!e Va!ue Range
Ma/imum
atio
Threshol&
of PD+,s
in a +ell
The total number of
T+,s an& PD+,s
a%ailable in a cell is
fi/e&* This #arameter
&etermines the
#ro#ortion of PD+,s to
the total number of
T+,s an& PD+,s*
If this #arameter is set
to an e/cessi%e %alue'
there are e/cessi%e
PD+,s an& insufficient
T+,s* This affects +S
ser%ices*
If this #arameter is set
to a mo&est %alue'
there are insufficient
PD+,s an& e/cessi%e
T+,s* This affects PS
ser%ices*
Dalue ran)e0 =3
2==*
Default %alue0
A=
PD+,
Downlink
Multi#le/
Threshol&
PD+, Downlink
Multi#le/ Threshol&
If this #arameter is set
to a lower %alue' the
TBFs establishe& on
the PD+, an& the
subscribers are fewer'
an& the &ownlink
Dalue ran)e0 2=3
E=
The %alue 2=
in&icates that at
most one TBF
%&'()*)+ ,-'%-(. a*/#* Pa0e ', of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Name Description "etting Princip!e Va!ue Range
ban&wi&th for each
subscriber is hi)her*
If this #arameter is set
to a hi)her %alue' the
number of TBFs
establishe& on the
PD+, an& the number
of subscribers are
)reater' an& the
&ownlink ban&wi&th for
each subscriber is less*
can be
accesse&* The
%alue E=
in&icates that a
ma/imum of E
TBFs can be
accesse&*
Default %alue0
E=*
7e%el of
Preem#tin
)
D(namic
+hannel
7e%el of &(namic
channel #reem#te& b(
+S ser%ices an& PS
ser%ices The T+,4Fs are
&(namic channels that
can be #reem#te&* If this
#arameter is set to 6ll
&(namic channels can
be #re3em#te&' it means
that the +S ser%ices can
#reem#t all &(namic
channelsF if this
#arameter is set to
+ontrol channels cannot
be #re3em#te&' it means
that the +S ser%ices can
#reem#t an( &(namic
channels e/ce#t the
control channelsF if this
#arameter is set to
D(namic channels
carr(in) ser%ices cannot
be #re3em#te&' it means
that the +S ser%ices
cannot #reem#t the
&(namic channels that
carr( ser%ices*
Generall(' +S ser%ices
ha%e the hi)hest
#riorit(* This #arameter
must be set to 6ll
&(namic channels can
be #re3em#te& so that
+S ser%ices can
#reem#t all &(namic
channels*
To ensure &ata
ser%ices' (ou can set
this #arameter to
+ontrol channels
cannot be #re3em#te&
or D(namic channels
carr(in) ser%ices
cannot be #re3em#te&*
Dalue o#tions0
6ll &(namic
channels can be
#reem#te&'
+ontrol
channels cannot
be #reem#te&
D(namic
channels
carr(in)
ser%ices cannot
be #reem#te&
Default %alue0
6ll &(namic
channels can be
#reem#te&*
The followin) table lists the relate& traffic measurement counters*
%&'()*)+ ,-'%-(. a*/#* Pa0e '. of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Cause Ce!!.Leve!
Insufficient
resources
Packet Switch +hannel Measurement 3C PD+, esource
+a#abilit( Measurement 3C
Number of T+, to PDT+, +on%ersion 6ttem#ts
Number of Successful T+, to PDT+, +on%ersions
Number of eclaime& D(namic PD+,s
Number of eclaime& Bus( D(namic PD+,s
Packet Switch +all Measurement 3C Downlink GPS TBF
Establish an& elease +a#abilit( Measurement 3C
Number of Downlink GPS TBF Establishment 6ttem#ts
Number of Successful Downlink GPS TBF Establishments
Number of Faile& Downlink GPS TBF Establishments &ue to No
+hannel
6%era)e Number of +oncurrent Downlink GPS TBFs
Packet Switch +all Measurement 3CDownlink EGPS TBF
Establish an& elease +a#abilit( Measurement 3C
Number of Downlink EGPS TBF Establishment 6ttem#ts
Number of Successful Downlink EGPS TBF Establishments
Number of Faile& Downlink EGPS TBF Establishments &ue to
No +hannel
6%era)e Number of +oncurrent Downlink EGPS TBFs
"." Chec%ing the Air (nterface
MSs ma( not recei%e &ownlink 6SSIGNMENT messa)es or P"77ING messa)es &ue
to #oor air interface 9ualit(* >ou can check the air interface 9ualit( b( checkin) the
BEP &istribution or #erformin) the +.T test* To check the BEP &istribution' (ou can
count the EPSKGME6NGBEP %ariants an& the GMSKGME6NGBEP %ariants* To
con&uct the +.T' (ou can use a &e&icate& tool' such as the TEMS*
If the air interface is e/#eriencin) serious interru#tion' (ou can im#ro%e the air
interface 9ualit( b( a&Hustin) the fre9uenc( #oint*
The followin) table lists the relate& traffic measurement counters*
KP( Ce!!.Leve!
Downlink air
interface 9ualit(
Packet Switch +all Measurement 3C
Measurement of numbers of EPSKGME6NGBEP %ariants
Measurement of numbers of GMSKGME6NGBEP %ariants
%&'()*)+ ,-'%-(. a*/#* Pa0e '8 of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
".& Chec%ing ai!ed Down!in% &# 'stab!ishments Due
to No Response from the $"
".&.1 ai!ed Down!in% &# 'stab!ishments Due to (mproper
Parameter Configurations
If the TBF at the network si&e an& the TBF at the MS are not starte& at the same
time' the &ownlink TBF establishment ma( fail* Therefore' the TBF at the network
si&e cannot be starte& before the TBF at the MS* "therwise' the MS ma( miss the
P"77ING messa)e from the network si&e' an& thus the &ownlink TBF establishment
fails*
The #arameters are as follows0
Name Description "etting Princip!e Va!ue Range
etr( Times of
Downlink TBF
eassi)nment
This #arameter
s#ecifies the ma/imum
number of attem#ts to
resen& the
IMMEDI6TE
6SSIGNMENT
messa)e* The
messa)e is sent when
the network si&e fails
to recei%e a %ali&
Packet +ontrol
6cknowle&)ement
messa)e on the
reser%e& u#link 7+
block in the #roce&ure
for establishin) the
&ownlink TBF* If the
number is e/cee&e&'
the network si&e
releases the &ownlink
TBF*
If the %alue of this
#arameter is too
small' the network
si&e will release the
&ownlink TBF with
onl( a few attem#ts to
resen& the
IMMEDI6TE
6SSIGNMENT
messa)e' which
lea&s to &ownlink
establishment failure*
If the number of faile&
&ownlink TBF
establishments is
)reat' (ou can set
this %alue to a hi)her
%alue*
Default %alue0
8*
etr( Times of
Downlink TBF
Pollin)
This #arameter
s#ecifies the ma/imum
number of attem#ts to
resen& the P"77ING
messa)e in the
#roce&ure for
establishin) the
&ownlink TBF*
If the %alue of this
#arameter is too
small' the &ownlink
TBF establishment
ma( fail because the
sen&in) of the
P"77ING messa)e
fails in the #roce&ure
for establishin) the
&ownlink TBF on the
+++,* If the number
of faile& &ownlink
TBF establishments
is )reat' (ou can
chan)e this %alue to a
hi)her %alue*
Default %alue0
A*
%&'()*)+ ,-'%-(. a*/#* Pa0e %& of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Name Description "etting Princip!e Va!ue Range
Dela( for
Downlink
Imme&iate
6ssi)nment
D: (block!
In D: mo&e' the
network si&e
&etermines the time to
start &ownlink TBF on
the network si&e b(
usin) this #arameter*
In a&&ition' the network
si&e calculates the
TBF Startin) Time
assi)ne& to MSs to
notif( the MSs of the
time to access the
assi)ne& channels*
If the %alue of this
#arameter is )reat'
the startin) time of
the &ownlink TBF on
the network si&e is
late* 6fter startin) the
&ownlink TBF' the
network si&e sen&s
the P6+KET
P"77ING E.-EST
messa)e or the
&ownlink &ata blocks
imme&iatel(* If the
%alue of this
#arameter is small'
the network si&e
starts the &ownlink
TBF before an MS*
The MS fails to
recei%e the
subse9uent &ownlink
7+ ra&io blocks
sent from the network
si&e because the MS
has not accesse& the
assi)ne& channel at
the time* Therefore'
the access
#erformance is
&e)ra&e&*
Default %alue0
28*
Dela( for
Downlink
Imme&iate
6ssi)nment
Non3D:
(block!
In Non3D: mo&e' the
network si&e
&etermines the time to
start &ownlink TBF on
the network si&e b(
usin) this #arameter*
In a&&ition' the network
si&e calculates the
TBF Startin) Time
assi)ne& to MSs to
notif( the MSs of the
time to access the
assi)ne& channels*
If the %alue of this
#arameter is )reat'
the startin) time of
the &ownlink TBF on
the network si&e is
late* 6fter startin) the
&ownlink TBF' the
network si&e sen&s
the P6+KET
P"77ING E.-EST
messa)e or the
&ownlink &ata blocks
imme&iatel(* If the
%alue of this
#arameter is small'
the network si&e
starts the &ownlink
TBF before an MS*
Because the MS has
not accesse& the
assi)ne& channel at
the time' the MS fails
Default %alue0
8I*
%&'()*)+ ,-'%-(. a*/#* Pa0e %' of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Name Description "etting Princip!e Va!ue Range
to recei%e the
subse9uent &ownlink
7+ ra&io blocks
sent from the network
si&e* Therefore' the
access #erformance
is &e)ra&e&*
".&.) ai!ed Down!in% &# 'stab!ishments Due to (ncorrect
(nformation '!ements in Assignment $essages
>ou nee& to check whether the im#ortant cells in assi)nment messa)es are correct'
inclu&in) the #arameters such as the fre9uenc(3ho##in) #arameter* +urrentl(' #ower
control is not #erforme& for &ownlink TBF establishment* Therefore' (ou &o not nee&
to check the #ower control #arameters*
+heck the fre9uenc(3ho##in) #arameters as follows0
+heck whether the %alues of the GPR" $obi!e A!!ocation #arameter in the "( 12
messa)e an& the fre9uenc( #arameters in the &ownlink assi)nment messa)e are
consistent with &ata confi)urations*
The fre9uenc( #arameters are &escribe& as follows0
6 &ownlink assi)nment messa)e contains the fre9uenc( #arameters that in&icate whether
fre9uenc( ho##in) is a##lie& for MSs an& enco&in) scheme of the fre9uenc( #oints*
The #arameters are as follows0
6F+N0 no fre9uenc( ho##in)
In&irect enco&in)0 fre9uenc( ho##in) an& in&irect enco&in)
Direct enco&in) 20 fre9uenc( ho##in) an& &irect enco&in) 2
Direct enco&in) 80 fre9uenc( ho##in) an& &irect enco&in) 8
J Fre9uenc( Parameters IE C 001
J &"C 0 bit (;! C
K == J ARCN 0 bit (2=! C
L =2 J (ndirect encoding 0 J In&irect enco&in) struct C C
L 2= J Direct encoding 1 0 J Direct enco&in) 2 struct C C
L 22 J Direct encoding 3 0 J Direct enco&in) 8 struct C C M F
J In&irect enco&in) struct C 001
J $A() 0 bit (I! C
J $A4N-$#'R 0 bit (B! C
K = L 2 J C/ANG'4$ARK41 0 bit (8! C
K = L 2 J C/ANG'4$ARK43 0 bit (8! C M M F
J Direct enco&in) 2 struct C 001
J $A() 0 bit (I! C
J GPR" $obi!e A!!ocation 0 J GPS Mobile 6llocation IE C C F
%&'()*)+ ,-'%-(. a*/#* Pa0e %% of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
J Direct enco&in) 8 struct C 001
J $A() 0 bit (I! C
J /"N 0 bit (I! C
J Length of $A re5uency List contents 0 bit (B! C
J $A re5uency List contents 0 octet (%al(7en)th of M6 Fre9uenc( 7ist contents! ?
;! C F
In&irect enco&in)0 Information use& b( MSs is obtaine& from the PSI 8 an& PSI or from the SI
2; an& the #re%ious assi)nment messa)es* Therefore' (ou nee& to check whether the %alues
of the fre9uenc(3ho##in) #arameters in the s(stem messa)es or assi)nment messa)es are
consistnet with &ata confi)urations accor&in) to $A4N-$#'R*
M6GN-MBE 1 =@2; shall be use& to reference a GPS mobile allocation recei%e& in a
PSI8 messa)eF
M6GN-MBE 1 2B shall be use& to reference a GPS mobile allocation recei%e& in a SI2;
or PSI2; messa)eF
M6GN-MBE 1 2A shall be use& to reference a GPS mobile allocation recei%e& in a
#re%ious assi)nment messa)e usin) the &irect enco&in)*
Direct enco&in) 20 MSs use the fre9uenc(3ho##in) in&e/ information s#ecifie& b( the GPR"
$obi!e A!!ocation #arameter in s(stem messa)es*
Direct enco&in) 80 MSs use the fre9uenc(3ho##in) information such as M6I"' ,SN' 7en)th of
M6 Fre9uenc( 7ist contents' an& M6 Fre9uenc( 7ist contents s#ecifie& in assi)nment
messa)es*
".&." ai!ed Down!in% &# 'stab!ishments Due to (mba!ance
#etween the -p!in% and the Down!in%
5hen the imbalance between the u#link an& the &ownlink occurs' no si)nals ma( be
recei%e& on the u#link or &ownlink at the e&)e of a cell co%era)e area* 6s a result'
TBF fails to be establishe&*
To anal($e the balance between the u#link an& the &ownlink' check whether the
transmit #ower of the BTS is hi)h* Then' check whether the com#onents such as the
TM6' BTS am#lifier' an& antenna #ort that affect u#link4&ownlink recei%e le%el ha%e
#roblems* For &etails' see the GSM BSS Network Performance KPI (Uplink and
Downlink Balance) Optimization Manual
If the u#link an& &ownlink are imbalance&' the followin) con&itions ma( occur0 The
&ifference between the mean u#link recei%e le%el an& the mean &ownlink recei%e
le%el is )reatF the u#link an& &ownlink balance le%el is hi)hF both the imme&iate
assi)nment success rate an& the assi)nment success rate are low* The followin)
table lists the traffic measurement counters relate& to the balance between the u#link
an& the &ownlink*
%&'()*)+ ,-'%-(. a*/#* Pa0e %1 of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Cause Ce!!.Leve! &R6.Leve!
Balance
between
u#link
an&
&ownlink
+all Measurement 3C 6ssi)nment
Measurement 3C
Success ate of T+, 6ssi)nment
Success ate of +all
Establishment
+all Measurement 3C Imme&iate
6ssi)nment Measurement 3C
Success ate of Imme&iate
6ssi)nment
M Measurement 3C
-#link3an&3Downlink Balance
Measurement
M Measurement 3C
T+,F ecei%e 7e%el
Measurement
M Measurement 3C
T+,, ecei%e 7e%el
Measurement
".&.& Chec%ing the eed "ystem
,ar&ware faults in the fee& s(stem or incorrect #arameter confi)urations' such as the
incorrect TM6 factor' lea& to low success rate of &ownlink TBF establishment* In
a&&ition' the fault( fee& s(stem ma( lea& to the imbalance between the u#link an&
the &ownlink* Therefore' (ou can check whether the fee& s(stem is fault( b( usin)
the traffic measurement counters relate& to the balance between the u#link an& the
&ownlink*
".&.2 Chec%ing the KP(s of the P" ie!d
7ow success rate of &ownlink TBF establishment ma( not be cause& sim#l( b( the
incorrect #arameter confi)urations of the +S fiel&* Incorrect #arameter settin)s of the
+S fiel& ma( affect the KPIs of the PS fiel&* Therefore' (ou must check whether the
im#ortant KPIs of the +S fiel& are normal* This hel#s (ou to locate faults* It is
recommen&e& that (ou focus on the success rate of imme&iate assi)nment* If the
success rate is low' (ou can infer that this is cause& b( the air interface*
%&'()*)+ ,-'%-(. a*/#* Pa0e %( of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
& Cases
&.1 Case 17 Low "uccess Rate of Down!in% &#
'stab!ishment Due to (ncorrect re5uency./opping
Parameter "ettings in C+ech Repub!ic
"ymptom
The success rate of &ownlink TBF establishment &ecrease& su&&enl( since
No%ember B' an& the number of abnormal TBF releases increase&* The statistics are
as follows0
&roub!eshooting
'2 The frame error rate of the G36bis interface is normal*
6ccor&in) to the formula for calculatin) the frame error rate of the G36bis
interface' the frame error rate was normal an& stable on an& near No%ember B*
Formula0 Frame error rate of the G36bis interface 1 (Number of Received
Chec% 'rror &RA- rames ? Number of Received )ut.of."ynchroni+ation
&RA- rames!4(Number of "ent Va!id &RA- rames ? Number of "ent
'mpty &RA- rames!
%&'()*)+ ,-'%-(. a*/#* Pa0e %+ of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Fi+u!e 1.1 6nal(sis of the frame error rate of the G36bis interface is normal
0. 00000000
0. 00200000
0. 00400000
0. 00600000
0. 00800000
0. 01000000
0. 01200000
0. 01400000
0
:
0
0
:
0
0
1
:
3
0
:
0
0
3
:
0
0
:
0
0
4
:
3
0
:
0
0
6
:
0
0
:
0
0
7
:
3
0
:
0
0
9
:
0
0
:
0
0
1
0
:
3
0
:
0
0
1
2
:
0
0
:
0
0
1
3
:
3
0
:
0
0
1
5
:
0
0
:
0
0
1
6
:
3
0
:
0
0
1
8
:
0
0
:
0
0
1
9
:
3
0
:
0
0
2
1
:
0
0
:
0
0
2
2
:
3
0
:
0
0
03/11/2008
04/11/2008
05/11/2008
06/11/2008
07/11/2008
08/11/2008
09/11/2008
%2 MSs &i& not res#on& to assi)nment messa)es*
The anal(sis of the TEMS si)nalin) in&icates that the MSs recei%e& Downlink
#acket assi)nment messa)es but &i& not sen& Packet +ontrol
6cknowle&)ement to res#on&* Therefore' the #roblem is case& b( no res#onse
from MSs*
Fi+u!e ).1 Downlink #acket assi)nment messa)e
The MSs &i& not res#on& to the &ownlink assi)nment messa)es because of incorrect
fre9uenc(3ho##in) information*
%&'()*)+ ,-'%-(. a*/#* Pa0e %* of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
The fre9uenc(3ho##in) information in the assi)nment messa)es were M6
number12B*
Fi+u!e ).) M6 Numeber in the &ownlink #acket assi)nment messa)e
6ccor&in) to the rele%ant #rotocol' the fre9uenc(3ho##in) information is &etermine&
base& on the %alue of the GPS Mobile 6llocation #arameter in the SI 2; messa)e*
In the SI 2; messa)e' the fre9uenc(3ho##in) information is null' which is &ifferent
from the &ata confi)uration* Therefore' the fault occurs because of this #ro&uct
&efect* The fre9uenc(3ho##in) information in the s(stem messa)es is incorrect &ue
to the #ro&uct &efect' an& thus the &ownlink TBF establishment fails* 5hen the
corres#on&in) channel is mo%e& to a fre9uenc( #oint that &oes not in%ol%e fre9uenc(
ho##in)' the success rate of &ownlink TBF establishment becomes normal*
%&'()*)+ ,-'%-(. a*/#* Pa0e %, of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
Fi+u!e )." Fre9uenc(3ho##in) information bein) null in the SI 2; messa)e
Solution
Fre9uenc(3ho##in) is &isable& to #re%ent this fault* This &efect will be rectifie& in
later %ersions*
&.) Case 37 Low "uccess Rate of Down!in% &#
'stab!ishment Due to No Responses from $"s After the
PC- (s -pgraded
"ymptom
The #ur#ose of u#)ra&in) the P+- %ersion to +=ASP=2 is to sol%e the #roblem that
the success rate of u#link TBF assi)nment in the GPS network is low* 6fter the
P+- is u#)ra&e&' the failure rate of u#link assi)nment &ro#s from E=N to 8=N* The
failure rate of &ownlink assi)nment' howe%er' rises from 8N to 8=N*
&roub!eshooting
6nal(sis in&icates that the frame error rate of the G36bis interface is normal' the
+++, is not o%erloa&e&' con)estion &oes not occur &ue to no channel' an& the air
interface 9ualit( is fine* Therefore' the fault occurs &ue to no res#onse from MSs*
The followin) fi)ure shows that in the &ownlink assi)nment #roce&ure the MS &oes
not return the Pac%et Contro! Ac%now!edgement messa)e after the P+- sen&s the
PACK'& P)LL(NG R',-'"& messa)e to the MS* In +=B' if the P+- fails to
resen& the ($$'D(A&' A""(GN$'N& messa)e for three times' the s(stem
increases the number of faile& &ownlink TBF establishments &ue to MS no res#onse
b( one* In +=A' if the MS &oes not res#on& with the Pac%et Contro!
Ac%now!edgement messa)e' the P+- resen&s the ($$'D(A&' A""(GN$'N& for
one time* If the MS still &oes not res#on&' the s(stem increases the number of faile&
&ownlink TBF establishments &ue to MS no res#onse b( one*
%&'()*)+ ,-'%-(. a*/#* Pa0e %. of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
The &ifference between +=B an& +=A is as follows0 The numbers of times that the
P+- resen&s the ($$'D(A&' A""(GN$'N& messa)e are &ifferent* 6s a result'
&urin) the establishment of the &ownlink TBF' traffic statistics about no res#onse
from the MS are &ifferent*
Solution
Increase the %alues of innner software #arameters Retry &imes of Down!in% &#
'stab!ishment an& Retry &imes of Down!in% &# Po!!ing*
%&'()*)+ ,-'%-(. a*/#* Pa0e %8 of 1&
GSM BSS Network Performance PS KPI (Downlink TBF Establishment Success ate!
"#timi$ation Manual
2 Prob!em eedbac%
'2 Traffic counters
unction &ype $easurement &ype
DSP Measurement DSP +P- Performance Measurement
6bis interface
measurement
T6- link measurement
PT6- Measurement
PS +all
Measurement
Measurement of #acket assi)nment ca#abilit( #er BS+
-#link GPS TBF establishment an& release ca#abilit(
measurement
-#link EGPS TBF establishment an& release ca#abilit(
measurement
PD+, resource ca#abilit( measurement
Performance measurement of PD+, e/tremes
Downlink GPS TBF establishment an& release ca#abilit(
measurement
Downlink EGPS TBF establishment an& release ca#abilit(
measurement
PS +hannel
Measurement
+ell ra&io channel ca#abilit( measurement
PD+, resource ca#abilit( measurement
%2 Fee&back on si)nalin) tracin) at the P+- si&e (-m an& Gb interfaces!
12 Fee&back on the %ersions of the BTS an& BS+
(2 Data confi)uration
%&'()*)+ ,-'%-(. a*/#* Pa0e 1& of 1&

You might also like