Aub TFD Fahed Al Salem Oha Engineering Consultant

The document provides a summary of engineering shop drawing and material submittals for an engineering consultant project. It includes tables showing the total numbers of items submitted and pending approval for architectural, electrical, mechanical and other systems. Additional tables list specific shop drawings submitted on October 13th for basement, ground and mezzanine floors showing their current status as under review.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views7 pages

Aub TFD Fahed Al Salem Oha Engineering Consultant

The document provides a summary of engineering shop drawing and material submittals for an engineering consultant project. It includes tables showing the total numbers of items submitted and pending approval for architectural, electrical, mechanical and other systems. Additional tables list specific shop drawings submitted on October 13th for basement, ground and mezzanine floors showing their current status as under review.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

AUB TFD FAHED AL SALEM OHA ENGINEERING CONSULTANT

Items
Total Nos
to be
submitted
Total
Nos
submitte
d and
Total Nos
submitted
but under
review
Total
Nos
pending
%
Approve
d
Delivere
d on site
Architectural / Civil 65 13 0 52 20.00
Electrical 38 25 0 13 65.79
Mechanical - HVAC 16 9 0 7 56.25
PL & FF 37 0 0 37 0.00
FIRE ALARM 8 0 0 8 0.00
CCTV 10 0 0 10 0.00
INTRUDER ALARM AND ACCESS CONTROL 16 0 0 16 0.00
PABX 7 0 0 7 0.00
SOUND SYSTEM 6 0 0 6 0.00
MATERIAL SUBMITTAL SUMMARY
Items
Total
Nos to
be
submitt
Total
Nos
submitt
ed and
Total
Nos
submitt
ed but
Total
Nos
pending
%
Approv
ed
Deliver
ed on
site
Architectural / Civil 117
Electrical
Mechanical - HVAC 10
Water Supply 8
Drainage 6
Drainage 6
SHOP DRAWING SUBMITTAL SUMMARY
# DIV Drawing # Item
1st
Submittal
Date
1st
Submittal
Response
1st
Submittal
Status
2nd
Submittal
Date
2nd
Submittal
Response
SD-AR-03 Builders work for Basement plan 13-Oct-13 13-Oct-13 Approved
SD-AR-04 Builders work for Ground plan 13-Oct-13 13-Oct-13 Approved
SD-AR-05 Builders work for Mezzanine plan 13-Oct-13 13-Oct-13 Approved
Basement Floor
SD-EUP-01 Electrical UPS power layout 13-Oct-13 13-Oct-13Under Review
SD-ED-01 Data system layout 13-Oct-13 13-Oct-13Under Review
SD-CCTV-01CCTV layout 13-Oct-13 13-Oct-13Under Review
SD-EP-01 Electrical power layout 13-Oct-13 13-Oct-13Under Review
SD-FA-01 Fire alarm layout 13-Oct-13 13-Oct-13Under Review
SD-EAC-01 Access & Time attendance 13-Oct-13 13-Oct-13Under Review
SD-EA-02 Alarm System 13-Oct-13 13-Oct-13Under Review
SD-TEL-01 Telephone Layout 13-Oct-13 13-Oct-13Under Review
SD-CO-01 Composite layout 13-Oct-13 13-Oct-13Under Review
SD-PA-01 Public address layout 13-Oct-13 13-Oct-13Under Review
SD-EQ-01 Q-Matic system layout 13-Oct-13 13-Oct-13Under Review
Ground Floor
SD-EUP-01 Electrical UPS power layout 13-Oct-13 13-Oct-13Under Review
SD-ED-01 Data system layout 13-Oct-13 13-Oct-13Under Review
SD-CCTV-01CCTV layout 13-Oct-13 13-Oct-13Under Review
SD-EP-01 Electrical power layout 13-Oct-13 13-Oct-13Under Review
SD-FA-01 Fire alarm layout 13-Oct-13 13-Oct-13Under Review
SD-EAC-01 Access & Time attendance 13-Oct-13 13-Oct-13Under Review
SD-EA-02 Alarm System 13-Oct-13 13-Oct-13Under Review
SD-TEL-01 Telephone Layout 13-Oct-13 13-Oct-13Under Review
SD-CO-01 Composite layout 13-Oct-13 13-Oct-13Under Review
SD-PA-01 Public address layout 13-Oct-13 13-Oct-13Under Review
SD-EQ-01 Q-Matic system layout 13-Oct-13 13-Oct-13Under Review
Mezzanine Floor
SD-EUP-03 Electrical UPS power layout 13-Oct-13 13-Oct-13Under Review
SD-ED-03 Data system layout 13-Oct-13 13-Oct-13Under Review
SD-CCTV-03CCTV layout 13-Oct-13 13-Oct-13Under Review
SD-CCTV-03CCTV Riser Diagram 13-Oct-13 13-Oct-13Under Review
SD-EP-03 Electrical power layout 13-Oct-13 13-Oct-13Under Review
SD-FA-03 Fire alarm layout 13-Oct-13 13-Oct-13Under Review
SD-EAC-03
Access & Time attendance
layout
13-Oct-13 13-Oct-13Under Review
SD-EA-03 Alarm System 13-Oct-13 13-Oct-13Under Review
SD-TEL-03 Telephone Layout 13-Oct-13 13-Oct-13Under Review
SD-TEL-03 Telephone Riser Diagram 13-Oct-13 13-Oct-13Under Review
SHOP DRAWING SUBMITTAL
SD-CO-03 Composite layout 13-Oct-13 13-Oct-13Under Review
SD-PA-03 Public address layout 13-Oct-13 13-Oct-13Under Review
SD-EQ-03 Q-Matic system layout 13-Oct-13 13-Oct-13Under Review
2nd
Submittal
Status
SHOP DRAWING SUBMITTAL
# DIV Drawing # Item
1st
Submittal
Date
1st
Submittal
Response
1st
Submittal
Status
2nd
Submittal
Date
2nd
Submittal
Response
SD-AR-03 Builders work for Basement plan 13-Oct-13 13-Oct-13 Approved
SD-AR-04 Builders work for Ground plan 13-Oct-13 13-Oct-13 Approved
SD-AR-05 Builders work for Mezzanine plan 13-Oct-13 13-Oct-13 Approved
SD-EUP-01
Basement floor plan - Electrical
UPS power layout
13-Oct-13 13-Oct-13Under Review
SD-ED-01 Basement floor plan - Data system 13-Oct-13 13-Oct-13Under Review
SD-CCTV-01 Basement floor plan - CCTV 13-Oct-13 13-Oct-13Under Review
SD-EP-01 Basement floor plan - Electrical 13-Oct-13 13-Oct-13Under Review
SD-FA-01 Basement floor plan - Fire alarm 13-Oct-13 13-Oct-13Under Review
SD-EAC-01
Basement floor plan - Access &
Time attendance layout
13-Oct-13 13-Oct-13Under Review
SD-EA-02 Basement floor plan - Alarm 13-Oct-13 13-Oct-13Under Review
SD-TEL-01Basement floor plan - Telephone 13-Oct-13 13-Oct-13Under Review
SD-CO-01 Basement floor - Composite layout 13-Oct-13 13-Oct-13Under Review
SD-PA-01 Basement floor - Public address 13-Oct-13 13-Oct-13Under Review
SD-EQ-01 Basement floor - Q-Matic system 13-Oct-13 13-Oct-13Under Review
SHOP DRAWING SUBMITTAL
2nd
Submittal
Status
SHOP DRAWING SUBMITTAL