Precommissioning Checks and Tests For Electric Cables Having Less Uo/U Than 8.7/15 KV

PRECOMMISSIONING CHECKS AND TESTS FOR ELECTRIC CABLES HAVING LESS Uo/U THAN 8.7/15 kV - agip

Uploaded by

brome2014
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views1 page

Precommissioning Checks and Tests For Electric Cables Having Less Uo/U Than 8.7/15 KV

PRECOMMISSIONING CHECKS AND TESTS FOR ELECTRIC CABLES HAVING LESS Uo/U THAN 8.7/15 kV - agip

Uploaded by

brome2014
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

M

O
D
.
E
L
E
.
F
T
C
.
0
0
3
/
4
S
h
.
0
1
/
0
1

NOTES : X Indicates : Considered Condition or Checks has been carried out
TEST INSTRUMENTS :
Test
date
Executor
Attendant or
Supervisor
Inspection
Authority
Employer
Test result : P positive - N negative
Uo/U rated voltage :
Installation :
Conditions
Ambient
Scope of tests :
Reference documents :
MECHANICAL INSTALLATION CHECKS HAVE BEEN CARRIED OUT SUCCESSFULLY
Construction type : - kV
In operation since :
Temperature : close to cable
Climate : Humid Wet
C
o
CABLE
CODE
FORMAT.
X
SECTION
LENGTH No. of
joints
TYPE
OF
INST.
km N. x mm
MEASUREMENT OF INSULATION RESISTANCE
MOhm km at 20 C
.
L1 L+E L2 L+E L3 L+E N L+E
TEST
RESULT
P N
PRECOMMISSIONING CHECKS AND TESTS FOR ELECTRIC CABLES
HAVING LESS Uo/U THAN 8.7/15 kV
-
Commissioning
O
P
S
.
This document is Company property. The Company lawfully reserves all rights.
Dept.
Agip
Sheet / of Compiled Date
Doc. n
/
COMPANY
Job.
AREA
COUNTRY
PLANT
Revision
0
INTERNAL NORMALIZATION
New
Dry
Correct mechanical installation