Design Drawing
Design Drawing
Design Drawing
2
4
4
0
2
4
4
0
2
4
4
0
2
4
4
0
2
4
4
0
2440 2440 2440 2440 2440 2440
2
4
4
0
2
4
4
0
2
4
4
0
800
1
2
7
0
2440 2440 2440
2440
2440 2440 2440 2440 2440 2440
2440 2440 2440 2440
800
2440 2440 2440 2440 2440 1270 1270
VARIES
2
7
0
0
1
9
8
0
1
9
8
0
2
7
0
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
2
7
0
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
1
9
8
0
2440
1
2
7
0
1
2
7
0
2
7
0
0
1
9
8
0
1
9
8
0
1
9
8
0
1270
800
1
2
7
0
8
0
0
2
4
4
0
2
4
4
0
2
4
4
0
1
9
8
0
2440 2440 2440 800
THE SCAFFOLD STRUCTURE DETAILED ON THIS DRAWING
HAS BEEN DESIGNED TO BE ERECTED USING ONLY MATERIALS
SUPPLIED OR APPROVED BY SAFE ACCESS (HIGHLAND) LTD
(Highland) Ltd
PLAN VIEW
NOTES:
- DUE TO UNFORESEEN SITE CIRCUMSTANCES, THE SCAFFOLD ERECTED MAY DIFFER FROM THAT NOTED. IF IN ANY DOUBT CONTACT SAFE ACCESS
(HIGHLAND) LTD TO DISCUSS.
- ALL ALLOWABLE LOADS AND DETAILS ARE BASED ON THE USE OF EQUIPMENT WITH SWL RATINGS IN ACCORDANCE WITH GENUINE KWIKSTAGE
COMPONENTS.
- CLIENT TO ENSURE FIRM & LEVEL BASES CAPABLE OF SAFELY SUPPORTING LOAD FROM SCAFFOLDING WITHOUT UNDUE SETTLEMENT OR DEFLECTION.
- BUTTRESS & LOADING BAY TO BE ERECTED IN ACCORDANCE WITH EQUIPMENT USER MANUAL.
- ALL SCAFFOLD MATERIALS TO COMPLY WITH BS 1139.
WORKING DRAWING
FRONT ELEVATION
SIDE ELEVATION
REAR ELEVATION
A: 22b Longman Drive
Inverness
IV1 1SU
T: 01463 (711750)
M: 07527 135487
E: [email protected]
W: www.safe-access.co.uk
CLIENT TO ENSURE GROUND BEARING
PRESSURES ADEQUATE TO SUPPORT
AXIAL LOADS IMPOSED BY UPRIGHTS
ADEQUATE SOLE
BOARDS MUST BE USED
TO TRANSER AXIAL LEG
LOAD TO THE GROUND
GENERAL NOTES:
A) This drawing is confidential and the exclusive property of Safe Access (Highland) Ltd.
No unauthorised use, copy or disclosure is to be made and it is to be returned upon request.
B) Construct in full compliance with BS EN 12811-1 (TG20:08) unless noted otherwise.
C) Scaffold built from tubular materials and fittings conforming to BS 1139 : 1982 or type 4
tube to BS EN 39. All tube must be in 'as new' condition.
D) Scaffold built with load bearing fittings, except intermediate bearers below platform level
and boards fixed with non-load bearing fittings.
E) This drawing has been prepared from details supplied to us by the enquirer/client, who
should check that we have correctly interpreted his/her requirements and that all loadings,
dimensions, details, erection and striking sequences are correct and practicable. No
alteration in the loading may be made without prior reference.
F) The client is to prepare and ensure that any foundations/supports are suitable for
supporting the loads imposed upon it by our scaffold including its working load.
G) No sheeting whatsoever, unless already shown, should be added to the scaffold without
prior reference.
H) It is the responsibillity of the client/enquirer to ensure that adequate facilities or tying the
scaffold are made available and that the building or structure is capable of withstanding the
loads applied to it by the scaffold and its working load.
I) No ties or braces re to be removed or any modifications to be made to the scaffold without
prior reference.
J) The enquirer/client is to design, supply and fix all necessary auxiliary equipment including
but not limited to, shuttering, timber, bearers, steel joists and to ensure that such auxiliary
equipment is capable of safely transmitting the loads to the standards.
K) The enquirer/client will be responsible for setting out and final leveling of scaffolding or
similar equipment used as a system support.
L) All dimensions are as stated or as calculated
M) This drawing has been prepared on the assumption that all loads will be applied axially to
the tubes unless specifically stated.
DESIGN LOADS:
THIS SCAFFOLD HAS BEEN DESIGNED FOR THE FOLLOWING:-
1 N0. LlFT3 _2.0 |N/r
1 N0. LlFT3 _1.0 |N/r
THE CLIENT MUST ENSURE THAT NO LOADS IMPOSED ARE GREATER
THAN THE ALLOWABLE STATED LOADS
R.MAIR
RETURN TRANSOMS
TO BE USED WITH ALL
GAPS FILLED USING
LAPPING BOARDS
AND TUBE & FITTING
ADEQUATE TIMBER SOLE BOARDS TO BE
USED TRANSFERRING LEG LOADS TO
0R0uN0. VlN 0.1r
CLIENT TO CONFIRM SUITABILITY OF
BUILDING STRUCTURE TO SUSTAIN
LOADS TRANSFERRED FROM THE
SCAFFOLD
ANCHORS SHOULD BE INSTALLED
ONLY BY TRAINED PERSONNEL
USING THE CORRECT TOOLS AND
STRICTLY IN ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS
SIDE ELEVATION
RETURN TRANSOM
TO BE USED AT ALL
90 lNTER3ECTl0N3
FIRST LIFT HEIGHT TO
BE DETERMINED ON
SITE BY CLIENT AGENT
ELEVATION TO BE TIED
INTO EXISITNG
BUILDING AND BUTTED
ON BOTH SIDES
DUE TO SITE CONDITIONS, ALL ELEVATIONS TO BE
TIED INTO EXISTING BUILDING USING M16 ANCHORS.
CLIENT TO ENSURE BUILDING IS CAPABLE OF
WITHSTANDING LOADS IMPOSED BY SCAFFOLD
ALL GAPS TO BE FILLED
USING TUBE & FITTING
AND LAPPING BOARDS
LOADING:
1 No. w0RKlN0 LlFT _2.00 |N/r
1 No. w0RKlN0 LlFT _1.00 |N/r
ALL lN3l0E 80AR03 0.Z5 |N/r
ADJACENT
UPRIGHTS TIED
USING SHORT TUBE
AN0 90 C0uPLER3
LEDGER BRACING
REQUIRED FIXED TO
UPRIGHTS WITHIN 300mm
OF NODE POINT
DOUBLE GUARD RAILS
AND TOEBOARDS ON ALL
WORKING LIFTS
FRONT ELEVATION HAS
BEEN DESIGNED TO
HAVE 3 No. WORKING
LIFTS DEBRIS NETTED
2.7m PAVEMENT
GANTRY. TO BE TIED
AT FIRST LIFT
FACE BRACING
INSTALLED AS PER
KWIKSTAGE USER
MANUAL
PLAN BRACING
REQUIRED IF TIES
CANNOT BE INSTALLED
TWO WAY TIE USING HILTI
M16 ANCHOR WITH TUBE AND
COUPLERS
TUBE WITH JACK BUTTED
AGAINST BUILDING
GRANTOWN ON SPEY. MORAY SHIRE
ALTITUDE, A = 222 m ABOVE SEA LEVEL
WIND FACTOR, S = 29.33
PLAN BRACING
SECURED TO
UPRIGHTS AS SHOWN
Hilti M16 HKD with Scaffold Ring Bolt (58253).
Min embedment depth - 65mm
Min edge distance - 230mm
Min corner distance -230mm
Anchor capacity should be determined on site
by testing. Concrete SWL : 6.1kN
ANCHOR DETAIL
PLAN BRACING
REQUIRED
MAX LEG LOAD:
11.54 kN
MAX LEG
LOAD: 8.96 kN
1 No. INSIDE
GUARD RAIL
1:10 @A1
PEDESTRIAN WALKWAY.
ALL STANDARDS SHOULD
BE ENCLOSED TO PREVENT
HARM TO PUBLIC
PUBLIC
ACCESS
PUBLIC
ACCESS
2 No. 9m APOLLO
X-BEAMSLACED AND
BRACED IN PAIRS @
1m INTERVALS
9m APOLLO X-BEAMS.
BRACED AT 1m INTERVALS.
FIXED TO UPRIGHTS USING
RIGHT ANGLE COUPLERS