Marine Survey Practice

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10
At a glance
Powered by AI
The document discusses guidelines for conducting marine surveys with a focus on boiler surveys. It provides details on examining different parts of boilers and the steps involved in conducting thorough surveys.

A complete boiler survey involves a full internal and external examination of all parts of the boiler and accessories. This includes checking for deposits, deformations, wastage, and researching and correcting any anomalies found. Safety valves are also checked and adjusted if needed.

For water-tube boilers, screen tubes and water wall tubes need attention to check for plugging or bulging. The main steam generating tube bank is also examined to ensure no more than 10% of tubes are plugged. Superheater temperatures above 400°C may require special materials and welding.

Marine Survey

Practice
This blog intended to provide information and experience to professionals who work in
the difficult career of Marine Surveyor.
Wednesday, January 30, 2013
Surveyor Guide Notes for Boiler Survey
Boiler Surveys (Including Thermal Oil Heaters)

General
A complete boiler survey allows us to check out if any build-up of deposits has taken place, and
deformations or wastage of plate work, piping or any of the various parts, which may compromise the sale
working order of the unit. The survey should include research as to cause of any anomalies found and
also their correction.


Any repair will have to ensure the sale working order of the boiler until the next survey.

A complete survey means a lull internal and external examination of all parts of the boiler and accessories
such as super heater, economizer, air-heater internal organs and all mountings. This examination may
lead the Surveyor to require thickness gauging of plate or tubes that appear to be wasted and eventually
to a lower assigned working pressure, if calculations prove this necessary.


Collision chocks, rolling stays and boiler stools are to be examined. The oil fuel burning system is to be
examined under working conditions and safely devices are to be checked, including any automatic burner
light-up sequence to verify purging of the furnace prior to lighting burners. A general examination is to be
made of fuel tank valves, pipes etc. and fuel pipes between pumps and burners.
Safety valves are to be adjusted to a pressure not greater than 105 % of design pressure.

Water-tube boilers


Typical survey plan


The main points to remember are:

At superheat temperatures > 400 C special steels and more advanced welding techniques
will be involved.
Check drawings of unfamiliar designs of boiler to correctly plan the survey.

Steam drum and tubes Pitting, fit of manhole door
Super heater Short-circuiting, erosion in headers. Weld fractures.
Boiler casing Overheating, leakage.
Furnace
Distortion of tubes, bulging of tubes. Condition of
baffles Refractory.
Water drums Pitting fit of manhole door.


Scotch boiler type


Typical survey plan

The main points to remember are:
Boiler should be thoroughly cleaned and prepared for survey.

Furnaces Overheating and subsequent distortion
Combustion Chambers
Overheating and distortion of crown.
Leaking tubes and stays.
Tubes Thinning at ends, repeated expansion.
Shell Internal Wastage, grooving
Shell External Wastage, in way of leaking mountings.

Cochran type boiler



The main points lo remember for these varied designs are similar to the foregoing:
Wastage, lire and water side.
Deformations due to overheating.
Leaking lubes.
Wastage externally due lo leaking mountings, manholes and handholds.
Hydraulic testing

Following major repairs or as required by the Surveyor hydraulic testing may be required.


Hydraulic test of boilers in service

P = Working pressure in bars.


Before 1.25 P if P < 40
12
th
year 1.2 P + 2 if P > 40
After 1.15 P whatever P
12
th
year value


Typical safety valve designs


Pressure tightness tests at working pressure may also be carried out after small maintenance jobs such
as part re-tubing, renewal of rivets or extensive caulking of seams or rivets, welding of small cracked
areas.

Plugging of Boiler Tubes

Water tube boilers

Screen tubes - These are the first rows of tubes and are exposed directly to the flame, they are gene rally
very closely slacked lo afford protection to the super-heater elements which lie behind.

Wale wall tubes - these are subject to the same defects as screen tubes, but more sensitive to poor
circulation, particularly roof tubes.

Any tubes found plugged or (bulged) should be renewed.


Main steam generating lube bank - a maximum of 10 % of the tubes may be accepted plugged before
renewals are required.

Note: In all cases of boiler problems it is important to ascertain the cause of damage (flame impingement,
lack of boiler water treatment etc.) and take remedial action.

Smoke tube boilers

Any tubes found plugged should be renewed.

Tubes with excessive thinning at the ends because of repeated rolling or showing signs of movement
should be renewed.

The makers instructions should be consulted where available.
































Posted by Harry Gonzlez at 17:24
Email ThisBlogThis!Share to TwitterShare to FacebookShare to Pinterest
Newer PostOlder PostHome
Total Pageviews
54,318
About Me

Harry Gonzlez
View my complete profile
Translate

Powered by Translate
Entries
2013 (50)
o January (50)
Code of Ethics.
The Underwriter's Surveyor
Salvage Surveys
Guidelines on survey for Marine Surveyor.
Preparation for Survey
Hull Survey Methods
Failure and Damage
Notes Relative to Shell and Deck Plate Repairs
What to look for?
Surveyor Guide Notes for Weld Inspection and Repai...
Repair Quality Standard for Existing Ships
Surveyor Guide Notes for Coating Condition Survey
Initial Survey of Hull
Annual Survey of Hull
Surveyor Guide Notes for Outside Inspection of the...
Surveyor Guide Notes for Anchors and Chains Survey...
Surveyor Guide Notes for Bilge Keels Survey
Surveyor Guide Notes for Doors Survey
Surveyor Guide Notes for Rudder, Rudder Stock and ...
Surveyor Guide Notes for Propeller Surveys
Intermediate and Periodical Survey
Renewal Survey
Surveyor Guide Notes for Additional Surveys
Surveyor Guide Notes for Reporting
Surveyor Guide Notes for General Cargo Ships Surve...
Surveyor Guide Notes for Hatch Covers of Dry Cargo...
Surveyor Guide Notes for Bulk Carriers Survey
Surveyor Guide Notes for Oil Tankers Survey
Surveyor Guide Notes for Container Ship Survey
Surveyor Guide Notes for Sailing Yachts Survey.
Surveyor Guide Notes for Boat Marine Survey
Surveyor Guide Notes for Wooden Vessels Survey
Surveyor Guide Notes for Draft Survey
Vernier Caliper.
Surveyor Guide Notes for Towing Arrangement Survey...
Surveyor Guide Notes for MODU Towing Arrangements....
Surveyor Guide Notes for Bollard Pull Tests.
Surveyor Guide Notes for Ship Stability, Inclining...
Surveyor Guide Notes for P&I insurance Surveys
Surveyor Guide Notes on Tailshaft Survey
Surveyor Guide Notes on Tailshaft/Propeller Assemb...
Surveyor Guide Notes for Boiler Survey
Surveyor Guide Notes for Marine Diesel Engine Surv...
Surveyor Guide Notes for Prepurchase Condition Sur...
Surveyor Guide Notes on Safety Construction Certif...
Surveyor Guide Notes on Safety Equipment Certifica...
Surveyor Guide Notes on Loadline Certificate Defic...
Surveyor Guide Notes on Marpol Certificate Deficie...
Surveyor Guideline Note on Hull Coating Inspection...
On/Off Hire Condition Survey
My Blog List
Calculo Estructural del Buque
Construccin del Buque I
Estabilidad del Buque I
Estabilidad del Buque II
Digital clock
Links
ABS
American Club Mutual P&I Association
AWS online
Binco
Britannian Steam Ship
Bureau Veritas Veristar
Class NK
DNV
Equasis
Estudios de Nutica
European Maritime Safety Agency (EMSA)
Gard P&I
General Cargo
GL Group
IACS
INEA Venezuela
Institute of Chartered Shipbrokers
Intercargo
International Group of P&I Clubs
Intertanko
Japan Coast Guard
Japan Ship Owners' Mutual Protection & Indemnity Association
Lloyd Register of Shipping
London Pandi
Marine Society
NDE/NDT Resource Center
Paris MOU
Ship Strcture Committe
Shipyards Directory
Skuld
Steamship Mutual P&I Club
The ImarEST
The Nautical Institute
The Standard Club
The Swedish Club
UK P&I Club
US Coast Guard
West of England P&I

Simple template. Template images by Maliketh. Powered b

You might also like