Commissioning Procedure

The document outlines the key stages of the plant commissioning process, including preparation and planning, mechanical completion and integrity checking, pre-commissioning testing, start-up and initial operation, performance testing, and post-commissioning. It discusses developing detailed commissioning procedures and checklists, considering sequencing and dependencies between systems, and performing mechanical integrity inspections of piping, vessels, equipment, and supporting infrastructure prior to start-up.

Uploaded by

ToniMelo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views18 pages

Commissioning Procedure

The document outlines the key stages of the plant commissioning process, including preparation and planning, mechanical completion and integrity checking, pre-commissioning testing, start-up and initial operation, performance testing, and post-commissioning. It discusses developing detailed commissioning procedures and checklists, considering sequencing and dependencies between systems, and performing mechanical integrity inspections of piping, vessels, equipment, and supporting infrastructure prior to start-up.

Uploaded by

ToniMelo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 18

Slide 1

Plant commissioning & start up procedure


Slide 2
The Commissioning Process
Key Stages
Preparation and planning
Mechanical Completion and Integrity checking
Pre-commissioning &Operational Testing
Start Up & Initial Operation
Performance and acceptance testing
Post Commissioning
Slide 3
1. Preparation and planning
Appointment of Commissioning Manager or Lead Commissioning ngineer!
Appointment of Commissioning Team Mem"ers and S#pport Staff!
Training!
Information Compilation!
Safety and $isk Assessment!
Commissioning Strategy Development;
Procedures and Checklist Development;
%etailed Plan and &#dget Preparation!
Slide 4
Commissioning Strategyt L
Facility Commissioning Issues
Time phasing constr#ction and commissioning acti'ities
Time phasing the commissioning of the 'ario#s parts of the plant relati'e to each other!
$elationships and timings determining (hen 'ario#s systems need to "e a'aila"le)
lectrical* Steam* +ater* Instr#mentation
Se,#encing of the o'erall plant start#p and sh#tdo(n to ens#re (e do not create #nsafe
conditions!
Initial start #p!
Process Control and Sh#tdo(n!
Performance testing!Slide 6
Developing Startup Procedures
ngineering and constr#ction companies generally follo( a systematic proced#re (here "y
their start#p engineers re'ie( the process design se'eral times as it is de'eloped!
After the first re'ie(* a preliminary start-#p and operations proced#re is (ritten!
%ecide (hat m#st "e added to the design to make the process capa"le of "eing started #p and
operated!
&y the time the final engineering flo(-sheets ha'e "een released a complete start#p and
operating instr#ctions man#al sho#ld ha'e "een completed-
Slide 7
Issues considered
Are 'ario#s part of the process too depend on one another!
Is there eno#gh s#rge capacity!
Are there pro'isions to pre'ent a"normal press#res* temperat#res and rates of reaction!
+here are additional 'al'es and "ypass lines needed!
Special lines to allo( e,#ipment to "e started #p and rer#n prod#ct.ra( materials-
Slide 8
System Level ctivities
Utilities systems - steam* instr#ment air* process (ater* fire (ater* drainage* condensate ret#rn!
lectrical systems!
Instr#mentation and instr#mentation systems!
Cleaning and fl#shing!
P#rging!
Initial start #p and sh#tdo(ns!
Performance testing!
Slide 9
!"uipment Level ctivities
Press#re testing & mechanical integrity testing of 'essel* col#mns and pipe (ork!
/eat 0changers* condensers* coolers etc-
Mechanical e,#ipment and machinery!
Control Systems and Instr#mentation!
Operational testing!
Proof testing and acceptance-
#hat can $e done $e%ore mechanical completiont
Utilities commissioning
L#"e and Seal-Oil Systems Cleaned
Instr#mentation and Control Loops Pro'en
Piping* To(ers and 1essels Cleaned
&oil-O#t* %ry-O#t and Acid Cleaning
T#r"ine* Motor and P#mp $#n-Ins
2itrogen P#rge and Tightness Testing
Slide 12
Procedures
Proced#res are (ritten ro#tines.instr#ctions that descri"e the logical se,#ence of acti'ities
re,#ired to perform a (ork process and the specific actions re,#ired to perform each acti'ity!
If there are no (ritten proced#res* there is no "asis for monitoring performance* foc#s for
impro'ement or mechanism "y (hich to capt#re learning!
The esta"lishment of proced#res and ro#tines allo( more time and mental energy to deal (ith
the #ne0pected* (hich al(ays happen d#ring commissioning-
Slide 13

Commissioning&Startup Logic
A Critical Path 2et(ork 3Plan4 (ith (ritten proced#res (ith related doc#ments are re,#ired-
These sho#ld define for the facility* each plant system)
-----The order in (hich the systems (ill "e started #p!
-----Indi'id#al acti'ities at each stage!
-----Operation testing re,#irements!
-----%#rations* (aiting times* cooling times!
-----Total d#ration for starting #p each system!
-----$eso#rces re,#ired - la"o#r* materials* e,#ipment* ser'ices!
-----Temperat#res* press#res* fl#id flo(s #sed-
Slide 14
Commissioning&Startup and Shutdo'n Issues
At the facility* system and e,#ipment le'el* (e (ant to a'oid)
-----Creation.e0istence of e0plosi'e mi0t#res* #s#ally "eca#se of the presence of air!
+ater hammer and (ater "ased e0plosion effects* d#e to contact "et(een (ater and
hot
s#"stances 3steam* oil* etc-4!
In partic#lar* d#ring commissioning hot fl#ids and gases (ill "e coming into contact (ith cold
s#rfaces in places that (o#ld "e hot #nder normal operations-
Slide 15
(. )echanical Completion and Integrity Chec*ing
Inspection
Press#re testing
Cleaning and 5l#shing
Machinery checko#t
Slide 17 Categories o% Process !"uipment
$e"oilers & Other Shell & T#"e /eat 0changers
&oilers and 5ired /eaters
Press#re 1essels and Pipe-(ork
5in-5an Coolers
Condensers
Machinery.$otating ,#ipment
1al'es
Instr#mentation
lectrical ,#ipment
Slide 18
)achinery& +otating !"uipment
P#mps
Steam T#r"ines
6as T#r"ines
Compressors
6as ngines
lectric Motors
Slide 19
)echanical Completion and Integrity Inspection
In'ol'es checking that e'erything has "een "#ilt and it there as per specification-
$efer)
----- Piping Plan %ra(ings!
-----Layo#t and constr#ction dra(ings!
-----P & I%7s
lectrical systems* Instr#mentation and control systems checko#t do(n "y appropriately
,#alified personnel 3lectricians and Instr#mentation technicians4-
6eneral commissioning engineers generally do not get in'ol'ed in this in a hands-on
manner-lide 20
)echanical Completion and Integrity Inspection Procedure
%i'ide plant into managea"le areas!
In a large plant* assign indi'id#als or teams to specific areas!
sta"lish a master set of piping plan dra(ings and P&I%7s* mark #p areas)
Indi'id#al commissioning engineers or teams (alk e'ery line and mark #p e'ery item that can
"e confirmed as present on master set of dra(ings!
Use different colo#red 8highlighter9pens to indicate different ser'ices-Slide 21
'ery line m#st "e (alked: Physically sight e'erything:
Slide 22
)echanical Completion and Integrity Inspection Procedure , -ints&Tips
ns#re pipes* 'essels* 'al'es etc- are all in the right place!
1al'es are correct type - glo"e* gate* control!
1ents* drains* steam traps etc-
5langes* "olts* types of "olts!
&lind flanges and s(inga"le "linds in place* correct rating!
Check all tag n#m"ers!
P#nchlist any non-conformances-de
23
Pipe Stressing
Piping sho#ld pro'ide ade,#ately for e0pansion and contraction d#e to temperat#re changes*
(itho#t .placing e0cessi'e stresses on e,#ipment!
Misalignment "et(een matching flanges on pipe(ork - partic#lar (here there are changes in
direction 3el"o(s4 can ca#se stressing!
Misalignments (here pipe-(ork connects to machinery* 'essels and other process e,#ipment!
Can often "e seen 'is#ally* or checked (ith ga#ges #sing the same proced#res (e #se to align
rotating e,#ipment-
Slide 25
Piping and !"uipment Supports
Slide 26
Mo"ile s#pports permit and g#ide the thermal gro(th of e,#ipment #ndergoing temperat#re
change!
If they do not f#nction correctly* 'essels* e,#ipment* pipe (ork* no;;les heat e0changers
etc- may "e damaged-
Slide 27
Slide 28
Piping and e"uipment supports
Inspection prior to start #p)
-----Check that installed according to specification and not <ammed!
Inspection d#ring (arm #p)
-----Check thermal gro(th is occ#rring and s#pports are responding as per design!
Check that there is no s#rface "#ckling or crimping - this needs to "e corrected!
-----Check e0pansion <oints!
Check long straight r#ns of piping for "o(ing or s#pport shoes that may ha'e
slipped!
Rule of thumb - bowing is excessive if you can see it.
Slide 29
Piping and e"uipment supports
Inspection after cool-do(n)
Check that sliding s#pports ha'e ret#rned to original positions!
sta"lish that e,#ipment can e0pand and contract as re,#ired-
Slide 30
Inspection o% spring supports
&efore hydro-testing)
-----Check that spring stops are installed- 3If not* the (eight of (ater in pipe (ill deform the
spring4-
After hydro-testing "#t "efore heating)
Check that stops are remo'ed!
Check that spring pointer is positioned to cold setting!
Slide 31
Inspection o% spring supports
%#ring and at end of heating)
Check pointer has not e0ceeded hot setting!
After cool do(n)
check to esta"lish piping can e0pand and contract as re,#ired!
esta"lish that springs can a"sor" loads-Slide 32
Slide 33
Inspection o% .essels and Tan*s
The inspection of 'essels* col#mns and reactors sho#ld "e sched#led to "e completed "efore
constr#ction has closed them #p!
Other inspections - e-g- for completeness or piping* ins#lation* safety etc- can "e sched#led
later!
If a 'essel has "een sealed #p "y constr#ction* it is yo#r d#ty to inspect it* e'en it constr#ction
resist-
Slide 34
Inspection o% .essels and Tan*s
Check that distri"#tors ha'e "een installed correctly!
%e-misters installed correctly and of correct materials* design* type!
1orte0 "reakers in place!
Trays - packed or 8"#""le-cap9are correct)
&#""le caps not <ammed or damaged* do(n comers clear* s#pports all O=-
Slide 35
Pressure TestingSlide 36
Press#re Testing - O"<ecti'es
The o"<ecti'e of press#re testing is to confirm the mechanical integrity of the plant!
1erifying capa"ility of containing the press#res it has "een designed to hold!
ns#re there are no leaks and 'erify that the plant can "e relia"ly made leak free!
Identify any '#lnera"ilities (ell "efore the plant is placed into ser'ice!
Meet the re,#irements of legislation* local* international and ind#stry standards-
Slide 37
Pressure Testing , responsi$ilities
Press#re tests of tanks* reactors and piping for mechanical strength and tightness of <oints is
#s#ally done "y the constr#ction team!
Commissioning team representati'es sho#ld (itness and certify the tests!
2eed to 'erify that all necessary safety preca#tions ha'e "een taken!
Slide 38

Pressure Testing , procedures
+ater for testing and fl#shing sho#ld contain a r#st inhi"itor - one lo( in chloride content for
stainless steel lines!
After testing* (ater sho#ld "e drained completely from all lines that do not normally carry
(ater* steam or steam condensate!
All lo( points sho#ld "e checked for presence of (ater!
Lines sho#ld "e dried "y "lo(ing hot air* dry inert gas or instr#ment air-
Slide 39
Pressure Testing , .acuum Systems
5inal checks of 'ac##m systems are "est performed "y p#lling a 'ac##m and o"ser'ing the
rate of press#re rise in the "locked in system!
0cessi'e leaks can then "e located "y applying a mild positi'e press#re and testing each flange
(ith "#""le sol#tion-
Slide 40
Pressure Testing , Procedures (
Isometric dra(ings of all systems to "e tested sho#ld "e displayed on a "oard and marked #p as
each section is tested!
/ydrotesting of piping and e,#ipment according to code re,#irements to confirm mechanical
strength sho#ld "e carried o#t on gro#ps of e,#ipment nat#rally s#ggested "y design press#re
and f#nction!
All (ater* steam* condensate* oil* gas and process steam piping sho#ld "e hydrotested!
Ma<or e,#ipment that has already "een tested as part of man#fact#ring may "e isolated "y
"lanks-
Slide 41 Cleaning and FlushingSlide 42

2eed to ens#re no constr#ction de"ris is left in pipes of 'essels - (elding rods* "olts* glo'es*
rags etc-
Large de"ris 3l#m"er* ca"le* packaging4 sho#ld ha'e "een remo'ed d#ring mechanical integrity
inspections!
Small de"ris 3rags* n#ts* dirt4 m#st "e fl#shed o#t of all pipe and 'essels!
+here oil coatings m#st "e remo'ed* chemical cleaning is necessary-Slide 43
&efore fl#shing is started* check the process thoro#ghly to ens#re)
Screens ha'e "een installed in front of p#mp s#ctions!
-----&linds in front of e,#ipment s#ch as compressors and t#r"ines!
8>#mper9spool pieces to allo( for contin#ity of flo(-
Slide 44 Flushing
Can "e handled "y geographic plant area!
Sections too large for (ater fl#shing)
-----Pipes greater than ?@ in diameter 3@-AB m4* or
-----Pipes that sho#ld not "e to#ched (ith (ater!
Sho#ld all "e "lo(n o#t (ith air or inert gas-
Slide 45
Flushing
$egardless of (hether pipes are cleaned (ith (ater* steam* air or nitrogen* flo( 'elocities
sho#ld "e high eno#gh to ens#re that pipes (ill "e s#ita"ly sco#red!
2eed to ens#re that the de"ris from one piece of e,#ipment (ill not simply "e fl#shed into
another!
+ater 'elocities sho#ld "e at least CD ft.sec 3appro0- ?-AB m.sec4!
Air 'elocities a minim#m of D@@ ft.sec 3appro0- EB m.sec4!
Slide 46
/. Pre,commissioning and 0perational Testing
4. Slide 47
5.
Steam and other #tilities commissioned and introd#ced!
%ry r#nning trials!
/ot r#nning trials!
Safe-fl#id dynamic testing!
Sol'ent dynamic testing!
Process fl#id tests-
Slide 48
Commissioning 1tilities
Slide 49
Utilities commissioning #s#ally represents the first phase of commissioning* as these #s#ally
need to operational first* "efore the rest of the plant can "e commissioned!
The steps for commissioning each #tility sho#ld "e planned in detail!
Pro'ides planning practice for planning the start#p of the main plant-
Slide 50
Commissioning 1tilities , 2road 3uidelines
Check s#pply press#res of all ser'ices - steam* cooling (ater* instr#ment air* nitrogen etc-
At the most distant points* open drains* 'ent 'al'es or pipe flanges and p#rge #ntil fl#ids come
o#t clean and r#st free!
P#rge."lo( o#t lines to each piece of e,#ipment!
Check that instr#ment air is clean and dry* and at correct press#re!
Circ#late (ater to (aste (ater system #ntil (ater lines clear and clean!
5l#sh (aste (ater and drain systems to ens#re no "lockages!
Check operation of steam traps!
%rain condensate to (aste (ater #ntil is is clean- 51
Commissioning 1tilities
Introducing Steam
Steam #s#ally represents the first 8ha;ardo#s9fl#id introd#ced into the 8ne(9system!
Admit steam slo(ly into the distri"#tion system (ith .atmospheric "leeds open)
Cold pipes (ill condense steam in places (here it (o#ld not #nder normal operation!
Can lead to 8(ater hammer9- can distort and r#pt#re lines!
After system has "een (armed* slo(ly raise press#re and "lo( do(n the system (ith traps
"ypassed* #ntil clean!
Then place steam traps into ser'ice and check operation-S
lide 52
-igh Pressure Steam Systems
Specific Issues
The cleanliness and p#rity of high press#re steam systems -partic#larly (here the steam is #sed
to dri'e a steam t#r"ine sho#ld "e checked "y #se of a 8target9!
5or ne( "oilers* or ne( sections added to steam system -"lo( do(n at f#ll press#re!
+hen steam appears clean* fit a target (ith a 8mirrored9 s#rface 3ie- Small steel plate (hich has
"een polished* so that it is in the steam "lo( do(n stream!
&lo( do(n the "oiler or system so that the target is impinged #pon for a fe( min#tes!
Check target - ens#re there are no small 8pock marks9left on the target- If pock marked - repeat
process-
Slide 53 !lectrical SystemsSlide 54
Commissioning lectrical Systems
The following checks are typical of what is required
Open circ#it "reakers and s(itches!
Check that all "#s-"ars are free of dirt and foreign matter!
Check gro#nding systems for contin#ity and resistance- Make s#re all electrical e,#ipment*
'essels* str#ct#res are connected to the gro#nding system in accordance (ith
dra(ings and specifications!
Check that all sealed fittings are filled (ith proper sealants* all e0plosion proof* 'apo#r-tight*
d#st-tight and (eather tight enclos#res are properly closed and sec#red!
Check motor control and po(er circ#itry for correct hook#p-Sl
ide 55
Commissioning lectrical Systems - D
Check all nameplates and panel directories to ens#re that each circ#it "reaker and s(itch does
control the proper circ#it- La"el all s(itches e'en tho#gh their application
may seem o"'io#s!
Close main transformer primary disconnect s(itch and s(itch-gear main circ#it "reaker!
Check 'oltmeter at s(itch-gear for proper 'oltage!
Close first s(itch-gear circ#it "reaker* second* third etc-
Close first motor control centre main circ#it "reaker* then .each motor starter circ#it "reaker-
$epeat for each MCC-
Check o'erload "reakers and heaters to ens#re that the correct capacity #nits ha'e "een
installed-
Slide 56
Commissioning lectrical Systems - ?
The following checks are typical of what is required
Check that all lighting and po(er circ#its are f#nctioning correctly!
Check motor "earings for proper l#"rication!
$emo'e motor po(er f#ses and check main contractor* .interlock and se,#encing de'ices!
Unco#ple each motor* replace f#ses and check direction of rotation "y momentarily pressing
the start "#tton* then stop!
Check man#al* then a#tomatic operation-
$eplace all co#plings* check dri'e "elts and make s#re g#ards are installed-
Slide 58
0perational TestingSlide 59
Progresses thro#gh se'eral stages!
%ry r#ns of indi'id#al items of e,#ipment
/ot testing of indi'id#al items of e,#ipment and systems!
Se'eral stages of %ynamic Testing of)
Indi'id#al items of e,#ipment!
------Indi'id#al Systems.processes in isolation!
The (hole ne( process plant installation-
Slide 60
Dry runs and -ot Tests
Check that motors are connected correctly and t#rn in the right direction!
Shafts and impellers mo'e freely!
,#ipment that is to "e operated at temperat#re* raise to temperat#re and check!
These tests sho#ld "e performed "y the man#fact#rer7s representati'e "#t (itnessed "y
mem"ers of the client7s operating.commissioning personnel-
Slide 61
-ot testing e"uipment
Applies to e,#ipment (hose leak-tightness m#st "e tested at operating temperat#res and after
temperat#re re'ersals!
5i0ed-"ed catalytic reactors that in normal conditions are heated "y heat transfer fl#ids (here
leakage (o#ld contaminate the catalyst!
Critical e0changers (hose steam or cooling (ater is at a high press#re than the process fl#id!
Any e,#ipment ha'ing complicated seals thro#gh (hich leakage co#ld occ#r!
$otating machinery (hich m#st "e a"le to rotate freely at temperat#re eg- Steam t#r"ines* etc-
Slide 62
-ot testing procedures
The thermal shock tolerance of e,#ipment m#st "e determined "eforehand!
To a'oid thermal shock* the temperat#re of the heating medi#m may ha'e to "e raised
grad#ally!
Time re,#ired for a hot test m#st "e esta"lished in ad'ance!
sta"lish a #niform temperat#re in all parts of e,#ipment that are s#pposed to "e #niformly hot
d#ring operation to a'oid setting #p stresses!
Slide 63
Dynamic Testing
Slide 64
In'ol'es operating the e,#ipment* "efore introd#cing 8li'e9process fl#id!
%#ring dynamic testing* (e progress thro#gh)
-----Safe-fl#id dynamic testing!
%ynamic testing (ith sol'ent!
-----Closed loop testing (ith process fl#id-
Once process fl#id is introd#ced* normal plant safety proced#res m#st come into effect as if it
(ere a li'e operating plant-
Slide 65
Sa%e,Fluid Dynamic Testing
Closed loop dynamic testing (ith safe fl#ids consists of operating e,#ipment systems (ith air*
(ater* inert gases etc-
This permits flo( testing of e,#ipment!
6i'es first indication of ho( control loops (ork!
sta"lishes performance (hile there is still time to modify the plant!
5amiliarises operators (ith the operation of the e,#ipment "efore ha;ardo#s materials are
introd#ced!
6ets rid of a lot of dirt (hich (o#ld "e more diffic#lt to clear once the process fl#id has "een
introd#ced-
Slide 66
3eneral Principles %or Testing
5or most plants* a period of D-? (eeks is #s#ally s#fficient for operational testing* after the
mechanical dry r#nning of indi'id#al pieces of e,#ipment and hot testing complete!
Air and (ater tests sho#ld "e set #p in a closed loop (ith fl#ids contin#o#sly recycled* (ith
loops as large as possi"le!
The loop sho#ld ideally "e the same loop that (ill "e s#"<ect to sol'ent testing!
Tests sho#ld contin#e for se'eral days in order to gi'e all shifts a chance to cond#ct the same
tests!
All shifts sho#ld "e gi'en the opport#nity to start #p and sh#tdo(n each closed loop test
A ro#gh flo(-sheet sho#ld "e de'eloped for air and (ater tests* predicting all information that
normally appears on a process flo( sheet - flo(* temperat#re* press#re* heat transfer* po(er etc-
-----(ill assist in alerting commissioning team to risks from o'er-press#ring* o'erloading*
temperat#re-shocking and stressing e,#ipment!e 68
Cautions during Testing
%ynamic testing may lead to)aead to)
-----Un#s#al or #nforeseen differential e0pansions!
-----Corrosion!
-----0cessi'e (eight of li,#id into parts of the system!
Care m#st "e taken not to collapse or "#rst press#re 'essels and tanks)
----ens#re there is al(ays ade,#ate 'enting!
----a'oid p#lling a 'ac##m
Slide 69
Dynamic Testing , Simulated 0perations
Safe luid Testing
A#0iliary ser'ices m#st "e "ro#ght into operation first)
(ater cooling* inert gas generators* "oiler feed(ater* fire(ater* steam prod#ction* etc-
+ater is p#mped thro#gh the process 3e0cept (here special conditions do not permit it4 and
"oiled #p in col#mns!
Compressors and "lo(ers sho#ld "e operated on air or inert gas-
Slide 70
The .alue o% Dynamic Testing -Simulated 0perations
1al#e of sim#lated operations (ill "e to allo( operator to "ecome familiar (ith the operation of
the process* "efore ha;ardo#s fl#ids are introd#ced!
,#ipment deficiencies can "ecome apparent d#ring dynamic testing!
5ail#res and pro"lems more easily corrected (ith safe fl#ids present
Leaks sho#ld "e fo#nd and tightened!
Instr#ments can "e placed into ser'ice - altho#gh selection of set-points (ill ha'e to "e
deferred!
Inspect the plant for e'idence of design and constr#ction errors-Slide 71
At the end of the sim#lation* (ater sho#ld "e drained - e,#ipment dried and p#rged!
%epending on the process - drying may not "e necessary - "#t p#rging (ill al(ays "e re,#ired!
Slide 72
Dynamic testing 'ith a solvent
After safe fl#id testing and s#"se,#ent repairs and modifications* (e are ready for dynamic
closed loop testing (ith a sol'ent!
The 8sol'ent9is a relati'ely safe fl#id (hose properties are close to that of the process fl#id* or
the process fl#id itself!
In order to allo( for contin#o#s re-circ#lation of the sol'ent and the #se of different sol'ents in
different parts of the plant* temporary lines (ill need to "e installed-
Slide 73

Dynamic Testing 'ith Process Solvent
Introd#ce the process sol'ent- 3if there is more than one* introd#ce only one at this stage4!
The dynamic testing proced#re #sed for the safe fl#id test is repeated for the process sol'ent
dynamic testing!
After operations (ith the first sol'ent ha'e "een "ro#ght completely #nder control* sho#ld the
second sol'ent "e introd#ced 3if there is one4-
Slide 74
Dynamic testing 'ith a solvent
The p#rpose of dynamic testing (ith a sol'ent is to check o#t e,#ipment and instr#ment loops
at* or near design conditions prior to the introd#ction of more ha;ardo#s process fl#id!
2o reactions sho#ld "e allo(ed to occ#r d#ring these tests* so as to ens#re that test fl#ids
remain predicta"le in composition and properties!
6#idelines #sed for safe-testing apply!
2eed to plan ho( sol'ent (ill "e fed into the .system and later remo'ed-
Slide 75
Stages o% dynamic testing 'ith a 4solvent5
%rain safe fl#id and p#rge air #sed in the pre'io#s test from the system!
%ry o#t e,#ipment (here safe fl#id (as (ater- Check flo( sheets for (here (ater is likely to
acc#m#late-
5ill systems (ith the sol'ent- ns#re pro'isions made for 'enting and drains closed!
+hen ade,#ate le'els esta"lished* place p#mps and compressors online to complete filling!
Start closed loop circ#lation!
/eat #p the systems to sim#late operating conditions "y placing refl#0* re"oiler and
condensation systems into .operationSlide 76
Systematically check o#t instr#mentation and control loops!
After instr#ments ha'e checked o#t* place as many as possi"le on a#tomatic control!
All shifts sho#ld go thro#gh starting and stopping e,#ipment* heating and cooling closed loop
systems!
%ynamic 8sol'ent9testing offers the "est opport#nity for operator training "efore the 8real
thing9!
Operate e,#ipment as near as possi"le to design capacities!
$elia"ility of emergency sh#tdo(n systems and alarms m#st "e pro'en!
Critical instr#ments m#st "e cali"rated o'er their f#ll range-Slide 77
%eli"erately operate e,#ipment near its limits)
5lood col#mns!
ase compressors into mild s#rges and plot s#rge c#r'es!
O'erload condensers!
%o not fear "lo(ing a relief 'al'e or t(o:
After tests ha'e "een completed* plant sho#ld "e ready for initial operation-
Slide 78

Closed Loop Dynamic Testing 'ith Process Fluid
5inally* introd#ce process fl#id!
%#ring this step* instr#ments sho#ld "e cali"rated to co'er their f#ll range of flo(* temperat#re
and press#re!
ns#re that instr#ments* process analysers and safety de'ices are kept (ork properly d#ring
these processes!
After operations (ith process fl#id are "ro#ght completely #nder control sho#ld the final stage
of start-#p "e attempted-
Slide 79
Preparing to introduce process %luids
&efore introd#cing ha;ardo#s li,#ids into the plant* (e complete additional press#re testing
and p#rging!
2eed to check that the stresses and strains of dynamic testing has not ca#sed any leaks - these
m#st "e fo#nd and fi0ed!
Slide 80

Pressure testing and purging
Consists of press#ring and de-press#ring (ith nitrogen se'eral times* #ntil at least F?G o0ygen
is reached!
1ac##m systems sho#ld "e e'ac#ated and then repress#red (ith nitrogen!
Long r#ns of piping are s(ept (ith nitrogen!
+hile #nder press#re* rate of press#re loss of the 8"locked in9system is monitored as a check
for leaks and that no 'ents or drains ha'e "een left open-
Slide 81
Dehydrating $y Circulation
It is #s#ally not possi"le to (ater-free e,#ipment simply "y draining!
Only positi'e method to (ater-free process e,#ipment is oil circ#lation follo(ed "y repeated
draining of lo( points!
ns#re s#fficient lo( point drains are pro'ided on piping* control 'al'e loops* 'essels and
process machinery!
Start#p lines - deli'er oil to #pper part 3trays4 of distillation to(ers 3si;e for D@G of net
distillate prod#ct rate4!
Slide 82
6. Start 1p and Initial 0peration
Slide 83
Introd#ction of process fl#id
Start-#p and initial operation
Tro#"le-shooting and pro"lem correction-
Plant taken to f#ll operations-
Slide 84Slide 85
Start 1p Logic
It is common practice to "#y in prod#ct and start #p the last past of the process first and (ork
"ack(ards to the front- -g-
----Start #p refining* get this (orking and in control!
Then possi"ly start #p reaction and reco'ery!
----5inally* feed preparation-
Slide 86
Into the initial operation
Once ra( materials are fed into the plant H #s#ally at red#ced rate #ntil reaction conditions ha'e
"een esta"lished!
As each section is started #p* esta"lish as ,#ickly as possi"le that process conditions are as
e0pected!
If potentially serio#s pro"lems de'elop* there sho#ld "e no hesitation on going into an
emergency sh#tdo(n-
Slide 87
+amping up the plant
Plant is "ro#ght slo(ly to design feed-rates and operating conditions!
Us#ally done in steps (ith operating data e'al#ated and 'erified as O= at each step!
Plant and la"oratory data are no( "eing collected and sho#ld "e "eing e'al#ated promptly!
Slide 88
Coordination and Supervision during start up
Additional personnel* "oth s#per'isory and 8onthe-gro#nd9are re,#ired at this stage!
Cooperation "et(een start#p personnel and plant s#per'isory personnel is critical at this stage)
2eed a daily meeting at least!
Often* a "riefing each shift-
Slide 89
Trou$le Shooting
At this stage* many pro"lem (ith e,#ipment of the process itself may "ecome apparent!
The commissioning process goes thro#gh (hat is often an intense 3and hopef#lly short4 period
of pro"lem tro#"le shooting* pro"lem sol'ing* engineering correction and plant modification!
Slide 90

7.Per%ormance and cceptance Trails Slide 91
Performance trails!
5ormal Acceptance test
Slide 92
The Per%ormance Trails
Once the plant is f#lly operational* the final 8pro'ing trail9or performance r#n is performed in
order to pro'e the plant can do (hat it is s#pposed to do!
The 'al#es or range of 'al#es for each independent 'aria"le - flo(* temperat#re* press#re*
le'el* concentrations* etc- to (hich the plant m#st "e operated to are determined!
The plant is "ro#ght #p to those conditions and the pre-agreed trial period "egins-
Slide 93
2e%ore the trail or per%ormance run need to ensure thatI
Control of plant operating conditions has "een achie'ed- I-e- temperat#re* press#res* le'els and
analyses are reasona"ly constant or in the case of a "atch process* there is repeata"ility!
%aily material and energy "alanced can "e performed and that these agree (ith 8official9
prod#ction fig#res!
Prod#ct specifications are "eing achie'ed consistently-
Slide 94
8eed to veri%y 9 .
Physical operation* capa"ility and capacity of plant and e,#ipment!
nergy and mass "alance!
Process chemistry!
fficiencies* yields and ,#ality!
All to specification-
Slide 95
cceptance
+hen the plant has met the Performance and Acceptance test re,#irements designed "y the
commissioning team there is #s#ally a formal acceptance process in'ol'ing signing of
acceptance certificates!
Once the plant is accepted it is officially part of the normal operations - the responsi"ility of
operations and maintenance!
Commissioning is officially o'er!
The may still "e o#tstanding p#nchlist items
Slide 96
cceptance Testing
It is common practice to pro'e performance repeata"ility and plant integrity as part of the
performance test- That is)
-----Sh#tdo(n and Start Up the plant on se'eral occasions and "ring it #p to test conditions to
pro'e repeata"ility- Also ramp do(n and ramp #p (hile online!
-----$e-inspection of critical process e,#ipment -partic#larly col#mns to ens#re they ha'e not
"een damaged "y the performance r#n-
Slide 97

Commercial Signi%icant o% cceptance
5ormal Acceptance represents formal ackno(ledgment that the
Contractor has f#ll-filled their contract#al o"ligations!
Commissioning team ha'e f#ll-filled their o"ligations!
Completion of the Capital Pro<ect and transfer to Operations!
0penses and costs from acceptance on(ards are no( operating e0penses not capital pro<ect
costs!
All s#"<ect to agreed p#nch-list items-
Slide 98
7.Post,Commissioning
Slide 99
5rom plant on-stream to settled do(n and in reg#lar prod#ction!
Ad<#stments* modifications and fa#lt correction!
Completion of o#tstanding p#nchlist itemsSlide 100
Co'ers the period immediately after Acceptance!
O#tstanding p#nch-list items are completed!
The first ro#tine maintenance checks are performed* findings e'al#ated and reported!
Process e,#ipment and items co'ered "y (arranty are scr#tini;ed for signs of premat#re (ear-
o#t or pro"lems!
Operating data is collected and e'al#ated to ens#re consistent plant operations are maintained
and s#staina"le-
Typical chec* list
Installation of gland packing and l#"rication of 'al'es and minor machinelJ* checking rotation
of dri'ers and so on-
Isolating e,#ipment* remo'ing e0pansion <oints* r#pt#re discs and relief 'al'es from pipe(ork
and e,#ipment "efore line fl#shing* cleaning and testing-
Cleaning of pipe(ork "y fl#shing* steaming* "lo(ing and so on-
/ydra#lic and.or pne#matic press#re testing of e,#ipment and pipe(ork-
Application of special treatment or other preparation of inside s#rfaces-
Testing of relief 'al'es-
$emo'ing loose material and dirt* installation of internals* inspection and closing #p of 'essels
and so on-
Installation of orifice plates after line cleaning* installation of temporaly strainers* remo'al of
slip-plates and so on-
Checking electrical installations-
Checking alignment of ma<or machinery and dri'ersK cleaning and fl#shing l#"ricating oil
installations and so on-
II- Carrying o#t short r#nning-in tests on machinery as re,#ired-
Checking action of instr#ments and control 'al'es* testing electrical controls and alarms and so
on-
Cali"ration of instr#ments-
%rying o#t refractories-
Ad<#stment of pipe s#pports for e0pansion-
$emo'al* cleaning and replacement of temporary strainers-
Checking orifice plates and permanent "lanks* relief systems* safety pro'isions and so on-
Charging ra( materials* process chemicals* f#el and so on* as re,#ired-
+arming-#p* starting-#p fl#id flo(s and so on* as re,#ired-
Tightening of hot <oints-
Starting-#p and operating the 'ario#s plant items-
$o#tine maintenance* cleaning* plant ad<#stments and so on-