This document provides the pneumatic test procedure for a heat recovery steam generator at the Nhon Trach CCPP Project in Vietnam. It outlines the scope, responsibilities, equipment, and steps for conducting the pneumatic test. Key points include: - The test will be conducted on the instrument air line and drum filling line at pressures of 1.3 bar and 9.3 bar respectively. - Equipment to be used includes pressure bottles, air compressor, and calibrated pressure gauges. Safety measures like walkie talkies and signage will be implemented. - Prior to testing, the piping will be flushed, supports installed, blanks and blanks installed, and valves verified. Pressure will be increased gradually and leaks

Uploaded by

Power Power
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
943 views12 pages

Pneumatic Test Procedure

This document provides the pneumatic test procedure for a heat recovery steam generator at the Nhon Trach CCPP Project in Vietnam. It outlines the scope, responsibilities, equipment, and steps for conducting the pneumatic test. Key points include: - The test will be conducted on the instrument air line and drum filling line at pressures of 1.3 bar and 9.3 bar respectively. - Equipment to be used includes pressure bottles, air compressor, and calibrated pressure gauges. Safety measures like walkie talkies and signage will be implemented. - Prior to testing, the piping will be flushed, supports installed, blanks and blanks installed, and valves verified. Pressure will be increased gradually and leaks

Uploaded by

Power Power
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Doosan Heavy Industries & Construction Co.

, Ltd
555 Guygok-Dong, Changwon Gyeongnam, Korea

Doc. Ref : DOOSAN/NHON TRACH CC!! !RO"#CT
Issue : $e% &', (&&
Rev : Rev.(
SIT# : NHON TRACH !ROR"#CT
CONTRACT :
CONTRACT D#SCRI!TION: H#AT R#CO)#R* ST#A+ ,#N#RATOR
CLI#NT : LILA+A COO!#RATION
C-STO+#R : SI#+#NS !O.#R ,#N#RATION / ,#R+AN*
TITL# : !N#-+ATIC T#ST !ROC#D-R#

I. SCOPE
+et0od State1ent of !neu1atic Test
II. RESPONSIBILITY
Site +ana2er : !aec3, "i, Hyun
Construction +ana2er : Na1, San2 Don2
+ec0anica4 +ana2er : +oon, 5a% Do
Safety +ana2er : H6an2, Seon2 -3
III. LIST OF THE METHOD STATEMENT
NO Method Statement Remark
Issued
Date
Re.
& #rection of stee4 structure for Site Office ('/('/ (&( Rev.(
Lay / do6n Construction ('/('/ (&( Rev.(
7 +o%i4i8ation and asse1%4y of 5o%e4co 9'( / $ 7(/('/(&( Rev.(
: +o%i4i8ation and asse1%4y of 5o%e4co SL;((( (9/(;/(&( Rev.(
' #rection <rocedure of Casin2 (=/(9/(&( Rev.&
; #rection <rocedure of stac3 &7/(9/(&( Rev.&
9 #rection <rocedure of 0ar< (/(9/(&( Rev.(
> #rection <rocedure of Stee4 Structure ;/(9/(&( Rev.(
= #rection <rocedure of Dru1 7&/(9/(&( Rev.(
&( #rection <rocedure of !i<in2 &:/(>/(&( Rev.(
&& #rection <rocedure of !aintin2 :/(>/ (&( Rev.(
& #rection <rocedure of Insu4ation :/(>/ (&( Rev.(
&7 $ie4d 1odification for Lin3 <i<e (9/(=/(&( Rev.(
&: Hydrostatic test <rocedure =/&/(&( Rev.(
&' !neu1atic Test !rocedure &'/(/(&& Rev.(
S!o"e o# $orks% +et0od state1ent of !neu1atic Test !rocedure
Br&e# des!r&"t&on o# deta&'ed $ork% Pressure test #or HRS(.
Se)uen!e o# o"erat&ons
& !re<aration for re4evant docu1ent & <er1it ;
!re<aration e?ui<1ent & too4s 9
7 !ressuri8in2 4ine insta44ation >
: !ressuri8in2 4ine for test =
' Recordin2 <ressure data &(
Man"o$er
#n2ineer -ns3i44ed La%ors '
Safety #n2ineer O<erator
Su<ervisor $irst Aider in 2rou< :
S3i44ed La%ors
Mana*ement stru!ture
- )isitin2 1ana2er: Na1 San2 Don2 / +oon 5a% Do
- Site su<ervisor: 5i1 Soo .oon2
- Safety: H6an2 Seon2 -3
- Out of 0ours contact na1e: Na1 San2 Don2 / +oon 5a% Do
- Out of 0our@s <0one no. (= 77': (:9= / (= (7= &:;
- .0o c0ec3s t0e 6or3A Na1 San2 Don2 / +oon 5a% Do
TABLE OF CONTENTS
1. PURPOSE
2. SCOPE
3. REFERENCE DOCUMENTS
4. DEFINITIONS
5. PROCEDURE
6. DOCUMENTATION
7. ATTACHMENTS
Annexure -: Flow Chart for Pneumatic Teting
Annexure -: !rgani"ation Chart for Pneumatic Teting
Annexure -: Pi#e $ork Punch %it
Annexure -: $el& 'n#ection (ummary (heet
Annexure -: 'n&ex of 'ometric Drawing
Annexure -: Preure Tet Certificate
Annexure -: Pi#e $ork )e-'ntatement Check %it
Annexure -: *echanical Com#letion Check %it

+,- PURPOSE
The #ur#oe of thi Proce&ure i to #ro.i&e controlle& ytem for Pneumatic Teting in
or&er to meet #ro/ect #ecification an& re0uirement of reference co&e an& tan&ar&,
2.0 SCOPE
The #roce&ure co.er minimum re0uirement for Pneumatic Teting of a1o.e groun& an&
un&ergroun& #reure #i#ing for 2hon Thach 3 CCPP Pro/ect
3.0 REFERENCE DOCUMENT
3.1 Co&e 4 (tan&ar&:
5+6 A(*7 8 9+,+
536 A(*7 (7C,:
3.2 (iemen Pro/ect (#ecification :
(#ecification of #i#ing ytem for water team cycle an& auxiliary ytem,
4.0 DEFINITIONS
2one
5.0 PROCEDURE
5.1 Gener!
5,+,+ D!!(A2 hall mark P4'D; a #er #i#ing ytem to 1e tete& an& i&entify the #i#ing
iometric an& the e0ui#ment to 1e inclu&e& for uch tet, Tet #ack hall 1e #re#are&
incor#orating marke& u# P4'D; 4 iometric for tet limit, #unch lit, #reure tet
certificate format, $el& 'n#ection (ummary (heet, Pi#e work )eintatement check lit
format, *echanical com#letion check lit format, etc,
5,+,3 All #i#e u##ort, gui&e an& anchor hown on #i#ing iometric hall 1e fitte& in #oition,
Any a&&itional tem#orary u##ort, if re0uire&, hall 1e intalle& 1efore teting, All wel&e&
attachment uch a #i#e u##ort an& hanger lug etc, hall 1e ma&e 1efore #reure tet,
5,+,9 Control .al.e, thermo well, orifice #late, trainer 1aket, filter element, in-line
intrument an& all other in line com#onent una1le to withtan& the tet #reure or lia1le
to &amage 1y the tet me&ium or 1y the im#act of foreign matter &uring the fluhing or
#urging #roce hall 1e remo.e& an& re#lace& with tem#orary #ool or #acer,
5,+,< Flange& relief .al.e an& afety .al.e hall 1e 1lanke& off 1y 1olting a 1lin& flange to the
mate of the inlet flange, (crewe& relief an& afety .al.e hall 1e remo.e& an& re#lace&
with ca#,
5,+,5 $here a .al.e to er.e a tet 1lock, the tet #reure hall not excee& the .al.e eat tet
#reure, 'f the ytem tet #reure i higher than the .al.e eat tet #reure, the .al.e
hall 1e o#ene& an& 1lanke& or remo.e& to allow 1lanking of the marking flange,
5,+,= All .al.e exce#t thoe co.ere& un&er 5,+,< 4 5,+,5 within the ytem to 1e tete& hall 1e
in the o#en #oition,
5,+,> %ine containing check .al.e hall ha.e ource of #reure u#tream of the .al.e, 'f thi i
not #oi1le, wing check hall 1e 1locke& o#en or ha.e the fla##er remo.e&, an& 1all an&
#iton check hall ha.e the internal #art remo.e&, All #art remo.e& hall 1e eale& in
#latic 1ag an& wire& to the .al.e, 'f none of thee are #ractical, the check .al.e hall 1e
1locke& off or com#letely remo.e&,
5,+,? All han&-o#erate& .al.e within a tet loo# hall 1e tem#orarily tagge& with large re&
@CAAT'!2B tag or imilar i&entification to a.oi& acci&ental o#eration &uring filling or
teting,
5,+,C Primary hut-off .al.e in 'ntrument lea& line from the main line an& e0ui#ment hall 1e
cloe&, Pi#ing or tu1ing &own team of the .al.e hall 1e &iconnecte& in or&er to #re.ent
any #reure 1uil& u# or intro&uction of foreign matter into the intrument ytem,
5,+,+- 'ntrument air u1-hea&er hall 1e iolate& from the main hea&er ytem 1y cloing the
1lock .al.e a&/acent to the main hea&er an& &iconnecting the firt union &own tream of
each .al.e, 'ntrument connection hall 1e cloe& with a #ro#erly gaket 1lin& flange, if
flange connection are ue&,
5,+,++ Tem#orary gaket hall 1e ue& to 1lank off line for #reure tet #ur#oe, unle #ecifie&
otherwie, Thee hall 1e remo.e& an& re#lace& with new #ermanent gaket after tet
ha.e 1een atifactorily com#lete&, Dowe.er, #ermanent gaket hall 1e ue& for flange
/oint, which &o not re0uire& to o#en again after teting,
5,+,+3 8olt tightening hall 1e in accor&ance with D!!(A2 Proce&ure,
5,+,+9 All #ot wel& heat treatment of the wel& /oint hall 1e com#lete& #rior to teting,
5,+,+< All 2D7 re0uirement hall 1e fulfille& 4 confirme& #rior to teting,
5,+,+5 The #i#e work ytem hall 1e fluhe& with water or 1lown with air in or&er to remo.e all
&e1ri #rior to teting,
5.2 C"n#$%$"n &"r 'ne()%$* +%%$* %e+%
5,3,+ Pneumatic tet #reure
(E(T7* Deign #reure Tet #reure )emark
'ntrument air line for (tack +- 1ar +3,- 1ar Deign #r x +,3
23 filling line for Drum ++ 1ar +9,3 1ar Deign #r x +,3
5,3,3 *eauring Tool an& 'ntallation
5+6 The #reure gauge intall at tem#orary #i#e,
536 The #reure gauge for #reure tet nee& to 1e cali1rate& an& the certificate a.aila1le at
ite #rior to uing in the #reure tet, %ocation of tet gauge will 1e hown in the
in&i.i&ual tet-#ack,
5,3,9 Communication
5+6 )a&io: more than 3 walkie-talkie
536 %ocation: Control center 5filling air .al.e an& #reuri"ation e0ui#ment area6
To# 5#reure gauge an& .ent area6 'n#ector
596 'n#ector an& recor&er mut #lace in a con.enient area to communicate for the #reure
gauge 'n#ection of control center,
5.3 Pre++(re %e+% e,($')en%+ n# $n+%r()en%+
The e0ui#ment an& intrument to 1e ue& for teting will 1e checke&, maintaine&, tete&
an& er.ice& for continuing #roce ca#a1ility,
5+6 23 8ottle unit for #reing #reure
536 Air Com#reor,
596 The #reure gauge ue& in #reure teting hall ha.e &ial gra&uate& o.er range of
a1out &ou1le the inten&e& maximum tet #reure, 1ut in no cae hall the range 1e le
than +
+
F
3
nor more than 9 time that #reure, The #reure gauge hall 1e cali1rate&
from authori"e& cali1ration agency 1efore ue an& re-cali1rate& at any time that there i
reaon to 1elie.e that they are in error, 7ach gauge hall ha.e an i&entification num1er,
which hall a##ear on the cali1ration certification recor&,
5.4 Pre-%e+% '$'$n. /!0 #"/n1I& re,($re+2.
5+6 (afe acce an& any re0uire& tem#orary caffol&ing hall 1e #ro.i&e& for in#ection of
all /oint an& a##urtenance #rior to walk-&own an& maintaine& until the atifactory
com#letion of the tet,
536 'ometric &rawing #ertaining to the tet #ackage hall 1e lite& on the 'n&ex of
'ometric Drawing,
596 !n com#letion of #i#ing intallation, the ytem will 1e walke& &own 1y the Pi#ing
7ngineer an& outtan&ing item will 1e &ocumente& on the Pi#e work Punch %it,
5.5 Pne()%$* %e+% "& '$'$n..
5,5,+ Preure tet hall 1e normally #erforme& 1y hy&rotatic metho& unle otherwie tate&,
Preure teting of #i#ing hall in accor&ance with the re0uirement of A(*7 8 9+,+, For
&etail, refer Para 5,> of thi #roce&ure,
5,5,3 Preure tet houl& 1e carrie& out on com#lete ytem whene.er #ractica1le,
5,5,9 Anle otherwie tate& on the &rawing, all #reure #i#ing hall 1e tete& in accor&ance
with the tet #reure with tet me&ium a #er %ine %it of each ytem,
5,5,< All #i#ing hall 1e #neumatic #reure tete& when:
5+6 $ater i harmful to the er.ice an& cannot 1e &rie& com#letely,
536 'ntrument air, utility air, nitrogen ytem an& er.ice air,
596 'n cae of #i#ing connecte& to an e0ui#ment or .eel no""le 1y wel&ing an& where the
70ui#ment i not inclu&e& in teting, the #i#ing hall 1e #reure tete& 1efore
intallation, After wel&ing of the #i#ing to e0ui#ment no""le, the final /oint hall 1e
u1/ecte& to 2D7 5)T, AT, *T, PT a a##lica1le6 intea& of #reure tet,
5<6 %ine which are o#en to atmo#here, uch a .ent, &rain an& o#en afety .al.e
&icharge, Thee line hall 1e .iually examine& to .erify that all /oint are #ro#erly
ma&e u#,
556 (afety .al.e, flame arretor, ru#ture &ic an& filter element hall not 1e u1/ecte& to
#reure tet,
5=6 Preure gauge, thermometer, flow meter an& other intrument hall not 1e
u1/ecte& to #reure tet,
5>6 )u11er 7x#anion /oint an& team tra# hall not 1e u1/ecte& to #reure tet,
5?6 Any other e0ui#ment &eignate& 1y (iemen,
5,5,5 $here an item of e0ui#ment ha 1een 1lanke& off at a flange& /oint &uring #reure tet of
#i#ing, it hall not 1e neceary to #reure tet the /oint after the 1lank i remo.e&, (uch
/oint hall 1e .iually examine& to enure that gaket are #ro#erly intalle&, 1olt
tightene& etc, an& in#ecte& for leak &uring commiioning an& er.ice tet, Flange& /oint
that are 1roken for #reure tet #ur#oe hall ha.e a new #ermanent gaket intalle& after
#reure tet i com#lete& #rior to commiioning,
5,5,= Pi#ing that i re#aire& or mo&ifie& after a #reure tet hall 1e re-tete&, exce#t in cae
an& agreement with (iemen, +--G 2D7 5)T, AT, *T, PT a a##lica1le6 may 1e
u1titute& in lieu of retet,
5,5,> +--G 2D7 5)T, AT, *T, PT a a##lica1le6 may 1e u1titute& after agreement with
(iemen intea& of hy&rotatic tet for wel&e& tie in #ortion with exiting #lant facility,
5,5,? All /oint inclu&ing wel& hall 1e left uninulate& an& ex#oe& for examination &uring
teting exce#t thoe /oint #re.iouly tete& in accor&ance with thi #roce&ure,
5.6 Pre'r%$"n "& '$'$n. +3+%e)+ &"r 're++(re %e+%.
5,=,+ Pi#ing hall 1e thoroughly .ente& of air 1efore intro&uction of the tet water, Digh #oint
.ent to 1e #ro.i&e& a re0uire&, A&e0uate meaure hall 1e taken not to allow any air to
remain in the high #oint of the tete& ytem,
5,=,3 Tem#orary 1lin& flange an& tet 1lin& hall 1e intalle& at location hown on the marke&
u# P4'D inclu&e& in the Preure Tet Pack, Tet 1lin& hall 1e of an a&e0uate thickne
to withtan& the tet #reure,
5,=,9 All internal #art an& in-line item remo.e& for the &uration of #reure teting hall 1e
la1ele& an& the com#onent to which they 1elong or the #oition in the line from which they
were remo.e& hall alo 1e la1ele& to enure correct re#lacement of com#onent following
the teting,
5,=,< All .al.e, exce#t a exclu&e& #ecifically herein, hall 1e inclu&e& in the #reure tet,
1all .al.e hall 1e in the half o#en #oition an& all other .al.e fully o#en,
Dowe.er, where the tet #reure to 1e a##lie& to line i greater than the maximum
allowa1le tet #reure #ecifie& for the .al.e, the .al.e hall 1e 1lin&e& on the tet i&e
or re#lace& with a tem#orary #ool,
5,=,5 7x#anion /oint hall 1e #rotecte& from excei.e #reure of the hy&rotatic tet
generally 1y remo.ing them, *etallic 1ellow ex#anion /oint hall not 1e u1/ecte& to
any #reure in exce of it ho# tet #reure,
5,=,= All line in .a#or er.ice hall ha.e ufficient tem#orary u##ort to withtan& weight of
the tet me&ium,
5,=,> All tem#orary u##ort, #ring u##ort retraint, tem#orary #ool, 1lin& an& #lug etc,
hall 1e #rominently flagge& or #ainte&, to enure their remo.al following teting,
5,=,? The tet #reure gauge hall 1e locate& at the high #oint of the ytem, a @CheckB gauge
hall, in a&&itional, 1e locate& at the low #oint of the ytem if ignificant .ertical leg
coul& caue the tatic hea& #reure to o.er-#reure #art of the ytem,
5,=,C All tet manifol& hall 1e hy&raulically tete& an& clearly marke& for the maximum
#reure rating,
5.7 Pne()%$* Pre++(re %e+%.
5,>,+ Pneumatic tet
5+6 Pneumatic tet hall only 1e #erforme& un&er the &irect u#er.iion of an ex#erience&
engineer, who mut enure that tet #roce&ure an& criteria are followe&, All #eronnel
in.ol.e& with teting mut 1e ma&e aware of, an& traine& in, the #roce&ure to 1e
im#lemente&, an& 1e familiar with the ha"ar& aociate& with thi ty#e of tet, A
#reure relie.e .al.e hall 1e ma&e a.aila1le 5for #i#ing ytem of tet #reure a1o.e
+5 1ar6, ha.ing a et #reure no higher than the tet #reure #lu the leer of +-G of
the tet #reure,
The relief .al.e hall 1e locate& at the firt connection on the tem#orary line nearet
the #reure ource, A 1lee& .al.e to facilitate &e-#reuri"ation hall 1e locate& at
the tet manifol& rea&ily accei1le 1y the o#erator in cae &e-#reuri"ation i
re0uire&, An iolation .al.e rate& for the tet #reure hall 1e #ro.i&e& 1etween the
manifol& an& the ytem 1eing tete&,
536 During the tet, the area, which may 1e affecte& 1y 1lat, hall 1e cor&one& off uing
colore& ta#e, (ign hall 1e #lace& to in&icate the &anger, Flahing light hall 1e ue&
to &eignate area un&er tet &uring non-&aylight hour,
7ntry to the cor&one& area hall 1e retricte& to the authori"e& #eronnel who are
#erforming an& witneing the tet,
596 The ytem un&er tet hall ha.e warning notice tag affixe& to all .al.e &uring the
time that the ytem i #reuri"e&,
5<6 $el& an& flange& /oint hall 1e wa11e& with oa# olution to facilitate &etection of
leak,
556 The ytem un&er tet hall 1e gra&ually #reuri"e& to the leer 5-G of the tet
#reure an& hel& for a ufficient length of time to allow #i#ing to e0uali"e train, All
/oint 5threa&e&, ocket wel&e&, 1utt-wel&e& an& flange&6 hall 1e in#ecte& for leak
with oa#u&,
5=6 Preure hall 1e increae& in te# 5each te# to 1e not more than +-G of the #ecifie&
tet #reure6 until the #ecifie& tet #reure ha 1een reache&, hel& for a ufficient
length of time at each te# to allow #i#ing to e0uali"e train, $hen the tet #reure
ha ta1ili"e& the tet #um# hall 1e &iconnecte&, The tet #reure hall 1e maintaine&
for +- minute, :iual in#ection of all /oint an& com#onent for leak with oa#u&
hall 1e #erforme& at the leer of &eign #reure or >1ar5G6
5>6 The #neumatic tet #reure hall 1e either from +3-G u# to maximum +5-G of the
&eign #reure, or a mutually agree& #reure 1etween Dooan an& (iemen
)e#reentati.e,
5?6 Throughout the teting #erio&, the #reure i to 1e cloely monitore& to enure that
o.er-#reuring &ue to thermal ex#anion &oe not occur,
5C6 The #reure tet of the #i#ing ytem hall 1e recor&e& on the Preure Tet
Certificate,
5+-6 After com#letion of a #neumatic tet the ytem hall 1e &e-#reuri"e& in a
afe manner un&er the &irection of a u#er.iing 7ngineer,
5.4 5en%$n. 6 &!(+7$n..
5,?,+ All line hall 1e thoroughly .ente& imme&iately after teting, Care hall 1e taken to enure
againt &amage 1y .acuum to any a##aratu or #i#ing 1y firt o#ening all .ent .al.e an&
remo.ing high #oint .ent #lug,
5,?,3 (#ecial #recaution houl& 1e taken to enure the &rainage of all #ocket where the teting
flui& may 1e tra##e&,

5.8 P"+% %e+% re$n+%%e)en%.
5,C,+ Following acce#tance of a ucceful tet, the ytem hall 1e imme&iately &e#reuri"e&
an& .ente& in a gra&ual an& afe manner, thoroughly &raine& allowing no #ocket of flui&
to remain, Prior to &raining out tet me&ium, all .al.e in #artially o#en #oition hall 1e
fully o#ene& after &ro##ing #reure to ytem #reure, For #neumatic tet, warn #eo#le
in the .icinity #rior to releae of #reure o#en .ent .al.e lowly kee#ing clear of &icharge
an& enure .ente& air or nitrogen cannot caue &anger,
5,C,3 All item remo.e& for the tet hall 1e re#lace& an& all tet 1lin&, tem#orary u##ort, etc,
hall 1e remo.e&, The re#lacement of #i#ing com#onent internal hall 1e carefully
controlle& to enure that they are reintalle& in the correct #lace, Flange& /oint o#ene& for
thee #ur#oe hall 1e re-ma&e with new gaket,
6.0 DOCUMENTATION.
The tet #ack hall 1e #re#are& an& u1mitte& to (iemen for re.iewFa##ro.al #rior to
teting, The tet #ack hall inclu&e following:
5+6 P 4 ' Diagram 5*arke& u# to how tet limit6
536 'ometric Drawing 5*arke& u# to how tet limit6
596 'n&ex of 'ometric Drawing
5<6 $el& 'n#ection (ummary (heet
556 Pi#e work Punch %it
5=6 Preure Tet Certificate
5>6 Pi#e work )e-intatement Checklit
5?6 *echanical Com#letion Checklit
7.0 ATTACHMENTS.
Annexure -: Flow Chart for Pneumatic Teting
Annexure -: !rgani"ation Chart for Pneumatic Teting
Annexure -: Pi#e $ork Punch %it
Annexure -: $el& 'n#ection (ummary (heet
Annexure -: 'n&ex of 'ometric Drawing
Annexure -: Preure Tet Certificate
Annexure -: Pi#e $ork )e-'ntatement Check %it
Annexure -: *echanical Com#letion Check %it