This document outlines the requirements and documentation for a part submission package. It includes sections for engineering documents and approvals, design failure analysis, process documentation including flow diagrams and process failure analysis, production control plans, measurement systems analysis, initial process studies, material certifications, appearance approval, production samples, and a part submission warrant. The document emphasizes that the process flow diagram and control plan must represent the physical process, and ensure that all key product characteristics have been properly defined, analyzed, and have controls in place.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
405 views3 pages
PPAP Checklist
This document outlines the requirements and documentation for a part submission package. It includes sections for engineering documents and approvals, design failure analysis, process documentation including flow diagrams and process failure analysis, production control plans, measurement systems analysis, initial process studies, material certifications, appearance approval, production samples, and a part submission warrant. The document emphasizes that the process flow diagram and control plan must represent the physical process, and ensure that all key product characteristics have been properly defined, analyzed, and have controls in place.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3
Part Name: Part Number:
Part Submission Level: Reason for Submission:
User Plants: STA: 1 Design Record Released Final Drawing Engineering Release Level Released Engg Specifications ES Number & Release Level CAD/CAM data (if applicable) Available Yes/No IMDS certificate IMDS # ISO marking on polymeric parts 2 Authorized Engineering Change Documents WERS Alert (if any) Alert # Others Explain 3 Customer Engineering Approval Engineering Sample Evaluation Report (ESER) Approved SREA WERS Concern Concern # WERS Notice Notice # Others Explain 4 Design Failure Mode and Effects Analysis (DFMEA) DFMEA signed by PD Engineer (if supplier is FSS) Copy of customer provided DFMEA available (if supplier is not FSS) YS & YCs are identified with necessary controls. 5 Process Flow Diagram(s) Copy of Process Flow Diagram available References * An organization supplying standard catalog production or service parts shall comply with PPAP unless formally waived by the authorized customer representatives. Does the Process Flow Diagram represents the physical process. 6 Process Failure Mode and Effects Analysis (PFMEA) Copy of PFMEA available. Linkage with DFMEA Exists CCs/SCs/HICs are identified Are all recommended actions are completed as per the timeline? Sev, Occ & Det ratings are in line with AIAG/Ford FMEA guidelines. 7 Control Plan Copy of Production Control Plan available Control plan includes all SCs/CCs/HICs with necessary controls identified. Control plan includes all print dimensions and process characteristics. Variable Gaging used for SCs/CCs/HICs if not, explain: Control plan has linkage with Process Flow and PFMEA and Work Instruction. Are all SCs/CCs defined and singned off in CRT agreement? 8 Measurment Systems Analysis Gage R&R conducted on all gages 9 Dimensional Results Layout inspection of each cavity All gages are used as mentioned in Control Plan. 10 Records of Material / Performance Test Results Material Test Certificate of all components 11 Initial Process Studies: Ppk study done for all special characteristics. Ppk > 1.67 for all special characteristics Gage R&R < 10% ; if gage R&R > 10% then containment is reduce the tolerance by the amount it exceeds 10%. Analyse AV & EV and provide take necessary improvements Data is normally distributed. Supplement K 12 Qualified Laboratory Documents 13 Appearance Approval Report AAR signed by Studio/FCPA 14 Sample Production Parts 15 Master Sample 16 Checking Aids 17 Customer Specific Requirements IMDS Capacity Analysis Report Packaging Approval (From 150/ 1121E) 18 Part Submission Warrant Safety/ Government Regulation Reason of submission Level Production Rate