Risk Management Plan
Risk Management Plan
2014
Table of Contents 1.0 INTRODUCTION .............................................................................................................................. 1 2.0 TOP TWO RISKS ............................................................................................................................. 2
2.1 Contamination of water ...................................................................................................................... 2 2.2 Delay in Server Equipment .................................................................................................................. 2
3.0 RISK MANAGEMENT APPROACH ........................................................................................................ 2 4.0 RISK IDENTIFICATION ....................................................................................................................... 3 5.0 RISK QUALIFICATION AND PRIORITIZATION .......................................................................................... 3 6.0 RISK MONITORING ......................................................................................................................... 3 7.0 RISK MITIGATION AND AVOIDANCE.................................................................................................... 4
1.0 INTRODUCTION
The reason of the risk management plan is to establish the structure in which the project team will identify risks and build up strategies to mitigate and it is also to avoid those risks in Keadue wastewater treatment plant. However, before risks can be recognized and managed, there are preliminary project elements which must be completed. These elements are outlined in the risk management approach. The overall risk score is 25 on a scale. A risk score below 5 is low risk project, a score between 5 and 9 is a medium risk project and a score above 9 is a high risk project.
Figure 1- Probability and Impact Matrix Before risk management begins it is imperative that a foundation is established for providing structured project information, thus, the following project elements were completed and defined prior to developing this Risk Management Plan: To define work scope, schedule, resources and cost Develop project WBS (Work-Breakdown Structure) Develop detailed schedules Establish performance measurement metrics
Need to define Risk Management Roles and Responsibilities Project Manager conduct risk assessment meetings Project team participates in risk assessment meetings Key stakeholders take part in risk assessment meetings.
The completion of the project also during the closing process, the project manager will analyze each risk as well as the risk management process based on this investigation. The project manager will identify any improvements on Project that can be made to the risk organization process for the future which all these improvements will be captured as part of the lessons learned data support.
Previous to when the risk is most likely to occur, the project manager will assign a risk manager to ensure loyalty to the agreed upon mitigation strategy. Each risk manager will provide the position of their assigned risk at the project team meeting for their risks considered timeframe. The Risk Register, done on Excel.
SPONSOR ACCEPTANCE
Date: ___________________