MB0028 POM Complete
MB0028 POM Complete
MB0028 POM Complete
Automation in the banking sector has resulted in ATMs which same the
banks a huge amount customer satisfaction. Automation is ideas when
the service provided or the product manufactured is highly standardized.
Set 1 MB0028
The machines have sensing and control devices that enable them to
operate automobile. The simplest of them called machine attachments
replace human effort. They guide, locate, move and achieve revise
position by means of came, optical sensing. Load sensing mechanisms
and activate the controls to remove human intention.
Automated guided vehicle systems- AGVS – are pallet trucks and unit
load carriers follow embedded guide wires or paint strips to destinations
as programmed.
About the automated flow lines we can say it is a machine which is linked
by a transfer system which moves the parts by using handling machines
which are also automated, we have an automated flow line.
Set 1 MB0028
of automation and the processes are conducted with self regulation, we
will have automated flow lines established.
Product layouts ate designed so that the assembly tasks are performed in
the sequence they are designed at each station continuously. The finished
item came out at the end of the line.
In automated assembly lines the moving pallets move the materials from
station to station and moving arms pick up parts, place them at specified
place and system them by perusing, riveting, & crewing or even welding.
Sensors will keep track of their activities and move the assembles to the
next stage.
Set 1 MB0028
various products in variety volumes of different time.
Exert influence over the project and its results players or also called
“stake holders’’ of the project.
Project manager - the individual responsible for managing the
project.
Set 1 MB0028
There are number of projects which an organization works on. It is not
possible for one individual to manage all the projects.
The project team is responsible for ensuring that the project upon
completion shall deliver the gain in the business for which it is intended
for.
Set 1 MB0028
Any project aimed at delivering a product or service has to go through
phases in a planned manner in order to meet the requirements. It’s only
by careful monitoring of the project progress. It required establishing
control factors to keep the project on the track of progress. The results of
any stage in a project, depends on the inputs to that stage. It is therefore
necessary to control all the inputs and the corresponding outputs from a
stage. A project management may use certain standard trolls to keep the
project on track.
The project manager and the team members should be fully aware of the
techniques and methods to rectify the factors influencing delay of the
project and its product. The methodology of PERT (programmer Evolution
Review Technique) and CPM (critical path method) may be used to
analyze the project. In the PERT method one car find out the variance and
use the variance to analyze the various probabilistic estimates pertaining
to the project. Using the CPM one can estimate the start time and the
finish time for every event of the project in its WBS (work Breakdown
Structure).
The analysis charts can be used to monitor, control, track and execute a
project. The various steps involved in monitoring and controlling a project
from start to end are as follows-
Set 1 MB0028
agendas. They must understand the stage status reposes, stage and
reports, stage end approval reports.
g. Approvals - lastly, project sage reviews and the decisions taken and
actions planned need to be approved by the top management. The
goals of such review are to improve quality by finding defects and to
improve productivity by finding defects in a cost effective manner. The
group review progress includes several stage like planning, preparation
and overview, a group review meeting and rework recommendation
and follow-up.
Set 1 MB0028
effectiveness with a following organizational objective:
• Reduction of inventory
A relatively new SCM option involves web based software with a browser
interface. Several electronic markets place for buying and selling goods
and materials.
Set 1 MB0028
planning, trade- off analysis, environmental requirement, process
stability, integrated supply, supplier management, product design,
suppliers, customers, material specifications, etc.
Set 1 MB0028
must be able to support multiple levels of decision making.
Set 1 MB0028