0% found this document useful (0 votes)
116 views9 pages

A Major Project Report: Design and Estimation of Overhead Water Tank in A Rural Area

This document is a major project report submitted to Shri Shankaracharya Institute of Engineering and Technology in Durg, India for the award of a Bachelor of Engineering degree in Civil Engineering. It discusses the design and estimation of an overhead water tank in a rural area, including calculations of water demand, tank requirements, and structural design elements like domes and reinforcements. The report follows standard engineering report sections like introduction, literature review, methodology, results, and conclusions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views9 pages

A Major Project Report: Design and Estimation of Overhead Water Tank in A Rural Area

This document is a major project report submitted to Shri Shankaracharya Institute of Engineering and Technology in Durg, India for the award of a Bachelor of Engineering degree in Civil Engineering. It discusses the design and estimation of an overhead water tank in a rural area, including calculations of water demand, tank requirements, and structural design elements like domes and reinforcements. The report follows standard engineering report sections like introduction, literature review, methodology, results, and conclusions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 9

DESIGN AND ESTIMATION OF OVERHEAD WATER TANK IN A RURAL AREA

A Major Project Report


Subm tte! To

"##att $%ar# S&am V 'e(a)a)! Tec#) ca* U) 'er$ t+ ,# *a -I)! a.

For /u*/ *me)t o/ t#e a&ar! o/ !e%ree

BACHELOR OF ENGINEERING in Civil Engineering

Submitted By PANKA0 KUMAR GADATI1A


ENROLL NO2 3AH4567 ROLL NO2 389675:5:74

Gu !e! ,+
MR2 DEEPAK KUMAR NAIK
A$$ $ta)t Pro/e$$or

DEPARTMENT OF "IVIL ENGINEERING

SHRI SHANKARA"HAR1A INSTITUTE OF ENGINEERING ; TE"HNOLOG1< DURG


SESSION 2010-1

"ERTIFI"ATE
This is to certify that the Project report entitle =DESIGN AND ESTIMATION OF OVERHEAD WATER TANK IN A RURAL AREA> is a record of work carried out by

PANKA0 KUMAR GADATI1A bearing Roll No. 3482 ! !2"# $nder %y guidance and
super&ision for the award of degree of 'achelor of (ngineering in the faculty of )i&il (ngineering of )hhattisgarh*wa%i +i&ekanand Technical $ni&ersity# 'hilai#).,# -ndia. To the best of %y knowledge and belief the project !. (%bodies the work of the candidates the%sel&es 2. /as dually been co%pleted 3. 0ulfils the re1uire%ent of the ordinance relating to the '( degree of the uni&ersity and 4. -s up to the desired standard both in respect of contents and language for being referred to the e2a%iner.

Pro/2 Deepa( Kumar Na ( A$$ $ta)t Pro/2 Project Gu !e a)! "oor! )ator Departme)t o/ "IVIL E)% )eer )%

Pro/2 Raje$# Tamr(ar HOD Departme)t o/ "IVIL E)% )eer )% SSIET<DURG

DE"LARATION ,1 THE "ANDIDATE


3e the undersigned sole%nly declare that the report of the Project work entitled =DESIGN AND ESTIMATION OF OVERHEAD WATER TANK 0EORA SIRSA -DURG.> -s based on our own work carried out during the course of %y study under the super&ision of Mr2 Deepa( Kumar Na ( < 4sst. Prof. 5epart%ent of )i&il (ngineering# *.*.-.(.T# 5urg. 3e assert that the state%ents %ade and conclusions drawn are an outco%e of %y research work. 3e further declare that to the best of our knowledge and belief the report does not contain any part of any work which has been sub%itted for the award of '.( degree certificate in this $ni&ersity of -ndia or abroad

NAME
P4N647 6$84R ,454T-94

ENROLLMENT NO2
4/" 82

ROLL NO2
3482 ! !2"

SIGNATURE

::::

::::

"ERTIFI"ATE ,1 THE E?AMINER


The project entitled De$ %) a)! E$t mat o) o/ O'er#ea! &ater ta)( sub%itted by

PANKA0 KUMAR GADATI1A bearing Roll No. 3482 ! !2" (nroll%ent No.
4/" 82# has been e2a%ined by undersigned as a part of the e2a%ination ; his here by reco%%ended for the award of the degree of 'achelor of (ngineering in the faculty of )i&il of )hhattisgarh *wa%i +i&ekanand Technical $ni&ersity# 'hilai # ).,# -ndia.

I)ter)a* E@am )er Na%e< 5ate<

E@ter)a* E@am )er Na%e< 5ate<

::::

::::

A"KNOWLEDGEMENT
3e hereby# earnestly acknowledge our sincere thanks to our Project guide and )oordinator Mr2Deepa( Kumar Na ( A$$ $ta)t Pro/2 o/ " ' * E)% )eer )% Departme)t for his sincere ; guidance throughout the project. 3e also e2press our sincere thanks to respected HOD of )i&il (ngineering 5epart%ent Mr2 Raje$# Tamra(ar and all the faculties of )i&il (ngineering 5epart%ent =**-(T. con&enient way at %any crucial junctures while working on the project. 3e also e2press our sincere thanks to respected D rector of our college Dr2 Deepa( S#arma for pro&iding us facilities for acco%plishing our project who guided us all the way through this project. 3e also acknowledge our thanks to all the go&t. e%ployee of PU,LI" HEALTH ENGINEERING DEPARDMENT ; SARPAN"H of jewara for assisting in the design of tank ; other aspects of this project.

Gu !e! ,+ 3 Mr2 Deepa( Kumar Na ( 4ssistant Prof. 5epart%ent

Subm tte! ,+3 PANKA0 KUMAR GADATI1A Roll No. > 3482 ! !2" (nroll%ent No. 4/" 82

::::

::::

TA,LE OF "ONTENTS
Ab$tract L $t o/ Tab*e$ L $t o/ F %ure$ I II III

"ONTENTS
:2 INTRODU"TION
!.! -NTR?5$)T-?N !.2 ?'7()T-+( !.3 *?$R)(* ?0 34T(R *$PP@9 !.4 34T(R A$4NT-T9 (*T-84T-?N !.B 0-R( 0-,/T-N, 5(84N5 !." 04)T?R 400()T-N, P(R )4P-T4 5(84N5 !.C 0@$)T$4T-?N -N R4T( ?0 5(84N5 !.8 5(*-,N P(R-?5 ?0 P?P$@4T-?N !.D P?P$@4T-?N 0?R)4*T-N, 8(T/?5*

PAGES
:A4
! ! ! 2 2 3 3 4 B

72

WATER TANKS
2.! )@4**-0-)4T-?N ?0 34T(R T4N6* 2.2 5(*-,N R(A$-R(8(NT* ?0 )?N)R(T( 2.3 ,(N(R4@ 5(*-,N R(A$-R(8(NT*

4A:8
" " C

82

DOMES
3.! 5?8( 3.2 ?+(R /(45 34T(R T4N6* 4N5 T?3(R* 3.3 5(*-,N ?0 R)) 5?8(

:9A:4
!4 !4 !B

92

METHODOLOG1

:BA97

4.! P?P$@4T-?N )4@)$@4T-?N 4.2 34T(R 5(84N5 )4@)$@4T-?N 4.3 R(A$-R(8(NT ?0 ?+(R/(45 T4N6 4.4 5(T4-@ ?0 T4N6

!C !8 !8 2

C2

ESTIMATION
B.! 5(T4-@ (*T-84T-?N B.2 4'*TR4)T ?0 (*T-84T-?N B.3 T?T4@ (*T-84T-?N

98AC5
43 43 43

42 B2 62

RESULT "ON"LUSION REFREN"E

C: C7 C8

S1M,OLS
4 : Total area of section 4sc: 4rea of longitudinal reinforce%ent =co%p.. 4st: 4rea of steel =tensile.. 4l: 4rea of longitudinal torsional reinforce%ent. 4s&: Total cross<sectional are of stirrup legs or bent up bars within distance *& 4w:4rea of web reinforce%ent. 4E: 4rea of cross Fsection of one bars. 4c : 4rea of concrete. 0d: design load fck: characteristic co%pressi&e stress. 0y: characteristic strength of steel. - : %o%ent of inertia. -e:e1ui&alent %o%ent of intertia of stress. j: le&er ar% factor. 8 : bending %o%entG %o%ent. 8r : %o%ent of resistanceG radial bending %o%ent. % : %odular ratio k : depth factor. n : depth of neutral a2is. nc:depth of critical neutral a2is. s: spacing of bars. . T:tensile force. Tu: torsional %o%ent. 3: point load. Hcc: unit weight of concrete Hw : unit weight of water Icc: per%issible stress in concrete. Icbc: per%issible co%pressi&e stress in concrete due to bending. Isc: per%issible co%pressi&e stress in bars.

Ist: per%issible stress in steel in tension. Ist: per%issible tensile stress in shear reinforce%ent. Isy: yield point co%pressi&e stress in steel.

You might also like