Test Forms For SS
Test Forms For SS
Test Forms For SS
CLIENT NAME
PH10-1C-10-15-P002
STAMP:
COMMON
B A 0 REV. B B STAT.
ISSUED FOR CONSTRUCTION ISSUED FOR CONSTRUCTION ISSUED FOR COMMENTS DESCRIPTION
CONTRACTOR NAME
MANUFACTUTRE NAME
NA
NA
PH10-1C-10-15-P002
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 2 OF 105 DATE:
LIST OF CONTENTS SL. NO. 1 2 3 4 DESCRIPTION Visual and Dimension check Power Frequency Withstand Voltage Test 2.1.Insulation Resistance Measurement 2.2.High Voltage AC Test Measurement of Insulation Resistance for Auxiliary circuit Vacuum Circuit Breaker Test 4.1 Insulation Resistance Measurement 4.2 Coil Resistance Measurement 4.3 Contact Resistance Measurement 4.4 Closing Coil And Tripping Coil Pickup(Operation) Test 4.5 Breaker Timing Test 4.6 Electrical & Mechanical Operation checks Measurement of Contact Resistance for Main Circuit Current Transformer Test 6.1. Incomer Feeder 6.1.1 General Checks 6.1.2 Insulation Resistance Measurement 6.1.3 Polarity Test 6.1.4 Winding Resistance Measurement 6.1.5 Knee Point Voltage Measurement 6.1.6 Ratio Test 6.2.Bus-Section 6.2.1 General Checks 6.2.2 Insulation Resistance Measurement 6.2.3 Polarity Test 6.2.4 Winding Resistance Measurement 6.2.5 Knee Point Voltage Measurement 6.2.6 Ratio Test 6.3.Outgoing Feeder 6.3.1 General Checks 6.3.2 Insulation Resistance Measurement 6.3.3 Polarity Test 6.3.4 Winding Resistance Measurement 6.3.5 Knee Point Voltage Measurement 6.3.6 Ratio Test 6.4.Station Transformer Feeder 6.4.1 General Checks 6.4.2 Insulation Resistance Measurement 6.4.3 Polarity Test 6.4.4 Winding Resistance Measurement 6.4.5 Knee Point Voltage Measurement
LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:
PAGE NO. 6 8 10 10
5 6
14 16
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 3 OF 105 DATE:
8 9 10 11
6.4.6 Ratio Test Voltage Transformer Test 7.1.Incomer Feeder 7.1.1. General Check 7.1.2. Insulation Resistance Measurement 7.1.3. Polarity Test 7.1.4. Winding Resistance Measurement 7.1.5. Ratio Test 7.2.Bus VT & Outgoing Feeders 7.2.1. General Check 7.2.2. Insulation Resistance Measurement 7.2.3. Polarity Test 7.2.4. Winding Resistance Measurement 7.2.5. Ratio Test Meter Calibration test 8.1. Ammeter Calibration Test 8.2. Voltmeter Calibration Test CT Secondary Injection Test VT Secondary Injection Test CT Primary Injection Test
44
54
56 80 105
Reference Drawings:
S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 Description Schematic for 11kV SWGR Incomer feeder Schematic for 11kV SWGR Bus section Schematic for 11kV SWGR Cable feeder Schematic for 11kV SWGR Aux transformer feeder Schematic for 11kV SWGR Capacitor feeder Schematic for 11kV SWGR Interlock Diagram Schematic for 11kv SWGR SYNCRO check Schematic for 11kv SWGR Bus1 CT Diagram Schematic for 11kv SWGR Bus2 CT Diagram Schematic for 11kv SWGR Bus Bar VT Diagram 11KV SWGR General Arrangement Diagram 11KV SWGR Name Plate Diagram 11KV SWGR Outline & Foundation Diagram Doc.No PH10-1C-10-15-3-001 PH10-1C-10-15-3-012 PH10-1C-10-15-3-008 PH10-1C-10-15-3-007 PH10-1C-10-15-3-009 PH10-1C-10-15-3-010 PH10-1C-10-15-3-011 PH10-1C-10-15-3-002 PH10-1C-10-15-3-006 PH10-1C-10-15-3-003 PH10-1C-10-15-2-002 PH10-1C-10-15-5-001 PH10-1C-10-15-2-001 Approval Status A A A A A I B I I B B I I
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 4 OF 105 DATE:
S.NO 1 2 3
EQUIPMENT
MAKE/TYPE
SERIAL NUMBER
CALIBRATION DATE
Note: Calibration Certificates will be produced along with the Testing equipments at site during testing activities.
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 5 OF 105 DATE:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 6 OF 105 DATE:
Sl.No. 1 2
DESCRIPTION Name Plate Inspection Check each nameplate according to drawing Space Heater Check and breaking of wires of heater of HV and LV compartment Check setting of thermostat Others 3.1. Check doors closing completely 3.2. Check earthing state of doors and frame 3.3. Check all indication lamps of local panel 3.4. Check wiring condition 3.5. Check any joint in middle of wire 3.6. Check terminal block cover 3.7. Check the door limit switches 3.8. Check phase marks 3.10. Check construction and inspection of operating mechanism After self test and official test check interlock levers set-up and its smooth operation Check cable number tag at cables Check the proper dressing at wire duct Check the cable proper glanding at the panel Check insulation cover on CT&AC/DC supply terminals Conformity of power/control cable connection and identification labels. Check the power/control cable connection and tightness. Check of component pad lock facilities. All TB are numbered at both sides.
RESULTS
4 5 6 7 8 9 10 11 12
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 7 OF 105 DATE:
Test procedure: 1. Carry out Insulation Resistance Test (Before HV). 2. Carry out HV Test. 3. Carry out Insulation Resistance Test (After HV). Pre-conditions: 1. Check and confirm the CT circuits should be shorted and earthed. 2. Check and confirm Bus and line VT are isolated. 3. Check and confirm Switchboard is earthed. 4. Check all VT Fuse Removed. 5. CVD contact shorted at front of Display terminals in each phase of HV test. (Note: CVD indications to be tested at 6KV AC during the HV test.) Safety Procedures: (i)During the HV test 11kv SWGR Room all the access points are should be closed and locked, No-one not permitted to remain with in the 11KV SWGR room during testing. (ii) All the energize component will be barricaded off with rigid safety fencing. (iii) 11KV SWGR room and basement as well as all access points are shall be locked. 2.1. IR value measurement: Measure insulation resistance at 5000V DC before and after HV test.
R YBE in G Before HV Test After HV Test Y-RBE in G B-RYE in G
2.2. HVAC test. This test is to be carried out on each of the phases with respect to earth. AC voltage at 50Hz equal to 80% FAT value i.e 22.4kV since this test was carried out at Factory 2.5 times of the line voltage i.e 28 kV for 1 minute was applied to the conductor with respect to ground. The leakage current is recorded and noted as mentioned in the below table. (Note: Since this test is carried out in factory. 80% of the 28kV i.e. 22.4 kV shall be applied in site test.) Test Result: HV Test @ 22.4 kV AC for 1 Minutes
Leakage current in mA 0 Sec RYBE Y-RBE B-RYE 30 Sec 1 min
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 8 OF 105 DATE:
2.2. PARTIAL DISCHARGE TEST DURING HV TEST (i) All secondary circuit of CTs must be shorted. (ii) Ground the other two phases through the bus bar at cable chamber and also at the CVD display on the chamber. (iii) For the selected phases apply 1.1 x E/1.732 Voltage (7.6KV) (iv) Note down the PD value for each panel at the applied voltage. (v) Repeat same procedure for all phases and all the feeders.
S.NO 1 2 3 4 BAY NO Test voltage (kV) 6.9KV Measured values Y-PH B-PH Result
R-PH
Criteria: Should be less than 15 db 2.3. VT RATIO TEST AT RATED VOLTAGE: For Incomer: Test Results
VT Designation Phase Terminal 1r - 1nr R 2r - 2nr 3r - 3nr 1y - 1ny Y 2y - 2ny 3y - 3ny 1b - 1nb B 2b - 2nb 3b - 3nb Applied Primary Voltage in (V) Calc Sec. Voltage in (V) Measured Sec. Voltage in (V) % Error
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 9 OF 105 DATE:
2.4.CVD INDICATOR TEST: CVD Indicator test have been tested with 6 kv single phase, check the all condition with individual Phases. CVD indications tested at 6KV AC VOLTAGE Remarks: : OK/NOT OK
3. MEASUREMENT OF INSULATION RESISTANCE FOR AUXILIARY CIRCUIT Insulation Resistance Measurement The insulation resistance between Auxiliary circuit and earth shall be measured with 1kV Megger.
Contents Between the Auxiliary Circuit and Earth Measured value of Insulation Resistance Result Remarks
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 10 OF 105 DATE:
Description Make
INCOMER
OUT GOING
HVX 12-40-31-E Type Installation Serial no Rated current Rated frequency Rated voltage Breaking rating Control voltage Auxiliary voltage Breaker operating sequence Year of manufacture 2500 A 50 Hz 12 kV 40 kA 110 VDC 240 VAC O0.3S-CO3M-CO
HVX 12-40-31-E
Criteria: 500M
Temperature :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 11 OF 105 DATE:
R-PH (msec)
Y-PH (msec)
B-PH( (msec)
: < 20 : <55
Check List for Print out 1.Breaker timing test report 4.6. Electrical & Mechanical Operational checks for Circuit Breaker 4.6.1 Electrical checks Sl.No 4.6.1.1 4.6.1.2 4.6.1.3 Description Rack In / Rack Out Spring charge indication Spring Charge Mechanism 1.Electrical Operation 2.Mechanical operation Current drawn by spring charge motor CB Spring Charge Time in Seconds Anti-pumping checked Open / Close Indication Auxiliary Contacts Operation of Counter Tripping & Closing Operation
Operation Trip Close Electrical Mechanical
Remarks
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 12 OF 105 DATE:
4.6.2 Mechanical Operational Checks Sl.No Description Check the correct closing/opening of the doors a. Make to VCB at TEST position 4.6.2.1 b. Un-latch or latch the door latch c. Lift up the door handle to opening the door d. Push down the handle to closing the door 4.6.2.2 Circuit breaker in test and closed condition should not be possible to rack IN. 4.6.2.3 Circuit breaker in service and closed condition should not be possible to rack OUT. Circuit breaker in between service and test position should not be possible to 4.6.2.4 Close. 4.6.2.5 Circuit breaker in test position should be possible to close or trip. 4.6.2.6 Circuit breaker in service position should be possible to close or trip. 4.6.2.7 All safety interlocks. 4.6.2.8 Smooth rack in and rack out for the circuit breaker. 4.6.2.9 Mechanical Interlock with Earth Switch 4.6.2.10 Earthing switch cannot be closed when the circuit breaker is in service position. 4.6.2.11 Circuit breaker cannot be Rack IN when the Earthing switch is Closed 4.6.2.12 Circuit breaker interchangeability test 4.6.2.13 Check the CB racking IN/OUT handle inserted properly The positions of the Withdraw able part are described as, State Operations possible Withdraw able truck in service 1. Switching device shall be switched position, switching device ON OFF from Local/Remote. 2. Switching device shall be switched OFF from emergency Push button. Withdraw able truck in service 1. Removal of the withdraw able truck. position, switching device 2. Switching device shall be switched OFF OFF from Local/Remote. Withdraw able truck located Transfer of the Withdraw able truck between the service and test to service or Test position positions Withdraw able truck in test 1. Switching device shall be switched position, switching device ON OFF from Local/Remote. Withdraw able truck in disconnected position LV plug pulled off, switching device OFF, door open
HYOSUNG Signature: Name: Date:
Remarks
Operations not possible 1.Removal of the Withdraw able truck 2.Opening of the door 3.Pulling of the LV plug 1. Opening of the door 2. Pulling of the LV plug 1. Closing of the switching device 2. Opening of the door 3. Pulling of the LV plug Transfer of the Withdraw able truck to service position Closing of the door transfer of the Withdraw able truck to service position
--
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 13 OF 105 DATE:
5. CONTACT RESISTANCE MEASUREMENT TEST 5.1. Bus Bar Contact Resistance Make : SCHNEIDER DC Current Injected : 100 A DC Pre-conditions for the measurement of BUSBAR contact resistance: 1. All the breakers are to be kept in service position. 2. Close the breakers in the bays through which current injected. And all other should be in open. 3. Ensure all the earth switches are in open position. 11KV SWITCHGEAR
SL.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Bay -1 Identification A210 A190 A170 A150 A130 A110 A18- I/C -1 A90 A70 A50 A30 A10 A20 A40 A60 A80 A100 A28 I/C -2 A120 A140 A160 A180 A200 A220 A290 A310 A330 A350 A38 A370 A390 A410 A430 A450 Bay -2 Identification A190 A170 A150 A130 A110 A18- I/C -1 A90 A70 A50 A30 A10 A12 Bus section A40 A60 A80 A100 A28 I/C -2 A120 A140 A160 A180 A200 A220 A32 Bus Section A310 A330 A350 A38 A370 A390 A410 A430 A450 A470 Bay -3 Identification ----------------------A20 ----------------------A290
Ambt Temperature :
R-Ph in Y-Ph in
C
B-Ph in
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 14 OF 105 DATE:
Note: For the all other test the value is for two breakers & bus. For the test Sl.No 12 the value is for three breakers & bus. Remarks:
5.2. Earth Switch Contact Resistance Measurement Make : SCHNEIDER DC Current Injected : 100 A DC Pre-conditions for the measurement of EARTH SWITCH contact resistance: 1. All the breakers are to be kept in test position. 2. Close the earth switches in the bay through which current injected, and all other should be in open. Earth Switch
SL.NO Bay Identification
Ambt Temperature :
R-Ph in Y-Ph in
C
B-Ph in
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
HYOSUNG Signature: Name: Date:
A210 A190 A170 A150 A130 A110 A18 A90 A70 A50 A30 A10 A12 A20 A40 A60 A80 A100 A28 A120 A140
LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 15 OF 105 DATE:
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
A160 A180 A200 A220 A32 A290 A310 A330 A350 A38 A370 A390 A410 A430 A450 A470
Remarks:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 16 OF 105 DATE:
Description Make Type Installation Highest system voltage Short time rating Ratio Class Rated burden(VA) CT sec. resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg.Year/Sl.No Y ph B ph CT Sec Terminals R ph Y ph B ph Function
CT1 (CORE-1)
CT2 (CORE-1)
3200/1A PX 18 563 18
6.1.1. General Checks 1.General visual inspection 2.Name plate details 3.HV Terminal Marking 4.LV Terminal Marking
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date:
: : : :
KAHRAMAA Signature: Name: Date:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 17 OF 105 DATE:
5.Check for tightness of all CT terminals 6.Neutral earthing / Single point earthing 7.Position of P1-towards BUS/FEEDER 8.Check CT Connection with ring type Lugs 9.Check CT wire as per the Schematic diagrams and tightness 6.1.2 Insulation Resistance Measurement: Minimum Value: 1M/KV
: : : : :
Ambt Temperature
Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - Ve Terminal of Megger Connect Y to + Ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results
Description Primary Earth Primary- Secondary 1 Primary- Secondary 2 Secondary 1-Earth Secondary 2-Earth Secondary 1- Secondary 2 Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V R-PH(G) Y-PH(G) B-PH(G)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 18 OF 105 DATE:
Test Results
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 R-PH Y-PH B-PH
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results CT Core No Terminal Measured Resistance ( in ohms)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 19 OF 105 DATE:
R-Ph At ambT At 75 C
Y-Ph At ambT At 75 C
B-Ph At ambT At 75 C
CT1 CT2
Ambt Temperature
Temperature at 75 C = Rt (1+0.00393(75-t)
Where, 75 : Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C)
Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores.
Ambt Temperature
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 20 OF 105 DATE:
Test Results CT Designation CT1 CT2 R-Ph Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current values and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results: R-Phase
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 21 OF 105 DATE:
Y-Phase
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error
B-Phase
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error
Check List for Print out 1.CT Ratio and Polarity Test (For all Cores and Taps) 2.Knee point test ( for all cores and taps) 3.Winding resistance test (for all core & taps) Remark :
: : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 22 OF 105 DATE:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 23 OF 105 DATE:
1. 2. 3. 4. 5. 6. 7. 8. 9.
General visual inspection Name plate details HV Terminal Marking LV Terminal Marking Check for tightness of all CT terminals Neutral earthing / Single point earthing Position of P1-Towards BUS/FEEDER Check CT Connection with ring type Lugs Check CT wire as per the Schematic diagrams and tightness
: : : : : : : : :
Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results- CT 1
CT Designation CT 1 Description Primary Earth Primary-Secondary(Core.1) Secondary (Core.1)- Earth Applied Voltage (DC) in V 5000 V 5000 V 500 V R-PH(G) Y-PH(G) B-PH(G)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 24 OF 105 DATE:
CT Designation
R-PH(G)
Y-PH(G)
B-PH(G)
CT 2
Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. Test Results
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 R-PH Y-PH B-PH
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 25 OF 105 DATE:
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 R-Ph At ambT At 75 C Y-Ph At ambT At 75 C B-Ph At ambT At 75 C
Ambt Temperature :
Temperature at 75 C = Rt (1+0.00393(75-t))
Where, 75: Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 26 OF 105 DATE:
Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores. Test Results
CT Designation CT1-1 CT2-1 CT2-2 R-Ph Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 27 OF 105 DATE:
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results R-Phase
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error
Y-Phase
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error
B-Phase
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 28 OF 105 DATE:
Check List for Print out 1. CT Ratio and Polarity Test ( For all Cores and Taps ) 2. Knee point test ( for all cores and taps) 3. Winding resistance test (for all core & taps)
: : :
Remark
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 29 OF 105 DATE:
6.3.1. General Checks 1. General visual inspection 2. Name plate details 3. HV Terminal Marking 4. LV Terminal Marking 5. Check for tightness of all CT terminals 6. Neutral earthing / Single point earthing 7. Position of P1-Towards BUS/FEEDER 8. Check CT Connection with ring type Lugs 9. Check CT wire as per the Schematic diagrams and tightness 6.3.2. Insulation Resistance Measurement: Minimum Value: 1M/KV
: : : : : : : : :
Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results
Description Primary Earth Primary- Secondary 1 Primary- Secondary 2 Secondary 1-Earth Secondary 2-Earth Secondary 1- Secondary 2 Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V R-PH(G) Y-PH(G) B-PH(G)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 30 OF 105 DATE:
Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. Test Results
CT Designation Core No CORE-1 CT1 CORE-2 CT2 CORE-1 Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 S1-S2 R-PH Y-PH B-PH
Test Procedure
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 31 OF 105 DATE:
Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
Measured Resistance ( in ohms) CT Designation Core No Terminal R-Ph At ambT 1S1-1S2 CORE-1 CT1 CORE-2 CT2 CORE-1 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 At 75 C Y-Ph At ambT At 75 C B-Ph At ambT At 75 C
Ambt Temperature
Temperature at 75 C = Rt (1+0.00393(75-t))
Where, 75: Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C)
Criteria: Resistance shall be less than specified CT specification. 6.3.5. Knee Point Voltage measurement Ambt Temperature : C
Test Procedure
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 32 OF 105 DATE:
Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores. Test Results
R-Ph CT Designation Core No Terminal 1S1-1S2 1S1-1S3 2S1-2S2 CORE-2 CT2 CORE-1 2S1-2S3 1S1-1S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)
CORE-1 CT1
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 33 OF 105 DATE:
Y-Phase
CT Designation Core Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error
B-Phase
CT Designation Core Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error
Criteria: Accordance with CT specification. Check List for Print out 1. CT Ratio and Polarity Test(For All Cores and Taps) 2. Knee point test ( for all cores and taps) 3. Winding resistance test (for all core & taps) Remarks
: : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 34 OF 105 DATE:
6.4.1. General Checks 1. General visual inspection 2. Name plate details 3. HV Terminal Marking 4. LV Terminal Marking 5. Check for tightness of all CT terminals 6. Neutral earthing / Single point earthing 7. Position of P1-Towards BUS/FEEDER 8. Check CT Connection with ring type Lugs 9. Check CT wire as per the Schematic diagrams and tightness
: : : : : : : : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 35 OF 105 DATE:
Ambt Temperature
Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results
Description Primary Earth Primary- Secondary 1 Primary- Secondary 2 Secondary 1-Earth Secondary 2-Earth Secondary 1- Secondary 2 Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V R-PH(G) Y-PH(G) B-PH(G)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 36 OF 105 DATE:
Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. Test Results
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 R-PH Y-PH B-PH
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 37 OF 105 DATE:
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) CT Designation Core No Terminal R-Ph At ambT CORE-1 CT1 CT2 CORE-2 CORE-1 1S1-1S2 2S1-2S2 1S1-1S2 At 75 C Y-Ph At ambT At 75 C B-Ph At ambT At 75 C
Ambt Temperature
Temperature at 75 C = Rt (1+0.00393(75-t))
Where,
75: Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C) Criteria: Resistance shall be less than specified CT specification.
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 38 OF 105 DATE:
Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores. Test Results
R-Ph CT Designation Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)
CT1 CT2
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 39 OF 105 DATE:
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results R-Phase
CT Designation Core CORE-1 CT1 CT2 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error
Y-Phase
CT Designation Core CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error
CT1 CT2
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 40 OF 105 DATE:
B-Phase
CT Designation Core CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error
CT1 CT2
Criteria: Accordance with CT specification. Check List for Print out 1. CT Ratio and Polarity Test(For All Cores and Taps) 2. Knee point test ( for all cores and taps) 3. Winding resistance test (for all core & taps) Remarks :
: : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 41 OF 105 DATE:
7.1.1. General Checks 1. General visual inspection 2. Name plate details 3. HV Terminal Marking 4. LV Terminal Marking 5. Check for tightness of all VT terminals 6. VT Primary and Secondary neutral earth check 7. Fuse rating 8. MCB rating 9. Equipment Grounding System
: : : : : : : : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 42 OF 105 DATE:
Ambt Temperature
Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results
Description Primary Earth Primary- Secondary 1 Secondary 1-Earth Applied Voltage (DC)in V 5000 V 5000 V 500 V R-PH(G) Y-PH(G) B-PH(G)
Test Procedure Isolate primary/ secondary / Neutral earth. Connect a to +ve and n to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. If the deflection is not enough to confirm, reverse the connection (meter shall be connected to Primary side and DC voltage shall be applied on secondary side) and try again. Test Results
VT Designation VT Core No CORE-1 Terminal 1r* - 1nr* R-Ph Y-Ph B-Ph
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 43 OF 105 DATE:
*Denotes respective phase .i.e (1r-1nr), (1y-1ny), (1b-1nb) 7.1.4. VT Winding Resistance
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the voltage transformer page As per instructions given by manual enter the test current and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) VT Designation Core Terminal R-PH At ambT HV R* - N* 1r* - 1nr* LV 2r* - 2nr* 3r* - 3nr* At 75 C Y-PH At ambT At 75 C B-PH At ambT At 75 C
*Denotes respective phase.i.e (R-N), (Y-N), (B-N), (1r-1nr), (1y-1ny),(1b-1nb) (2r-2nr), (2y-2ny),(2b-2nb) & (3r-3nr),(3y-3ny),(3b-3nb) Ambt Temperature: C Temperature at 75 C = Rt (1+0.00393(75-t))
Where, 75: Resistance at 75C () Rt: Resistance at ambient temperature () t: Ambient temperature (C)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 44 OF 105 DATE:
Test Procedure Do the connection as shown fig. Switch on the kit. Select the voltage transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary voltage and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results
VT Designation Phase R VT Y B Terminal 1r - 1nr 1y - 1ny 1b - 1nb Applied Primary Voltage in (V) Calc Sec. Voltage in (V) Measured Sec. Voltage in (V) % Error
Criteria: Accordance with VT specification. Check List for Print out 1.VT ratio and polarity test 2. VT secondary winding resistance
: :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 45 OF 105 DATE:
7.3. Bus VT
Description Make Type Installation Highest System Voltage Insulation Level R ph Mfg.Year/Sl.No: Y ph B ph Ratio Class Burden(VA) Function 11kV/3 : 110V/3 3P/1.0 50 VA BCU + MET. + SYNC. Core 1 SCHNEITER VBF12 INDOOR 12 kV
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 46 OF 105 DATE:
7.2.1. General Checks 1.General visual inspection 2.Name plate details 3.HV Terminal Marking 4.LV Terminal Marking 5.Check for tightness of all VT terminals 6.Fuse rating 7.MCB rating 8.Equipment Grounding System 9. VT Primary and Secondary neutral earth check 10. VT truck rack IN/OUT check 7.2.2. Insulation Resistance Measurement: Minimum Value: 1M/kV
: : : : : : : : : :
Ambt Temperature
Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results Applied Voltage Description R-PH(G) Y-PH(G) B-PH(G) (DC) in V Primary Earth 5000 V Primary- Secondary 5000 V Secondary -Earth 500 V
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 47 OF 105 DATE:
Test Procedure Isolate primary/ secondary / Neutral earth. Connect a to +ve and n to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. If the deflection is not enough to confirm, reverse the connection (meter shall be connected to Primary side and DC voltage shall be applied on secondary side) and try again. Test Results VT Designation Core No Terminal R-Ph 1r* - 1nr* VT CORE -1 *Denotes respective phase .i.e (1r-1nr),(1y-1ny),(1b-1nb)
Y-Ph
B-Ph
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 48 OF 105 DATE:
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the voltage transformer page As per instructions given by manual enter the test current and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) VT Designation Core Terminal R-PH At ambT VT 1 1r* - 1nr* At 75 C Y-PH At ambT At 75 C B-PH At ambT At 75 C
Temperature at 75 C = Rt (1+0.00393(75-t))
Where,
75 : Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C) Criteria: Resistance shall be less than specified CT specification.
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 49 OF 105 DATE:
Test Procedure Do the connection as shown fig. Switch on the kit. Select the voltage transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary voltage and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results
VT Designation Phase R Y B Terminal 1r - 1nr 1y - 1ny 1b - 1nb Applied Primary Voltage in (V) Calculated Sec. Voltage in (V) Measured Sec. Voltage in (V) % Error
Criteria: Accordance with VT specification. Check List for Print out 1. VT ratio and polarity test 2. VT secondary winding resistance
: :
Remarks
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 50 OF 105 DATE:
8. METER CALIBRATION TEST 8.1. Ammeter with Selector Switch 8.1.1. Name Plate Details Device Ref : Make : Sl. No. : Full Scale Reading : CT Ratio : Accuracy Class : 8.1.2. Secondary Injection Test
Injected Secondary Current in (A) Measured Current in (A) Expected Current in (A) % Error
Allowable Error Range: As per the Ammeter Class Ammeter Found Healthy Selector switch function checked : : YES / NO YES / NO
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 51 OF 105 DATE:
8.2. Volt Meter with Selector Switch: 8.2.1. Name Plate Details Device Ref : Make : Sl. No. : Full Scale Reading : CT Ratio : Accuracy Class : 8.2.2. Secondary Injection Test
Injected Secondary voltage in V Measured Voltmeter Reading in (kV) Expected Voltmeter Reading in (kV) % Error
Allowable Error Range: As per the Voltmeter Class Volt meter Found Healthy Selector switch function checked : : YES / NO YES / NO
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 52 OF 105 DATE:
9.11kV CT SECONDARY INJECTION TEST 9.1. Incomer Feeder 9.1.1 Name Plate Details:
Description Make Type Installation Highest system voltage Short time rating Ratio Class Rated burden(VA) CT sec. resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg. Year/Sl.No Y ph B ph CT Sec Terminals R ph Y ph B ph Function 1S1-1S2 1S1-1S2 1S1-1S2 MAIN TRF DIFF(87T) + REF 2S1-2S2 2S1-2S2 2S1-2S2 Directional O/C Protection +BCU+AVR+ Ammeter S1-S2 S1-S2 S1-S2 Bus Bar Protection 2500/1A PX <8.75 230 30 (CT1) CORE-1 (CT1) CORE-2 SCHNEIDER RING INDOOR 12 kV 40 kA for 3Sec 2500/1A 5P20/1.0 15VA <14 3200/1A PX <18 563 8.8mA (CT2) CORE-1
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 53 OF 105 DATE:
9.1.2. A18
CT1- Core-1, Diff Protection (87T) + REF (87NI). Ratio : 2500/1A SWGR Terminals X11-612, 615, 618 & 613 and
Inject R- PH 0.6 A, Y- PH 0. 8A, B- PH 1.0A at A, measure the Current in the following terminals.
Secondary Current In mA measured at SWGR Panel A18 TB Terminal X11 R 612 Y 615 B 618 N 613 R 1 Relay Panel +B11 RP CT Terminal X650 Y 3 B 5 N 7 Relay Panel +B11 .RP Test Block S871.B Test Position R 21 Y 23 B 25 N 27
Relay Panel +B11 RP Display Pri. Current at Relay87T Main7UT613 R IL1 Y IL2 B IL3 N -
Relay Panel +B11 RP Display Sec. Current at Relay87T Main7UT613 R IL1 Y IL2 B IL3 N -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 54 OF 105 DATE:
Relay Panel +A18 .RP- Display Pri. Current at Relay (87NL/51) P141 R IL1 Y IL2 B IL3 N 3I0
Relay Panel+A18 .RPDisplay Sec. Current At Relay (87NL/51) P141 R IL1 Y IL2 B IL3 N 3I0
3I0
Q7/Q8
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 55 OF 105 DATE:
9.1.3. A18
CT1- CORE-2, AVR+DIR OC+BCU+AMMETER Ratio : 2500/1A SWGR Terminals X11 622, 625, 628 & 623
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
Secondary current in mA measured at SWGR Panel +A18 TB Terminal -X11 R 622 Y 625 B 628 N 623 Relay Panel+A18 .RP TB Terminal X620 R 1 Y 3 B 5 N 7 Relay Panel+A18 .RP TB TerminalX620 B B 10 13 AVR Panel TB Terminal X620 B 1 B 4
Relay panel +A18 .RP Relay (67/67N/51/50BF) P141 R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8
Relay panel +A18 .RP Relay Display Pri at (67/67N/51/50BF) P141 R Y B N IL1 IL2 IL3 IE
Relay panel +A18 .RP Relay Display Sec at (67/67N/51/50BF) P141 R Y B N IL1 IL2 IL3 IE
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 56 OF 105 DATE:
Relay Panel+A18 .RP A201 BCU 7SJ647 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel+A18 .RP - Display Pri. at BCU 7SJ647 IL1 IL2 IL3 IE
Relay Panel+A18 .RP - Display Sec. at BCU 7SJ647 IL1 IL2 IL3 IE
R 661
N 667
R 2
N 1
R-ph
9.1.4. A
CT2- CORE-1, BB PROTN. Ratio: 3200/1A SWGR Terminals X11 634, 637, 640 &
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A 633 and measure the current in the following terminals.
SWGR Panel A18 TB Terminal X11 Y B 637 640
R 634
N 633
-BB Relay Panel +BB .RP1 Test Block S87Z1 Service Position R Y B N 22 24 26 28
BB Relay Panel +BB .RPRelay F87Z1 BBP 7SJ611 R Y B N Q7/Q8 Q7/Q8 Q7/Q8 ---
BB Relay Panel +BB .RPRelay Display Pri.F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -
BB Relay Panel +BB .RP-Relay Display Sec.F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 57 OF 105 DATE:
9.1.5.
Burden Measurement Test Inject 1A at each core and each phase. Measure the voltage at terminal.
LOCATION
CORE NO
PHASE
TERMINAL
VOLTAGE
BURDEN
X11 612 & 613 X11 615 & 616 X11 618 & 619 X11 622 & 623 X11 625 & 626 X11 628 & 629 X11 633 & 634 X11 636 & 637 X11 639 & 640
S1/S2
Note: 1. 2. 3. 4. 5. Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT Terminal tightness CORE identification checks : : : : :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 58 OF 105 DATE:
9.2.2. A CT1, CORE-1 (87B/50BF) Inject R-PH 0.6A, Y-PH- 0.8A, B-PH-1.0A at A measure the current in the following terminals.
SWGR Panel +A18 TB Terminal-X11 Y B 609 613
R 605
N 603
N --
N ---
-BB Relay Panel +BB .RP1 Test Block S871Z1 Test Position R Y B N 22 24 26 28
BB Relay Panel +BB .RP1Relay 87BB1 BBP 7SJ611 R Y B Q7/Q8 Q7/Q8 Q7/Q8
BB Relay Panel +BB .RP1Relay Display Pri-87BB1 BBP 7SJ611 N --3I0 3I0 3I0 ---
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 59 OF 105 DATE:
BB Relay Panel +BB .RP1Relay Display Sec-87BB1 BBP 7SJ611 3I0 3I0 3I0 --
----------------------------------
---------------
9.2.3. A CT2, CORE-1 O/C + E/F +BCU+METERING Ratio: 3200/1A Inject R-PH 0.6A, Y-PH- 0.8A, B-PH-1.0A at A SWGR Terminals X11: 612, 615, 618&613 and measure the current in the following terminals.
Relay Panel +A TB Terminal X11 Y B 615 618 Secondary current in mA measured at Relay Panel +A .RP TB Terminal X610 R Y B N 1 3 5 7 Relay Panel +A .RP Test Block S511 Test Position R Y B N 21 23 25 27
R 612
N 613
Q3/Q4
Relay Panel +A .RP Relay Display Pri- (51/50BF) 7SJ621 R IL1 Y IL2 B IL3 N IE
Relay Panel +A .RP Relay Display Sec - (51/50BF) 7SJ621 R IL1 Y IL2 B IL3 N IE R 2
Relay Panel +A .RP -A201 BCU (7SJ647) R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A .RP Relay Display Pri -A201 BCU (7SJ647) R Y B N IL1 IL2 IL3 IE
Relay Panel +A .RP Relay Display Sec -A201 BCU (7SJ647) R Y B N IL1 IL2 IL3 IE
R 10
N 13
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 60 OF 105 DATE:
R 651 +A R
Y 652
B 653
N 654
R 621
Y 623
B 625
N 627
R 2
Y 6
B 10
N 1
9.2.4. A
CT2, CORE-2 87BB2 PROTN Ratio: 3200/1A SWGR Terminals X11:612,615,618 & 613 and
Inject R-PH 0.6A, Y-PH- 0.8A, B-PH-1.0A at +A measure the current in the following terminals.
SWGR Panel +A TB Terminal X11 R 612 Y 615 B 618 N 613
Secondary current in mA measured at BB Relay Panel +BB .RP1 TB Terminal X610 R 1 Y 17 B 33 N 49 R 1,2
BB Relay Panel +BB .RP1 R103,R104,R105- (Resistor) R 1,2 Y 1,2 B 1,2 N --BB Relay Panel +BB .RP1 Test Block S87Z1 Service Position R 22 Y 24 B 26 N 28
BB Relay Panel +BB .RP1Relay 87BB2 BBP 7SJ611 R Q7/Q8 Y Q7/Q8 B Q7/Q8 N --
BB Relay Panel +BB .RP1Relay Display Pri-87BB2 BBP 7SJ611 3I0 3I0 3I0 ----
BB Relay Panel +BB .RP1Relay Display Sec-87BB2 BBP 7SJ611 3I0 3I0 3I0 ----------
---------------------
-------------
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 61 OF 105 DATE:
9.2.5. Burden Measurement Test: Inject 1A at each core and each phase, Measure the voltage at terminal.
Location Core No CT1-Core 1 11KV SWGR CT2-Core 1 Phase R Y B R Y B R CT2-Core 2 Y B Terminal X11 612 & 613 X11 615 & 616 X11 618 & 619 X11 612 & 613 X11 615 & 616 X11 618 & 619 X11 622 & 623 X11 625 & 626 X11 628 & 629 Voltage Burden
CT Star Point Conformation: Description CT Core CT1-Core-1 Star Point Conformation Note: 1. 2. 3. 4. 5. CT2-Core-1 CT2-Core-2 S1/S2
Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks
: : : : :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 62 OF 105 DATE:
Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (Vk) I mag at VK/2 Purpose
(CT1) CORE 1 400 - 300/1A 5P20/1.0 15-11.5 VA <2 1.5 OC/EF+BCU+MET 50/50N/51/ 51N/49C
(CT1) CORE 2 400 - 300/1A PX <1.4 1.05 425-320V 50-70mA PILOT WIRE 87PA (7SG11+7PG211)
9.3.2. A
CT1-CORE-1, OC/EF+BCU+MET Ratio: 400 - 300/1A SWGR Terminals X11 602, 606, 610 & 604
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0 A at A and measure the current in the following terminals.
SWGR Panel TB Terminals - X11 Y B 606 610
R 602
N 604
R 21
N 27
R 22
N 28
R 22
N 28
R F1/F2
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 63 OF 105 DATE:
Relay Panel +A .RP- Display Pri. Relay (50/50N/51/51N) 7SJ802 R Y B N IL1 IL2 IL3 IE
Relay Panel +A .RP- Display Sec. Relay (50/50N/51/51N) 7SJ802 R Y B N IL1 IL2 IL3 IE
R 2
N 8
Q3/Q4
Relay Panel +A .RP Display Pri A201.A BCU 7SJ632 R Y B N IL1 IL2 IL3 IE
Relay Panel +A .RP Display Sec A201.A BCU 7SJ632 R Y B N IL1 IL2 IL3 IE
9.3.3. A
CT1- CORE-2, Pilot Wire Diff PRTN Ratio : 400 - 300/1A SWGR Terminals X11 622, 626, 630 & 624
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A TB Terminal X11 R 622 Y 626 B 630 N 624
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 64 OF 105 DATE:
22
24
26
28
22
24
26
28
27/28
25/26
23/24
21/22
Relay Panel +A .RP- Relay Display Pri. F501.A (50GR) 7SG111 R Y B N 1AIA 1AIB 1AIC 5AIA
Relay Panel +A .RP- Relay Display Sec. F501.A (50GR) 7SG111 R Y B N 1AIA 1AIB 1AIC 5AIA
9.3.4. A
CT2-CORE-1, BUSBAR PRTN Ratio: 3200/1A SWGR Terminals X11 644, 647,650 &643
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A TB Terminal X11 Y B 647 650
R 644
N 643
Relay Panel +A .RP - Relay -F87Z1 BBP 7SJ611 R Y B N Q7/Q8 Q7/Q8 Q7/Q8 ---
Relay Panel +A .RP - Relay Display Pri -F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -
Relay Panel +A .RP - Relay Display Sec -F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 65 OF 105 DATE:
9.3.5. Burden Measurement Test Inject 1A at each core and each phase. Measure the voltage at terminal.
Location Core No CT1-Core 1 Phase R Y B 11KV SWGR CT1-Core 2 R Y B R CT2-Core 1 Y B Terminal X11 602 & 604 X11 606 & 608 X11 610 & 612 X11 624 & 622 X11 626 & 628 X11 630 & 632 X11 644 & 643 X11 646 & 647 X11 650 & 649 Voltage Burden
S1/S2
Note: 1. 2. 3. 4. 5.
Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks
: : : : :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 66 OF 105 DATE:
9.4.
Bay Ref : A
Purpose
OC/EF PROTN
BUSBAR PROTN.
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 67 OF 105 DATE:
9.4.2. A
CT1- CORE-1, OC/EF PROTN Ratio : 150/1A SWGR Terminals X11 602, 605, 608 & 603
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A10 TB terminal X11 R 602 Y 605 B 608 N 603
Relay Panel +A10 .RP- Relay 50/50N/51/51N (7SJ611) Y Q3/Q4 B Q5/Q6 N Q7/Q8 Q1/Q2
Relay Panel +A10 .RP- Relay Display Pri-50/50N/51/51N (7SJ611) R Y B N IL1 IL2 IL3 IE
Relay Panel +A10 .RP- Relay Display Sec -50/50N/51/51N (7SJ611) R Y B N IL1 IL2 IL3 IE
----------------------------
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 68 OF 105 DATE:
9.4.3. A
CT1- CORE-2, BCU+METERING Ratio : 150/1A, SWGR Terminals X11 622, 625, 628 & 623
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A TB terminal X11 R 622 Y 625 B 628 N 623 R 1 Relay Panel +A .RPTB terminal X620 Y 3 B 5
Secondary current in mA measured at Relay Panel +A .RPTest Block S201 Test Position N 7 R 21 Y 23 B 25 N 27
Relay Panel +A .RP - A201 BCU 7SJ647 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A .RP - A201Relay Display Pri-BCU 7SJ647 R Y B N IL1 IL2 IL3 IE
Relay Panel +A .RP - A201Relay Display Sec-BCU 7SJ647 R Y B N IL1 IL2 IL3 IE
R 10
N 13
R 661
N 667
SWGR Panel +A R Y
Ammeter Display B N
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 69 OF 105 DATE:
9.4.4. A
CT2-CORE-1, BUSBAR PROTN. Ratio: 3200/1A SWGR Terminals X11 644, 647, 650 & 643
Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel A TB Terminal X11 Y B 647 650
R 644
N 643
N --
Relay Panel +A .RPRelay Display Pri-87BB1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 --
Relay Panel +A .RPRelay Display Sec-87BB1 BBP 7SJ611 3I0 3I0 3I0 ---
---------------
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 70 OF 105 DATE:
9.4.5. Burden Measurement Test : Inject 1A at each core and each phase. Measure the voltage at terminal
Location Core No Phase R (CT1) Core 1 Y B R (CT1) Core 2 11KV SWGR (CT2) Core 1 Y B R Y B Terminal X11 602 & 603 X11 603 & 606 X11 608 & 609 X11 622 & 623 X11 625 & 626 X11 628 & 629 X11 644 & 643 X11 647 & 646 X11 650 & 649 Voltage Burden
S1/S2
Note: 1. 2. 3. 4. 5.
Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks
: : : : :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 71 OF 105 DATE:
10. VT SECONDARY INJECTION TEST 10.1. Bay Ref : A Incomer Feeder 10.1.1. Name Plate Details:
Core No. Class Ratio (Volt) Burden(VA) 67PROTN+SYNC. Purpose VT-WDG-1 3P/1.0 11kV/3 :110V/3 50 +BCU+VOLT METER
10.1.2. Core-1 VT secondary injection: : CORE1, 67PTN+BCU+SYNC +VOLT METER Ratio : 11kV/3 / 110V/3 Injected voltage: R-N: 60 Y-N: 50 B-N: 40 at X11- 671,672, 673 & 674 Terminals measure the voltage with respect to Earth in the following terminals
Voltage in volts measured at SWGR Panel +A MCB (F404) OFF Position R Y B N 1 3 5 7
R-Y
SWGR Panel +A -K101,K102, K103- U/V Relay R Y B -2,10 2,10 2,10 ---
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 72 OF 105 DATE:
SWGR Panel +A -K101.1,K102.1, K103.1- U/V Relay R Y B -2,10 2,10 2,10 --SWGR Panel +A R 511.A Y 512.A TB Terminal X4 B 513.A N 514.A
SWGR Panel +A R 1 Y 3
TB Terminal X4 -
TB Terminal X4 -
R 14
Relay Panel+A12 .RP TB Terminal X710 Y 15 Relay Panel+A12 .RP -A251 (7SJ640)
Relay Panel+A12 .RP Relay Display Pri -A251 (7SJ640) RY V4 Relay Panel+A18 .RP TB Terminal X710 R 1 Y 3 B 5 N 7 -
R R13
Y R14
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 73 OF 105 DATE:
R 10
Relay Panel +A .RP Test Block-S671.B Service Position R E13 Y E33 B E53 N E73
Relay Panel +A .RP Relay F671 (67/67N/51/50BF) 7SJ621 R R14 Y R15 B R17 N R16
Relay Panel +A .RP Relay A201 BCU (7SJ647) Y R17 B R18 N R16
R15
Relay Panel +A .RP Relay Display Pri A201 BCU (7SJ647) R VL1 Y VL2 B VL3 N -
Relay Panel +A .RP Relay Display Sec A201 BCU (7SJ647) R VL1 Y VL2 B VL3 N -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 74 OF 105 DATE:
Note: 1. Confirmation of isolating links and shorting links as per drawing 2. Confirmation of Earthing of STAR at single point 3. Terminal tightness checked Remarks: : : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 75 OF 105 DATE:
Bus Section :
A166
VT-WDG 3P/1.0
A266
VT-WDG 3P/1.0
10.2.1. A166 VT secondary injection: Core and Function : A166 - BCU + Voltmeter + LOAD SHEDDING Ratio: 11kV/3:110V/3 Injected voltage: R-N: 60V Y-N: 50V B-N: 40V at X4:651, 652, 653 & 654 Terminals measure the voltage with respect to Earth in the following terminals.
Voltage in volts measured at SWGR Panel +A16 VT MCB (F404) OFF Position R Y B N 1 3 5 7
TB Terminal X4 N 654
653
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 76 OF 105 DATE:
Relay Panel +A12 .RP Relay A251 (7SJ640) R Y B N R15 R17 R18 R16
Relay Panel +A12 .RP Relay Display A251 (7SJ640) R Y B N VL1 VL2 VL3 -
Relay Panel +A12 .RP Relay A252 (7SJ804) R Y B N VL1 VL2 VL3 -
TB Terminal X4
TB Terminal X710
TB Terminal X231
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 77 OF 105 DATE:
R 511
Y 512
B 513
N 514
R 1
Y 3
B 5
N 7
R 2
Y 5
B 8
N 11
TB Terminal X231.A -
Relay Panel +A10 .RP Test Block S201 Service Position R Y 12 14 Relay Panel +A18 R 1 Y 13 -
TB Terminal X231.A -
Relay Panel +A18 .RP Test Block S201 Service Position R Y 10 12 Relay Panel +LSP R 9 Y 10 -
Relay Panel +A18 .RP Relay Display A201 (7SJ647) R-Y V4 Relay Panel +LSP Selector Switch S66 OFF R 2 Y 4 B 6 N 8 -
TB Terminal X231 B 11 N 12
Relay Panel +LSP .RP Relay F811 (7SJ621) R Y B N R14 R15 R17 R16
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 78 OF 105 DATE:
Relay Panel +A12 .RP Relay A201 (7SJ647) R Y B N R15 R17 R18 R16
Relay Panel +A12 .RP Relay Display Pri A201 (7SJ647) R Y B VL1 VL2 VL3 -
Relay Panel +A12 .RP Relay Display Sec A201 (7SJ647) R Y B VL1 VL2 VL3 -
Relay Panel +A12 .RP Relay Display A253 (7SJ804) R Y B VL1 VL2 VL3 -
10.2.2. A266 VT secondary injection : VT core and function : BCU + Voltmeter + LOAD SHEDDING
Injected voltage : R-N: 60V Y-N: 50V B-N: 40V at A X4: 651, 652, 653 & 654 Terminals measure the voltage with respect to Earth in the following terminals.
Voltage in volts measured at SWGR Panel +A26 VT MCB (F404) OFF Position R Y B N 1 3 5 7
TB Terminal X4 N 654
653
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 79 OF 105 DATE:
SWGR Panel +A26 Selector Switch (-S404) R 10 Y 6 B 2 N 12 SWGR Panel +A26 Ammeter Display (P404) RY YB BR SWGR Panel +A12 R 672 Y 673 TB Terminal X4 SWGR Panel +A20 R 668 Y 670 TB Terminal X4 B 672 N 674 SWGR Panel +A32 R 668 Y 669 TB Terminal X4 B 670 N 671 SWGR Panel +A26 R 511.A Y 512.A TB Terminal X4 B 513.A N 514.A
TB Terminal X4 N 514
513
Relay Panel +LSP .RP Relay F811 (7SJ621) R Y B N R14 R15 R17 R16
TB Terminal X231.A -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 80 OF 105 DATE:
Relay Panel +A20 .RP Test Block S201 Service Position R Y 12 14 Relay Panel +A28 R 1 Y 13 -
TB Terminal X231.A -
Relay Panel +A28 .RP Test Block S201 Service Position R Y 10 12 Relay Panel +A12 R 14 Y 16 -
TB Terminal X231 -
Relay Panel +A12 .RP Relay A511(51/50BF) 7SJ621 R Y B N R14 R15 R17 R18
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 81 OF 105 DATE:
Phase
Current measured in mA
Calculated Burden in VA
R Y B
A266
Phase
VT
Voltage applied in Volts Current measured in mA Calculated Burden in VA
R Y B
Note: 1. Confirmation of isolating links and shorting links as per drawing : 2. Confirmation of Earthing of STAR at single point : 3. Terminal tightness checked : Remarks:
Bus Section :
A566
VT-WDG 3P/1.0
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 82 OF 105 DATE:
11.1A566 VT secondary injection : VT core and function : BCU + Voltmeter + LOAD SHEDDING
Injected voltage : R-N: 60V Y-N: 50V B-N: 40V at A X4:651, 652, 653 & 654 Terminals measure the voltage with respect to Earth in the following terminals.
TB Terminal X4 N 654
Voltage in volts measured at SWGR Panel +A56 VT MCB (F404) OFF Position R Y B N 1 3 5 7
653
TB Terminal X4 -
TB Terminal X4 -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 83 OF 105 DATE:
Relay Panel +A12 .RP Relay A252 (7SJ804) R Y B N VL1 VL2 VL3 -
Relay Panel +LSP .RP Relay F811 (7SJ621) R Y B N R14 R15 R17 R16
TB Terminal X720 B 9 N 12
Relay Panel +A38 .RP Test Block S201 Service Position R Y 10 12 Relay Panel +A32 R 1 Y 3 -
TB Terminal X231 B 5 N 7
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 84 OF 105 DATE:
Relay Panel +A32 .RP Relay A201 (7SJ647) R Y B N R15 R17 R18 R16
Relay Panel +A32 .RP Relay Display A201 (7SJ647) R Y B N VL1 VL2 VL3 -
Relay Panel +A32 .RP Relay Display A255 (7SJ804) R Y B N VL1 VL2 VL3 -
TB Terminal X231 B 6 N 8
Relay Panel +A32 .RP Relay A511(51/5BF) (7SJ621) R Y B N R14 R15 R17 R18
10.3. Bay Ref : A30 Cable Feeder 10.3.1. Name Plate Details:
Core No. Class Ratio (Volt) Burden(VA) Purpose VT-WINDING 1.0/3P 11kV/3:110V/3 50 BCU + Synch Check Relay
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 85 OF 105 DATE:
10.3.2. VT core and function : BCU+SYNC Ratio : 11kV/3:110V/3 Injected voltage: R-N: 60 Y-N: 50 B-N: 40 at VT X511: 1,2,3,4 Terminals measure the voltage with respect to Earth in the following terminal
Voltage in volts measured at SWGR Panel +A30 VT MCB (F404) OFF Position R Y B N 1 3 5 7 SWGR Panel +A30 VT MCB (F404) OFF Position R Y B N 2 4 6 8
TB Terminal X511 B 3 N 4
SWGR Panel +A30 Synch Selector Switch -S25 OFF R 1 Y 3 SWGR Panel +A30 R 661 Y 663 TB Terminal X4 -
SWGR Panel +A30 Synch Selector Switch -S25 OFF R 2 Y 4 SWGR Panel +A12 R 684 Y 686 -
TB Terminal X4 -
TB Terminal -
Relay Panel +A12 .RP Test Block S252 Service Position R Y 8 10 SWGR Panel +A30 R 511 Y 512 -
Relay Panel +A12 .RP Relay Display A252 (7SJ804) R-Y VL3 -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 86 OF 105 DATE:
Relay Panel +A30 .RP Relay A201 BCU (7SJ632) R Y B N R14 R15 R17 R18
Relay Panel +A30 .RP Relay Display A201 BCU (7SJ632) R Y B N VL1 VL2 VL3 -
Note: 1. Confirmation of isolating links and shorting links as per drawing 2. Confirmation of Earthing of STAR at single point 3. Terminal tightness checked Remarks:
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date:
: : :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 87 OF 105 DATE:
10.4. Bay Ref: A10 Aux.TR. Feeder 10.4.1. Name Plate Details:
Core No. Class Ratio (Volt) Burden(VA) Purpose VT-WINDING 1.0/3P 11kV/3:110V/3 50 VA BCU+SYNC.
: BCU+SYNC. Ratio : 11kV/3 / 110V/3 X511: 1, 2, 3 & 4 terminals measure the voltage with
Injected voltage : R-N: 60 Y-N: 50 B-N: 40 at VT respect to Earth in the following terminal
SWGR Panel +A10 R 1 Y 2 TB Terminal X511 B 3 N 4
Voltage in volts measured at SWGR Panel +A10 VT MCB (F404) OFF Position R 1 Y 3 B 5 N 7
SWGR Panel +A10 Synch Selector Switch -S25 OFF R Y 1 3 SWGR Panel +A10 R 661 Y 663 TB Terminal X4 -
SWGR Panel +A10 Synch Selector Switch -S25 OFF R Y 2 4 SWGR Panel +A12 R 661 Y 663 -
TB Terminal X4 -
TB Terminal -
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 88 OF 105 DATE:
Relay Panel +A12 .RP Test Block S251 Service Position R Y 10 12 SWGR Panel +A10 R 511 Y 512 -
Relay Panel +A12 .RP Relay Display A251 (7SJ804) R-Y VL4 -
Relay Panel +A10 .RP Relay A201 BCU (7SJ647) R Y B N R15 R17 R18 R16
Relay Panel +A10 .RP Relay Display A201 BCU (7SJ647) R Y B N VL1 VL2 VL3 -
10.4.3. Burden Measurement: Phase R Y B Voltage applied in Volts 63.5 63.5 63.5 Current measured in mA Calculated Burden in VA
Note: 1. Confirmation of isolating links and shorting links as per drawing 2. Confirmation of Earthing of STAR at single point 3. Terminal tightness checked
: : :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 89 OF 105 DATE:
11. CT PRIMARY INJECTION TEST 11.1. Bay Ref : A18 Incomer Feeder 11.1.1. Name Plate Details:
Description Ratio Class Rated Output(VA) CT Sec. Resistance(Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose (CT1) Core 1 2500/1A PX <8.75 230V 30mA MAIN PRTN 87T/REF (DIFF.) (CT1) Core 2 2500/1A 5P20/1.0 15 VA <14 Dir-OC/EF+ BCU+ AMMETER (CT2) Core 1 3200/1A PX <18 563V 30mA BB PRTN 87BBP
Note: 1. Temporary short for REF protection& Bus bar protection stabilizing resistor 11.1.2 CT Core And Function: A Ratio Injected Current
Inj. Phase SWGR Panel A18 CT Terminal -X11 R Y B N 612 R-E R-Y R-B Relay Panel +B11 .RP Test Block S871.B Service Position R 22 R-E R-Y R-B -Y 24 B 26 N 28 Relay Panel +B11 .RP Main Relay 87T (7UT613) R R1//R2 Y R3/R4 B R5/R6 N -Relay Panel +B11 .RP Display Pri. Current at Relay87T Main 7UT613 R Y B N IL1M2 IL2M2 IL3M2 615 618 613
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 90 OF 105 DATE:
Inj. Phase
Relay Panel+B11 .RP Display Sec. Current at Relay 87T Main 7UT613 IL1M2 IL2M2 IL3M2 -
R-E R-Y R-B Relay Panel +B11 .RP TB Terminal -X650 R Y B N 10 R-E R-Y R-B Relay Panel+A18 .RP Test Block S871 Serice Position R Y B N 22 R-E R-Y R-B Relay Panel+A18 .RP- Display Sec. Current At Relay 87NL/51 (7SJ611) IL1 R-E R-Y R-B Relay Panel +A18 .RPDisplay Pri. Current at Relay 87NL/51 (7SJ611) 3I0 Relay Panel +A18 .RPDisplay Sec. Current at Relay 87NL/51 (7SJ611)P141 3I0 IL2 IL3 3I0 Relay Panel +A18 .RPB1 Metrosil N 1 N 2 Relay Panel +A18 .RPR102 Resistor N 1 N 2 Relay Panel +A18 .RP Test Block S871 Service Position N 1 N 3 Relay Panel +A18 .RP Test Block 871Service Position N N 2 4 24 26 28 Relay Panel+A18 .RPRelay 87NL/51 (7SJ611) Y B N Q3/Q4 Q5/Q6 --Relay Panel+A18 .RP- Display Pri. Current at Relay 87NL/51 (7SJ611) IL1 IL2 IL3 3I0 11 12 13 -Relay Panel+A18 .RP TB Terminal -X610 Y B N 6 7 8 -Relay Panel+A18 .RP Test Block S871 Service Position R Y B N 21 23 25 27 --
R 5
R Q1/Q2
-------
---------
----------
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 91 OF 105 DATE:
R-Y R-B
11.1.3. CT Core and Function: A18 CT1-CORE-2, OC/EF+BCU+AMMETER Ratio : 2500/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A18 Relay Panel +A18 .RP TB .RP TB Terminal Terminal -X620 -X620 R Y B N B B 1 3 5 7 10 13
TB N 623
Relay panel+A18 .RP Relay 67/67N/51/50BF (7SJ621) R Q1/Q2 R-E R-Y R-B Y Q3/Q4 B Q5/Q6 N Q7/Q8
Relay panel+A18 .RP Relay Display Pri -67/67N/51/50BF (7SJ621) R Y B N IL1 IL2 IL3 IE
Relay panel+A18 .RP Relay Display Sec -67/67N/51/50BF (7SJ621) R IL1 Y IL2 B IL3 N IE
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 92 OF 105 DATE:
Inj. Phase
R-E R-Y R-B Relay Panel+A18 .RP Test Block S201 Service Position R 22 Y 24 B 26 N 28 Relay Panel+A18 .RP A201 BCU (7SJ647) R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8 Relay Panel+A18 .RP Relay Display PriA201BCU (7SJ647) R IL1 Y IL2 B IL3 N IE
R-E R-Y R-B Relay Panel+A18 .RP Relay Display PriA201BCU (7SJ647) R Y B N IL1 R-E R-Y R-B SWGR Panel+A18 Selector Switch S401 R 2 R-E R-Y R-B Y 6 B 10 N 1 SWGR Panel+A18 Ammeter Display P401 R 9 Y 10 B 11 N 12 IL2 IL3 IE Relay Panel+A18 TB Terminal X620 R Y B N 10 11 12 13 SWGR Panel+A18 TB Terminal- X11 Y B 663 665
R 661
N 667
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 93 OF 105 DATE:
S1/S2
Note: 1. 2. 3. 4. 5.
Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks
: : : : :
Remarks:
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 94 OF 105 DATE:
Note: 1. Temporary short for Bus bar protection stabilizing resistor 11.2.2. CT Core And Function : CT1, CORE-1 87BB1 Ratio : 3200/1A Injected Current : A
R 603 RE RY RB
Secondary Current in mA Measured at BB Relay Panel +RP1 TB BB Relay Panel +RP1 Terminal X610 B103,B104,B105-(Metrosil) N R Y B N R(1,2) Y(1,2) B(1,2) 605 1 17 33 49 -
BB Relay Panel +RP1 R103,R104,R105- Resistor R(1,2) RE RY RB Y(1,2) B(1,2) BB Relay Panel +RP1- Relay 87BB1 BBP (7SJ611)
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 95 OF 105 DATE:
R Q7/Q8 RE RY RB
Y Q7/Q8
B Q7/Q8
N --
R 3I0
Y 3I0
B 3I0
N --
R 3I0
Y 3I0
B 3I0
N --
Relay Panel +A12 .RP Relay (51/50BF ) 7SJ621 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A12 .RP Relay Display Pri-(51/50BF ) 7SJ621 R Y B N IL1 IL2 IL3 IE
Relay Panel+A12 .RP Relay A201 (7SJ647) R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 96 OF 105 DATE:
Relay Panel+A12 .RP Relay Display Pri A201 (7SJ647) R Y B N IL1 RE RY RB SWGR Panel+A12 TB Terminal X11 Y B 626 629 IL2 IL3 IE
Relay Panel+A12 .RP Relay Display Sec A201 (7SJ647) R Y B N IL1 IL2 IL3 IE
R 623 RE RY RB
N 630
R 2
R -
N -
Inj Phase SWGR Panel BUS-CT1 TB Terminal -X11 R 623 R-E R-Y R-B BB Relay Panel +RP1 R103,104,105- (Resistor) R Y B R(1,2) RE RY RB BB Relay Panel + RP1Relay 87BB2 BBP 7SJ611 R Y B N Y(1,2) B(1,2) Y 626 B 629 N 622
R(1,2)
N -
BB Relay Panel + RP1- Display Sec. Current at Relay 87BB2 BBP 7SJ611 R Y B N
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 97 OF 105 DATE:
Q7/Q8 RE RY RB
Q7/Q8
Q7/Q8
--
3I0
3I0
3I0
--
3I0
3I0
3I0
--
Note:
S1/S2
1. 2. 3. 4. 5.
Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness Core identification checks Remarks
: : : : :
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 98 OF 105 DATE:
11.3. Bay Ref : A30 Cable Feeder : 11.3.1. Name Plate Details:
Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose CT1-Core 1 400 - 300/1A 5P20/1.0 15-11.5 VA < 2 1.5 OC/EF+BCU+METER 50/50N/51/51N/49C CT1-Core 2 400 - 300/1A PX <1.4 1.05 425-320V 50-70mA PILOT WIRE PRTN 87P CT2-Core 1 2500/1A PX <18 563V 8.8 mA BB PRTN 87BB1
11.3.3. CT Core And Function : CT-CORE-1, OC/EF+BCU+METERING Ratio : 400 - 300/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A30 .RP- TB Relay Panel +A30 .RP Terminal -X610.A Test Block S502.A -Service Position R Y B N R Y B N 1 3 5 7 21 23 25 27
Inj phase
N 604
R-E R-Y R-B Relay Panel +A30 .RP Test Block S502.A -Service Position R 22 R-E R-Y R-B Y 24 B 26 N 28 R F1/F2 Relay Panel +A30 .RP- Relay 50/50N/51/51N (7SJ802) Y F3/F4 B F5/F6 N F7/F8 Relay Panel +A30 .RP- Display Pri. Current at Relay 50/50N/51/51N (7SJ802) R Y B N IL1 IL2 IL3 IE
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 99 OF 105 DATE:
Relay Panel +A30 .RP- Display Pri. Current at Relay 50/50N/51/51N (7SJ802) R Y B N IL1 R-E R-Y R-B Relay Panel +A30 .RP Test Block S201.A Service Position R 21 R-E R-Y R-B Relay Panel +A30 .RP-201.A Display Pri. Current- BCU 7SJ632 R Y B N IL1 R-E R-Y R-B SWGR Panel A30 TB Terminal -X11 R 661 R-E R-Y R-B Y 662 B 663 N 664 IL2 IL3 IE Y 23 B 25 N 27 IL2 IL3 IE
Relay Panel +A30 .RP -201.A BCU 7SJ632 R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8
Relay Panel +A30 .RP-201.A Display Pri. Current- BCU 7SJ632 R Y B N IL1 IL2 IL3 IE
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 100 OF 105 DATE:
11.3.4. CT Core And Function : CT2-Core-2, PILOT WIRE PRTN 87P Ratio : 400 - 300/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A30 TB Terminal Relay Panel +A30 .RP X620.A Test Block S501.A Service Position N 624 R 1 Y 3 B 5 N 7 R 21 Y 23 B 25 N 27
Relay Panel +A30 .RP Test Block S501.A Service Position R Y B N 22 R-E R-Y R-B Relay Panel +A30 .RP Test Block S501.A Service Position R 2 R-E R-Y R-B Y 4 B 6 N 8 24 26 28
Relay Panel +A30 .RP- Relay 50GR (7SG111) R Y B N 27/28 25/26 23/24 21/22
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 101 OF 105 DATE:
11.3.5. CT Core And Function : CT2-Core-1, BUSBAR PRTN(87B) Ratio : 3200/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A30 .RP TB Terminal X610 R Y B N 4 20 36 58
N 643
Relay Panel +BB .RP1 Test Block S87Z1 Test Position R Y B N 21 R-E R-Y R-B Relay Panel +BB .RP - Display Pri. Current at Relay 87BB1 BBP (7SJ611) R Y B N 3I0 R-E R-Y R-B 3I0 3I0 23 25 27
Relay Panel +BB .RP1 - Relay 87BB1 BBP (7SJ611) R Y B N Q7/Q8 Q7/Q8 Q7/Q8 -
Relay Panel +BB .RP - Display Sec. Current at Relay 87BB1 BBP (7SJ611) R Y B N 3I0 3I0 3I0 -
------
S1/S2
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 102 OF 105 DATE:
Note: 1. 2. 3. 4. 5.
Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks
: : : : :
Remarks:
11.4. Bay Ref : A10 Station Transformer Feeder 11.4.1 Name Plate Details:
Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose CT1- Core 1 150/1A 5P20 15 VA <3 OC/EF + METERING CT1- Core 2 150/1A 5P20/1.0 15 VA <3 BCU+AMMETER CT2- Core 1 3200/1A PX <18 563V 8.8mA BUSBAR PRTN.
Note: 1. Temporary short for REF protection & Bus bar protection stabilizing resistor 11.4.2. CT Core and Function Ratio Injected Current : CORE-1, OC/EF+METERING : 150/1A : A
.RP
.RP- Relay
.RP- Display
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 103 OF 105 DATE:
Test Block S511 Service Position R 22 R-E R-Y R-B Relay Panel +A10 .RP- Display Pri. Current at Relay 50/51/50N (7SJ611) R Y B N IL1 R-E R-Y R-B IL2 IL3 IE Y 24 B 26 N 28 R Q1/Q2
---------------------------------------------------------------
-----------------------
R 1
Y 3
B 5
N 7
R 21
Y 23
B 25
N 27
Relay Panel +A10 .RP- Relay A201 BCU 7SJ647 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A10 .RP- Relay Display Pri A201 BCU 7SJ647 R Y B N IL1 IL2 IL3 IE
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 104 OF 105 DATE:
R-Y R-B SWGR Panel+A10 Ammeter Selector Switch (-S401) R Y B N 2 R-E R-Y R-B 6 10 1 SWGR Panel +A10 Ammeter Display (-P401) R Y B N -
N --
KAHRAMAA
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 105 OF 105 DATE:
Description
CT Core
CT1-Core-1
CT1-Core-2
CT2-Core-1
S1/S2
Note: 1. 2. 3. 4. 5. Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness Core identification checks : : : : :
S.NO 1 2 3 4
EQUIPMENT
MAKE/TYPE
KAHRAMAA