This document provides an overview and schedule for an Extravehicular Activity (EVA) using Orlan spacesuits to transfer a docking cone on the International Space Station. It lists the key equipment used in the EVA, including oxygen tanks, control panels, umbilicals, and interfaces between the suits and station. It outlines the practice run and pre-EVA activities from June 1-7, and provides a timeline for suit checks and the EVA on June 8th. Post-EVA activities on June 9th include reconfiguring the station and drying and stowing the spacesuits.

Uploaded by

alexpgp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
313 views20 pages

Orlan Suit Introduction

This document provides an overview and schedule for an Extravehicular Activity (EVA) using Orlan spacesuits to transfer a docking cone on the International Space Station. It lists the key equipment used in the EVA, including oxygen tanks, control panels, umbilicals, and interfaces between the suits and station. It outlines the practice run and pre-EVA activities from June 1-7, and provides a timeline for suit checks and the EVA on June 8th. Post-EVA activities on June 9th include reconfiguring the station and drying and stowing the spacesuits.

Uploaded by

alexpgp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

Orlan-M Familiarization Briefing

MOD Orlan Team DX35

DC-1 EVA Support Equipment

-3 Oxygen Tanks Vacuum Monometer - EVA Control Panel

Depress Valves (only open & closed visible)

Onboard Spacesuit Control Assembly (OSCA) -3 Oxygen Tanks Emergency O2 Umbilicals Cue Cards frag-minty

- EVA Control Panel

Onboard Interface Unit


To Onboard Heat Exchanger

(OSCA)

Emergency O2 Umbilical

Integrated Fluid Umbilical

Emergency O2 Umbilical

Electrical Umbilical

Electrical Umbilical

Orlan 1

Orlan 2

- Onboard Spacesuit Control Assembly (OSCA)

Pressue Indicator Blinker

Fluid Umbilical Connector

Depress Valves

2 (below 350mm)

Vacuum Monometer

Orlan Entry

Radio-Telemetry Unit

Radio

Battery

- Pneumohydrolic Control Panel


O2 Flow Selector OFF (.) INJECTOR (.) EMERGENCY () O2 Tank Selector Regulator Selector Temperature Control Lever Sublimator Actuator

O-4 Electrical Control Panel

Orlan-M Interfaces

Orlan Fluid Umbilical Connector

Orlan Electrical Umbilical Connector Emergency O2 Umbilical Connector

Orlan-M Replaceable Components

-4 Feedwater Filter

-9 LiOH Canister

Measurement Unit Filter

Moisture Collector

External Water Refill, Degassing, & Separation Components

5 Water Reservoir

Pressure Relief Valve

Manual Pump -2 Bag External Degassing & Separation Unit

EV Hatch -1

Hatch Removal Latches (Behind Closout MLI)

EV Hatch -1 (-2) Components

Emergency Closure Latches PUSHER (Hatch Opener)

Hatch Tool Installed & Deployed

June 1 (8 crew hours)

June 5: Orlan Practice Run (12 crew hours)

- Suit Checkouts - Donning Gear - Comm Check - Fit, Task, and Leak Checks - Post EVA Activities

- Prep Orlan Spares - Inspect Orlan - Checkout - Orlan Battery Install - Orlan Equipment Prep - Separation of Orlan & Water Systems - Orlan Fitcheck

June 1st through 7th, Pre-EVA Activities

June 6 (5 crew hours)

- Soyuz Prep for EVA - EVA Prep

June 4 (14 Crew Hours)

June 7 (10 crew hours)

- Glisser Video Cam Setup - ITCS Reconfig for EVA - Timeline Updates - Medical Conferences

- EVA Timeline Review - EVA Tool Prep - Comm Mode C/O - Leak Check - Install Portable Repress Tank - Orlan/ TLM C/O - Orlan Comm Check - Pressure Checks

Legend

EVA from (-) Orlan Operations () ISS RS EVA Radiogram Other

EVA

POST 1510h - Airlock Ops Post EVA


40 min 30 min 30 min

PREP 0755h - Vozdukh Deact and Hatch Positioning 0825h - Prep for EVA/Deact

0800h

150 min

1550h - ISS Act, comm reconfig, ventilation reconfig

0900h
80 min

0850h - Suit & Status Checks

1000h

30 min

1820h - Body mass/ Urine Test

15 15

1010h - Body Mass and Urine Biochemistry Tests


50 min 45 min

1600h 1700h 1800h 1900h

1850h - Meal

1040h - Medical Monitoring Comm Config Check


30 min

1125h - Subsystems Deact


90 min

June 8th, Day of Docking Cone Transfer EVA

1100h 1200h

EVA1: Transfer of Docking Cone to Docking Cone Assy, Plane Y in

1940h - ISS Act, Suit reconfig, removal of consumables, prep for drying

45 min 105 min

1200h - Don Gear

1300h

Legend

EVA from (-) Orlan Operations () ISS RS EVA Radiogram Other

1245h - Airlock Ops Before EVA

June 9th, Post-EVA Activities

June 9 (7 crew hours)

- Reconfig ISS to Pre-EVA - Spacesuit Drying and Reconfig - Spacesuit Drying and Water Refill - Spacesuit Drying and Stowage

Legend
EVA from (-) Orlan Operations () ISS RS EVA Radiogram Other