Material Master Mass Change
Material Master Mass Change
Step 2: Press F4 and select the business object as shown below BUS1001
Step 3: After entering the business object. Execute the transaction & you will get an information Window as shown below.
Tabs 1. Tables 2. Fields Select the line General material data: MARA & select the field to be mass change as shown in 2nd screen shot. I m going to change gross weight here Instead of 13. I am going change as 11.
Step 5 : After click on execute . You will get a screen as shown below and press ok.
Step 8: By default it is 13 . 1. I M going to change it have 11. 2. Click on carry a mass out change button & Click on save it will change the value to 11. As shown below.
Step 9: Finally we have changed a value 13 to 11 and a message will be generated as shown below.