Simulation of Hydraulic Parameters in Water Distribution Network Using EPANET and GIS
Simulation of Hydraulic Parameters in Water Distribution Network Using EPANET and GIS
Simulation of Hydraulic Parameters in Water Distribution Network Using EPANET and GIS
Simulation of Hydraulic Parameters in Water Distribution Network Using EPANET and GIS
Dr. H. Ramesh, L. Santhosh and C. J. Jagadeesh
of a chemical species throughout the network during a simulation period comprised of multiple time steps. A. OBJECTIVES: Objectives of the study are as follows. Generation of thematic layers for Alnavar town using GIS based census data. Design of pipe network for the future demand (for town level and ward level). To find alternative alignments for main pipe line from source to OHT using DEM. Simulation of the water distribution network system for various hydraulic parameters Comparison of Hydraulic Gradient Lines and Total Energy Lines. II. STUDY AREA
I. INTRODUCTION ESIGN of surface water supply system concerns the locations and capacities of diversion works and storage, as well as the operations of these to meet multiple purposes and objectives [11]. Therefore in order to ensure the availability of sufficient quantity of good quality of water, it becomes almost imperative in a modern society, to plan and build suitable water supply schemes [5, 12], which may provide potable water to the various section of the community in accordance with their demand and requirements. Due to the advent of Geographical Information Systems (GIS), it possible to visualize, and model the entire cycle of water supply network from source to household [5, 8]. The network system must be modeled, analyzed, and its performance [10] is evaluated under the various physical and hydraulic parameters or conditions [2, 4]. This process is called as Simulation [12]. EPANET [3, 6] is a computer program that performs extended period simulation of hydraulic and water quality behavior within pressurized pipe networks [9]. EPANET tracks the flow of water in each pipe, the pressure at each node, the height of water in each tank, and the concentration
Dr. H. Ramesh is Assistant Professor, Dept. of Applied Mechanics and Hydraulics, National Institute of Technology Karnataka, Surathkal, Mangalore 575025, INDIA, Email: [email protected] L. Santhosh is Post graduate student, Dept. of Applied Mechanics and Hydraulics, National Institute of Technology Karnataka, Surathkal, Mangalore 575025, INDIA C. J. Jagadeesh is Scientist, RRSC/ISRO, Bangalore, India.
Alnavar is a taluk panchayat (sub-district) of Dharwad district, Karnataka state, India lies between 1526N 7444E and 15.43N 74.73E an average elevation of 563 m above MSL rainfall of 930 mm. The total area considered is 165 km2 which covers 29 villages around Alnavar town for which water supply system is designed and pipe network has to be simulated. This study was carried out as part of part of ongoing project of Karnataka Urban Water Supply and Drainage Board (KUWS & DB), Bangalore, India. The total population of the town is 16,290 as per the Census 2001. The town consists of 15 administrative wards. The data used in the present study are listed in the table 1 with description.
TABLE I VARIOUS DATA USED IN THE STUDY
Source Regional Remote sensing CentreBangalore Regional Remote sensing CentreBangalore Survey of India Census of India City Administration
CARTO DEM
Description CARTOSAT-1; dt: 15/03/2009; 2.5m Resolution; IRS LISS-IV, dated 02/02/2008; 5.8 m resolution. Spatial resolution of 20 m was generated from stereo pairs using Leica photogrammetric suite. Used as base map. Used to project water demand. To design pipe network.
350
International Conference on Ecological, Environmental and Biological Sciences (ICEEBS'2012) Jan. 7-8, 2012 Dubai
III. METHODOLOGY The methodology (figure 1) was developed by conceptualized the water supply system. Ortho rectified Cartosat-1 images, rectified LISS IV images and topo sheets are masked and extracted for the required area using ArcGIS software. The ward wise census data is attached to the database of the Alnavar wards boundary layer. Future Population was estimated using following three methods. The methods used in this project are mentioned below. (1) Arithmetic Increase Method : P n = [P 0 +n. x*] Geometric Increase Method : P n = P 0 (1+r/100) n (2) Incremental Increase Method : P n = {P 0 + n. x*+ [n (n+1)/2] y*} (3) Where P n = Prospective or forecasted population; n = Number of decades;
r = Assumed growth rate in % ; x* = Average increase of population of known decades; y* = Average of incremental increase of the population of known decades. Hulikere Lake is selected as potential water source for drinking situated at a distance of 6.5 Km. Transmission pipe and Main pipe lines are designed based on the required discharge and the velocity of flow using discharge and Manning's hydraulic equations. (4) Discharge equation Q = A* V m3/s (5) Mannings equation V= (1/n) R2/3S1/2 Where V= Average velocity of water in m/sec; R =Hydraulic mean depth; S = Bed slope (V: H) in m; n = Manning roughness coefficient; A= Cross sectional area of the pipe in m2.
IV. SIMULATION The network is simulated for both present demand scenario and future demand scenarios using GIS and EPANET [1]. In this study, an AutoCAD map (figure 2) was converted to GIS file format and overlaid on CARTOSAT-1 imagery. Pipe
network and nodes are created on the map and water demands at each junction were provided. EPANETs hydraulic simulation model was used to compute junction heads.
351
International Conference on Ecological, Environmental and Biological Sciences (ICEEBS'2012) Jan. 7-8, 2012 Dubai
The head loss was estimated using equation (6) and total energy line and hydraulic gradient line were drawn for the simulated results. Total time duration considered for the extended period simulation is 72 hours with a reporting time step of 1:00 hr. Darcy-Weisbach formula. HL= fLv2/2gd (6) Pressure at each node = P = gh (7) Where HL = headloss in m/1000 m; g = acceleration of gravity; L = pipe length in meters; d = pipe diameter in meters; v = flow velocity in m/sec; f = friction factor (Assumed 0.25 for new pipes); = Density of water =1000kg/m3; g = Acceleration due to gravity = 9.81 N/ m2; h = height of the point from free surface. V. ANALYSIS AND RESULTS IRS P6 LISS-IV and IRS P5 Cartosat-1 images were orthorectified geo-referenced to geographic co-ordinates and WGS 84 datum using the Rational Polynomial Coefficients in Lieca Photogrammetric suite and DEMs with the resolution of 10m. The main distribution pipe line was designed by considered future population at rate of 135lpcd using continuity and Mannings equation. The required peak discharge was estimated to be 0.0045m3/s. Earth work excavation for alignment 1 and 2 are 5436.9 m3 and 3218.15 m3 respectively. Hydraulic simulation: After a network has been suitably described, water demand at each junction was provided. Hydraulic analysis [12] at 9.00 hours for head and pressure head were carried out to understand the performance and behavior network and results are tabulated in table 2. The results of present and future demand were compared for extended period hydraulic simulation. The time instance used for drawing HGL and TEL is at 9:00 hrs. At this time, water level in the tank is 3.46 m. Similarly, total head is computed for all nodes using EPANET and hydraulic equations and the results are tabulated in table 3 (only selected nodes are presented).
TABLE II RESULTS FOR THE NETWORK NODES AT 9:00 HRS Base demand in CMD 15.12 18.9 33.264 69.552
Node ID 2 71 74 73B
TABLE III COMPARISON OF HGL AND TEL FROM EPANET RESULTS AND HYDRAULIC
EQUATIONS
2 71 74 73B
0 0 0 0
0 0 0 0
VI. CONCLUSIONS The following conclusions were drawn from this study. The satellite image and DEM have shown in effectively in selection of alternate alignment and quantity of earth work estimation. This paper has demonstrated an application of stochastic simulation for reliability analysis of water distribution systems using EPANET 2.0, taking into account the hydraulic considerations such as pressure, head, velocity etc... The results of the simulations are checked using hydraulic equations. This showed that the results are correct and can be used for modeling water supply system.
352
International Conference on Ecological, Environmental and Biological Sciences (ICEEBS'2012) Jan. 7-8, 2012 Dubai
This study would help the water supply engineers in saving time as it this process is fast, less tedious, easy to incorporates the changes etc under one umbrella. REFERENCES
[1]
Petr Ingeduld, Zdenek Svitak. Ajay Pradhan, and Ashok Tarai. Modelling Intermittent Water Supply Systems with Epanet. 8th annual WD symposium, Pp 1-7, 2006. [2] Ioan Sarbu and Emilian Stefan Valea. Nodal analysis of looped water supply networks, International Journal of Energy and Environment, Issue 3, Volume 5, Pp 452-460, 2011. [3] Machell,J., Mounce, S. R. and Boxall, J. B.Online modelling of water distribution systems: A UK case study, Copernicus Publications, Drink. Water Eng. Sci., 3, Pp 2127, 2010. [4] Vasan, A. and Slobodan P. Simonovic. Optimization of Water Distribution Network Design using Differential Evolution. Journal of Water Resources Planning and Management, Pp 279-287, 2010. [5] Anil Kumar. M. Plan for Augmentation of Capacities for Water Supply System in GIS. Thesis of Bachelor of Planning, Jawaharlal Nehru Technological University, Hyderabad. 2004. [6] Ingeduld, P. Real-Time Forecasting with EPANET. World Environmental and Water Resources Congress, ASCE, 2007. [7] Alonso J. M., Alvarruiz F., Guerrero D., Hernandez V., Llopis J. D., Ramos E, Martinez F., Bou V., Bartolin H. Simulation of Control Strategies in Water Distribution Systems, using Scada in Conjunction with Calibrated Models Obtained from GIS. 6th International Conference on Hydroinformatics, Pp 1-8, 2004. [8] Raskin, P., Hansen, E., Zhu, Z. M. and Stavisky D. Simulation of Water Supply and Demand in the Aral Sea Region. Water International, 17, 55-67, 1992. [9] Tospornsampan, J., Kita, I., Ishii, M., and Kitamura, Y. Split-Pipe Design of Water Distribution Network Using Simulated Annealing. International Journal of Computer information, and Systems Science, and Engineering 1:3. Pp 153-163, 2007. [10] Amir Nafi, Caty Werey, and Patrick Llerena. Water pipe renewal using a multi objective optimization approach. Can. J. Civ. Eng. Canada, Vol 35: Pp 87-94, 2008. [11] George Kuczera. Water supply head works simulation using network linear programming. Advances in Engineering Software, 14, 55-60, 1992. [12] Daene C. McKinney, John F. Burgin, and David R. Maidment. Water Supply Planning Using an Expert Geographic Information System. Texas Water Resources Institute, Technical Report No. 162, 1992.
353