Kpcl/Ce GSW / STA / 2011/: Office Note Karnataka Power Corporation LTD

The document discusses a technical inspection report for installing solar photovoltaic systems at Sainik School in Bijapur, Karnataka. It provides details on the area required, estimated power plant capacity and costs for systems of 2.5 kW and 3.5 kW. Total costs estimated are Rs. 3.02 lakhs for the 2.5 kW system and Rs. 4.18 lakhs for the 3.5 kW system including replacement of fixtures with LED lights and efficient fans.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Kpcl/Ce GSW / STA / 2011/: Office Note Karnataka Power Corporation LTD

The document discusses a technical inspection report for installing solar photovoltaic systems at Sainik School in Bijapur, Karnataka. It provides details on the area required, estimated power plant capacity and costs for systems of 2.5 kW and 3.5 kW. Total costs estimated are Rs. 3.02 lakhs for the 2.5 kW system and Rs. 4.18 lakhs for the 3.5 kW system including replacement of fixtures with LED lights and efficient fans.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

N w hN u q xS x q

OFFICE NOTE KARNATAKA POWER CORPORATION LTD. Sub: Inspection Report of Sainik School , Bijapur to provide Technical "o! #P$%&$' Assistance for establishing Solar Photovoltic Syste s at Sainik School, (S) & STA & *+,,& Bijapur! -ate: ,. !+/!*+,, ,!+ The Principal, Sainik School, Bijapur has re0uested vide their letter "o!SSB1 & /23&0, -ated: *,!+*!*+,, to depute a Technical '4pert for surveying the area and giving suggestions to set up a Solar 5oltic Syste for %ighting and other re0uire ent at Sainik School, Bijapur! Accordingly, the undersigned -r! 6! "aganagouda, -irector, "ational Training $enter for Solar Technology, deputed on +/!+/!*+,, to identify the site conditions and for surveying the area and assess the potential re0uire ent to set up a Solar 5oltic Syste for %ighting and other re0uire ent at Sainik School, Bijapur -uring the visit a detailed discussion 7as held 7ith the principal 7ith regards to re0uire ent of Solar %ighting for the buildings and 6ostels! After inspection, a detailed report is furnished hereunder8 a). AREA REQUIRED TO INSTALL 1 KWP SPV ROOFTOP POWER PLANT IS 10 ft WIDTH X 15ft BREADTH- tota 150 S!. ft "#W$.

*!+

/!+

b9! SP5 Po7er Plant Re0uire ent is either :i9 or:ii9as under!
:i9! SP5 Po7er Plant capacity of about 2+ k)p for 6ostel, -inning hall and ;ain&Ad inistrative Building by utilising e4isting fittings&fi4tures! :ii9! SP5 Po7er Plant capacity of about 3. k)p is re0uired for 6ostel, -inning hall and ;ain&Ad inistrative Building by replacing e4isting fittings&fi4tures of tube light 7ith %'- fittings and replace ent of 'nergy 'fficient <an Regulator! c9! T=TA% $=ST A"- ;"R' S>BSI-? T= I"STA%% R==<T=P SP5 P=)'R P%A"T Sl! -etails Total $ost as ;"R' Beneficiary "o per ;"R' subsidy $ost Base rate Rs! Rs!+!2 in Rs& / lakhs&k) %akhs&k)p %akhs 7ith battery Rs , ,k)p SP5 /!++ +!2+ *!,+ Po7er Plant * 2+k)p SP5 *@+!++ A,!++ ,A2!++ Po7er Plant / 3. k)p SP5 ,/.!++ 3+!.+ 23!.+ Po7er Plant

d9! Additional Invest ent for %'- and ''R fittings , * %'- %ights 'nergy 'fficient <an Regulator Total Rs! ,3!AA %akhs Rs! ,!32%akhs Rs! ,B!/@ %akhs

e9! Total cost -etails i9! Total cost for 2+ k)p is Rs! ,A2!++ %akhs 7ith e4isting fi4tures! ii9! Total cost for 3. k)p is Rs! ,,+!A@ %akhs by replacing e4isting fittings & fi4tures 7ith %'- and 'nergy 'fficient <an Regulator! 3!+ .!+ The detailed Inspection Report and correspondence is placed opposite in perusal <or kind advice! file for kind

-irector, "T$ST