This document establishes the foundation for the initial deployment of EVSE by Electric Transportation Engineering Corporation. Neither Electric Transportation Engineering Corporation, nor any of its affiliates: (a) represents, guarantees or warrants to any third party, either expressly or by implication: (i) the accuracy, completeness, or usefulness of; (ii) the intellectual or other property rights of any person or party in; or (iii) the merchantability, safety, or fitness for purpose of; any information, product, or process disclosed, described, or recommended in this document, (b) assumes any liability of any kind arising in any way out of the use by a third party of any information, product, or process disclosed, described, or recommended in this document, nor any liability arising out of reliance by a third party upon any information, statements, or recommendations contained in this document. Should third parties use or rely on any information, product, or process disclosed, described or recommended in this document, they do so entirely at their own risk. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. This material is based upon work supported by the U.S. Department of Energy under Award Number DE-EE0002194 2010 Electric Transportation Engineering Corporation All rights reserved
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
ii
The Deployment Guidelines for the State of Tennessee for the EV Project were created through the eTec process of involving stakeholders and interactively creating content. These guidelines were authored through the eTec process specifically for the EV Project. Working in conjunction with project partners and local area stakeholders through the creation of State and Area Advisory Boards, eTec received content contributions and content review from the following Advisory Board member organizations.
ECOtality North America eTec 430 S. 2nd Ave. Phoenix, AZ 85003 (602) 716-9576
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
iii
Table of Contents
1. Introduction ........................................................................................................................ 1 2. Electric Vehicle Technology .............................................................................................. 2 A. B. C. D. A. B. C. A. B. C. D. E. A. B. C. D. E. F. G. H. I. J. A. B. C. D. E. F. A. B. C. D. Electric Vehicle Configurations ................................................................................... 2 Electric Vehicle Categories ......................................................................................... 4 Batteries ..................................................................................................................... 4 Automaker Plans ........................................................................................................ 6 Charging Components ................................................................................................ 7 Charging Levels ......................................................................................................... 9 Level 1 versus Level 2 Considerations ..................................................................... 12 Single Attached/Detached Garages .......................................................................... 15 Carport ..................................................................................................................... 20 Multi-Family Dwellings .............................................................................................. 21 Commercial Fleets.................................................................................................... 24 Publicly Available Charging Stations ........................................................................ 27 Signage .................................................................................................................... 34 Lighting and Shelter.................................................................................................. 34 Accessibility Requirements ....................................................................................... 35 Safety Issues Related to Indoor Charging ................................................................ 36 Installations Located in Flood Zones ........................................................................ 37 Point of Sale Options ................................................................................................ 38 Data Collection ......................................................................................................... 40 Vandalism ................................................................................................................ 40 Station Ownership .................................................................................................... 40 Maintenance ............................................................................................................. 41 Regulatory Agencies ................................................................................................ 42 National Electric Code .............................................................................................. 43 SAE and UL.............................................................................................................. 45 Construction Codes .................................................................................................. 46 Occupational Safety and Health ............................................................................... 48 Engineering, Permitting, and Construction ................................................................ 48 Background .............................................................................................................. 49 Interconnection Requirements .................................................................................. 51 Electrical Supply/Metering ........................................................................................ 52 Summary .................................................................................................................. 52
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
iv
8. Cost Estimating ................................................................................................................ 53 A. B. C. D. Residential Cost Estimate Worksheet ....................................................................... 53 Commercial Fleet Cost Estimate Worksheet (10 Charging Stations) ........................ 54 Commercial Publicly Available Cost Estimate Worksheet (2 Charging Stations) ....... 55 DCFC Cost Estimate Worksheet (Two Charging Stations) ....................................... 56
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
List of Figures
Figure 2-1 Battery Electric Vehicle ....................................................................................... 2 Figure 2-2 Series Plug-In Hybrid Vehicle Block Diagram ..................................................... 3 Figure 2-3 Parallel Plug-In Hybrid Vehicle Block Diagram.................................................... 3 Figure 2-4 Automaker PHEV and BEV Plans ....................................................................... 6 Figure 3-1 Level 2 Charging Diagram .................................................................................. 7 Figure 3-2 J1772 Connector and Inlet (Preliminary) ............................................................. 8 Figure 3-3 Level 1 Charging Diagram .................................................................................. 9 Figure 3-4 Level 1 Cord Set ............................................................................................... 10 Figure 3-5 Level 2 Charging .............................................................................................. 11 Figure 3-6 DC Fast Charging (DC Charging or Fast Charging) .......................................... 11 Figure 3-7 Chrysler EPIC DC Fast Charging (90kW) circa 1997 ........................................ 12 Figure 3-8 Wheel Stop ....................................................................................................... 13 Figure 3-9 Garage Wheel Stop .......................................................................................... 13 Figure 4-1 Double Garage Location for EVSE ................................................................... 16 Figure 4-2 Typical Single Garage Location for EVSE......................................................... 17 Figure 4-3 Typical Level 1 and Level 2 Installations for a Residential Garage ................... 18 Figure 4-4 Installation Process for a Residential Garage/Carport....................................... 19 Figure 4-5 Installation Considerations for Outdoor Parking ................................................ 20 Figure 4-6 Typical EVSE Installation in Multi-Family Lot .................................................... 21 Figure 4-7 Installation Process for Multi-Family ................................................................. 23 Figure 4-8 Level 2 Commercial EV Charging Location....................................................... 25 Figure 4-9 Installation Process for Commercial Fleet Operations....................................... 26 Figure 4-11 Publicly Available Charging Examples ............................................................ 29 Figure 4-12 Example Shopping Mall EVSE Parking ........................................................... 30 Figure 4-13 Indoor Charging .............................................................................................. 31 Figure 4-14 Outdoor Charging ........................................................................................... 31 Figure 4-15 Installation Flowchart for Public Charging ....................................................... 32 Figure 4-16 Curbside Charging .......................................................................................... 33 Figure 5-1 EV Signs........................................................................................................... 34 Figure 5-2 Public Charging with Shelter and Lighting......................................................... 35 Figure 5-3 Smartcard Reader ............................................................................................ 38 Figure 5-4 RFID Fob .......................................................................................................... 39
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
vi
Figure 5-5 RFID Fob .......................................................................................................... 40 Figure 7-1 Smart Grid Infrastructure .................................................................................. 50 Figure 8-1 Conceptual Fast Charge Station (2 Charging Stations)..................................... 56
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
vii
List of Tables
Table 2-1 EV Charge Times ................................................................................................ 5 Table 5-1 Accessible Charging Station Recommendations ................................................ 35 Table 8-1 Cost Estimate Worksheet for Residential EVSE Level 2 Installation .................. 53 Table 8-2 Cost Estimate Worksheet for Commercial Fleet Level 2 Installation (10 Charging Stations) ............................................................................................................................. 54 Table 8-3 Cost Estimate Worksheet for Level 2 Public Installation (Two Charging Stations) ........................................................................................................................................... 55 Table 8-4 Cost Estimate Worksheet for DC Fast Charge Installation (2 Charging Stations)56
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
viii
Acronyms
AC AMI ARRA BEV CCID DC DCFC DFE DOE EPRI EV EV-ETS EREV EVSE ICE IWC kW kWh LEED LSV MUTCO NEC Alternating Current Advanced Metering Infrastructure American Reinvestment and Recovery Act Battery Electric Vehicle - vehicles powered 100% by the battery energy storage system available on-board the vehicle. Charge Current Interrupting Device Direct Current Level 2 DC Fast Charger Design Flood Elevation U.S. Department of Energy Electric Power Research Institute Electric Vehicle Electric Vehicle-Energy Transfer System Extended Range Electric Vehicle see PHEV. Electric Vehicle Supply Equipment equipment that provides for the transfer of energy between the electric utility power and the electric vehicle. Internal Combustion Engine Infrastructure Working Council Kilowatts. A measurement of electric power. Used to denote the power an electrical circuit can deliver to a battery. Kilowatt Hours. A measurement of total electrical energy used over time. Used to denote the capacity of an EV battery. Leadership in Energy and Environmental Design Low Speed Vehicle Manual on Uniform Traffic Control National Electric Code - part of the National Fire Code series established by the National Fire Protection Association (NFPA) as NFPA 70. The NEC codifies the requirements for safe electrical installations into a single, standardized source. National Electrical Manufacturers Association. Develops standards for electrical products. Neighborhood Electric Vehicle National Flood Insurance Program National Fire Protection Association Occupational Safety and Health Act
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
ix
Plug-in Hybrid Electric Vehicle vehicles utilizing a battery and an internal combustion engine (ICE) powered by either gasoline or diesel. Photovoltaic Range Extended Electric Vehicle see PHEV. Radio Frequency Identification Real Time Pricing a concept for future use whereby utility pricing is provided to assist a customer in selecting the lowest cost charge. Society of Automotive Engineers. Standards development organization for the engineering of powered vehicles. Service Entrance Section Time of Use - an incentive-based electrical rate established by an electric utility. Underwriters Laboratory Vehicle to Grid - a concept that allows the energy storage in electric vehicles to be used to support the electrical grid during peak electrical loads. Volts Alternating Current
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
A typical BEV is shown in the block diagram in Figure 2-1. Since the BEV has no other significant energy source, the battery must meet the BEV range and power requirements. BEV batteries are typically larger and more powerful than the batteries in hybrid electric vehicles.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
Manufacturers of PHEVs use different strategies in combining the battery and ICE. For example, the Chevy Volt will utilize the battery only for the first several miles, with the ICE providing generating power for the duration of the vehicle range. Other PHEVs may use the battery power for sustaining motion and the ICE for acceleration or higherenergy demands at highway speeds. Frequently, the vehicles employing the first strategy gain a designation such as PHEV-20, to indicate that the first 20 miles are battery only. Other terms related to PHEVs may include Range Extended Electric Vehicle (REEV) or Extended Range Electric Vehicle (EREV).
C. Batteries
Battery Technology Recent advancements in battery technologies will allow EVs to compete with ICE vehicles in performance, convenience, and cost. Although lead-acid technology serves many EV applications like forklifts and airport ground support equipment very costeffectively, the limitations on energy density and repeated cycles of charging and discharging make its application to on-road highway speed EVs less practical. Today, most major car companies utilize nickel-metal-hydride or various lithium-based technologies for their EVs. Lithium provides four times the energy of lead-acid and two times that of nickel-metal-hydride. The materials for lithium-based batteries are generally considered abundant, non-hazardous, and lower cost than nickel-based technologies. The current challenge with lithium-based technologies is increasing battery capacity while maintaining quality and cycle life and lowering production costs. From an EV infrastructure standpoint, it is important to consider that, as battery costs are driven down over time, the auto companies will increase the size of the lithiumbased battery packs, and thus the range of EVs will increase.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
Relative Battery Capacity Battery size, or capacity, is measured in kilowatt hours (kWh). Battery capacity for electric vehicles will range from as little as 3 kWh to as much as 40 kWh or more. Typically, PHEVs will have smaller battery packs because they have more than one fuel source. BEVs rely completely on the storage from their battery pack for both range and acceleration, and therefore require a much larger battery pack than a PHEV for the same size vehicle. Battery Charging Time The amount of time to fully charge an EV battery is a function of the battery size and the amount of electric power or kilowatts (kW) that an electrical circuit can deliver to the battery. Larger circuits, as measured by voltage and amperage, will deliver more kW. The common 120 volts AC (VAC), 15 amp circuit will deliver at minimum 1.1 kW to a battery. A 240 VAC, 40 amp circuit (similar to the circuit used for household appliances like dryers and ovens) will deliver at minimum 6 kW to a battery. Table 2-1 provides information on several different on-road highway speed electric vehicles, their battery pack sizes, and charge times at different power levels to replenish a depleted battery.
Table 2-1 EV Charge Times Circuit Size and Power in kW Delivered to Battery 120 VAC, 15 amp 1.2 kW PHEV-10 PHEV-20 PHEV-40 BEV BEV PHEV Bus 4 8 16 24 35 50 3 h 20 m 6 h 40 m 13 h 20 m 20 h 29 h 10 m n/a 120 VAC, 20 amp 1.6 kW 2 h 30 m 5h 10 h 15 h 21 h 50 m n/a 240 VAC, 40 amp 6.5 kW 35 m 1 h 15 m 2 h 28 m 3 h 41 m 5 h 23 m 7 h 41 m 480 VAC, 85 amp 60 kW n/a n/a 16 m 24 m 35 m 50 m
EV Configuration
Note: Power delivered to battery calculated as follows: 120VAC x 12Amps x.85 eff.; 120VAC x 16Amps x .85 eff.; 240VAC x 32 Amps x.85 eff.; 480VAC x 3 x 85 Amps x .85 eff.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
D. Automaker Plans
Many automakers have announced plans for the introduction of on-road highway speed electric vehicles in the near future. A summary table of these plans is shown in Figure 2-4.
Credit Suisse Electric Vehicles, Equity Research, Energy Technology/Auto Parts & Equipment, October 1, 2009 Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 6
3. Charging Requirements
This section discusses the terminology and general requirements for EVSE, which provides for the safe transfer of energy between electric utility power and an electric vehicle.
A. Charging Components
The terms used to identify the components in the delivery of power to the vehicle are defined first.
Power is delivered to the EVs onboard battery through the EV inlet to the charger. The charger converts AC to the DC required to charge the battery. The charger and EV inlet are considered part of the EV. A connector is a device that, by insertion into an EV inlet, establishes an electrical connection to the electric vehicle for the purpose of charging and information exchange. The EV inlet and connector together are referred to as the coupler. The EVSE consists of the connector, cord, and interface to utility power. The interface between the EVSE and utility power will be directly hardwired to a control device, as illustrated in Figure 3-1, or a plug and receptacle, as illustrated in Figure 3-3. During the 1990s, there was no consensus on EV inlet and connector design. Both conductive and inductive types of couplers were designed and in both cases, different designs of each type were provided by automakers. At the present time, however, the Society of Automotive Engineers (SAE) has agreed that all vehicles produced by automakers in the United States will conform to a single design, known as the J1772 Standard.2
While the J1772 Standard will be utilized by all automakers in the United States, it may not be the standard used in other countries. This is the subject of a harmonization project with the Canadian Codes. A common connector is also the goal of European, Asian, and North American designers.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
J1772 Connector
The J1772 Standard EV coupler is designed for 10,000 connections and disconnections with exposure to dust, salt, and water; is able to withstand a vehicle driving over it; and is corrosion resistant. The J1772 Standard and National Electrical Code (NEC) requirements create multiple safety layers for EV components, including: The EV coupler must be engineered to prevent inadvertent disconnection. must have a grounded pole that is the first to make contact and the last to break contact. must contain an interlock device that prevents vehicle startup while connected. must be unique to electric vehicle charging and cannot be used for other purposes.
The EV inlet must be de-energized until it is attached to the EVSE. must de-energize prior to removal of the connector.
The EVSE must be tested and approved for use by Underwriters Laboratory (UL), or a similar nationally-recognized, independent testing lab. must be able to initiate area ventilation for those specific batteries that may emit potentially explosive gases. must have a charge current interrupting device (CCID) that will shut off the electricity supply if it senses a potential problem that could result in electrical shock to the user.
In addition, when connected, the vehicle charger will communicate with the EVSE to identify the circuit rating (voltage and amperage) and adjust the charge to the battery accordingly. Thus, an EVSE that is capable of delivering 20 amps will deliver that current only, even when connected to a 40 amp rated circuit.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
The J1772 coupler and EV inlet will be used for both Level 1 and Level 2 charging levels, which are described below.
B. Charging Levels
In 1991, the Infrastructure Working Council (IWC) was formed by the Electric Power Research Institute (EPRI) to establish consensus on several aspects of EV charging. Level 1, Level 2, and DCFCs were defined by the IWC, as well as the corresponding functionality requirements and safety systems. EPRI published a document in 1994 that describes the consensus items of the IWC3. Note: For Levels 1 and 2, the conversion of utility AC power to the DC power required for battery charging occurs in the vehicles on-board charger. In DCFC, the conversion from AC to DC power typically occurs off-board, so that DC power is delivered directly to the vehicle.4
Electric Vehicle Charging Systems: Volume 2 Report of the Connector and Connecting Station Committee, EPRI, December 1994.
4
AC DC Fast Charging (delivering high-power AC directly to the vehicle) is defined within the SAE J1772 document, but this approach has not been implemented as yet. Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 9
Level 1 charging typically uses a standard 3-prong electrical outlet (NEMA 5-15R/20R) to connect to premises wiring. Future EV suppliers probably will provide a Level 1 Cord Set (120 VAC, 15 or 20 amp) with the vehicle. The Cord Set will use a standard 3-prong plug (NEMA 5-15P/20P) with a CCID located in the power supply cable within 12 inches of the plug. The vehicle connector at the other end of the cord will be the design identified in J1772 Standard. This connector will mate properly with the vehicle inlet, also approved by J1772. Because charge times can be very long at Level 1 (see Table 2-1), many EV owners will be more interested in Level 2 charging at home and in publicly available locations. Some EV manufacturers suggest their Level 1 Cord Set should be used only during unusual circumstances when Level 2 EVSE is not available, such as when parked overnight at a non-owners home. Several companies provide kits to convert internal combustion and hybrid vehicles to plug-in vehicles. Many of these conversions use a standard 3-prong electrical plug and outlet to provide Level 1 charging of their vehicles. With the standardization of EVs on the J1772 Standard and the higher level of safety afforded by a J1772-compliant charging station, existing vehicles will need to be retrofitted to accommodate a J1772 inlet in order to take advantage of the deployment of EVSE infrastructure.
Conceptual Design for Chevy Volt, Electrifying the Nation, PHEV Summit, Tony Posawatz, January 2009 Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 10
This off-board charger is serviced by a three-phase circuit at 208, 480, or 600 VAC. The SAE standards committee is working on a standardizing the DCFC connector as they have with the Level 2 J1772 connector, but has placed the highest priority in getting the Level 1 and 2 connector approved first. The DCFC connector standard is expected to be approved soon. eTec will be utilizing DCFC equipment in infrastructure developed in 2010. DCFC was accomplished by eTec for the Chrysler EPIC in the 1990s and in many industrial applications since 1998. Similar, though smaller, equipment will be used for the coming generation of EVs.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
11
Note: Although it is uncommon, a vehicle manufacturer may choose not to incorporate an on-board charger for Levels 1 and 2, and instead utilize an off-board DC charger for all power levels. In this case, the electric vehicle would only have a DC charge port. Another potential configuration that may be found, particularly with commercial vehicles, is providing 3-phase power directly to the vehicle. This configuration requires dedicated charging equipment that will not be compatible with typical publicly available infrastructure.
General Requirements
This section identifies general requirements of Electric Vehicle Supply Equipment, also referred to as EVSE. Certification: EVSE will meet the appropriate codes and standards, and will be certified and so marked by a nationally-recognized, independent testing laboratory (e.g., Underwriters Laboratories). Owners should be cautioned against using equipment that has not been certified for EV use. Cord Length: The EVSE will provide a maximum of 25 feet of flexibility from the wall location to the EV inlet. The EV inlet location on each EV model will vary by manufacturer; however, this standard length should be sufficient to reach from a reasonably-positioned EVSE to the inlet. Tripping hazard: An extended EV cord may present a tripping hazard, so the EVSE should be located in an area with minimum pedestrian traffic. If the EVSE must be installed in an area with high pedestrian traffic, it would be appropriate to install a cord management system.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
12
Ventilation Requirements: Charging of the Nissan LEAF will not require ventilation. The charging within the EV Project also will not involve the need for ventilation. However, if there are special ventilation requirements for a battery charged by publicly available EVSE, the EVSE will be required to automatically energize a properly-sized ventilation system. This type of requirement is expected to be extremely rare, since automobile manufacturers are expected to use non-gassing batteries. Some EV owners who convert their own vehicles to electric or purchase conversion vehicles may use gassing batteries. The approved EVSE will communicate with the vehicle to specifically check for any ventilation requirements for the battery being charged; and, if ventilation is required, but no ventilation system exists, the EVSE will not charge the vehicle. In multi-family or parking garage situations that may already have ventilation systems for exhaust of normal vehicle emissions, that system typically would be expected to suffice. However, professional calculations should verify this result. It may also be impractical to wire the charger to the ventilation controls or costly to run the system for a single vehicle charging. In these cases, it may be prudent to specify that the chargers are intended for non-gassing batteries only. Energized Equipment: Unless de-energized by the local disconnect, the EVSE is considered to be electrically energized equipment. Because it operates above 50 volts, Part 19 Electrical Safety of the Occupational Health and Safety (OHS) Regulation requires guarding of live parts. EVSE may be positioned in a way that requires a physical barrier for its protection. Wheel stops are recommended to prevent a vehicle from contacting the EVSE. They also help position the EV for the optimum location for charging.
6 7
Rubberform Recycled Products LLC, www.rubberform.com ProPark Garage Wheel Stop, www.organizeit.com 13
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
Shortest Run: In addition to the above requirements, the lowest-cost installation generally is the location closest to the electrical supply breaker because it minimizes the conduit run to the charger. Ergonomics/Ease of Use: EV owners will find it most convenient to have the EVSE located near the EV inlet. In some cases, it may be desirable to back into the garage, which helps reduce the tripping hazard while at the same time reducing the electrical circuit run to the EVSE, which reduces installation costs.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
14
4. Charging Scenarios
A. Single Attached/Detached Garages Power Requirements
Level 1 Dedicated branch circuit with NEMA 5-15R or 5-20R Receptacle. Level 2 Dedicated branch circuit hardwired to a permanently-mounted EVSE with the following specifications: 240VAC/Single Phase, 4-wire (2 Hot, GND, and Neutral), 20, 30 or 40Amp Breaker. Level 2 Notes: o The breaker size recommended will meet the requirements of almost all BEVs and PHEVs. A PHEVs with a small battery pack (see Table 3.1) may only require a 20 or 30Amp breaker for its recommended EVSE, in which case the breaker can be easily changed. The Neutral may not be required by some EVSE, but since it is inexpensive to include and may be required in the future if a different vehicle is purchased, it is recommended. For new construction, bring the circuit to a dual gang box with a cover plate for future installation of EVSE. For new construction that is incorporating an advanced internet network within the home, an internet connection at the EVSE location would be advisable. For existing homes, the value of providing an internet connection at the EVSE location is unknown at this time, and is left up to the individual homeowner. It is likely that wireless methods will be available in cases where a hard connection is not available. Many Level 2 EVSE suppliers will provide controls in the EVSE to control charging to programmable times to take advantage of off-peak power pricing. If not, homeowners may desire to install a timer device in this circuit to control charging times.
o o
Siting Requirements An indoor-rated EVSE is acceptable for an enclosed garage. The EV owner probably will prefer a particular location for the EV. However, the EV should be positioned so that the above general requirements are considered. This often means the EV will be at the farthest point from the residence entry into the garage. The installation of the EVSE at the front of the vehicle may be acceptable unless the cord becomes a tripping hazard. Often the EVSE will be placed on an exterior wall to shorten the distance from the electrical box and at the same time positioning the EVSE out of the way.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
15
If the EVSE is installed after the EV has been purchased and is accommodating a single vehicle, the location of the EV inlet will play a key part in the location of the EVSE. It is best to keep the EVSE as close to the inlet as possible to minimize how much the cord is spread out on the floor. If the branch circuit is installed prior to the EV purchase, the garage junction box should be on the wall closest to the utility service connection, consistent with the general requirements above. Typical locations are shown in the figure below.
In Figure 4-1, the best location would be for the EV on the right. The non-preferred EVSE locations are in typical walking areas and could present a tripping hazard. In addition, these locations are further away from the utility panel. An option for the EV owners desire to place the EVSE in these locations could be accommodated by using an overhead support for the charge cable and connector. If the EV inlet is on the left side of the vehicle, the owner could consider backing into the garage.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
16
In the single garage environment, most locations will be acceptable for locating the EVSE, except at the head of the vehicle because of tripping concerns. The preferred locations were selected for their proximity to the utility panel. Again, overhead support for the EVSE cable would allow EVSE installation at the head of the vehicle to accommodate an owner preference. The NEC provides additional requirements should the EVSE be located in a hazardous area. The other materials stored in the garage also should be considered when placing the EVSE if they are determined to be of a hazardous nature. Detached garages will involve additional considerations when routing the electrical supply to the garage. Landscaping will be disrupted during the installation process. This may be of great significance to the owner and should be thoroughly planned in advance.
Installation Process
Installation of the EVSE in a residential garage typically consists of installing a dedicated branch circuit from an existing house distribution panel to an EV outlet receptacle (120 VAC, 15/20 A) in the case of Level 1 charging, or to an EVSE unit (operating at 240 VAC, 40 A) for Level 2 charging. If the garage was built with the conduit or raceway already installed from the panel to the garage, installation is simplified.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
17
Figure 4-3 Typical Level 1 and Level 2 Installations for a Residential Garage
The specific steps involved in this process are shown in the installation flowchart in Figure 4-4. In general, they include: Consultation with the EV dealer to determine whether Level 1 or Level 2 EVSE is required, whether ventilation will be required, and which EVSE to purchase Consultation with the electric utility to notify them of the installation of an EVSE, including checking for any special requirements such as a second meter to submeter the energy used for EV charging. Consultation with a licensed electrical contractor to plan the installation effort, including location of the EVSE, routing the raceway from the utility service panel to the EVSE, Level 1 or Level 2 requirements, ventilation requirements, adequacy of the current utility service, and to obtain an installation quote. Submission of required permitting documents and plans. Completion of EVSE installation and utility service components, if required. Inspection of final installation.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
18
If the garage has a pre-existing raceway, a 120 VAC, 15/20 amp circuit or a 240 VAC, a 40 amp circuit can be installed. Some homes may not have sufficient utility electrical service to install this circuit. In that case, either a new service must be added as noted previously, or installation of an approved load control device may allow the homeowner to avoid a major panel upgrade and the utility to avoid upgrading the electrical service to the homeowner.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
19
Although a new home may already have the raceway installed, a permit for the service still will be required. Increasingly, standards are directing that a raceway for an electric vehicle be included in new home construction. The conductors may or may not be included. If included, consideration should be given to sizing the conductors for the 240 VAC, 40 amp circuit, required for Level 2 charging, but installing the 120 VAC, 20 amp Level 1 breaker and receptacle. The homeowner then would have a functional circuit that could be upgraded easily to Level 2, if desired. A local electrical contractor is needed to evaluate the need of adding a new service vs. upgrading the existing service, and utility fees may apply.
Siting Requirements
The siting requirements for a carport will include those identified above for the garage. Some EV owners may elect to place the EVSE in the garage, but charge the EV outdoors. This scenario is similar to the carport requirements. A carport is considered to be an outdoor area, and the EVSE should be properly designed for exterior use. Consideration must be given to precipitation and temperature extremes. In geographic areas that experience high precipitation, pooling of water in the carport or driveway may be a concern. While the EVSE charging is very safe when using the J1772, owners may be uncomfortable with standing in pooled water while connecting the EVSE. Consultation with the owner will be required when locating the EVSE.
Freezing temperatures can cause cords to freeze to the parking surface, and cord support should be considered. Adequate lighting is an additional consideration, along with mitigating efforts to prevent vandalism, as noted in Section 5. The installation process is similar to the garage process outlined previously.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
20
Siting Requirements
In multi-family dwellings, there will be additional considerations because the apartment or condominium owner also must be involved in any siting decisions. It is best that the potential EV owner work through the details identified here prior to purchasing an EV. The EV owner generally will prefer a site close to his or her dwelling, but this may not be in the best interests of the apartment owner. In addition, special flooding or drainage conditions may be present. Lighting and vandalism concerns will exist. Payment methods for the electrical usage will need to be identified. There may be insurance and liability questions, as well as damages if the EVSE is vandalized. All of these concerns should be discussed prior to the EV purchase. Should the EV owner later relocate, the electrical installation raceway and panel upgrades, if any, will be retained at the multi-family location. Ownership of the EVSE needs to be identified clearly. If the EV owner takes the EVSE, site restoration may be required. Circuit removal or de-energizing methods should be settled. Discussion with the utility is also required, since there may be metering questions or other issues to be resolved. In condominiums, the Homeowners Association (HOA) may be involved to approve EV additions.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
21
In general, unless the location is well protected from the environment, the EVSE will need to be outdoor rated. Installation of the EVSE at the front of the vehicle may be the only choice unless an adjacent wall is available. If it is located at the front of the parking stall, the EVSE should be placed on the vehicle side of any walkway to minimize the cord becoming a tripping hazard. The walkway for pedestrians then would be on the back side of the EVSE. Because a wheel stop will be installed, consideration should also be given to make sure the EV parking is not in an area of normal pedestrian traffic, in order to avoid pedestrians tripping over the wheel stop when no vehicle is present. Trenching and concrete work and repairs are likely. Consideration must be given to maintaining a safe and secure area around the parking stall to avoid tripping hazards or EVSE interference with other operations.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
22
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
23
Installation Process
If the parking area has a pre-existing raceway, the wishes of the EV owner and property owner can determine whether this will be a 120 VAC, 15/20 amp circuit or a 240 VAC, 40 amp circuit. This would also require review by the electrical contractor to verify that the service panel is sufficient to support this choice. Although a raceway may have been installed previously, a permit for the service still will be required.
Siting Requirements
At the present time, commercial fleets make up the highest population of EVs. Utilities, governmental agencies, and other private fleets have been encouraged themselves and are encouraging the private sector adoption of EVs. A significant amount of planning is required to correctly size EV parking and charging area ratios. Consideration should given to current needs, as well as anticipated future requirements. Electrical service requirements will be much higher than residential or multi-family installations, and can have a significant impact on electrical usage on the electric distribution system and on the utility itself. For that reason, electrical utility planners need to be involved early on in large fleet planning processes. The individual homeowner will be strongly encouraged to do electric vehicle charging during off-peak times, as will fleet managers. Flood-prone area restrictions must be considered, as well as issues of standing water. Often large parking lots have low spots where water accumulates. Although the Level 2 EVSE contains the proper protection device, employees will not be comfortable operating the EVSE in standing water.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 24
Installation of EVSE in a commercial facility typically consists of installing new dedicated branch circuits from the central meter distribution panel to a Level 2 EVSE. In a commercial fleet, there are typically many such EVSE units in adjacent parking stalls. Proximity to the electrical service is an important factor in locating this parking area. The length of the circuit run and the number of units will have an impact on the installation and power costs. Because these EVSE units are in designated areas set aside for EV charging, the potential for pedestrian traffic can be controlled. Although fleet charging often has limited access, it also has greater overall security, such as fences and gates, so the threat of vandalism is minimized. Fleet managers must be aware of other equipment that will be stored in the vicinity of the EVSE. It is important that a hazardous environment does not already exist in the area planned. Fleet manager interests and priorities can also lead to the implementation of DCFC. The higher recharge rate means a shorter turnaround for each vehicle and maximizes on-road time. The 480/600 VAC required is generally available in commercial facilities.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
25
Installation Process
The installation process is similar to the processes shown previously, except that much more detailed planning is involved prior to the owners final decision and obtaining permits.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
26
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
27
Power Requirements
Level 2 Dedicated branch circuits hardwired to permanently-mounted EVSE with the following specifications: 208VAC or 240VAC / Single Phase, 4-wire (2 Hot, GND, Neutral), 40Amp Breaker DCFC Dedicated branch circuit hardwired to permanently-mounted charger supplied with the circuit, as specified in the installation manual. DCFC chargers rated up to 30kW may require either 208AVC/3-Phase or 480VAC/3-Phase. DCFC chargers greater than 30kW generally will require 480VAC/3Phase.
Example Sizes 1. For 30kW Output Power, typical input power requirements are: 208VAC/3-Phase, 4-wire (3-Hot, GND), 125 Amp Breaker, -or480VAC/3-Phase, 4-wire (3-Hot, GND), 60 Amp Breaker
2. For 60kW Output Power, typical input power requirement is: 480VAC/3-Phase, 4-wire (3-Hot, GND), 125 Amp Breaker
Communication probably will be desired for any publicly available charge stations, but it is not necessarily required. Wireless methods are the most likely to be utilized, but if a hardwired internet connection is available, it is generally preferable to wireless.
Siting Requirements
Siting requirements for publicly available charging are similar to other scenarios previously discussed, but involve additional considerations. Topics such as ownership, vandalism, payment for use, maintenance, and data collection are addressed in the following sections. Flood-prone area restrictions must be considered, as well as issues of standing water or high precipitation. As noted above, EV owners will not be comfortable operating the EVSE in standing water. Unlike fleet use, the area designated for public use should be in a preferred parking area. Also unlike fleet use, the area is public, so the threat for vandalism will be greater. This generally will be in a high pedestrian traffic area, so placing the charger in a way that avoids the charge cord or wheel stop being tripping hazards is very important.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
28
There are several ways to address protection of the equipment, shelter, signage, and pedestrian safety. The following pictures provide several examples.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
29
Some publicly available charging will be driven by commercial businesses interested in promoting EV use due to personal preference or as part of LEED certification. These business owners may decide on their own to purchase and install systems or to participate in these costs. Other business owners will be receptive to placing chargers in their parking lots once approached with incentives. And other public, private, and governmental agencies will install EVSE out of support for EVs. Mapping these selected locations will provide input to an overall municipal plan identifying the ideal sites to ensure wide coverage of publicly available charging. Publicly available sites also will invoke accessibility requirements and affect the number of parking stalls with EVSE that are accessible and van accessible. This is further discussed in Section 5. Lighting and shelter are extremely important in public sites. The EV owner must feel safe when parking at night, and must be able to read directions and properly locate the EV connector and insert into the EV inlet. Installation of the EVSE in a public area typically consists of installing new dedicated branch circuits from the central meter distribution panel to a Level 2 EVSE. There probably will be many such EVSE units in adjacent parking stalls. Proximity to the electrical service is an important factor in locating this parking area. The length of the circuit run and the number of units will have a significant impact on the cost. The cost of providing power to a EV parking location must be balanced with the convenience of the parking location to the facilities being visited by the EV owner. An EV owner may find it more convenient for a large shopping mall to have two or three EV parking areas, rather than one large area, although the installation cost for three areas will be greater than the cost for one; however, the utilization rate might be significantly higher.
Figure 4-12 Example Shopping Mall EVSE Parking Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 30
Local area aesthetics are also important, and may require the installation of landscaping or screening walls to shield the electrical transformer, panel, or other equipment from the public eye. Trouble reporting can be very important in public charging areas. Each publicly available charging area should be equipped with a method whereby the EV user can notify the equipment owner of trouble found with the equipment. Public satisfaction will suffer if stations are found to be out of service or not kept in an appealing condition. This may be a normal business call number, or a service call number that monitors many publicly available charging locations. This will require a communications line. At a minimum, a sign may be posted at the EVSE location directing comments to a particular office or store location.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
31
Installation Process
The installation process is similar to the processes shown previously, except that much more detailed planning is required prior to submittal of plans for obtaining permits.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
32
The quality of the advance planning will determine the quality of the final installation and ultimately, the EV owners acceptance and satisfaction.
Curbside Charging
Curbside charging is not necessarily associated with a commercial business. Generally speaking, these areas are owned by the municipality rather than private interests. Many of the same considerations noted above apply.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
33
Previous experience has shown that signs that follow the red on white standards for No Parking work best to keep non-EV drivers from occupying designated charging spaces. The Manual on Uniform Traffic Control (MUTCD) defines the standards used by road managers nationwide to install and maintain traffic control devices on all public streets, highways and private roads open to the public. The examples in Figure 5-1 follow MUTCD standards. Sites that have friendly green or blue EV Parking or EV Parking Only are not recognized by the public. No Parking signs in blue may be mistaken for an accessible location. Green signs are often mistaken for short-term parking signs. Wide spread adoption of EVs will include maps or websites identifying charging locations. It is helpful to post EV parking area signs on adjacent streets and access points directing EV drivers to the charging locations.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
34
Just as in residential garages or car ports, lighting is important so that pedestrians can avoid tripping over extended charge cords while the EV is charging.
C. Accessibility Requirements
Current state and federal regulations do not provide design criteria that specifically address EV parking and charging; however, certain design requirements were added to the National Electric Code for accessible EVSE, and some municipalities provide guidance for accessible EV parking locations. New standards may be developed; therefore, recommendations herein constitute the best guidance to date. There are two possible scenarios to consider when establishing charging stations and accommodating persons with disabilities: where the primary purpose is EV charging, and where the primary purpose is accessible parking.
1 50 51 100
1 2
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
35
The accessible EV charging stations should be located in close proximity to major buildings and site facilities; however, these charging stations need not be located immediately adjacent to the buildings and other facilities like traditional ADA parking, since EV charging, not parking, is considered the primary purpose.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
36
8 9
44CFR60.3(a)(3)
FEMA Publication 348 Principles and Practices for the Design and Construction of Flood Resistant Building Utility Systems, November 1999 Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 37
Card Readers
Several types of card readers exist that may be incorporated with an EVSE. Credit/debit card readers would be simple to use and are already widely accepted by the public. The credit/debit card would record a fee each time the publicly available charging is accessed and would base the fee upon the number of times the unit is accessed, rather than length of time on charge. A smartcard is a card that is embedded with a microprocessor or memory chip, so it can securely store more detailed information than a credit/debit card. The smartcard could be sold with a monthly subscription or in a pre-paid model and could be embedded with more information on the user. That information could be captured in each transaction and used for data recording, as noted in Section G below. The smartcard could be used for a pre-set number of charge opportunities or to bill a credit card number for each time of access. In both cases, a communication system from the reader to a terminal for off-site approval and data recording will be required. Receipt of approval then may close a contact for power to be supplied to the EVSE.
10
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
Communications terminal
RFID Reader
11
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
G. Data Collection
More than simply recording payment for service, the use of a smartcard or RFID can substantially increase the amount of information available at each publicly available charging station. Data collection systems can track usage at each of the stations and provide feedback on actual EV usage. It may be found that usage at some venues is lighter than expected whereas usage at others may be heavier. This information could be helpful in expanding publicly available charging locations. In addition, the time of day usage may show peak usage at unexpected times, which may impact power utilization. Some EVSE may include features to allow a wide range of data to be collected.
H. Vandalism
Publicly available charging carries the risk of vandalism and theft. Destruction or damage of property through purposeful defacing of equipment is a possibility, however, such vandalism actually proved to be very minimal during EV usage during the mid1990s. Still, as public acceptance and the number of publicly available charging sites continue to grow, steps should be taken to minimize this possibility. Most EVSE can be constructed of materials that will clean easily and allow removal of graffiti. Careful planning of site locations to include sufficient lighting and equipment protection will discourage damage and theft. Motion sensor activated lighting may be a benefit to users and a deterrent for abusers. EVSE with cable retractors or locking compartments for the EVSE cord and connector may be designed. Location of the EVSE in security-patrolled areas or within sight of manned centers will discourage vandalism. EVSE owners in condominiums and apartments may wish to protect the equipment by installing it behind existing gates or with an additional lockable, secure cabinet to prevent unauthorized use and for protection from vandalism.
I. Station Ownership
Ownership of an individual charging station may not be entirely clear. A business owner may wish to host publicly available charging, but may not have the legal right to the parking lot or for making improvements. Charging stations constructed with public grants or other financing may have split ownership. One entity may own the charger and another may own the infrastructure. The sale of a business may include the EVSE or the sale of the property may include both. EVSE may be rented or leased equipment. Before planning any installation, it is important to identify the entities that have legal rights with respect to the equipment and its installation. For individual EV owners, the ownership of the EVSE resides with the owner. The ownership of the installation resides with the property owner. However, both may share legal responsibilities and liabilities for the equipment and both should be protected by insurance.
12
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
For publicly available charging, there may be a combination of owners. Utilities may wish to own and manage the public charging infrastructure in order to manage power requirements. Upon widespread EV market penetration, ownership of new public charging may then shift to private ownership. Several businesses may join together to promote EV usage and may share in the EVSE ownership.
J. Maintenance
The EVSE typically will not require routine maintenance. However, all usable parts can wear, and periodic inspections should be conducted to ensure that all parts remain in good working order. Periodic cleaning may be required, depending upon local conditions. Testing of communications systems and lighting should be conducted periodically. Repair of accidental damage or purposeful vandalism may also be required. Unless otherwise agreed, these responsibilities generally fall to the owner identified in Section G above.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
41
A. Regulatory Agencies
Tennessee Code Annotated (T.C.A.) 68-120-101 requires the State Fire Marshal (Commissioner of the Department of Commerce and Insurance) to adopt rules establishing minimum statewide building construction safety standards. T.C.A. 68102-113 and 143 authorize the Commissioner of the Department of Commerce and Insurance to adopt an electrical code and require the inspection of electrical installations. The Department of Commerce and Insurance adopted minimum statewide building construction safety standards and requires plans review of educational and daycare occupancies, state buildings, detention and correctional occupancies, assembly occupancies with a capacity of 300 or more, covered malls and high hazard occupancies, business occupancies of three or more stories, and residential occupancies, excluding one- and two-family dwellings and townhouses. Local units of government are allowed to adopt and enforce building construction safety standards for most buildings regulated by the Department of Commerce and Insurance and the electrical code, so long as it adequately enforces its codes and its codes are within seven years of the most recent edition of the state code. Local governments are allowed to adopt and enforce building construction safety codes for those buildings and occupancies not regulated by the Department of Commerce and Insurance.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
42
o o
Section 625.13 Electric Vehicle Supply Equipment. o Electric vehicle supply equipment rated at 125 volts, single-phase, 15 or 20 amperes or part of a system identified and listed as suitable for the purpose and meeting the requirements of 625.18, 625.19, and 625.29 shall be permitted to be cord-and-plug-connected. All other electric vehicle supply equipment shall be permanently connected and fastened in place.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
43
Section 625.14 Rating. o Level 1. 125 VAC. This method, which allows broad access to charge an EV, permits plugging into a common, grounded 125-volt electrical receptacle (NEMA 5-15R or 5-20R) when cord-and-plug is approved. Level 2. 240 VAC, 40 amp electric vehicle supply equipment shall be permanently connected and fastened in place. All EVSE shall be marked FOR USE WITH ELECTRIC VEHICLES and VENTILATION NOT REQUIRED or VENTILATION REQUIRED
Section 625.16 Means of Coupling. o The means of coupling to the electric vehicle shall be either conductive or inductive. Attachment plugs, electric vehicle connectors, and electric vehicle inlets shall be listed or labeled for the purpose.
Section 625.17 Cable. o The electric vehicle supply equipment cable shall be Type EV, EVJ, EVE, EVJE, EVT, or EVJT flexible cable, as specified in Article 400 and Table 400.4. The overall length of the cable shall not exceed 7.5 meters (25 feet) unless equipped with a cable management system that is listed as suitable for the purpose.
Section 625.18 Interlock. o Electric vehicle supply equipment shall be provided with an interlock that de-energizes the electric vehicle connector and its cable whenever the electrical connector is uncoupled from the electric vehicle. An interlock shall not be required for portable cord-and-plug-connected electric vehicle supply equipment intended for connection to receptacle outlets rated at 125 volts, single phase, 15 and 20 amperes.
Section 625.19 Automatic De-Energization of Cable. o The electric vehicle supply equipment or the cable-connector combination of the equipment shall be provided with an automatic means to de-energize the cable conductors and electric vehicle connector upon exposure to strain.
Section 625.22 Personnel Protection System. o The electric vehicle supply equipment shall have a listed system of protection against electric shock of personnel. Where cord-and-plugconnected electric vehicle supply equipment is used, the interrupting device of a listed personnel protection system shall be provided and shall be an integral part of the attachment plug or shall be located in the power supply cable not more than 300 millimeters (12 inches.) from the attachment plug.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
44
Section 625.25 Loss of Primary Source. o Means shall be provided such that, upon loss of voltage from the utility or other electrical system(s), energy cannot be back fed through the electric vehicle and the supply equipment to the premises wiring system unless permitted by 625.26.
Section 625.26 Interactive Systems. o Electric vehicle supply equipment and other parts of a system, either onboard or off-board the vehicle, that are identified for and intended to be interconnected to a vehicle and also serve as an optional standby system or an electric power production source or provide for bidirectional power feed shall be listed as suitable for that purpose.
Section 625.29 Indoor Sites. o (B) Height. Unless specifically listed for the purpose and location, the coupling means of the electric vehicle supply equipment shall be stored or located at a height of not less than 450 millimeters (18 inches) and not more than 1.2 meters (4 feet) above the floor level.
Section 625.30 Outdoor Sites. o (B) Height. Unless specifically listed for the purpose and location, the coupling means of electric vehicle supply equipment shall be stored or located at a height of not less than 600 millimeters (24 inches) and not more than 1.2 meters (4 feet) above the parking surface.
C. SAE and UL
Currently, the SAE has determined that there will be a single conductive coupler design. J1772 SAE Electric Vehicle Conductive Charge Coupler is the standard that is being used by automotive suppliers in the United States. While J1773, the Inductive Charge Coupler, is still active, none of the automakers are using this method. Applicable SAE Standards include: SAE J1715 Hybrid Electric Vehicle (HEV) & Electric Vehicle (EV) Terminology SAE J1772 Electric Vehicle and Plug-in Hybrid Electric Vehicle Conductive Charge Coupler SAE J2847 Communication between Plug-in Vehicles SAE J2836 Use Cases for Communication SAE J2894 Power Quality Requirements for Plug-in Vehicle Chargers SAE J2931 Power Line Carrier Communications for Plug-in Electric Vehicles SAE J551 Vehicle Electromagnetic Immunity
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
45
SAE J2293 establishes requirements for EV and the off-board EVSE used to transfer electrical energy to an EV from a utility source. This document defines, either directly or by reference, all characteristics of the total EV Energy Transfer System (EV-ETS) necessary to ensure the functional interoperability of an EV and EVSE of the same physical system architecture. The ETS, regardless of architecture, is responsible for the conversion of AC electrical energy into DC electrical energy that can be used to charge an EVs storage battery. J2847 provides specifics on digital communications. J2836 provides use case for digital communications between vehicle and EVSE. J2894 addresses on-board charger power quality. J551 provides standards for electromagnetic compatibility. The UL provides testing and certification that equipment complies with relevant standards, especially in areas involving public safety. The following UL standards form a basis for certifying EVSE: UL 2202 Electric Vehicle (EV) Charging System Equipment UL 2231-1 Personnel Protection Systems for Electric Vehicle (EV) Supply Circuits: General Requirements UL 2231-2 Personnel Protection Systems for Electric Vehicle (EV) Supply Circuits: Particular Requirements for Protection Devices for Use in Charging Systems UL 2251 Plugs, Receptacles and Couplers for Electric Vehicles UL2594 Electric Vehicle Supply Equipment
Equipment that successfully completes the testing is certified, approved, or listed as meeting the standard. In general, the SAE and UL requirements are more restrictive, and are expected to be incorporated in harmonized standards.
D. Construction Codes
Tenn. Comp. Rule and Reg. 0780-02-02-.01, effective September 1, 2008, adopts the 2006 edition of the International Building Code, except for Chapters 11 (accessibility) and 27 (electricity). Tenn. Comp. Rule and Reg. 0780-02-02-.01, effective December 16, 2008, adopts the 2006 edition of the International Fire Code. Tenn. Comp. Rule and Reg. 0780-02-03-.02, Submission of Plans, requires the submission of plans and specifications for certain buildings, but the installation of EVSE is unlikely to require submission of plans unless the installation is part of a larger project or construction on state property. Chattanooga, Knoxville, and Nashville and many of their surrounding communities have adopted local codes, and each county and municipality may have its own specific requirements regarding permits. The City of Chattanooga has adopted the following codes: o o o o Building 2006 IBC Mechanical 2006 IMC Electrical 2005 NEC Residential 2003 IRC
46
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
o o o o o o o o o o o o o o o o o o o o
Fire 2006 IFC Energy 2006 IECC Fuel 2006 IFGC Plumbing 2006 IPC Building 2003 IBC Mechanical 2003 IMC Electrical 2005 NEC Residential 2003 IRC Fire 2003 IFC Energy 2003 IECC Fuel 2003 IFGC Plumbing 2003 IPC Building 2006 IBC and 2006 IEBC Mechanical 2006 IMC Electrical 2005 NEC Residential 2006 IRC Fire 2006 UFC Energy 2006 IECC Fuel 2006 IFGC Plumbing 2006 IPC
The City of Knoxville has adopted the following codes, with local amendments:
Nashville/Davidson County has adopted the following codes, all with local amendments: o o o o o o o o Building 2006 IBC Mechanical 2006 IMC Electrical 2005 NEC Residential 2006 IRC Fire 2006 IFC Energy 2006 IECC Fuel 2006 IFGC Plumbing 2006 IPC
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
47
13
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
7. Utility Integration
A. Background
Electric utilities are under significant pressure to maintain a dependable, clean, low-cost electrical supply to their customer base. In order to achieve these goals, utilities are evaluating, and in some cases implementing, Smart-Grid technologies that allow them to monitor and control various electrical loads on their system. Through these SmartGrid technologies, utilities intend to minimize or defer investment in new power supply, distribution, and transmission systems, while minimizing the impact to the customer. Advanced Metering Infrastructure (AMI), or smart meters, are being deployed by some utilities to provide remote meter reading. Depending on the level of sophistication, smart meters may enable customers to manage their own energy use, and utilities to implement programs such as time-of-use rates, demand response, real-time pricing, and direct load control. Electric vehicles, like water heaters, are one of the better residential loads for utilities to control through smart meters, because delaying the charge of the EV battery has no immediate impact on the customer, in contrast to lighting or air-conditioning loads, which may. Additionally, a neighborhood transformer may not be sized to accommodate every EV in the local area at the same time. The ability to schedule EV charging could significantly extend the life of that transformer and delay transformer replacement. As the penetration levels of EVs increase, load control strategies for multi-family dwellings may allow the utility to control the charge times to maximize effectiveness and utilization of existing transformers. During residential EVSE installations, the electrical contractor will evaluate the electrical service capabilities of the existing system. If inadequate power is available at the service entrance, a service upgrade may be required. The electrical contractor will coordinate with the local utility to determine the lowest-cost method, as utility fees may apply.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
49
14
Figure 7-1 illustrates many features of a residential Smart Grid, including renewable and distributed energy resources and electric vehicle integration. There are various mechanisms for utilities to control EV load, including the following.
14
Successful Integration of Plug-in Electric (PEV) Transportation Systems, EPRI, Plug-In 2009 Canada, September 2009
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 50
Dual Metering
Some utilities may provide a special rate for EV charging and may require the installation of a second meter to track energy used as transportation fuel. This will require additional installation time, since the utility must install the meter before the EVSE can be used. The use of a revenue grade meter in the EVSE and a communications path to allow the utility direct access and control may eliminate the need for a second meter.
Demand Response
Demand response is a voluntary program that allows a utility to send out a signal to customers (typically large commercial customers) to cut back on loads when electrical use is high throughout their power service territories. The customers are compensated when they participate in these programs to make it worth their while. EVs may participate in such programs in the future, as deployment of smart meters becomes more prevalent. Utilities may enter into contracts with EV owners to allow the utility to maintain more control on EV charging.
Vehicle-to-Grid (V2G)
V2G is a concept that allows the energy storage in electric vehicles to be used to support the electrical grid during peak electrical loads, either to enhance reliability or to lower power delivery costs. A related concept is V2H, or vehicle-to-home, whereby the energy stored in the vehicle battery could provide power to the home during grid outages or when the grid is stressed. Both V2G and V2H require a bi-directional vehicle charger (energy can flow both directions) and EVSE. V2G further requires accommodating utility safety standards for flowing energy back into the electrical grid. Although there are various developmental pilot efforts in V2G, this concept for on-road EVs is probably several years away from implementation on any commercial scale.
B. Interconnection Requirements
Although V2G connections may be in the future for most applications, some infrastructure will incorporate EVSE with solar parking structures or other renewable resources. Because these systems will feed energy back to the local grid, it will be necessary to contact the local utility to determine interconnection requirements. These requirements are in place to protect personnel and property. Generally utilities already have procedures in place for connecting solar photovoltaic and wind systems to the utility.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
51
C. Electrical Supply/Metering
There are typically two primary scenarios for connection to an electrical supply. The first is utilizing the existing main service entrance section (SES) or an otherwise adequate supply panel, and the second is to obtain a new service drop from the local electric utility. The decision on which approach to take depends on a number of factors, including: the ability to obtain permission from the property owner and/or tenant the location of the existing SES the location of the proposed electric vehicle charge station.
If permission is granted by the property owner and/or tenant (as required), then a fairly simple analysis can be performed to compare the cost of utilizing an existing supply or a new service drop. A new utility service drop typically will require establishing a new customer account, which may include a credit evaluation of the entity applying for the meter, as well as a monthly meter charge in addition to the energy and applicable demand charges. In addition, the local utility may require an analysis of the anticipated energy consumption in order to justify covering the cost of the new service. For commercial customers, consideration of peak demand charges and load factor also may be deciding factors in selecting between the use of Level 2 or DCFC for fleet applications. A commercial customer should consult with their utility for rate structure information.
D. Summary
The transition from petroleum to electricity as a transportation fuel is challenging the current paradigm for electric utilities and end-use customers. Given the complexities of this new paradigm, engaging the utility in the process at the earliest opportunity is the best practice to enhance the customer experience and minimize costs and redundant processes in EV charging infrastructure deployment.
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
52
8. Cost Estimating
This section provides cost estimate worksheets and sample costs for residential, commercial fleet, and public scenarios. The material and labor costs provided here are for general information purposes only, and should not be used for actual planning purposes.
Materials 40amp Breaker #8 THHN Wire Conduit - 3/4 EMT 40Amp Fused Disconnect Miscellaneous Material Sub-Total 1 140 35 1 1 $ $ $ $ $ 35.00 0.30 3.00 115.00 840.00 $ $ $ $ $ $ 35.00 42.00 105.00 115.00 840.00 1,137.00
Permit
85.00
85.00
Total
2,272.00
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
53
Materials Distribution Panel (400amp) 40amp Breaker #12 THHN Wire Conduit - 3/4 EMT 40Amp Fused Disconnect Signage Miscellaneous Material Sub-Total Trenching & Repair Permit 200 1 $ $ 45.00 85.00 1 10 1000 250 10 10 10 $ $ $ $ $ $ $ 650.00 35.00 0.30 3.00 115.00 250.00 2,560.00 $ $ $ $ $ $ 650.00 350.00 300.00 750.00 1,150.00 2,500.00
Total
44,675.00
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
54
Materials Distribution Sub-Panel (100Amp) 40amp Breaker #12 THHN Wire Conduit - 3/4 EMT 40Amp Fused Disconnect Ground Signage & Striping (painted) Signage (Post Mount) Miscellaneous Material Sub-Total Trenching & Repair Permit 100 1 $ $ 45.00 85.00 1 2 400 100 2 2 2 2 $ $ $ $ $ $ $ $ 250.00 35.00 0.30 3.00 115.00 125.00 250.00 2,560.00 $ $ $ $ $ $ $ $ $ $ $ 250.00 70.00 120.00 300.00 230.00 250.00 500.00 5,120.00 6,840.00 4,500.00 85.00
Total
16,095.00
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
55
Figure 8-1 Conceptual Fast Charge Station (2 Charging Stations) Table 8-4 Cost Estimate Worksheet for DCFC Installation (Two Charging Stations 30kW) Description Labor (hrs) Consultation with Property Owner/Tenant Initial Site Visit Engineering Drawings Permit Application / Acquisition Installation Approval Labor Sub-Total Materials Distribution Sub-Panel (480VAC/3Phase) Point of Sale System 60amp 480VAC/3Pole Breaker #6 THHN Wire Conduit 1" 60Amp Fused Disconnect Ground Signage & Striping (painted) Signage (Post Mount) Miscellaneous Material Sub-Total Trenching & Repair Concrete Work Permit 30 1 1 $ $ $ Total Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee 50.00 1,500.00 85.00 1 1 2 160 50 2 2 1 1 $ $ $ $ $ $ $ $ $ 650.00 2,500.00 45.00 0.30 3.50 150.00 125.00 2,500.00 50,350.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ 650.00 2,500.00 90.00 48.00 175.00 300.00 250.00 2,500.00 50,350.00 56,863.00 1,500.00 1,500.00 85.00 66,968.00 56 16 4 24 4 24 4 $ $ $ $ $ $ 95.00 95.00 90.00 95.00 95.00 95.00 $ $ $ $ $ $ $ 1,520.00 380.00 2,160.00 380.00 2,200.00 380.00 7,020.00 Quantity Cost Each Total
Electric Vehicle Charging Infrastructure Deployment Guidelines for the State of Tennessee
57