BEFORE HEADWORKS INSTALLATION 125mm NB FRP CASING WITH 80mm NB SCREENS TELESCOPED
Anticipated Casing String Run Casing float shoe 396.00 - 395.55 Drill-out Pipe 395.55 - 390.05 Centron x/over 390.05 - 389.60 45 lengths FRP 389.60 - +0.68 Stick-Up is 0.68metres
FRP Casing Grades DHC200 30 joints 0-266 Approx DHC250 9 joints 266 - 389 Approx
125mm NB FRP MAIN CASING WITH RELEVANT GRADE TO SUIT DEPTH - PRESSURE GROUTED IN
Screen Assembly SS end plate 80mm 55 Sump 80mm Screen 80mm Riser Pipe 80 x 125 Packer 416.000 410.00 - 408.00 408.00 - 396.00 396.00 - 392.00 392.00 - 391.50
TOTAL SCREEN ASY EXTENDS FROM TOP OF PACKER AT 389m TO BASE OF SUMP (BOTTOM OF HOLE) AT - 410m
Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 13ackers@ripe - packers.com
www.ripe-packers.com
Australian supplier and manufacturer of well screen PVC rubber k-packers, well packer tri-seals, equipment and services
Bore Construction: Drill for and install 273.10mm OD steel surface casing at ~66metres with a casing float shoe and centralisers and pressure grout it into place. take 2 samples of the grout slurry. Allow 12 hours for grout cure; Top up the annulus with grout to ground level as required; Drill out the shoe and drill a hole of suitable diameter to the target depth which is expected to be approximately 410metres; Stand-by while the contracted operator conducts a geophysical log of the bore; Install 125mm NB FRP casing with casing float shoe, bottom drill-out pipe, crossover and centralisers and pressure grout it into place at the depth directed expected to be at ~ 396metres. Take 2 samples of the grout slurry. (125mm NB FRP casing has a maximum diameter over the tool joints of 167mm); **The decision to grout without the bottom of the hole or to gravel pack the bottom of the hole prior to grouting is entirely at the contractor's discretion.** Allow 24 hours for grout cure; Run in and drill out the cement at the shoe; Continue to clean out the borehole to the depth required for the screen assembly, anticipated to be ~410metres; Run the 80mm NB stainless steel screen assembly and vulcanised bore packer and set it at the depth directed; develop the bore in line with the requirements of the contract; fit the head works assembly standpipe; Cast a concrete block around the standpipe at surface. the block shall be a minimum of 750mm square x 350mm deep. The top of the block shall be at ground level. The top of the standpipe shall be not less than 600mm and not more than 750mm above the top of the block. ** Surface casing depth should be decided on-site as drilling is undertaken.**