Ansi Index
Ansi Index
Ansi Index
N45.2.1 -1973
Cleaning of Fluid Systems and Associated Components During Construction Phase of Nuclear Power Plants
Reg. Guide 1.37 Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants
N45.2.2 -1972
Packaging, Shipping, Receiving, Storage, and Handling of Items for Nuclear Power Plants
Reg. Guide 1.38 Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants
N45.2.3 -1973
N45.2.4 -1972
Installation, Inspection, and Testing Requirements for Instrumentation and Electric Equipment During Construction of Nuclear Power Generating Stations
Reg. Guide 1.30 Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment
N45.2.5 -1974
Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants
Reg. Guide 1.94 Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants
N45.2.6 -1978
Qualifications of Inspection, Examination, and Testing Personnel for the Construction Phase of Nuclear Power Plants
Reg. Guide 1.58 Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel
N45.2.8 -1975
Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants
Reg. Guide 1.88 Collection, Storage, and Maintenance of Nuclear Power Plant
N45.2.9 -1974
N45.2.10 -1973
N45.2.11 -1974
N45.2.12 -1977
Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants
Reg. Guide 1.144 Auditing of Quality Assurance Programs for Nuclear Power Plants
N45.2.13 -1976
Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants Selection and Training of Nuclear Power Plant Personnel
Reg. Guide 1.8 Personnel Selection and Training
N45.2.23 -1978
N18.1 -1971
N18.7 -1972
RAINBOW SERIES
WASH-1284 Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants (Orange Book) 10-26-73 Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants - Revision 1 (Gray Book) 5-24-74 Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants (Green Book) 5-10-74
WASH-1283
WASH-1309