CA7 Scheduling
CA7 Scheduling
8.1.2. Externally tracked jobs The following SCHID will be used by jobs which are submitted outside of CA7 and Externally Tracked. SCHID DESCRIPTION 10 Externally Tracked Jobs
8.1.3. `Specific Day' jobs The following Schedule IDs are for jobs which run every "day" of their calendar, e.g. jobs which run every Working Day Monday; or jobs which run every Bank Holiday Friday. SCHID 011 012 013 014 015 016 017 DESCRIPTION Every Monday Every Tuesday Every Wednesday Every Thursday Every Friday Every Saturday Every Sunday
Page 2
SCHID 97 to 99
SCHID 100
Page 3 8.1.9. `Specific Working Day' jobs The following Schedule IDs will be used only by those jobs resolved against the Working Day Only calendar :
][DESCRIPTION 1 st working day of each month 2nd working day of each month etc. through to 23rd working day of each month (max.) Last working day of each month Every working day
8.1.10. `Specific Day of Month' jobs The following Schedule IDs will be used only by those jobs resolved against the Every Day or Working Day Only calendars :
SCHID 1xy
SECOND DIGIT x = Day 3 = Monday 4 = Tuesday 5 = Wednesday 6 = Thursday 7 = Friday 8 = Saturday 9 = Sunday
THIRD DIGIT y = week in the month 1 = 1 st week 2 = 2nd week 3 = 3rd week 4 = 4th week 5 = 5th week 6 = Last week -3 7 = Last week -2 8-= Last week -1 9 = Last week
8.1.11. `Specific Dates of the Month' jobs The following Schedule IDs must be used only by those job resolved against the Every Day calendar :
Page 4
SCHID
201 to 231 232 to 239
[DESCRIPTION
1 st of the Month through to 31 st of the Month
SCHID
240 to 244
DESCRIPTION Half-yearly - second Monday of January and July Annual Jobs Quarterly - last day of months.: 3, 6, 9, 12 Quarterly - first Saturday of months : 1, 4, 7, 10 Quarterly - first Sunday of months : 1, 4, 7, 10 Quarterly - second Friday of months : 2, 5, 8, 11 Quarterly - third Saturday of months : 3, 6, 9, 12 Quarterly - third Friday of months : 3, 6, 9, 12
Page 5
SCHID
DESCRIPTION
ED
WO BH IN
1. When calendars are defined, holidays which fall on Saturdays and Sundays must not be defined as NOSCHDDAYS. 2. Any additional calendars must have a unique first letter to comply with the standard for schedule header jobs, and their use must be agreed with the CSO Operate MVS Scheduling Team, who will liaise with MVS Production Control North who will supply the calendar. 8.2.2. Scheduled headers All scheduled header jobs must have a #NOX card in the JCL 8.2.3. `Simple Scheduled' headers The jobname format of all scheduled header jobs (except for Complex and Symetric scheduled headers - see below), will be as follows : rxxxhhmz where : . r = the roll parameter: N - do not roll on non-schedule days
D - do not run on non-schedule days F - roll forward on non-schedule days B - roll backward on non-schedule days
Page 6