PIPE WALL THICKNESS CALCULATION
PETRONAS
GAS
BERHAD
Document No.
Revision
Date
Confidential
9000-PRISM-12-05-00-PI-CAL-001
B
25/03/13
Page 1 of 5
Document No:
9000-PRISM-12-05-00-PI-CAL-001
Revision Record
Revision No.
B
Revision Description
Date
Rev
No.
25/03/13
Review
Origin.
Process
Mech/
Piping
HH
MSMS
HH
HH
MSMS
HH
Pipeline
Approval
Instr
Civil/
Struct
Elec.
Tech
Advisor
Originators
Section
Head
Eng. Mgr
Project Mgr
MSM
MNAK
MNAI
MJMI
MDK
ARM
JMI
JA
MSM
MNAK
MNAI
MJMI
MDK
ARM
JMI
JA
Table of Content
1.0
SCOPE
2.0
METHODOLOGY
3.0
RESULTS
4.0
CONCLUSION
PETRONAS
GAS
BERHAD
Document No.
Revision
Date
Confidential
9000-PRISM-12-05-00-PI-CAL-001
B
25/03/13
Page 2 of 5
1.0
PETRONAS
GAS
BERHAD
Document No.
Revision
Date
Confidential
9000-PRISM-12-05-00-PI-CAL-001
B
25/03/13
Page 3 of 5
SCOPE
This calculation refers to wall thickness for stations piping for Prai II Lateral Gas Pipeline
Project (PRISM).
2.0
METHODOLOGY
a)
where
t
S
E
T
P
F
D
T
where
t
SH
T
P
D
PETRONAS
GAS
BERHAD
Document No.
Revision
Date
Confidential
9000-PRISM-12-05-00-PI-CAL-001
B
25/03/13
Page 4 of 5
Information
Material is API 5L Gr B/ASTM A 106 Gr. B/ ASTM A 333 Gr. 6
Design pressure is 1000 psig (6895 kPa)
Design factor is 0.5 for location Class 3 and 0.4 for location class 4
SMYS is 35,000 psi
Corrosion allowance is 0 mm
Mill tolerance is 12.50%
Note: ASTM A 333 Gr.6 material is for blowdown piping
3.0
RESULTS
a)
1
1
1
2
3
4
8
10
12
12
14
16
20
24
(15)
(20)
(25)
(25)
(40)
(50)
(80)
(100)
(200)
(250)
(300)
(300)
(350)
(400)
(500)
(600)
0.840(21.3)
1.050 (26.7)
1.315 (33.4)
1.315 (33.4)
1.900 (48.3)
2.375 (60.3)
3.5 (88.9)
4.5 (114.3)
8.625 (219.1)
10.75 (273.1)
12.75 (323.9)
12.75 (323.9)
14.00 (355.6)
16.00 (406.4)
20.00 (508.0)
24.00 (609.6)
Min.required t in.
Class 3
0.024
0.030
0.038
0.038
0.054
0.068
0.100
0.129
0.246
0.307
0.364
0.364
0.400
0.457
0.571
0.686
Class 4
0.030
0.038
0.047
0.047
0.068
0.085
0.125
0.161
0.308
0.384
0.455
0.455
0.500
0.571
0.714
0.857
Selected t in.
(mm)
Sch
0.147 (3.73)
0.154 (3.91)
0.179 (4.55)
0.250 (6.35)
0.200 (5.08)
0.218 (5.54)
0.300(7.62)
0.337(8.56)
0.500 (12.70)
0.500 (12.70)
0.500 (12.70)
0.688 (17.48)
0.750 19.05)
0.844 (21.44)
1.031 (26.19)
1.219 (30.96)
80
80
80
*160
80
80
80
80
80
XS
XS
80
80
80
80
80
Considering
undertolerance
12.5%
0.129 (3.28)
0.135 (3.43)
0.157 (3.99)
0.2188 (5.56)
0.175 (4.45)
0.191(4.85)
0.263 (6.68)
0.295 (7.49)
0.438(11.12)
0.438(11.12)
0.438 (11.12)
0.602 (11.12)
0.656 (16.67)
0.739 (18.77)
0.902 (22.91 )
1.067 (27.10)
Remark
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
Not ok
ok
ok
ok
ok
ok
b)
Document No.
Revision
Date
Confidential
9000-PRISM-12-05-00-PI-CAL-001
B
25/03/13
Page 5 of 5
Hoop stress
Pipe size
in. (mm)
1
1
2
3
4
8
10
12
14
16
20
24
PETRONAS
GAS
BERHAD
(15)
(20)
(25)
(40)
(50)
(80)
(100)
(200)
(250)
(300)
(350)
(400)
(500)
(600)
Allowable hoop
stress, psig
(MPa)
Class 3 Class 4
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
17500
14000
Calculated hoop
stress, psig
(MPa)
Remarks
2857.14
3409.09
3673.18
4750.00
5447.25
5833.33
6676.56
8625
10750
9265.99
9333.33
9478.67
9699.32
9844.13
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
Note: Allowable hoop stress is calculated as design factor, F (from Table 841.1.6-1 ASME B31.82010) multiply with SMYS x E x T.
4.0
PETRONAS
GAS
BERHAD
Document No.
Revision
Date
Confidential
9000-PRISM-12-05-00-PI-MS-CALPI-019
A
29/01/13
Page 6 of 6
CONCLUSION
The proposed pipe wall thicknesses obtained are higher than the required minimum
thickness calculated based on the ASME B31.8-2010.
The calculated hoop stress is lower than the allowable hoop stress by the code.
Thus the selected thickness are acceptable for the project.
END OF DOCUMENT