0% found this document useful (0 votes)
356 views9 pages

Check List Tray List

The document appears to be a checklist for electrical and mechanical completion of cable ladder and tray support systems for the Wortel Field Development Project by Santos (Sampang) Pty Ltd. It includes inspection checklists for cable ladder and tray supports, with tags for each support item to be checked against design drawings and specifications. The checklist aims to verify proper fabrication, installation, and finishing of the cable ladder and tray support systems.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
356 views9 pages

Check List Tray List

The document appears to be a checklist for electrical and mechanical completion of cable ladder and tray support systems for the Wortel Field Development Project by Santos (Sampang) Pty Ltd. It includes inspection checklists for cable ladder and tray supports, with tags for each support item to be checked against design drawings and specifications. The checklist aims to verify proper fabrication, installation, and finishing of the cable ladder and tray support systems.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS

SANTOS (SAMPANG ) PTY LTD

Project Name Customer

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD

TABLE OF CONTENT 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 Cable Ladder and Tray Support Cable Ladder and Tray Multi Cable Transit (MCT) Cable Pulling Report Electrical Cable Grounding Conductor Ground Rod Lightning Conductor Lightning Protection Junction Box Distribution Board Local Control Panel Switchboard Motor Control Center (MCC) Charger / Inverter Batteries Lighting Receptacle Generator Motor E01MC E02MC E03MC E04MC E05MC E06MC E07MC E08MC E09MC E10MC E11MC E12MC E13MC E14MC E15MC E16MC E17MC E18MC E19MC E20MC

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : : : System / Sub No. System Desc. Sub System Desc. : : : Tag No. E00MC

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12 Notes :

Performed Company Name Sign

Checked

Approved

Print Name Date

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

CABLE LADDER AND TRAY SUPPORT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : : : System / Sub No. System Desc. Sub System Desc. : : : Tag No. E01MC

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that tray support location refer to layout Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where applicable Check that support are tight installed Check that support have completed finishing work

Notes :

Performed Company Name Sign

Checked

Approved

Print Name Date

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

CABLE LADDER AND TRAY SUPPORT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : 9820-64-356 : N/A : E/I Building Area System / Sub No. System Desc. Sub System Desc. : 9820-G-004 : Cable Tray and Support System : Tag No. E01MC

TS-1-01

TS-1-02

TS-1-03

TS-1-04

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that tray support location refer to layout Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where applicable Check that support are tight installed Check that support have completed finishing work

Notes :

Performed Company Name Sign

Checked

Approved

Print Name Date

TS-1-05

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

CABLE LADDER AND TRAY SUPPORT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : 9820-64-356 : N/A : E/I Building Area System / Sub No. System Desc. Sub System Desc. : 9820-g-004 : Cable Tray and Support System : Tag No. E01MC

TS-1-06

TS-1-07

TS-1-08

TS-1-09

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that tray support location refer to layout Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where applicable Check that support are tight installed Check that support have completed finishing work

Notes :

Performed Company Name Sign

Checked

Approved

Print Name Date

TS-1-10

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

CABLE LADDER AND TRAY SUPPORT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : 9820-64-356 : N/A : E/I Building Area System / Sub No. System Desc. Sub System Desc. : 9820-G-004 : Cable Tray and Support System : Tag No. E01MC

TS-1-11

TS-1-12

TS-1-13

TS-1-14

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that tray support location refer to layout Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where applicable Check that support are tight installed Check that support have completed finishing work

Notes :

Performed Company Name Sign

Checked

Approved

Print Name Date

TS-1-15

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

CABLE LADDER AND TRAY SUPPORT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : 9820-64-356 : N/A : E/I Building Area System / Sub No. System Desc. Sub System Desc. : : Cable Ladder & Support Sys : Tag No. E01MC

TS-2-01

TS-2-02

TS-2-03

TS-2-04

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that tray support location refer to layout Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where applicable Check that support are tight installed Check that support have completed finishing work

Notes :

Performed Company Name Sign

Checked

Approved
SANTOS(SAMPANG) PTY LTD

Print Name Date

TS-2-05

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

CABLE LADDER AND TRAY SUPPORT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (SAMPANG ) PTY LTD : 9820-64-356 : N/A : E/I Building Area System / Sub No. System Desc. Sub System Desc. : 9820-G-004 : Cable Tray and Support System : Tag No. E01MC

TS-2-06

TS-2-07

TS-2-08

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that tray support location refer to layout Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where applicable Check that support are tight installed Check that support have completed finishing work

Notes :

Performed Company Name Sign

Checked

Approved

Print Name Date

TS-2-09

You might also like