Loading Unloading LNG Carrier
Loading Unloading LNG Carrier
Hazard
Risk Category S E C T X X X
R X
Cause/Failure mode description Danger overloading cargo tanks with effects on structure/equipment and possibly creating gas pockets onboard Faults in connection or pipes leading to spill During overloading LNG is overflowing into neighbouring rooms causing damage to equipment/structure, caused by malfunction of equipment and human failure Tanks are being filled too high due to commercial pressure, calculating that the boil off rate will reduce the high level in the tanks after a while LNG transfer system is designed to withstand a certain movement and will break causing spillage if violated Leading to overloading Causing high movement or displacement movements in LNG transfer system Lack of stability during loading/unloading may lead to roll over
Safeguards/Risk reducing Operational procedure and alarm system Operational procedure, maintenance Operational procedure and alarm system
Operational procedure
6 7
Lack of communication with shore X personell Faults in ballast system or fault operation of ballast system Lack of crew competence and training X
Operational restrictions related to weather and wave conditions Crew awareness and training Operational procedure and alarm routines Alarm routines, crew awareness
Roll-over
Lack of stability during loading unloading may lead to roll-over Cause/Failure mode description Fault operations may pump LNG into other tanks leading to them overfilling with secondary effects Working the pumps when the tank is empty, will depressurise the tank and it may collapse, membrane will be damage, sphere structure may buckle (moss type) LNG transfer system is designed to withstand a certain movement and will break causing spillage if violated Tanks are being filled too high due to commercial pressure, calculating that the boil off rate will reduce the high level in the tanks after a while May cause tank rupture and secondary a high rate spillage Leading to overloading Causing high movement or displacement movements in LNG transfer system Lack of stability during loading/unloading may lead to
Alarm routines, crew awareness Safeguards/Risk reducing Alarm system, barriers Operational procedure, Alarm system, barriers
No
Hazard
Risk Category S E C T X X
Tank depressurising
5 6 7
Lack of communication with shore X personell Faults in ballast system or fault operation of ballast system Lack of crew competence and training X
Radar watch, collision alarm Crew awareness and training Operational procedure and alarm routines Alarm routines, crew awareness
10
Roll-over
roll over Ice clogging may result if water gets into system causing ice formation. This may damage pumps and cause operational failure Lack of stability during loading unloading may lead to roll-over
Scenario