ra ft
Outline of the SWM Part of the Project Review of Second Working Group and Identified Issues Development Vision and Policy and Planning Strategy Consideration of Technical Options - Collection and Transportation - Treatment and Disposal (with consideration of land use plan in Nairobi County) Future Demand Projection of Solid Waste Amount (according to this socio-economic framework in this Urban M/P) Future Action Plan
or k
in g
ro up
at
er ia
l
2
Objectives
Expected Outputs
ra ft
To implement future projection of solid waste generation To review the current solid waste management concept and revise it if necessary. To consider future land use plan for solid waste treatment facility To review the current implementation and management program and revise it if necessary.
or k
in g
ro up
To review and develop the concepts for sustainable urban development and improvement living condition related to solid waste management
at
er ia
Outline of the SWM Part of the Project (Objectives and Expected Outputs)
ra ft
or k
in g
ro up
Estimate solid waste generation Consider land use plan for solid waste treatment facility Discuss the concept of current M/P and future action plan
at
er ia
Future projection of solid waste Review of the current SWM policy and concept Input the SWM policy and concept to Urban M/P My assignment
ra ft
or k
in g
ro up
at
Contents of Study
Apr
May
Jun
Jul
Aug
er ia
Sep
l
Oct
Nov
Issues regarding solid waste management has been identified Technical options has been considered. Preliminary future amount of solid waste has been projected.
ra ft
How to incorporate the solid waste management facilities in the future land use plan Necessary of technical options except final disposal
or k
in g
ro up
at
er ia
6
Cause
Issue
ro up
at
No proper legal system and enforcement for to prevent illegal dumping No enough human resource for landfill operation
or k
in g
ra ft
er ia
l
Establishment of CBO collection system Introduction of institutional system to supervise PSP Set up legal for system to prevent illegal dumping Prepare suitable collection points and equipment Prepare sanitary landfill site in suitable location Implementation of training for landfill operation
7
Vision
A healthy, safe, secure and sustainable solid waste management system fit for a world-class city
Mission
ra ft
or k
To improve and protect the public health of Nairobi residents and visitors To protect ecological health, diversity and productivity To maximize resource recovery through the participatory approach
in g
ro up
at
er ia
8
Planning Strategy
Collection and transportation plan 3R and Intermediate Treatment Plan
Improvement of SWM operational capacity Enhancement of PPPP in SWM Public Awareness and participation of CBOs and NGOs
ro up in g G
Organizational restructuring and human resource development plan Legal and institutional reform plan Financial management plan
or k
ra ft
at
er ia
Options Handcart
Merit -Easy to collect along small road -Cheap cost -Easy to collect and transport effectively -Easy to collect -Effective collection - Not so expensive
at
ro up
in g
Merit
or k
Demerit -Taking the time for collection Necessary to monitor the collection point Individual house Apartment, secondary collection area
10
-Effective collection
ra ft
er ia
Area of narrow road Area of high income Area of station collection Other area
Options Landfill
Merit -Comparatively cheaper option -Technically feasible -Comparatively cheaper option -Technically feasible
Demerit
in g
ra ft
or k
3R + landfill + (composting)
11
ro up
3R+Landfill
M
-If no cooperation with waste generator, not enough waste reduction -Expensive for initial cost and O&M cost -Waste separation is necessary and necessity of market of compost
at
er ia
Improvement of Treatment and Disposal System (Difference between dump site and sanitary landfill site)
ra ft
Open dump site (e.g. Dandora dump site) Current issues - Odor problem - Rodents and birds - Leakage of leachate to water course - Bad condition of inner and access roads - Bad condition of unloading place
Improvement - Cover soil - Liner system and leachate treatment facility -Improvement of access and inner roads -Monitoring by waste pickers and landfill officers
or k
in g
ro up
M
Image of Sanitary Landfill Site After Improvement - Reduction of odor - Reduction of rodents and birds - Prevent the leachate leakage - Improvement of unloading and waste spreading activities - Improvement of waste picking activities
at
er ia
12
ra ft
or k
in g
ro up
at
er ia
ra ft
or k
in g
ro up
at
er ia
14
or k
in g
Kajiado County
ra ft
Nairobi County
ro up
JKTA airport
at
er ia
Thika County
l
Machakos County
15
4500 4000 3500 Generated Wste [t/day] 3000 2500 2000 1500 1000 500 0 2005
M ro up G in g or k W
2010 2015 2020 Year 2025 2030 2035 Household waste Commercial waste Market waste Total amount of waste (JICA Urban Plan Study) Total amount of waste(JICA SWM Study in 2010)
ra ft
at
er ia
16
er ia at
10% 2025 2025 10.0% 10.8% 3.4% 2025 83.6%
ro up
2020
5.0% 6.3%
7.5%
9.3% 3.4%
in g
3.3%
or k
2015 48.8%
2020 64.6%
ra ft
l
2030 10% 2030 10.0% 12.3% 3.4% 2030 100%
ra ft
or k
in g
Asante Sana