www.power-hitachi.com
2,400 2,200 2,000 1,800 1,600 1,400 1,200 1,000 800 600 400 200 0 MAXMAM SINGLE UNIT CAPACITY [MW] TOTAL NUMBER OF TURBINES
1980
1990
2000
2010
Europe
North Asia
11.2
Central & South America
4.8
Africa
5.3
3.3 4.5
Oceania
Andres Project (Dominica Republic) 121 MW, TCSF-40, 3600rpm 12.2 MPa, 566/552C
Cairo North Power Station (Egypt) 259.2 MW , TCDF-40, 3000rpm 11.9 MPa, 560/558C
Experiences
Genesee Power Station No.3 Unit (Canada) 495 MW, TCDF-40, 3600rpm 24.1 MPa, 566/566C >>Best Coal Fired Projects of the Year Award 2005 / Power Gen International <<
Tomato-Atsuma Power Station No.4 Unit (Japan) 700 MW, TC4F-43, 3000rpm 25.0 MPa, 600/600C
Walter Scott, Jr. Energy Center No.4 Unit (USA) 870 MW , TC4F-40, 3600rpm 25.3 MPa, 566/593C >>2007 Plant of the Year / Power-USA<< >>Best Coal Fired Projects of the Year Awards 2007 / Power Gen International <<
Zouxian Power Station Unit No.7 and No.8 (China) 1000 MW , TC4F-43, 3000rpm 24.9 MPa, 600/600C
Experiences
Qinshan III Power Plant Unit No.1 and No.2 (China) 728 MW, TC4F-52, 1500rpm 4.41 MPa, 257.6/243.4C
Shika Power Plant Unit No.1 (Japan) 540 MW, TC4F-38, 1800rpm 6.55 MPa, 282C
Kashiwasaki Kariha Power Plant Unit No.4 (Japan) 1100 MW, TC6F-41, 1500rpm 6.55 MPa, 282C
Hamaoka Power Plant Unit No.4 (Japan) 1137 MW, TC6F-43, 1800rpm 6.55 MPa, 282/251C
Hamaoka Power Plant Unit No.5 (Japan) 1380 MW, TC6F-52, 1800rpm 6.69 MPa, 284/253C
Analysis
Blade Profile Development
Conventional
New Profile
Structual
Fin
Nozzle
Bucket
700
MAIN STEAM TEMPERTURE 600C 620C
35
30
26.3MPa
500
25
400
FIRST REHEAT TURBINE
20
300
MAIN STEAM PRESSURE
15
200
10
100
0 1930
Test Facility
Hitachi keeps the test facility for the elemental development and the assembling testing. Each result is applied to the products.
The development of longer last stage blades for steam turbines is one of the most effective solutions to achieve a compact and highly efficient turbine design at large unit capacities. As such, Hitachi has successfully developed multiple kinds of long last stage blades based on its own proven technology and processes.
Manufacturing Facilities
Hitachi, Ltd. was founded in 1910 with the aim to establish a national industrial technology. Hitachi Works is marked as the first major factory by achievement to manufacture and supply variety of products around the world.
Hitachi Works
Kaigan Factory of Hitachi works is the main factory to product steam turbines. It was established in 1931.
Dalian Hitachi Baoyauan Machinery & Equipment Co., Ltd. (DHME), China
DHME was established in 1997, and merged in 2005.
Customer
Power Station
Customer
Technical Inquiry/Reply
Internet
Operating Data
Power Station
Turbine
Generator
HRSG
I &C
Middle East
Hitachi Dubai Office - Dubai
CANADA, USA
Hitachi Canadian Ltd. - Calgary Hitachi Canadian Industry - Saskatoon MD&A - Albany, NY
Europe, Africa
Hitachi Power Europe - Duisberg
Asia
Hitachi Asia Ltd. - Singapore
East Asia
Hitachi Ltd. Japan
Oceania
Hitachi AustraliaLtd. - Sydney, Brisbane
10
Hitachi, Ltd.
Akihabara UDX Bldg., 14-1 Soto-kanda 4-chome, Chiyoda-ku, Tokyo, 101-8010, Japan Tel: 81-3-3258-1111 / Fax: 81-3-4564-3149 E-mail:power-hitachi@hitachi.co.jp
www.power-hitachi.com