SECTION 15505 Package Roof Top Direct Expansion Airconditioning Unit Part 1 - General 1.01 Description
SECTION 15505 Package Roof Top Direct Expansion Airconditioning Unit Part 1 - General 1.01 Description
SECTION 15505 Package Roof Top Direct Expansion Airconditioning Unit Part 1 - General 1.01 Description
SECTION 15505 PACKAGE ROOF TOP DIRECT EXPANSION AIRCONDITIONING UNIT PART 1 - GENERAL 1.01 DESCRIPTION A. Scope: Supply and install packa e !"# coolin units co$plete in acco%dance &it' t'e %e(ui%e$ents o) t'e Cont%act !ocu$ents. T'is section %elates to t'e supply and installation o) packa e !"# coolin units )o% HVAC installation.
1.02
QUALITY ASSURANCE A. Accepta*le +anu)actu%e%s: Su*,ect to co$pliance &it' t'e %e(ui%e$ents o) t'e Cont%act !ocu$ents: -. +anu)actu%e%s o))e%in %oo)top 'eatin and coolin units &'ic' $ay *e inco%po%ated into t'e &o%k include *ut a%e not li$ited to t'e )ollo&in : a. *. c. d. 1. Ca%%ie%. U.S.A. T%ain. U.S.A. /o%k. E(ual app%o0ed.
Alte%nati0e $anu)actu%e%2s units &ill *e conside%ed i) t'ey a%e p%oduced *y a speciali3ed $anu)actu%e% &'ose units a%e e(ual in e0e%y %espect and &'ic' 'a0e *een in si$ila% se%0ice )o% not less t'an 4 yea%s.
5.
Re ulato%y Re(ui%e$ents -. ARI Co$pliance a. Test and %ate %oo)top 'eatin and coolin units in acco%dance &it' ARI 678 9Standa%d )o% Co$$e%cial and Indust%ial Unita%y Ai%:
-4484:-
Conditionin E(uip$ent?. 1. ASHRAE Co$pliance: Const%uct %e)%i e%ation syste$ o) %oo)top 'eatin and coolin units in acco%dance &it' ASHRAE -4 9Sa)ety Code )o% +ec'anical Re)%i e%ation? UL Co$pliance: >%o0ide %oo)top 'eatin and coolin units &'ic' a%e desi ned. $anu)actu%ed. and tested in acco%dance &it' UL %e(ui%e$ents.
6.
1.03
SUBMITTALS A. >%oduct !ata: Su*$it $anu)actu%e%2s tec'nical p%oduct data. includin %ated capacities o) selected $odel clea%ly indicated. &ei 'ts. )u%nis'ed specialties and accesso%ies@ and installation and sta%t:up inst%uctions. S'op !%a&in s: Su*$it $anu)actu%e%2s asse$*ly:type s'op d%a&in s indicatin di$ensions. &ei 't loadin s. %e(ui%ed clea%ances. and $et'ods o) asse$*ly o) co$ponents. Wi%in !ia %a$s: Su*$it $anu)actu%e%2s elect%ical %e(ui%e$ents )o% po&e% supply &i%in )o% %oo)top 'eatin and coolin units. Su*$it $anu)actu%e%2s ladde%:type &i%in dia %a$s )o% inte%lock and cont%ol &i%in . Clea%ly di))e%entiate *et&een po%tions o) &i%in t'at a%e )acto%y installed and po%tions to *e )ield installed.
5.
C.
1.04
PRODUCT DELIVERY STORAGE AND !ANDLING A. Handle. %oo)top 'eatin and coolin units and co$ponents ca%e)ully to p%e0ent da$a e. *%eakin . dentin and sco%in . !o not install da$a ed %oo)top 'eatin and coolin units o% co$ponents@ %eplace &it' ne&. Sto%e %oo)top 'eatin and coolin units and co$ponents in clean d%y place. >%otects )%o$ &eat'e%. di%t. )u$es. &ate%. const%uction de*%is. and p'ysical da$a e. Co$ply &it' +anu)actu%e%2s %i in and installation inst%uctions )o% unloadin %oo)top 'eatin and coolin units. and $o0in t'e$ to )inal location.
5.
C.
1.05
"ARRANTY ON COMPRESSOR A. >%o0ide &%itten &a%%anty. si ned *y t'e $anu)actu%e%. a %eein to %eplace"%epai%. &it'in &a%%anty pe%iod. co$p%esso%s &it' inade(uate and de)ecti0e $ate%ials and &o%k$ans'ip. includin leaka e. i$p%ope%
-4484:1 R;;= T;> >ACKA<E! A"C UNITS
asse$*ly. o% )ailu%e to pe%)o%$ as %e(ui%ed@ p%o0ided $anu)actu%e%s inst%uctions )o% 'andlin installin . p%otectin . and $aintainin units 'a0e *een ad'e%ed to du%in &a%%anty pe%iod. Replace$ent is not li$ited to co$ponent %eplace$ent only. and it does include la*ou% )o% %e$o0al and %einstallation. 5. Wa%%anty >e%iod )o% co$p%esso%s: 4 yea%s )%o$ date o) 'andin o0e%.
PART 2 # PRODUCTS 2.01 ROOFTOP UNITS A. <ene%al : >%o0ide )acto%y:asse$*led and tested %oo)top unit desi ned )o% %oo) o% sla* $ountin consistin o) co$p%esso%s. condense%s. e0apo%ato% coils. condense% and e0apo%ato% )ans. %e)%i e%ation and te$pe%atu%e cont%ols. )ilte%s. and da$pe%s. >%o0ide capacities and elect%ical c'a%acte%istics as sc'eduled. Casin : >%o0ide al0ani3ed steel casin const%uction. co%%osion p%otection coatin . and eAte%io% )inis'. >%o0ide %e$o0a*le panels and"o% access doo%s )o% inspection and access to inte%nal pa%ts. Insulate casin &it' -? t'ick $ini$u$ t'e%$al insulation. >%o0ide knockouts )o% elect%ical and pipin connections. >%o0ide condensate d%ain connection. and li)tin lu s. >aint casin *ei e colo%. E0apo%ato% =ans: >%o0ide )o%&a%d:cu%0ed. cent%i)u al. *elt:d%i0en )ans &it' ad,usta*le s'ea0es and pe%$anently lu*%icated $oto% *ea%in s. Condense% =ans: >%o0ide p%opelle%:type. di%ect:d%i0en )ans &it' pe%$anently lu*%icated *ea%in s &it' 'ea0y:duty $oto%. Coils: =o% e0apo%ato% and condense%. p%o0ide non:)e%%ous const%uction &it alu$inu$ plate )ins $ec'anically *onded to sea$less coppe% tu*es@ &it' *%a3ed tu*in ,oints. Ci%cuit e0apo%ato% to p%o0ide )ull acti0e )ace on $ini$u$ coolin step. >%o0ide condense% coil &it' anti co%%osi0e paint. >%o0ide e0apo%ato% coil &it' a 448 =>+ $aAi$u$ ace 0elocity o) ai% out coil. Co$p%esso%s: >%o0ide se%0icea*le. se$i:'e%etic &it' auto$atically %e0e%si*le oil >u$pBsC. o% 'e%$etic co$p%esso%s. >%o0ide 0i*%ation
5.
C.
!. E.
=.
-4484:6
isolato%s. and c%ankcase 'eate%s &'ic' de:ene% i3e du%in co$p%esso% ope%ation. -. 1. >%o0ide cylinde% unloade%s )o% capacity cont%ol. &it' $ini$u$ steps as sc'eduled. >%o0ide t'e%$al eApansion 0al0es. )ilte% d%ye%s. si 't lasses. co$p%esso% se%0ice 0al0es. li(uid line se%0ice 0al0es@ and p%o0ide $ini$u$ o) 1 %e)%i e%ant ci%cuits )o% units 'a0in 1 o% $o%e co$p%esso%s. >%o0ide )an:cyclin cont%ol )o% lo& a$*ient cont%ol to 64D= B1DCC. Sa)ety Cont%ols: -. 1. 6. E. 4. H. >%o0ide t'e )ollo&in cont%ols:
<.
Lo& p%essu%e cutout. $anual %eset. Hi ' p%essu%e cutout. $anual %eset. Co$p%esso% $oto% o0e%load p%otection. $anual %eset. Sin le p'ase p%e0ention. Ad,usta*le lo&:a$*ient lockout.
=ilte%s: >%o0ide )%es' ai%"%etu%n ai% )ilte% sections consistin o) E?"1? t'ick &i%e $es' $etal cleana*le p%e:)ilte% in )ilte% %acks. &it' $aAi$u$ )ace 0elocity o) 148"688 )p$. and e))iciency o) not less t'an F8G. Elect%ical: >%o0ide 1E8V con0enience outlet. sepa%ately )used. )o% unit se%0ice. >%o0ide $eans )o% unit po&e% connection eit'e% t'%ou ' unit ca*inet o% &it'in %oo) cu%* pe%i$ete%. Accesso%ies: >%o0ide t'e )ollo&in accesso%ies: -. Anti:Recyclin Cont%ol: >%o0ide cont%ols to auto$atically p%e0ent co$p%esso% %esta%t )o% 4:$inutes a)te% s'utdo&n. PART 3 # EXECUTION
I.
H.
3.01
INSPECTION EAa$ine a%eas and conditions unde% &'ic' %oo)top 'eatin and coolin units a%e to *e installed. !o not p%oceed &it' &o%k until unsatis)acto%y conditions 'a0e *een co%%ected.
3.02
INSTALLATION OF ROOFTOP !EATING AND COOLING UNITS A. <ene%al: Install %oo)top 'eatin and coolin units in acco%dance &it' $anu)actu%e%2s installation inst%uctions. Install units plu$* and le0el.
-4484:E
)i%$ly anc'o%ed in locations indicated. and $aintain $anu)actu%e%s %eco$$ended clea%ances. 5. Suppo%t: Install units on %oo) cu%*. in acco%dance &it' National Roo)in cont%acto%s Association BNRCAC installation %eco$$endations. Elect%ical Wi%in : Install elect%ical de0ices )u%nis'ed *y $anu)actu%e% *ut not speci)ied to *e )acto%y:$ounted. =u%nis' copy o) $anu)actu%e%s &i%in dia %a$ su*$ittal. -. Ve%i)y t'at elect%ical &i%in installation is in acco%dance &it' $anu)actu%e%s su*$ittal and installation %e(ui%e$ents o) t'e Elect%ical Section o) t'e HVAC Installation. !o not p%oceed &it' e(uip$ent sta%t:up until &i%in installation is accepta*le. !. !uct&o%k: Re)e% to Lo& >%essu%e !uct&o%k Section o) t'e HVAC Installation. Connect supply and %etu%n ducts to units &it' )leAi*le duct connections. >%o0ide t%ansitions to eAactly $atc' unit duct connection si3es.
C.
3.03
START-UP A. Sta%t:up %oo)top 'eatin and coolin units. in acco%dance &it' $anu)actu%e%s sta%t:up inst%uctions. Test cont%ols and de$onst%ate co$pliance &it' %e(ui%e$ents. Replace da$a ed o% $al)unctionin cont%ols and e(uip$ent. 5alance %oo)top unit syste$s to 0e%i)y its capacity and *alance deli0e%y o) ai% )o% eac' space.
5.
END OF SECTION
-4484:4