Generator Bus - Swing Bus - Disconnected Bus - Voltage Dependent - Frequency Dependent - Load Schedule Between Reactor & Capacitor

1. The document lists the data required to perform load flow and short circuit studies for a power system. This includes system, bus, generator, branch/interconnector, transformer, and fault current limiting data. 2. Bus data includes bus numbers, names, types and associated loads, shunts, and voltage dependencies. Generator data includes real and reactive power outputs, schedules, and impedances. 3. Transformer data includes ratings, voltage ratios, impedances, and tap schedules for load tap changing transformers. Overhead line and cable data includes resistances, reactances, and ratings.

Uploaded by

joydeep_d3232
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views3 pages

Generator Bus - Swing Bus - Disconnected Bus - Voltage Dependent - Frequency Dependent - Load Schedule Between Reactor & Capacitor

1. The document lists the data required to perform load flow and short circuit studies for a power system. This includes system, bus, generator, branch/interconnector, transformer, and fault current limiting data. 2. Bus data includes bus numbers, names, types and associated loads, shunts, and voltage dependencies. Generator data includes real and reactive power outputs, schedules, and impedances. 3. Transformer data includes ratings, voltage ratios, impedances, and tap schedules for load tap changing transformers. Overhead line and cable data includes resistances, reactances, and ratings.

Uploaded by

joydeep_d3232
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

DATA TO BE FURNISHED FOR LOAD FLOW STUDY : 1.

SYSTEM DATA : To decide Base kV and Base kVA (/MVA) for the entire system. 2. BUS DATA : 2.1 Bus number 2.2 Bus name 2.3 Bus !"e : - Load Bus - Generator Bus - Swin Bus - !isconnected Bus 2.# L$a% : & in M" and MVA# at nomina$ %o$ta e - Vo$ta e de&endent - 're(uency de&endent - Load schedu$e 2.' S(un : in MVA# at nomina$ %o$ta e with &ro&er si n con%ention to distin uish )etween reactor * ca&acitor 2.) *er un+ ,$- a.e / an.-e 2.0 Bus base 12 3. 3ENERATOR DATA : 3.1 Rea- "$4er $u "u +n MW 3.2 Ma5. rea6 +,e "$4er $u "u +n M2AR 3.3 M+n. rea6 +,e "$4er $u "u +n M2AR 3.# S6(e%u-e% ,$- a.e +n "u. 3.' 3enera +$n s6(e%u-e 3.) 3enera $r +n ser,+6e7 $u $8 ser,+6e s a e 3.0 3enera $r $"era +n. 6(ar 3.9 3enera $r M2A base 3.: 3enera $r;s s ea%! s a e +n erna- +m"e%an6e #. BRAN<H7INTER<ONNE<TOR DATA : #.1 F$r ransm+ss+$n -+ne : #.1.1 Res+s an6e #.1.2 Rea6 an6e : !etai$s of $ine confi uration+ &hase s&acin + ty&e of conductor etc. #.1.3 <(ar.+n. sus6e" an6e =s(un 6a"a6+ an6e> #.1.# L+ne ra +n. : current ratin in A or in MVA

Power System Study

1 of 3

#.2

F$r n$n ransm+ss+$n -+ne : S&ecify whether it is a series reactor+ series ca&acitor or transformer de%oid of susce&tance term

'. TRANSFORMER DATA : '.1 Name "-a e ra +n. %a a : M2A? 2$- a.e ra +$? @ +m"e%an6e $n $4n base '.2 Ta" se +n. +n "u. '.3 Ta" an.-e +n %e.ree '.# F$r -$a% a" 6(an.+n. rans8$rmer : - Ma,. ta& &osition - Min. ta& &osition - Schedu$ed %o$ta e ran e with ta& ste& si-e

Power System Study

2 of 3

DATA TO BE FURNISHED FOR SHORT <IR<UIT STUDY :

1. Trans8$rmer : 1.1 T4$ 4+n%+n. rans8$rmer -

1.2

.ame &$ate data / #atin (kVA/MVA)+ nomina$ %o$ta e ratio+ 0 im&edance+ 1/# ratio - 2ero se(uence short circuit im&edance of transformer T(ree 4+n%+n. rans8$rmer 3 #ated a&&arent &ower (kVA) )etween three sides with one side o&en - #ated nomina$ %o$ta e ratin of three sides - #ated 0 short circuit %o$ta es )etween 4 sides - 5u $oss in each of three windin s at rated nomina$ current

2. O,er(ea% L+ne / <ab-e : 5onductor detai$s $ike ty&e+ cross section+ confi uration+ &hase centre to centre s&acin 3. S($r 6+r6u+ 6urren -+m+ +n. rea6 $r : (6) i%e se(uence im&edance #. M$ $rs : #.1 S!n6. m$ $rs 3 #ated %o$ta e+ rated &ower out&ut+ stator resistance+ su)transient reactance #.2 As!n6. M$ $rs A #ated &ower out&ut+ rated %o$ta e+ &f+ efficiency at fu$$ $oad+ ratio of $ocked rotor current to fu$$ $oad current

'. S a +6 6$n,er er : - #ated %o$ta e of con%erter transformer on network side - #ated current of con%erter on network side ). 3enera $r : #ated %o$ta e+ &ower out&ut+ &f+ resistance +su)transient reactance