Building Permit

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

THE CITIZENS CHARTER

MUNICIPAL ENGINEERING OFFICE


Poblacion, Dalaguete, Cebu Tel. Nos.: (032) 484-8718; 484-8500; 484-8501; 484-8261 local 209 Service Who may avail the Service Schedule of Service Availability Requirements : Building/Fencing/Signs/Demolition/Scaffolding/Excavation & Ground

Preparation/Sidewalk Construction/Ancillary Permit Application


: Individual, Legal Entity intend to build structures within the Municipality : Monday to Friday ( 08:00AM 12:00PM, 01:00PM -05:00PM ) : 1.) Duly accomplished & notarized prescribed form/s signed & sealed by the full-time supervising duly license professionals 2.) DPWH Highway Clearance (for structures/improvements along National High Road) 3.) Zoning/Location Clearance 4.) Brgy. Clearance for Building Permit 5.) Bureau of Fire & Protection Endorsement 6.) Certified True Copy of OCT/CTC, on file with the Registry on Deeds 7.) Tax Declaration (Certified True Copy from Municipal Assessor) 8.) Duly Notarized Contract of Lease, or Dead of Absolute Sale in case the applicant is not the registered owner of the lot 9.) Current Year Real Property Tax Clearance 10.) Bill of Materials, Cost Estimate, Specifications 11.) Five(5) sets of Survey Plans, design plans, specifications and other documents prepared, signed & sealed over printed names of the duly licensed & registered professionals 12.) Structural Analysis & Design/Investigation for all building/structures except for one storey & single detached building structure with a total floor area of 20.00 sq. meters or less 13.) Boring & Load Test for building of structures of three (3) storey & higher or lower building/structures at areas with potential geological/geotechnical hazards 14.) Whenever necessary, written Clearances from various authorities exercising & enforcing regulatory functions affecting buildings/structures : Filling Fee = P25.00 Permit Fees = P.D. 1096 New Scheduled of Permit Fees

FEES/CHARGES

HOW TO AVAIL THE SERVICE.. STEPS


1

CLIENT
a) Goes to the receiving recording section of the Engineering Office & asks for the Permit Application checklist & Permit Forms b) Pays filing Fee to MTO Submits the requirements listed in the permit application checklist (Pre-evaluation only)

SERVICE PROVIDER
Gives a copy of the permit forms & permit application checklist and provides a short briefing regarding the service availed; advises client to pay filling pay at the Treasurers Office

DURATION

RESPONSIBLE PERSON
Chief Processing & Receiving/ Releasing Officer (Mr. Celso Cayetor)

OFFICE / LOCATION

REQUIREMENTS

10 mins.

MEO

a.) Permit Application Checklist b.) Permit Forms

Receives the Plans & documents, verifies & checks the accuracy and completeness of the requirements submitted a.) If complete, instructs the client to wait for technical evaluation & inspection. Advises client to claim the result of the technical evaluation after four (4) working hours. b.) If incomplete, advises the client to comply all the requirements; gives back to the documents submitted Chief Processing & Receiving/ Releasing Officer (Mr. Celso Cayetor)

30 mins.

MEO

Permit Application Checklist

STEPS
3

CLIENT
Waits for the request to be processed

SERVICE PROVIDER
Verification & Technical Evaluation

DURATION
30 mins.

RESPONSIBLE PERSON
a.) Chief Geodetic Section (Engr. Capondag) b.)Architectural Accessibility Section (Engr. Hayo)

OFFICE / LOCATION

REQUIREMENTS

30-60 mins. (could be more for complicated & large structures) 30 mins.

30-60 mins. (could be more complicated & large structures) 30 mins.

c.) Electrical Section (Engr. Lara) d.) Civil Structural (Engr. Lara)

30 mins.

e.) Sanitary / Plumbing (Engr. Lara) f.) Mechanical (Engr. Ambrad) g.) Electronics (Celso Cayetor)

Receives the Technical Evaluation Result & order of Payment

Gives the technical evaluation result a.) If plans & specifications are satisfactory, an order of payment is issued to the applicant b.) If plans were found defective or faulty, returns to applicant w/ notice/advice of action for compliance Issues the Official Receipt Chief processing & Receiving/ Releasing Officer (Mr. Celso Cayetor)

20 minutes

MEO

Order of Payment or Deficiency Slip

a.) Pays Permit Fees at the Treasurers Office b.) Presents the OR at the OBO Processing Section a.) Obtains the approved Plans and Permits b.) Receives Construction signage format & signs the log book

5 mins.

MTO Cashier

MTO

Official Receipt

Approves & releases the Plans & Permit

1 min.

Building Official (Engr. Lara) Chief Processing & Receiving / Releasing Officer (Mr. Celso Cayetor)

MEO

Pro=forma of Construction Permit Signage

MEO

Assigns Permit number & give a Pro-forma of the Construction permit signage and lets the client sign the log book

10 mins.

You might also like