FP Analysis Workbook
FP Analysis Workbook
0.65
Instructions:
Complete the project information above - it will be shown on every worksheet Enter the functional details on the appropriate worksheets as shown by the tabs above (e.g. Internal Logical Files on the ILF sheet). For each Functional element, enter a description, the number of RETs/FTRs and DETs. The column titled "A/CB/CA/D/Con" indicates whether the element is Added (A), Changed (record both Changed Before (CB) and Changed After (CA) function points), Deleted (D) or for conversion (Con). It is initialized to A so you need to enter the appropriate value if it is not Added Function Use the sheet labelled "GSCs" to capture the 14 General System Characteristics, as assessed at the end of the project. For enhancement projects, record the current FP Base above as well as the current Total Degrees of Influence. The sheet labeled FPSummary shows a summary of all the data entered. The two pieces of data that needs to be recorded in BMRS are shown at the end of this Sheet. To add lines to the detail worksheets: 1. Insert rows above the line of dashes ('----') 2. Copy one of the ROWS with type filled in 3. Paste into the inserted rows (This is necessary since there are hidden columns to the right, the content of which will only be copied in this fashion)
12/25/2013
Page 1
Project
Project: Application: Claim Number: Project Contact: FP Analyst Project Type: Count Date: Total hours spent:
Internal Logical Files
Function Points
After Change Conversion Complexity A/CB/CA/ D/Con
2. Copy one of the ROWS with Type fi 3. Paste into the inserted rows
Before Change
Deleted
RETs
DETs
Added
FPs
Element Description
Type ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF ILF
Comments
A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A Page 2 ILFs
12/25/2013
A/CB/CA/ D/Con
Before Change
Deleted
# Type Comments ILF A ILF A ILF A ILF A ILF A ------------------------------------------- ------- ------- ------- ------- ----- ------- ------- ------- ------- ------- ------- ------- -----------------------------------------------Element Description
RETs
DETs
Added
FPs
12/25/2013
Page 3
ILFs
Project: Application: Claim Number: Project Contact: FP Analyst Project Type: Count Date: Total hours spent:
External Interface Files
Function Points
After Change Conversion Complexity A/CB/CA/ D/Con
2. Copy one of the ROWS with Type fi 3. Paste into the inserted rows
Before Change
Deleted
RETs
DETs
Added
FPs
Element Description
Type
Comments
EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A EIF A ------------------------------------------- ------- ------- ------- ------- ----- ------- ------- ------- ------- ------- ------- ------- ------------------------------------------------
12/25/2013
Page 4
EIFs
A/CB/CA/ D/Con
Before Change
Deleted
RETs
DETs
Added
FPs
Element Description Changed Unadjusted Function Points After Change Deleted Unadjusted Function Points Conversion Unadjusted Function Points
Type
Comments
12/25/2013
Page 5
EIFs
Project: Application: Claim Number: Project Contact: FP Analyst Project Type: Count Date: Total hours spent:
External Inputs
Function Points
After Change Conversion Complexity A/CB/CA/ D/Con
2. Copy one of the ROWS with Type fi 3. Paste into the inserted rows
Before Change
Deleted
DETs
Added
FTRs
FPs
Element Description
Type
Comments
EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A EI A ------------------------------------------- ------- ------- ------- ------- ----- ------- ------- ------- ------- ------- ------- ------- ------------------------------------------------
A/CB/CA/ D/Con
Before Change
Deleted
DETs
Added
FTRs
FPs
Element Description Type Deleted Unadjusted Function Points Conversion Unadjusted Function Points
Comments
12/25/2013
Page 7
EIs
Project: Application: Claim Number: Project Contact: FP Analyst Project Type: Count Date: Total hours spent:
External Outputs
Function Points
After Change Conversion Complexity A/CB/CA/ D/Con
2. Copy one of the ROWS with Type fi 3. Paste into the inserted rows
Before Change
Deleted
DETs
Added
FTRs
FPs
Element Description
Type
Comments
EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A EO A ------------------------------------------- ------- ------- ------- ------- ----- ------- ------- ------- ------- ------- ------- ------- ------------------------------------------------
A/CB/CA/ D/Con
Before Change
Deleted
DETs
Added
FTRs
FPs
Element Description Type Deleted Unadjusted Function Points Conversion Unadjusted Function Points
Comments
12/25/2013
Page 9
EOs
Project: Application: Claim Number: Project Contact: FP Analyst Project Type: Count Date: Total hours spent:
External Inquiries
Function Points
After Change Conversion Complexity A/CB/CA/ D/Con
2. Copy one of the ROWS with Type fi 3. Paste into the inserted rows
Before Change
Deleted
DETs
Added
FTRs
FPs
Element Description
Type
Comments
EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A EQ A ------------------------------------------- ------- ------- ------- ------- ----- ------- ------- ------- ------- ------- ------- ------- ------------------------------------------------
A/CB/CA/ D/Con
Before Change
Deleted
DETs
Added
FTRs
FPs
Element Description Type Deleted Unadjusted Function Points Conversion Unadjusted Function Points
Comments
12/25/2013
Page 11
EQs
Project: Function Point Counting Worksheet 0 Application: 0 Claim Number: Project Contact: 0 FP Analyst 0 Project Type: 0 1/0/1900 Count Date: Total hours spent:
General System Characteristics: 1. Data Communications 2. Distributed Functions 3. Performance 4. Heavily Used Configuration 5. Transaction Rate 6. On-Line Data Entry 7. End User Efficiency 8. On-Line Update 9. Complex Processing 10. Reusability 11. Installation Ease 12. Operational Ease 13. Multiple Sites 14. Facilitate Change Total Degrees of Influence Value Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.65
12/25/2013
Page 12
GSCs
Project: Application: Claim Number: Project Contact: FP Analyst Project Type: Count Date: Total hours spent:
Application FP Prior to Project: Application TDI prior to Project: Value Adjustment Factor Prior to Project (VAFB) Added Function Points (ADD) Low ILF x 7 EIF x 5 EI x 3 EO x 4 EQ x 3
0.65
Average x 10 x 7 x 4 x 5 x 4
x x x x x
High 15 10 6 7 6
Total
Changed Function Points Before Change (CHGB) Low Average ILF x 7 x 10 EIF x 5 x 7 EI x 3 x 4 EO x 4 x 5 EQ x 3 x 4
x x x x x
High 15 10 6 7 6
Total
Changed Function Points After Change (CHGA) Low Average ILF x 7 x 10 EIF x 5 x 7 EI x 3 x 4 EO x 4 x 5 EQ x 3 x 4
x x x x x
High 15 10 6 7 6
Total
Average x 10 x 7 x 4 x 5 x 4
x x x x x
High 15 10 6 7 6
Total
Average x 10 x 7 x 4 x 5 x 4
x x x x x
High 15 10 6 7 6
Total
New Application TDI: New Application Value Adjustment Factor: Actual Delivered Function Points: New Application Function Point Count: Function Point Analyst: 12/25/2013 Page 13
0.65
FPSummary
Function Point Counting Worksheet Project: 0 Application: 0 Project Contact: 0 FP Analyst 0 Project Type: 0 1/0/1900 Count Date:
12/25/2013
Page 14
Comments