This document outlines safe work practices for a bored piling operation. It lists 18 steps for the procedure, including preparing equipment, erecting barriers, inserting and extracting steel casings using a vibro-hammer, inspecting hole depth, installing reinforced concrete cages, backfilling holes, and securing excavated pile pits. Personnel protective equipment and signalmen are required for lifting and boring activities to ensure worker safety.

Uploaded by

Hassan Abdullah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
351 views4 pages

SWP-24 Piling Operation Daiman

This document outlines safe work practices for a bored piling operation. It lists 18 steps for the procedure, including preparing equipment, erecting barriers, inserting and extracting steel casings using a vibro-hammer, inspecting hole depth, installing reinforced concrete cages, backfilling holes, and securing excavated pile pits. Personnel protective equipment and signalmen are required for lifting and boring activities to ensure worker safety.

Uploaded by

Hassan Abdullah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Ryobi Kiso (S) Pte Ltd

Safe Work Practices (SWP) for Bored Piling Operation Procedures check for minimum requirements (Please tick):

SWP-24


#$

Permit-to-Work Procedure in place where applicable Logout Tag out S stem where applicable PP! requirements

!mergenc "esponse Plan(!"P) ______________________________________________________________ Prepare the lifting machine for hoisting of steel casing$ a$ b$ c$ d$ e$ %ppro&al for Permit to Work 'hecklist %ppro&al for Permit to (oist 'hecklist %ppro&al for (ot work Permit 'hecklist 'heck Limit switch for workabilit 'heck Lifting )ears for &alidit and workabilit

*$

Prepare the access for ser&ice crane and boring rig$ a$ b$ 'heck the ground conditions +f ground is not firm enough, la steel plates onto ground

-$ 1$

.irect traffic and unauthori/ed personnel awa from the installation area (at least 0m radius)$ Pre-boring for the steel casing installation$ a$ b$ c$ !nsure all personnel in&ol&ed to wear PP! 2oring "ig operator is to be shield-off from falling debris !nsure signalman 3 riggerman to be present

0$

(oisting and inserting the steel casing into the pre-bored hole$ a$ b$ c$ 4se shackles during lifting of steel casing !nsure adequate co&er for the lifting hole of steel casing i$e$ 05mm !nsure the casing is inserted at least -m into the ground before releasing the wire rope

6$

(oisting and mounting the &ibro-hammer onto the steel casing$ a$ b$ 'heck wire rope of &ibrator hammer for kinks 'heck the h draulic hose for leakage

Page 1 of 2

Ryobi Kiso (S) Pte Ltd


7$ Slowl insert the steel casing using &ibro-hammer$ a$ b$ 8$ !nsure all personnel clear at least 0m awa from the point of insertion !nsure signalman 3 riggerman to be present

SWP-24

.ismounting the &ibro-hammer$ a$ b$ !nsure all personnel clear at least 0m awa from the point of insertion !nsure signalman 3 riggerman to be present

9$

'ontinue boring to the required depth$ a$ b$ c$ !nsure all personnel in&ol&ed to wear PP! 2oring "ig operator is to be shield-off from falling debris !nsure signalman 3 riggerman to be present

Page 2 of 2

Ryobi Kiso (S) Pte Ltd


#5$ +nspection of bored hole depth$ a$ b$ c$

SWP-24

'onstruct a standing platform for personnel in&ol&ed in the inspection using steel plates !nsure that the height of steel casing is at least 5$6m abo&e platform +nstall prefabricated co&er made of steel rebar to pre&ent personnel from falling into the borehole while measuring the depth$

##$

Shift boring rig awa from the bored hole area to gi&e wa to concrete truck$ a$ !nsure signalman 3 riggerman to be present

#*$

(oist and lower the prefabricated steel cage into the bored hole$ a$ b$ 4se shackles instead of hooks 'heck lifting point of the steel cage i$e$ at least * links must be welded to all the main bars

#-$

:ill 2ored hole with concrete to the desired depth$ a$ b$ c$ !nsure signalman 3 riggerman to be present Proper signage and barricading to pre&ent unauthorised personnel to enter the work area Lifting crew to be present and conduct ph sical and &isual inspection prior an hoisting

#1$

:urther lower and release the steel cage$ a$ !nsure no workers put their hands on the steel cage

#0$

(oisting and mounting the &ibro-hammer onto the steel casing$ a$ b$ !nsure all personnel clear at least 0m awa from the point of e;traction !nsure signalman 3 riggerman to be present

#6$

!;tracting the steel casing using &ibro-hammer$ a$ b$ c$ !nsure all personnel clear at least 0m awa from the point of e;traction !nsure signalman 3 riggerman to be present Piling <peration signage to be displa ed to warn all personnel

#7$

.ismounting the &ibro-hammer$ a$ !nsure the casing is still at least -m inserted into the ground before releasing the wire rope

#8$

"emo&al of casing from the bored hole

Page 3 of 2

Ryobi Kiso (S) Pte Ltd


a$ b$ c$ d$ #9$ !nsure all personnel clear at least m awa from the point of remo&al !nsure signalman 3 riggerman to be present !nsure the casing is loose from soil friction !nsure the casing wire rope is of appropriate rating

SWP-24

2ackfill the hole to the ground le&el$ a$ b$ !nsure a firm backfill using the e;ca&ator to compact the backfill 'o&er the backfill using a steel plate

!;ca&ated Pile Pits a) c) Secured ladders will be pro&ided into pile pits$ 2arricades with warning signs will be pro&ided to the peripher of the pile pits$ Prepared 2 : =r .aiman .esignation: WS(< .ate: #9 @anuar *5## "e&iewed 2 : =r >g 'hoon (uat .esignation: Senior Pro?ect =anager .ate: #9 @anuar *5##

b) Pile pits will be cut in steps or timbering pro&ided to the sides to pre&ent collapse$

Prepared 2 : =r .aiman .esignation: WS(< .ate: #1 @une *5#5

"e&iewed 2 : =r >g 'hoon (uat .esignation: Senior Pro?ect =anager .ate: #1 @une *5#5