Hawar Highway
Hawar Highway
Hawar Highway
Specified requirements
Accommodation for the Engineer's staff
Class A
29 To Collection BD 30,990.000
Page 1 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Photographs
A27 Provision of digital camera for use on site as described nr 1 250.000 250.000
A28 Set of selected digital photographs as described nr 100 3.000 300.000
As built drawings
A29 Provide a set of "As-Built" drawings upon sum 600.000
completion of the contract. For this purpose
the contractor will be supplied with a set of
negatives of all the drawings for his use and
the final set to the Engineer shall show the
co-ordinates of all the ducts, the depth, the
size and the number of pipes, whether they
are utilised, and all other information relating
to the road positioning and heights, etc.
NOTE : The issue of the Certificate of
Practical Completion will depend on the
satisfactory supply of the above drawings
to the Engineer
Class A
30 To Collection BD 37,440.000
Page 2 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Number Item Description Unit Quantity Rate Amount
BD.
Provisional sums
Daywork
A30 Labour sum 1,000.000
Percentage adjustment to provisional sum for day work labour 100.000
A31 materials sum 1,000.000
Percentage adjustment to provisional sum for day work material 100.000
A32 Plant sum 1,000.000
Percentage adjustment to provisional sum for day work plant 100.000
A33 Allow for the relocation of existing street lighting posts sum 35,000.000
A34 Relocation of overhead electrical cables sum 25,000.000
Other cahrges and profits % 12,500.000
A35 Relocation of underground electrical cables sum 20,000.000
A36 Earthwork in connection with relocationna nd diversion of
water supply sum 20,000.000
Class A
31 To Collection BD 140,800.000
Page 3 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
Page
29 30,990.000
30 37,440.000
31 140,800.000
Page 4 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Class B
33 22,600.000
Page 5 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
33 22,600.000
Class B
34 22,600.000
Page 6 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Class D
35 To Collection BD 37,878.500
Page 7 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
35 37,878.500
Class B
36 37,878.500
Page 8 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Class E
37 To Collection BD 79,442.550
Page 9 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Class E
38 To Collection BD 65,015.450
Page 10 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
CLASS E: EARTHWORKS Page
37 79,442.550
38 65,015.450
39 144,458.000
Page 11 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 12 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
CLASS I: PIPE WORK - PIPES Page
40 39,114.000
41 39,114.000
Page 13 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 14 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
CLASS J: PIPE WORK - FITTING AND VALVES Page
42 1,735.000
43 1,735.000
Page 15 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 16 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
K16 Duct marker blocks; precast concrete; stamp coded with duct nr 72 7.000 504.000
type; as standard detail SRCD 5.08a
Page 17 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
CLASS K: PIPE WORK - MANHOLE AND Page
PIPE WORK ANCILLARIES
44 43,578.600
45 714.000
46 44,292.600
Page 18 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 19 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
CLASS L: SUPPORTS AND PROTECTION Page
ANCILLARIES
47 80,650.000
48 80,650.000
Page 20 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 21 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 22 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 23 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
R44 Give way line at roundabout; broken line of 1m mark,1m m 18 0.850 15.300
gap and 0.20m wide
R45 Broken line of 4.0m mark, 2.0m gap and width of 0.1m m 48 0.425 20.400
R46 Intermittent center line m 369 0.425 156.825
R47 Chevron lines; 100mm wide m 150 0.425 63.750
Hand or machine applied white thermoplastic road markings
R48 letters and shapes; arrows; as standard details drawing nr 40 6.700 268.000
R49 bus lay by edge/line; broken ;lines of 1.0m mark, 1.0m gap m 404 0.425 171.700
R50 Stop line solid line of 0.40m width mark up to m 127 1.700 215.900
R51 Speed humps markings as per detail design nr 5 53.000 265.000
Paint to kerbs as described -
R52 to exposed faces of kerb; black & yellow m 5244 0.325 1,704.300
Page 24 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLETION From
Page
49 319,360.510
50 142,084.800
51 30,082.400
52 2,881.175
53 494,408.885
Page 25 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 26 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
X11 Mortared rip rap; 150mm thick nominal size stone laid in full m2 200 14.000 2,800.000
class 1 mortar bed
Page 27 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLECTION
Page 28 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
Page 29 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
COLLECTION
CLASS Y:
From Page 57 609.000
Page 30 of 31
Hawar Highway Improvement (from Jaw to Al Dour)
GRAND SUMMARY
Page 31 of 31