Hydropower unprofitable due to very high investment in civil works A lot of existing sites which do not produce electricity
Drunner : H: Qinst : P:
Head: 3m Installed flow: 2 x 15 mc/s Installed power: 650 kW Energy: 2 GWh/year Runner diameter: 3.55 m instalation: Novembre 2011 Price: 1.000.000 Euros Time needed for up/ down 20 min
Head: 3 m 3 Siphon turbine S (Des Grosses Battes, Liege) Installed flow: 27,5 m /s Installed power: 486 kW Energy: 2,6 GWh/year (2 years) Runner diameter: 3,25 m (92 rot/min) 4 adjustable blades (Kaplan) Weight turbinated water
Power plant realized from modules Recommended for low head navigation dams No civil works Without regulation ON / OFF H: 1.80 4.00 m Q : 10 18 mc/s P : 120 560 kW Downstream min level : 2.5 4 m Fish Friendly
Power plant realized from 6 modules Head: 2.8 m Installed flow: 6 x 17 m3/s Installed power: 6 x 400 kW Energy: 10 GWh/year Investment: 6 mil Euros Weight: 350 t Height of the metal structure: 8 m
The screw has an efficiency of 87% for low heads [ 1 10 m]. Robustness it is given by the simple working and construction principles, and also the waste tolerance In Europe are installed more than 200 Archimedes screws.
Conclusions
Europe still has an important hydropower potential ( 50% from technical feasible) and existing very low head sites (built for other purposes than hydropower) represents an important part of it. Low head sites unprofitable due to major construction works needed for the classic power station turbines which dont need major civil works.
The paper presents the state of the art regarding Very low head fish friendly turbines:
VLH Omega S and Omega D Archimedes screw