0% found this document useful (0 votes)
85 views9 pages

Scope Chart

scope Chart

Uploaded by

Krishnamoorthy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views9 pages

Scope Chart

scope Chart

Uploaded by

Krishnamoorthy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

RLA OF 2X125 MW UNITS (STAGE#1) OF

SCOPE MATRIX S. No DESCRIPTION


Supervision & Report Submission

Pre shutdown Activity A 1 2 5 6 7 8 CONDITION ASSESMENT OF THE UNITS Boiler and its auxiliaries Turbine and its auxiliaries Generator and its auxiliaries Power Transformers (Gen + Station) ESP Civil Structures

CCEL

CCEL CCEL CCEL CCEL CCEL CCEL

B 1 2 3 4 5 6 7 8 9

ENERGY AUDIT Generator & Electrical systems Balance Of Plant Water Treatment Plant DM Plant Ash Handling System ESP Coal handling system and also for the Lighting system Insulation Audit Auxiliary power consumption of the units

CCEL

10 C D E F G

Air conditioning system etc Review of the previous studies (if any) Environment studies of the units as per guide lines of MOE To address generic problems of the units. Market survey for the modern/latest technologies available for such units Feasibility of such technologies to incorporate it along with the advantages and cost benefit analysis studies for efficient, Reliable, economical and safe performance of the units Preparation of detailed project report (DPR) having complete scope & justification To prepare the detailed scope of work and cost estimates along with the exploration of cost effective alternate rehabilitation options

MW UNITS (STAGE#1) OF GLTPP


SCOPE MATRIX
Testing

MAN DAYS MECH ELEC & CI CIVIL PIP

No of man power

Time Duration (Days) (THIRD PARTY)

Site Site Site Site Supervision Supervision Supervision Supervision THIRD PARTY Site Site Site Site Supervision Supervision Supervision Supervision THIRD PARTY THIRD PARTY THIRD PARTY THIRD PARTY THIRD PARTY THIRD PARTY 7 20 15 5 10 10 3 20 5 2 1 2 1 2 1 10 25

THIRD PARTY

MECH

ELEC

CIVIL

PIP

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

1 10

1 10 5

10 30

10 20 20

5 10

45

20

20

10

45

20

20

10

425

3400 425

Site Supervision S. No Name Pre Shut Down Mechanical 1 Electrical 1 M Ranjit Kumar C4 20 160 G Ramakrishnan C5 20 160 Total MD Total MH

Control and Instrumentation 1 Mullai Venthan Shut Down Mechanical 1 2 G Ramakrishnan K Dinesh Post Shut Down Mechanical 1 2 Electrical 1 2 Civil 1 Piping 1 Ravichandran Report Preperation S. No Mechanical 1 2 3 Electrical G Ramakrishnan K Dinesh S Krishnamoorthy C5 C3 C3 20 60 60 160 480 480 Name Total MD Total MH C4 5 40 S. Saravanan C5 20 160 M Ranjit Kumar P Manivannan C4 C3 23 10 184 80 G Ramakrishnan S Manimaran C5 C3 25 25 200 200 C5 C3 20 20 160 160 C5 20 160

1 2 Civil 1 2

M Ranjit Kumar J Karthik

C4 C3

20 30

160 240

S. Saravanan K Venkatesh

C5 C3

25 35

200 280

Control and Instrumentation 1 2 Piping 1 2 Ravichandran Sugumar C4 C3 15 25 120 200 Mullaiventhan Santhosh Kumar C5 C3 10 20 80 160

G Ramakrishnan 8MH/ Day for site K Dinesh S Krishnamoorthy

S. Saravanan Mullaiventhan

M Ranjit Kumar

Ravichandran

J Karthik

Mullaiventhan