0% found this document useful (0 votes)
1K views4 pages

Checklist - SWM Jpif DBKL

This checklist provides requirements for stormwater management systems including onsite stormwater detention (OSD) tanks, rainwater harvesting (RWH) tanks, and a combination system using a common tank. Key requirements covered include tank design standards, engineering drawings showing locations and dimensions, and tables calculating stormwater runoff volumes and tank storage capacities. Guidelines are provided for separate or combined OSD and RWH tanks, with requirements to allocate separate compartments by volume, locate inlets and outlets properly, and include relevant calculation tables in drawings.

Uploaded by

Phang S. Sun
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views4 pages

Checklist - SWM Jpif DBKL

This checklist provides requirements for stormwater management systems including onsite stormwater detention (OSD) tanks, rainwater harvesting (RWH) tanks, and a combination system using a common tank. Key requirements covered include tank design standards, engineering drawings showing locations and dimensions, and tables calculating stormwater runoff volumes and tank storage capacities. Guidelines are provided for separate or combined OSD and RWH tanks, with requirements to allocate separate compartments by volume, locate inlets and outlets properly, and include relevant calculation tables in drawings.

Uploaded by

Phang S. Sun
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

CHECKLIST JPIF DBKL STORMWATER MANAGEMENT

JPIF -SWM 01 : ONSITE STORMWATER DETENTION (OSD) Below Groun


a. ONSITE STORMWATER DETENTION - Tank Design i Setback 2.30 meter / 7ft 6in from the boundary line. Building Act ii Made of reinforced concrete structure !ith !ater "roofing insulation#MASMA $%.7.$ a# or material a""ro&ed by manufacturer for 'S( "ur"ose. iii i& & &i Minimum freeboard 300mm from to" !ater le&el at A)* +0 years#. *nlet "i"e entry abo&e A)* +0 years to" !ater le&el 'utlet "i"e si,e bigger than the *nlet "i"e at A)* +0 years to" !ater le&el -entilation / maintenance manhole minimum si,e 7+0mm.7+0mm at 30 meter inter&al MASMA $%.7.$ e# &ii /rash Screen co&ers both "rimary 0 secondary outlet MASMA $%.1.6 &iii Slo"e gradient minimum 22 $3+0# and ma.imum $02 $3$0# MASMA $%.7.$ d# .i 4rimary "i"e outlet at bottom5most "oint of the tank MASMA 3.+.3.7 .ii *n&ert 5le&el at the "rimary outlet "i"e h igher than recei&ing drain in&ert le&el .iii 4um" to be install if .ii# not com"ly. .i& Ste" ladder for tank more than $.2 meter de"th $%.7.$ g# . ONSITE STORMWATER DETENTION Enginee!ing D!a"ings i ii iii i& & 6ocation on the Site 4lan. Sho! "lan8 cross5section and long5section of the 'S(. Sho! the recei&ing drain on the 'S( long5section dra!ing. COLO$R CODE . . B+0e . 2e++)" MASMA

/. D!ainage F+)" *ndicate $002 flo! from the "erimeter drain 0 )7(4 into the 'S(. 1. OSD

3. B)0n4a!5 Line . Das6e4 Sho! engineering calculation from 9ydraulic )e"ort on /able)0'+ine A and B Re4 PER#IO$S S$RFACE AREA Be()!e De*e+),-en ' A('e! De*e+),-e n' IMPER#IO$S S$RFACE AREA Be()!e De*e+),-en' A('e! De*e+),-en'

AREA OF DE#ELOPMENT A%!es S&. Me'e!

TABL EA

Ti-e )( C)n%en'!a' i)n T%s T%

F+)" e()!e De*e+),-e n' 8 ,!e

F+)" a('e! De*e+),-e n' 8 ,)s'

Pe!-issi + e Si'e Dis%6a!ge PSD

Si'e S')!age Re&0i!e-e n' SSR

P!i-a!5 O0'+e' Si7e P )0'+e'

Se%)n4a !5 O0'+e' Si7e S )0'+e'

TABL EB

Confirmed

Prepared by Checking by by (.................) (.................)

(..................)

JPIF SWM 0! : RAINWATER "AR#ESTING (RW")


a. RAINWATER HAR#ESTING - Tank Design i ii iii i& & )ain!ater M:S/ collected from the roof catchment. ;hannel to the )97 /ank / ;istern by rain !ater do!n "i"e )7(4#. <iltering System. <irst <lush System flo! from )7(4# :nderground <irst <lush System flo! from 4erimeter (rain#

&i )ain 7ater 9ar&esting /ank / ;istern 3m3 = Bungalo! / Semi (etach or $m3 = /errance 9ouse# <or commercial8 a"artments and other ty"e of de&elo"ment = 302 of the SS) &olume. &ii ;on&eyance system to usage "oint &iii /y"e of :sage "oint >arden /a" / /oilet etc# i. . .i '&erflo! "i"e *nto 'S( tank 3 ;ommercial / A"artment. *nto recei&ing drain 3 )esidential Scouring "i"e and mos?uito "rotection netting. 4i"e system anti clog / inside cage# COLO$R CODE . /. D!ainage F+)" . B+0e 9ouse#

. RAINWATER HAR#ESTING Enginee!ing D!a"ings i ii iii i& & 6ocation on the Site / <loor 4lan. *ndicate $002 flo! from the )7(4 into the )79 /ank.

1. RWH . 2e++)" Sho! "lan8 cross5section and long5section of the )97 /ank. 3. B)0n4a!5 Line . Das6e4 ;ross5section against the house or building being construct. )0'+ine Re4 Schematic (ra!ing for the )79 /ank.

&i

Sho! )79 engineering data on /able ; ROOF CATCHMENT AREA T)'a+ Ca'%6-en ' A!ea F+)" in') RWH Tank FILTER CAPACIT2 FIRST FL$SH CAPACIT2 N) Ca,a%i' 5 P$MP

N)

Ca,a%i' 5

Ca,a%i'5

TABL EC
NOTE. FIRST FLUSH 1. Rooftops of 1 m! or sma""er !. Rooftops of 1 m! or "arger $. Rooftops or s%rface catchments of &$#'m! or "arger

. !# to # "iters . # "iters per 1 m! . !# "iters

()R*I+, T) -. I+CLU*. I+ /LL ST)R0 (/T.R 0/+/,.0.+T PL/+ 1 S/2/ 0.+,.S/H3/+ SIST.0 P.+U/I/+ /IR HU4/+ 2/+, *I S.*I/3/+ */+ /3/+ *I-I+/ 0.+,I3UT ,/RIS P/+*U/+ 3.0.+T.RI/+ P.RU0/H/+ */+ 3.R/4//+ T.0P/T/+ */+ 4/-/T/+ P.+,/IR/+ */+ S/LIR/+ 54PS67

Prepared by Confirmed by

Checking by

(................) (..............) (.............)

JPIF - SWM 0$: %OMBINATION OF ONSITE STORMWATER DETENTION (OSD) AND RAINWATER "AR#ESTING (RW")
a. SEPARATE TANK - Tank Design - Re(e! ') 4PIF 1 5a68)S* an4 4PIF ! 5a68R(H ()! Tank Design. - Re(e! ') 4PIF 1 5b68)S* an4 4PIF ! 5b68R(H ()! Enginee!ing D!a"ing. . COMBINE TANK - Tank Design - Re(e! ') 4PIF 1 5a68)S* an4 4PIF ! 5a68R(H ()! Tank Design. - Re(e! ') 4PIF 1 5b68)S* an4 4PIF ! 5b68R(H ()! Enginee!ing D!a"ing. E9TRA CHECKLIST C)- ina'i)n )( RWH : OSD 0sing %)--)n TANK i ii iii i& Se"arate com"artment !ith 302 5 )79 and 702 5 'S(. 4rimary 0 Secondary 'utlet located at the 'S( com"artment. COLO$R CODE . )7(4 must flo! into )79 com"artment 0 4erimeter (rain flo! in 'S( com"artment.

*nlet 4i"e )7(4# abo&e to" height of com"artment se"arator . /. D!ainage F+)" . B+0e &i Secondary 4i"e outlet belo! to" height of com"artment se"arator. 1. OSD : RWH . 2e++)" &ii Manhole 2 no# located abo&e the *nlet 4i"e and 'utlet 4i"e. &iii *nclude /able A8 /able B 0 /able ; in @ngineering (ra!ing.3. B)0n4a!5 Line . Das6e4 )0'+ine Re4

AREA OF DE#ELOPMENT A%!es S&. Me'e!

PER#IO$S S$RFACE AREA Be()!e De*e+),-en ' A('e! De*e+),-en'

IMPER#IO$S S$RFACE AREA Be()!e De*e+),-en ' A('e! De*e+),-en'

TABL EA

Ti-e )( C)n%en'!a 'i)n

F+)" e()!e De*e+),en'

F+)" a('e! De*e+),en'

Pe!-issi + e Si'e Dis%6a!ge

Si'e S')!age Re&0i!een'

P!i-a!5 O0'+e'

Se%)n4 a!5 O0'+e'

T%s

T%

8 ,!e

8 ,)s'

PSD

SSR

P )0'+e'

S )0'+e'

TABL EB

TABL EC

ROOF CATCHMENT AREA T)'a+ Ca'%6-en' A!ea F+)" in') RWH Tank

FILTER CAPACIT2

FIRST FL$SH CAPACIT2 N) Ca,a%i' 5

P$MP

N)

Ca,a%i'5

Ca,a%i'5

Prepared by Confirmed by

Checking by

(................)

(..............)

(.............)

You might also like