Name of Project Client Consultant: Contractor Sample Description Sampling Method Source Location Weight of Mould A : Design & Construction of Underpasses and Flyovers along Darsait Al Wadi Al Kabir Road : Muscat Municipality : Renardet SA & Partners Consulting Engineers LLC : Larsen & Toubro (Oman) LLC : Embankment material Date of Sampling : BS 812 part 102 Date of Testing 145+250 Test Method : BS 1377 Part 4-3.6 Sample Number 7063 Volume of Mould B 2299 1 2 11924 4861 2.11 924 875.5 190.4 48.5 685.1 7.1 1.97 2 1.5 12027 4964 2.16 921 866.7 199.5 54.3 667.2 8.1 2.00 3 1.5 12242 5179 2.25 1119 1034.2 194.3 84.8 839.9 10.1 2.05 4 1.5 12258 5195 2.26 1087 996.6 168.5 90.4 828.1 10.9 2.04 5 1.5 12319 5256 2.29 1026 921.1 130.7 104.9 790.4 13.3 2.02 5 2 12176 5113 2.22 927 820.1 109.7 106.9 710.4 15.0 1.93
Trial No. Water Added (ml) Mould + Wet Soil (g) Weight of Wet Soil (g) Wet Density (Mg/m) Container No. Container + Wet Soil (g) Container + Dry Soil (g) Weight of Container (g) Weight of Water (g) Weight of Dry Soil (g) Moisture Content (%) Dry Density of Soil (Mg/m)
2.07
2.02
1.97
1.92 6 7 8 9 10 11 12 13 14 15 16
Maximum Dry Density (Mg/m) Optimum Moisture Content (%) Equipment Asset Number : Remarks : LTO Lab Technician Date LTO Materials Engineer Date Engineer Material inspector Date
2.05 10.1
Trial No. Water Added (ml) Mould + Wet Soil (g) Weight of Wet Soil (g) Wet Density (Mg/m) Container No. Container + Wet Soil (g) Container + Dry Soil (g) Weight of Container (g) Weight of Water (g) Weight of Dry Soil (g) Moisture Content (%) Dry Density of Soil (Mg/m)
2.26 2.22 2.18 2.14 2.10 2.06 2.02 3 4 5
10
11
12
13
14
Maximum Dry Density (Mg/m) Optimum Moisture Content (%) Equipment Asset Number : Remarks : LTO Lab Technician Date LTO Materials Engineer Date Engineer Material inspector Date
2.25 8.1