1908 Edition PDF
1908 Edition PDF
1908 Edition PDF
Models:
Congratulations on your choice. Your boiler is electronically controlled and has electronic ignition. The materials it is made of and the control systems it is equipped with give you safety, a high level of comfort and energy savings to allow you to get the greatest benefit out of independent heating.
Remember that...
that you will be able to use the boiler in a safe and sensible way; must be carefully kept. It may be necessary for reference in the future.
--- dont operate any electrical switches, the telephone or any device that may produce sparks; --- open the windows and doors at once to create a draught of air which will purge the area; --- shut off the gas cocks; --- get the assistance of a qualified person.
n Do not touch the appliance with parts of the body that are wet or damp and/or bare feet. n In case of structural work or maintenance near the exhaust duct and/or fume exhaust devices or their attachments, turn off the appliance. On completion of the work, have a professionally qualified person check their efficiency. n Repairs (under guarantee) must be carried out only by an approved engineer, using genuine spare parts. Thus do no more than switching off the boiler yourself (see the instructions). n Your boiler allows heating up of water to a temperature less than boiling point; --- must be connected to a central heating system and/or a hot water supply system, compatible with its performance and output; --- can be used only for those purposes for which it has been specially designed; --- must not be touched by children or by those unfamiliar with its operation; --- must not be exposed to weather conditions.
vels are only likely to arise following harsh abrasion. In general, normal handling and use will not present high risk, follow good hygiene practices, wash hands before, touching eyes, consuming food, drinking or using the toilet. First aid --- Medical attention must be sought following eye contact or prolonged reddening of the skin. Thermostat / Temperature gauge Description --- Sealed phial and capillary containing liquid. Known hazards --- irritating to skin, eyes and throat. Vapour is harmful. Inflammable --- do not extinguish with water. Precautions --- Do not incinerate. Avoid contact with broken/leaking phials. Do not purposely puncture. First aid medical attention must be sought following eyes/skin contact, wash with clean water.
Appliance category II2H3+ Gas G20 20 mbar, G30 29 mbar, G31 37 mbar Country of destination: United Kingdom (GB) Irealnd (IE) This appliance conforms with the EEC directive 90/396 and, consequently, it has the right to make use of the brand name Moreover, the appliance conforms with the EEC directive 87/308 relative to the prevention and elimination of radio disturbances. The appliance is built to comply with the regulation now in force regarding gas appliances safety and the European regulation now in force relative to safety of household and similar electrical appliances. The manufacturer, in the continuous pocess to improve his products, reserves the right to modify the data expressed in the present documentation at any time and without prior notice. The present documentation is an informative support and it cannot be considered as a contract towards third parties.
Please remember that if you are in any doubt about the installation of this product you can contact our Technical Helpline on tel. 0121 506 1350
TABLE OF CONTENTS
1 1.1 1.2 1.3 1.4 2 2.1 2.2 2.3 2.4 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 Appliance description . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . Control panel . . . . . . . . . . . . . . . . . . Isolation valves . . . . . . . . . . . . . . . . . Technical data . . . . . . . . . . . . . . . . . Instructions for use . . . . . . . . . . . . Warnings . . . . . . . . . . . . . . . . . . . . . . Refilling procedure . . . . . . . . . . . . . . Ignition . . . . . . . . . . . . . . . . . . . . . . . . C.h. circuit temperature . . . . . . . . . . Technical information . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . Main diagram . . . . . . . . . . . . . . . . . . Hydraulic specifications . . . . . . . . . Expansion vessel . . . . . . . . . . . . . . . Technical data M90E.24S . . . . . . . . Technical data M90E.28S . . . . . . . . Technical data M90E.32S . . . . . . . . 1 1 1 1 1 2 2 2 3 3 11 11 12 13 13 14 16 18 20 20 20 20 21 21 21 21 22 22 22 24 24 24 37 37 37 39 39 39 39 39 2.5 2.6 2.7 2.8 3 3.1 3.2 3.3 3.4 3.5 D.h.w. temperature . . . . . . . . . . . . . . Extinguishing . . . . . . . . . . . . . . . . . . Built in time switch A . . . . . . . . . . . . Built in time switch B . . . . . . . . . . . . Useful advice . . . . . . . . . . . . . . . . . Central heating . . . . . . . . . . . . . . . . . Frost protection . . . . . . . . . . . . . . . . Periodic maintenance . . . . . . . . . . . External cleaning . . . . . . . . . . . . . . . Operational faults . . . . . . . . . . . . . . . 4 4 5 7 9 9 9 9 9 9 24 25 25 25 26 26 26 28 30 31 31 31 31 31 32 32 33 34 36 36 36 40 40 41 41 41 41 41
USE
5 General requirements . . . . . . . . . . 5.1 Related documents . . . . . . . . . . . . . 5.2 Location of appliance . . . . . . . . . . . 5.3 Flue system . . . . . . . . . . . . . . . . . . . . 5.4 Gas supply . . . . . . . . . . . . . . . . . . . . 5.5 Air supply . . . . . . . . . . . . . . . . . . . . . 5.6 Ventilation . . . . . . . . . . . . . . . . . . . . . 5.7 Water circulation (c.h.) . . . . . . . . . . . 5.8 Domestic water . . . . . . . . . . . . . . . . . 5.9 Water treatment . . . . . . . . . . . . . . . . 5.10 Electrical supply . . . . . . . . . . . . . . . . 6 Installation . . . . . . . . . . . . . . . . . . . . 6.1 Warnings . . . . . . . . . . . . . . . . . . . . . . 6.2 Precautions for installation . . . . . . . 8 Gas conversion . . . . . . . . . . . . . . . 8.1 Warnings . . . . . . . . . . . . . . . . . . . . . . 8.2 Procedures . . . . . . . . . . . . . . . . . . . . 9 9.1 9.2 9.3 9.4 Maintenance . . . . . . . . . . . . . . . . . . Warnings . . . . . . . . . . . . . . . . . . . . . . Dismantling the external panels . . . Emptying the d.h.w. system . . . . . . Emptying the c.h. system . . . . . . . .
6.3 Installing the bracket . . . . . . . . . . . . 6.4 Overall dimensions . . . . . . . . . . . . . 6.5 Joints . . . . . . . . . . . . . . . . . . . . . . . . . 6.6 Mounting the boiler . . . . . . . . . . . . . 6.7 Fitting the flue system . . . . . . . . . . . 6.8 Flue restrictors . . . . . . . . . . . . . . . . . 6.9 Choice of flue . . . . . . . . . . . . . . . . . . 6.10 Electrical connections . . . . . . . . . . . 6.11 External frost protection . . . . . . . . . Commissioning . . . . . . . . . . . . . . . Electrical installation . . . . . . . . . . . . Gas supply installation . . . . . . . . . . Filling the d.h.w. system . . . . . . . . . Initial filling of the system . . . . . . . . Lighting the boiler . . . . . . . . . . . . . . Checking the gas pressure at the burner . . . . . . . . . . . . . . . . . . . 7.7 Adjusting the burner ignition . . . . . 7.8 Adjustment of useful c.h. output . . 7.9 Checking the ignition device . . . . . 7.10 Checking the flue system . . . . . . . . 7.11 Instructing the user . . . . . . . . . . . . . 9.5 Combustion analysis check . . . . . . 9.6 Cleaning the primary heat exchanger . . . . . . . . . . . . . . . . 9.7 Checking the pressurisation in the expansion vessel . . . . . . . . . . 9.8 Cleaning the burner . . . . . . . . . . . . . 9.9 Checking the flue . . . . . . . . . . . . . . . 9.10 Visual inspection of appliance . . . . 9.11 Gas pressures and soundness . . . 7 7.1 7.2 7.3 7.4 7.5 7.6
MAINTENANCE
INSTALLATION
Abbreviations used in the manual C.h. = Central heating D.h.w. = Domestic hot water D.c.w. = Domestic cold water
1
1.1
APPLIANCE DESCRIPTION
Overview
8 Function selector and c.h. temperature control knob 9 D.h.w. temperature control knob 10 Appliance operation light
1.3
Isolation valves
2 3 Fig. 1.1 1 Case front panel 2 Control panel 3 Control panel cover 15 14 13 12 Fig. 1.2 (bottom view of the boiler) 11 12 13 14 15 C.h. return valve D.c.w. inlet valve Gas inlet valve D.h.w. outlet pipe C.h. flow valve 11
1.2
4 5 6 7
Control panel
C.h. circuit temperature and pressure gauge Time switch (c.h. control) Lock--- out signal lamp Lockout reset button
1.4
Technical data
For detailed technical data see section 4.5 or 4.6 of this manual.
10 Fig. 1.3
USE
2
2.1
Biasi UK Ltd support the Benchmark initiative. The Benchmark Log Book is located at the back of this manual and should be completed by the Installing/Commisssioning Engineer and handed over to the User for future reference by other visiting Engineers. Also included is the Service Interval Record card that should be completed by the Service Engineer following the annual service maintenance of the boiler and system. All CORGI Registered Installers carry a CORGI ID card, and have a registration number. Both should be recorded in your Benchmark Log Book. You can check your installer is registered by calling CORGI direct on 01256 372300. In order to guarantee safety and correct operation, it is essential that all the tests are carried out by a competent and responsible service engineer before lighting up the boiler. The tests are described in the installation instructions in section 7 commissioning. Ensure that the c.h. circuit is regularly filled with water (even if the boiler is only used for d.h.w. supply) checking that the pressure indicated on the temperature and pressure gauge 4 is not lower than that shown in Fig. 2.2. If the pressure reading on the pressure gauge is below that shown in Fig. 2.2, then the system will require topping up. A filling loop is normally provided by the installer for this purpose. If you are in any doubt regarding this procedure you are advised to contact your Installer or an Approved Engineer. This appliance is provided with a built in anti--freeze system that operates the boiler when the temperature is below 4 C Therefore, when the boiler is not lit or used in cold weather, with consequent risk of freezing do not switch off the boiler at the fused spur isolation switch or close the gas inlet cock. When you do not expect to use the boiler for a long period and the boiler is not to be used for frost protection then follow the instructions given in section 2.6 on page 4.
USE
Control valve Double check valve Temporary connection Supply pipe (cold water inlet) C.h. return pipe Control valve
Fig. 2.1 2 Open the valves of the filling loop and watch the gauge until it reaches normal filling pressure as shown in Fig. 2.2. 4
Normal filling pressure Fig. 2.2 3 Close the valves and remove the filling loop. If you experience any difficulty with the operation of the boiler, switch off the boiler immediately at the fused spur isolation switch and contact your Installer or an approved Service Engineer Air introduced into the boiler during this filling process will vent through the automatic air purger fitted to the boiler. You may also find it necessary to vent air from your radiator circuit using your radiator key, however be aware that excessive venting will cause the pressure in the system to drop. Always ensure that the pressure gauge is set at the required pressure.
Open position Fig. 2.3 2 Turn on the electricity supply to the boiler, switching on the fused spur isolation switch. The appliance operation light 10 (Fig. 2.4) will flash every 4 seconds (stand --- by condition). 3 If the boiler is to be used for c.h. and d.h.w position the function selector 8 as in Fig. 2.4. The appliance operation light 10 will flash every 2 seconds (operating boiler). 10 8
Minimum
Maximum
Fig. 2.6 Adjustment In order to achieve optimal settings for economy and comfort, we recommend adjusting the operating temperature of the c.h. water according to the outside temperature, positioning the knob as follows: From 5 to 15 C Between --- 5 and +5 C
Fig. 2.4 4 If d.h.w. supply only is required, position the function selector 8 as in Fig. 2.5. The appliance operation light 10 will flash every 2 seconds (operating boiler). 10 8
USE
USE
2.5
D.h.w. temperature
Fig. 2.9
The temperature of the d.h.w. leaving the boiler can be varied from a minimum of about 35C to a maximum of about 55C (Fig. 2.8), by turning the temperature control knob 9.
Minimum 9
Maximum
In these cases, however, it is advisable to install a small water treatment device or softener. With such a device you should avoid periodic descaling. Consequently, the d.h.w. heat exchanger will keep its performance consistent for a longer period of time with resulting gas savings. If the demand for d.h.w. is so great as to prevent reaching a high enough temperature, have the appropriate output limiting valve installed by your installer or an Authorised Service Engineer.
2.6
Fig. 2.8 Adjustment of the d.h.w. temperature is completely separate from that of the c.h. circuit. The adjustment system integrated within the boiler automatically controls the flow of gas to the burner in order to keep the temperature of d.h.w. delivered constant, between the limits of maximum and minimum output. Where the demand is at a low level or with the temperature set to the minimum, it is normal to see a cycle of lighting and extinguishing of the burner when running. Adjustment It is advisable to adjust the d.h.w. temperature to a level commensurate with the demand, minimising the need to mix with cold water. In this way, the automatic control facilities will be fully exploited. Moreover, where the amount of limescale present in the water may be particularly great, not exceeding the position in Fig. 2.9 of the d.h.w. temperature control knob 9 corresponding to about 50C
Extinguishing
To turn the boiler off set the function selector 8 to the position shown in Fig. 2.10. The appliance operation light 10 will flash every 4 seconds. 10 8
Fig. 2.10 When you do not expect to use the boiler for a long period: 1 Switch off the electricity supply to the boiler, by means of the fused spur isolation switch; 2 Shut off the gas supply cock 13 and the valves for the water circuits fitted under the boiler (Fig. 2.11).
13 Fig. 2.11
Closed position
2.7
The combi boilers are equipped with a built in electronic time switch (5, Fig. 1.3 on page 1) which controls the c.h. operation. G H
Fig. 2.13 Setting the switching time 20 memory locations are available, corresponding to 10 on--- off sequences. Set the mode selector switch A to the C1 position. The symbols shown in Fig. 2.14 appears in the display. A
Fig. 2.14 F Fig. 2.12 E D C B Press the buttons D or E to set the desired ON time. Press the enter button C to confirm the setting and to continue programming the OFF time. Set the OFF time as explained above for the ON setting and confirm by pressing the enter button C. Proceed in the same way for other settings. Setting example shown in Fig. 2.15: A --- ON time 7.45. B --- OFF time 10.30.
Display and control panel A Mode selector switch B Reset button C Enter button D Increase + setting button E Decrease --- setting button F On--- off button G Time display H ON--- OFF display
USE
USE
Fig. 2.15
Activating the timed settings Set the mode selector switch A to the AUTO position shown in Fig. 2.16. The current time appears in the display. The ON--OFF display H indicates the current state of operation (according to the settings). A
Fig. 2.17 The operation can be switched permanently on or off by pressing the button F and leaving the switch A in the TIMER position. To force a timed delay on or off operation, set the mode selector switch A in the TIMER position. Set the time delay by pressing the button D or E and the operation can be forced on or off by pressing the button F. The time delay can be set within the following ranges: 1 to 23 hours with steps of 1 hour 1 to 27 days with steps of 1 day The time delay setting is activated by moving the switch A to the AUTO position. The ON--- OFF display H flashes indicating that the current state of operation has been forced. To delete the timed delay setting, set the mode selector switch A in the TIMER position, press the button D or E until the symbols shown in Fig. 2.17 appears in the display and then set the mode selector switch A to the AUTO position Setting example shown in Fig. 2.18: forced ON state for 4 hours.
Fig. 2.16 Note: when the mode selector switch A is in the AUTO position and the boiler is switched off at the fused spur isolation switch, the display H indicates only the OFF state. The other indications are blanked. Reading the timed settings Set the mode selector switch A to the C1 position. The symbols shown in Fig. 2.14 appears in the display. Press the enter button C. Each time the button is pressed the display shows the details of the next setting. Changing or deleting the timed settings Set the mode selector switch A to the C1 position. The symbols shown in Fig. 2.14 appears in the display. Press the enter button C until the display shows the setting to be modified or deleted. The time setting can be modified now by pressing button D or E and the operation can be switched on or off by pressing the button F. To delete a time set press the button D or E until the symbols shown in Fig. 2.14 appears in the time display G. The new settigs are memorized by moving the switch A to a different position. Manual operation The operation of the time switch can be forced on or off constantly or for a timed period. 6
Fig. 2.18 Resetting To completely reset the timer, press the reset button with a pointed object (pencil). CAUTION: pushing the reset button will completely erase the settings as well as all the data, including the current time.
F Fig. 2.19
Display and control panel A Mode selector switch B Reset button C OK button D Increase + setting button E Decrease --- setting button F On--- off button G Time display H ON--- OFF display Setting the current time Press repeatedly the button A until the display shows the symbol Press the buttons D or E until the current time appears in the display G. The clock starts by pressing the button A to show the symbol AUTO. Setting example shown in Fig. 2.20: Current time 16.30, day Thursday.
Fig. 2.22
Activating the timed settings The current time appears in the display. The ON--OFF display H indicates the current state of operation (according to the settings).
Fig. 2.23 A Note: when the display shows the symbol AUTO and the boiler is switched off at the fused spur isolation switch, the display H indicates only the OFF state. The other indications are blanked. Reading the timed settings 7
Fig. 2.20
USE
USE
Fig. 2.25 Note:If during manual operation, power supply turns off, timer must be set again following previous steps Resetting To completely reset the timer, press the reset button with a pointed object (pencil). CAUTION: pushing the reset button will completely erase the settings as well as all the data, including the current time.
Fig. 2.24 The operation can be switched permanently on or off by pressing the button F and leaving the display shows the symbol TIMER.
3
3.1
USEFUL ADVICE
Central heating
--- general check of the appliances operation.
For reasonably economical service install a room thermostat. Never shut off the radiator in the area where the room thermostat is installed. If a radiator (or a convector) does not heat up, check that no air is present in it and that its valve is open. If the ambient temperature is too high, do not alter the radiator valves. Reduce the central heating temperature instead by means of the room thermostat and the function selector (8 in Fig. 3.1). 8
3.4
Before carrying out any cleaning, disconnect the appliance from the electrical mains, using the fused spur isolation switch fitted adjacent to the appliance. To clean the external panels, use a cloth soaked in soapy water. Do not use solvents, abrasive powders or sponges. Do not carry out cleaning of the appliance and/or its parts with readily flammable substances (for example petrol, alcohols, naphtha, etc.).
3.5
Operational faults
Fig. 3.1
If the lock---out signal lamp comes on this indicates that the safety lock--- out 6 (Fig. 3.2) has stopped the boiler To re--- start the boiler, it is necessary to press the boiler reset button 7 (Fig. 3.2).
3.2
Frost protection
This appliance is provided with a built in anti--freeze system that operates the boiler when the temperature is below 4 C Therefore, when the boiler is not lit and used in cold weather, with consequent risk of freezing do not switch off the boiler at the fused spur isolation switch or close the gas inlet cock.
7 Fig. 3.2 For the first lighting up and following maintenance procedures for the gas supply, it may be necessary to repeat the resetting operation several times so as to remove the air present in the pipework. If noises due to air bubbles are heard during operation... you should check that the pressure on the temperature and pressure gauge (Fig. 2.2 on page 2) is not below the correct setting. If required, top up the system correctly, as described in the section 2.2 of this manual. Bleed any air present in the radiators, if necessary. If the pressure on the temperature and pressure gauge (4 on page 1) has gone down... it is necessary to top up the appliance with water again, so as to raise the pressure to an adequate level as described in the section 2.2 of this manual. If topping up with water has to be done very frequently, have the system checked for leaks.
3.3
Periodic maintenance
For efficient and continuous operation of the boiler, it is advisable to arrange maintenance and cleaning by an Authorised Service Centre Engineer, at least once a year. During the service, the most important components of the boiler will be inspected and cleaned. This service can be part of a maintenance contract. In particular, you are advised to have the following checks carried out: --- primary heat exchanger; --- domestic hot water heat exchanger; --- burner; --- exhaust fume duct and flue; --- pressurisation of the expansion tank; --- filling up of the central heating circuit; --- bleeding of air from the central heating system;
Useful advice
If water comes out of the pressure relief valve Check on the temperature and pressure gauge (4 on page 1) that the pressure in the central heating circuit is not close to 3 bars. In this case, temperature rise in the circuit can cause the pressure relief valve to open. So that this does not happen and to decrease the pressure to a normal value, it is advisable to vent some of the water in the appliance through the bleed valves present in the radiators. If in time, a reduction in domestic hot water supply is observed... The likely causes may be impurities caught in the domestic hot water flow switch filter or limescale deposited in the domestic hot water heat exchanger. It is advisable to have the appliance cleaned out by an Authorised Service Centre Engineer. If water should occasionally leak from the boiler... shut off the valves positioned under the boiler (Fig. 2.11 on page 5) and call an Authorised Service Centre Engineer. If the appliance operation light 10 (Fig. 3.3) flashes very quickly the boiler is faulty. 10
USE
Fig. 3.3 In this case or in case of problems other than those mentioned here, switch off the boiler, as described in section 2.6 on page 4 and call a competent and responsible service engineer.
10
4
4.1
32
TECHNICAL INFORMATION
Overview
33 34 35 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Gas inlet valve D.h.w. outlet pipe C.h. flow valve D.h.w. temperature probe NTC Main circuit drain valve C.h. pressure relief valve Pump Pump vent plug Automatic air purger valve D.h.w. flow switch Modulation gas valve Primary circuit flow switch C.h. temperature probe NTC Three--- way diverter valve Flame--- detecting electrode Ignition electrodes Burner Combustion chamber Primary heat exchanger Air pressure switch Air switch pressure test points Fan Safety thermostat Modulation operator Gas valve outlet pressure test point Gas valve inlet pressure test point D.h.w. heat exchanger C.h. expansion tank By--- pass valve Venturi device Domestic water circuit filter D.h.w. flow limiter Flue outlet pipe Air intake pipe
30
29 28 27 26
25 24 23 22 Fig. 4.1
21 20 19 18 17 16
11
INSTALLATION
31
INSTALLATION
32 31
34 35
29 21 25 28 27 37 36 38 23 40 24 44 43 19
39
26
16 18
22
41 17 11 15 12 14
13
Fig. 4.2
12
Hydraulic specifications
tem component cocks, the by--- pass valve ensures a minimum flow of water through the primary heat exchanger.
4.4
Expansion vessel
Fig. 4.3 The hydraulic specifications in Fig. 4.3 represent the pressure (available head for the central heating system) as a function of the flow rate. The load loss due to the boiler has already been subtracted. Output with thermostat cocks shut off The boiler is fitted with an automatic by--- pass valve (41 on page 11), which protects the primary heat exchanger. In case of excessive reduction or total blockage of water circulation in the central heating system owing to closure of the thermostatic valves or sys-
Capacity Pre--- load pressure Maximum volume of water in the system * Tab. 4.1
l kPa
bar
6,0 100
1,0
104
* Where conditions are: --- Average maximum temperature of the system is 80C --- Initial temperature when filling up the system is 10C For systems with volumes greater than 104l, an additional expansion vessel must be provided.
13
INSTALLATION
Note: this boiler is designed for operation only in a sealed central heating system The height difference between the pressure relief valve and the highest point in the system may be 7m at most. For greater differences, increase the pre--- load pressure in the expansion vessel (40 on page 11) and the system, when cold, by 0.1 bar for each additional 1m.
Injectors 26,6 Natural G20 Butane G30 Propane G31 Gas supply pressures Gas Natural G20 Butane G30 Propane G31 Pa
mbar
Nominal heat input Minimum heat input Maximum useful output Minimum useful output
130 77 77
90 754
kW
BTU/h
11,0
37 530
kW
BTU/h
24,3
82 906
kW
BTU/h
9,1
31 047
norm. 2 000
20
min 1 700
17
max 2 500
25
INSTALLATION
Central heating Maximum temperature Minimum temperature Maximum pressure Minimum pressure Available head (in 1000 l/h) Domestic hot water Maximum temperature Minimum temperature Maximum pressure Minimum pressure Flow rate minimum 30 rise 35 rise 40 rise l/min l/min l/min l/min 2,5 11,6* 10,0* 8,7* C C kPa
bar
Pa
mbar
2 900
29
2 000
20
3 500
35
C C kPa
bar
85 38 250
2,5
Pa
mbar
3 700
37
2 500
25
4 500
45
kPa
bar
30
0,3
min 180
1,8
max 1 170
11,7
Ignition 600
6,0
kPa
bar
27
0,27
Pa
mbar
500
5,0
2 760
27,6
1 200
12
55 35 1 000
10
Propane G31 Gas rate Gas Natural G20 Butane G30 Propane G31
Pa
mbar
610
6,1
3 570
35,7
1 300
13
kPa
bar
30
0,3
* calculated values subject to tolerance Net calorific value at 15 C and 1013,25 mbar G 20 34,02 MJ/m3 G 30 45,6 MJ/kg G 31 46,4 MJ/kg 1 mbar approximately equals 10 mm H2O 14
Technical information
Electrical Data Voltage Frequency Power consumption Protection degree External fuse rating Internal fuse rating Flue design Flue pipe diameter Coaxial Twin split pipes Roof Nominal heat flow rate** Exhaust temperature** Smoke production** Flue gas figures Nominal heat input** CO2 content O2 content CO content Exhaust temperature** Other specifications Height Width Depth Weight (dry) Water volume in the boler (up to 1 bar) mm mm mm kg l (kg) 703 400 325 37 1,0 kW % % ppm C 26.6 7,0 8,4 150 145 mm mm mm kW C kg/h 60/100 80 80/125 26,6 145 55,1 A A V~ Hz W 230 50 150 IPX4D 3 1,6 T
** Values refer to tests with a 1 m chimney working at the nominal heat input 15
INSTALLATION
Injectors 31,1 Natural G20 Butane G30 Propane G31 Gas supply pressures Gas Natural G20 Butane G30 Propane G31 Pa
mbar
Nominal heat input Minimum heat input Maximum useful output Minimum useful output
130 77 77
106 107
kW
BTU/h
13,0
44 353
kW
BTU/h
28,4
96 895
kW
BTU/h
10,8
36 847
norm. 2 000
20
min 1 700
17
max 2 500
25
INSTALLATION
Central heating Maximum temperature Minimum temperature Maximum pressure Minimum pressure Available head (in 1000 l/h) Domestic hot water Maximum temperature Minimum temperature Maximum pressure Minimum pressure Flow rate minimum 30 rise 35 rise 40 rise l/min l/min l/min l/min 2,5 13,6* 11,6* 10,2* C C kPa
bar
Pa
mbar
2 900
29
2 000
20
3 500
35
C C kPa
bar
85 38 250
2,5
Pa
mbar
3 700
37
2 500
25
4 500
45
kPa
bar
30
0,3
min 180
1,8
max 1 170
11,7
Ignition 600
6,0
kPa
bar
27
0,27
Pa
mbar
450
4,5
2 760
27,6
1 200
12
55 35 1 000
10
Propane G31
Pa
mbar
570
5,7
3 570
35,7
1 300
13
kPa
bar
30
0,3
Gas rate Gas Natural G20 Butane G30 Propane G31 m3/h kg/h kg/h min 1,37 1,02 1,00 max 3,29 2,45 2,41
* calculated values subject to tolerance For the net calorific values of G20, G30, G31 see the technical data at page 14 1 mbar approximately equals 10 mm H2O 16
Technical information
Electrical Data Voltage Frequency Power consumption Protection degree External fuse rating Internal fuse rating Flue design Flue pipe diameter Coaxial Twin split pipes Roof Nominal heat flow rate** Exhaust temperature** Smoke production** Flue gas figures Nominal heat input** CO2 content O2 content CO content Exhaust temperature** Other specifications Height Width Depth Weight (dry) Water volume in the boler (up to 1 bar) mm mm mm kg l (kg) 703 400 325 39 1,1 kW % % ppm C 31,1 6,3 9,7 <100 165 mm mm mm kW C kg/h 60/100 80 80/125 31,1 165 70,6 A A V~ Hz W 230 50 170 IPX4D 3 1,6 T
** Values refer to tests with a 1 m chimney working at the nominal heat input 17
INSTALLATION
Gas supply pressures 35,2 Gas Natural G20 Butane G30 Propane G31 Pa
mbar
Nominal heat input Minimum heat input Maximum useful output Minimum useful output
norm. 2 000
20
min 1 700
17
max 2 500
25
120 102
kW
BTU/h
15,5
52 886
Pa
mbar
2 900
29
2 000
20
3 500
35
kW
BTU/h
32,0
109 184
Pa
mbar
3 700
37
2 500
25
4 500
45
kW
BTU/h
12,7
43 435
INSTALLATION
Central heating Maximum temperature Minimum temperature Maximum pressure Minimum pressure Available head (in 1000 l/h) Domestic hot water Maximum temperature Minimum temperature Maximum pressure Minimum pressure Flow rate minimum 30 rise 35 rise 40 rise Injectors Natural G20 Butane G30 Propane G31 130 77 77 l/min l/min l/min l/min 2,5 15,3* 13,1* 11,5* C C kPa
bar
85 38 250
2,5
min 180
1,8
max 1 170
11,7
Ignition 600
6,0
Pa
mbar
500
5,0
2 760
27,6
1 200
12
kPa
bar
30
0,3
Pa
mbar
670
6,7
3 570
35,7
1 300
13
kPa
bar
27
0,27
Gas Natural G20 Butane G30 Propane G31 m3/h kg/h kg/h
kPa
bar
30
0,3
Electrical Data Voltage Frequency Power consumption Protection degree External fuse rating Internal fuse rating A A V~ Hz W 230 50 180 IPX4D 3 1,6 T
* calculated values subject to tolerance For the net calorific values of G20, G30, G31 see the technical data at page 14 1 mbar approximately equals 10 mm H2O 18
Technical information
Flue design Flue pipe diameter Coaxial Twin split pipes Roof Nominal heat flow rate** Exhaust temperature** Smoke production** Flue gas figures Nominal heat input** CO2 content O2 content CO content Exhaust temperature** Other specifications Height Width Depth Weight (dry) Water volume in the boler (up to 1 bar) mm mm mm kg l (kg) 703 400 325 39 1,1 kW % % ppm C 35,2 6,5 9,3 200 155 mm mm mm kW C kg/h 60/100 80 80/125 35,2 155 90
** Values refer to tests with a 1 m chimney working at the nominal heat input 19
INSTALLATION
GENERAL REQUIREMENTS
cal switch or appliance control, utilising mains electricity should be so situated that it cannot be touched by a person using the bath or shower. The location must permit the provision of an adequate flue and termination. For unusual locations special procedures may be necessary and BS 6798 gives detailed guidance on this aspect. A compartment used to enclose the appliance must be designed specifically for this purpose. This appliance is not suitable for external installation.
Biasi UK Ltd support the Benchmark initiative. The Benchmark Log Book is located at the back of this manual and should be completed by the Installing/Commisssioning Engineer and handed over to the User for future reference by other visiting Engineers. Also included is the Service Interval Record card that should be completed by the Service Engineer following the annual service maintenance of the boiler and system.
INSTALLATION
For Ireland (IE), it is necessary to complete a Declaration of Conformity to indicate compliance to I.S.813.2002. This appliance must be installed by a competent person in accordance with the Gas Safety (installation & Use) Regulations.
5.3
Flue system
5.1
Related documents
The installation of this appliance must be in accordance with the relevant requirements of the current Gas Safety (Installation & Use) Regulations, the Local Building Regulations, the current I.E.E. Wiring Regulations, the Regulations and by--- laws of the local water undertaking, and in Scotland, in accordance with the Building Standards (Scotland) Regulation. Health and safety document n 635 Electricity at work regs.. It should also be in accordance with the British Standard Codes of Practice: In Ireland (IE). The installation must be carried out by a Competent Person and installed in accordance with the current edition of I.S.813.2002 Domestic Gas Installations the current Building Regulations and reference should be made to the current ETCI rules for electrical installations.
The provision for satisfactory flue termination must be made as described in BS 5440 part 1. For Ireland (IE), refer to I.S.813.2002. The appliance must be installed so that the flue terminal is exposed to external air. It must not be installed so that the terminal discharges into an other room or space as an outhouse or lean--- to. It is important that the position of the terminal allows a free passage of air across at all times. The terminal should be located with due regard for the damage or discoloration that might occur to building products in the vicinity. In cold and/or humid weather water vapour may condense on leaving the flue terminal; the effect of such steaming must be considered. The minimum acceptable spacing from the terminal to obstructions and ventilation openings are specified in Fig. 5.1.
5.2
Location of appliance
The appliance may be installed in any room or internal space, although particular attention is drawn to the requirements of the current I.E.E. Wiring Regulations, and in Scotland, the electrical provisions of the Building Regulations applicable in Scotland, with respect to the installation of the combined appliance in a room containing a bath or shower. For Ireland (IE), reference should be made to the current edition of I.S.813.2002 and the current ETCI rules for electrical installations. Where a room---sealed appliance is installed in a room containing a bath or shower, any electri20
N BC F D IJ K A E O H G
M L G
Fig. 5.1
rev. 17.09.93
General requirements
Terminal position A. B. C. D. E. F . G. H. I.. J . K. mm
5.7
5.4
Gas supply
The Gas meter is connected to the service pipe by the local gas region or a local gas region contractor. If the gas supply for the boiler serves other appliances ensure that an adequate supply is available both to the boiler and the other appliance when they are in use at the same time. Pipework must be of adequate size. Pipes of a smaller size than the boiler inlet connection should not be used. Installation pipes should be fitted in accordance with BS 6891 and the complete installation should be tested for soundness. For Ireland (IE), refer to I.S.813.2002.
5.5
Air supply
The room in which the boiler is installed does not require a purpose provided air vent.
By---pass The appliance includes an automatic by--- pass valve which protects the main heat exchanger in case of reduced or interrupted water circulation through the heating system due to the closing of thermostatic valves or cock--- type valves within the system. The by--- pass is calibrated to assure a minimum flow of 500--- 600 lts/hr through the main heat exchanger. If you are installing a system that includes thermostatic radiator valves (TRV) and/or small bore (8--- 10 mm) it may be necessary to fit an external by--- pass to facilitate correct operation of the boiler. Air release points These must be fitted at all high points where air will natural collect and must be sited to facilitate complete filling of the system. Expansion vessel The appliance has an integral sealed expansion vessel to accommodate the increase of water volume when the system is heated. Refer to Tab. 4.1 on page 13 for its technical data.
5.6
Ventilation
If installed in a cupboard or compartment, it is not necessary to provide additional ventilation for cooling for this particular product. However consideration must be given to clearance requirements for maintenance (see section 6.2) and under no circumstances must stored articles be allowed to come into contact with the boiler or flue pipe.
rev. 17.09.93
21
INSTALLATION
Directly below a window or other opening . . . 300 Below gutters, soil pipes or drain pipes . . . . . 75 Below eaves . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 Below balconies or car port roof . . . . . . . . . . 200* From vertical drain pipes and soil pipes . . . . . 75 From internal corners . . . . . . . . . . . . . . . . . . . 150* From external corners . . . . . . . . . . . . . . . . . . . . 75* Above ground or balcony level . . . . . . . . . . . . 300 From a surface facing a terminal . . . . . . . . . . . 600 From a terminal facing a terminal . . . . . . . . . 1 200 From an opening in the car port (e.g. door, window) into dwelling . . . . . . . . . 1 200 L . Vertically from a terminal in the same wall . 1 500 M Horizontally from a terminal in the same wall . 300 N . Above the roof pitch with roof slope less than or equal to 30 . . . . . . . . . . . . . . . . . . . . . . 350 Above the roof pitch with roof slope more than 30 . . . . . . . . . . . . . . . . . . . . . . . . . . . 600 O . From wall face . . . . . . . . . . . . . . . . . . . . . . . . . . 600 * specific manufacturer requirements
Detailed recommendations are given in BS 6798 and BS 5449; the following notes are given for general guidance. For Ireland (IE), refer to I.S.813.2002. Pipework Copper tubing to BS EN 1057 is recommended for water pipes. Jointing should be either with capillary soldered or with compression fittings. Where possible pipes should have a gradient to ensure air is carried naturally to air release points and water flows naturally to drain taps. The appliance has a built--- in automatic air release valve, it should be ensured as far as possible that the appliance heat exchanger is not a natural collecting point for air. Except where providing useful heat, pipes should be insulated to prevent heat loss and to avoid freezing. Particular attention should be paid to pipes passing through ventilated spaces in roofs and under floors.
General requirements
If the heating circuit has an unusually high water content, calculate the total expansion and add an additional sealed expansion vessel with adequate capacity. Mains water feed: central heating There must be no direct connection to the mains water supply even through a non return valve, without the approval of the Local Water Authority. Mains water feed: hot water supply The domestic section of the boiler is designed to withstand an internal domestic water pressure of 10 bar. Where it is likely that the mains domestic water pressure may exceed 5 bar, it is possible due to internal water hammer effects that the pressure within the domestic system can increase to a level in excess of the 10 bar limit. In these circumstances it is therefore recommended that a 3 bar pressure reducing valve be fitted to the incoming mains water supply and a mini expansion vessel installed on the domestic circuit. These devices will protect the boiler and the domestic system from damage due to excessive domestic water pressure. Filling A method for initially filling the system and replacing water lost during servicing must be provided and it must comply with local water authority regulations. The correct method is shown in Fig. 5.2. The temporary connection must be removed immediately after filling.
5.8
Domestic water
The domestic water installation must be in accordance with the relevant recommendations of BS 5546. Copper tubing to BS EN 1057 is recommended for water carrying pipework and must be use for pipework carrying potable water. For Ireland (IE), refer to I.S.813.2002.
5.9
Water treatment
INSTALLATION
Central heating circuit Where a new boiler is fitted to a new system with either plastic or copper pipes, it is important the system is fully flushed, on completion, to ensure flux residues, swarfs, oils and other installation debris is removed. Where a new boiler is fitted to an existing system, it is important the debris from the existing system is fully removed in order to ensure the efficiency of the new appliance is maintained. Details on flushing procedure are given in the section 7.4 of this manual. Domestic hot water circuit (scale protection) In areas where the water is hard (i.e. more than 200 ppm total hardness as defined by BS 7593: 1993 Table 2) it is recommended that a proprietary scale--- reducing device is fitted into the boiler cold supply, within the requirements of the local water company.
Control valve Double check valve Temporary connection Supply pipe (cold water inlet) C.h. return pipe Control valve
Fig. 5.2 The installer should ensure that no leaks exist either inside the boiler or on the system as frequent filling of the system could cause premature scaling of the heat exchanger.
22
rev. 17.09.93
General requirements
fused three pin plug and unswitched shuttered socket outlet both complying with BS 1363. The point of connection to the electricity supply must be readily accessible and adjacent to the appliance except were the appliance is installed in a bathroom this must then be sited outside the bathroom.
rev. 17.09.93
23
INSTALLATION
6
6.1
INSTALLATION
Warnings
25 250 50
The use of gas appliances is subject to statutory control; it is essential to observe the current regulations and laws in force (see also chapter 5). The appliance must discharge combustion products directly outside or into a suitable exhaust duct designed for this purpose. Combustion products must be discharged using original flue kits only, since they are integral parts of the boiler. For LPG, the appliance must also conform with the requirements of the distributors and comply with current Regulations and laws in force. The safety relief valve must be connected to a suitable drain, or discharge in a safe manner. The electrical wiring must conform with current Regulations, in particular: --- the boiler must be earthed using the correct bonding clamp. --- Adjacent to the boiler a fused spur isolation switch must be installed which permits a complete switching off in the conditions of the overvoltage category III. Refer to section 6.10 in this chapter for the electrical connections. In no circumstances will the manufacturer be held responsible if the warnings and instructions contained in this manual have not been complied with.
200
INSTALLATION
Fig. 6.1 (all dimensions in mm) --- When installing the boiler in a cupboard, cover or alcove allow at least 50mm permanent clearance from the front face of the boiler. Also ensure sufficient clearance to allow free access for servicing and the lowering of the front control panel. --- If the boiler is installed outside, cover the appliance to protect it against the elements and add some special anti--- freeze (neutralised) to the c.h. system. --- Before installing the boiler on an existing c.h. system, flush it out thoroughly before fitting the boiler, so as to remove muddy deposits. --- It is advisable to equip the system with a sediment filter, or use a water--- treatment product in the circulating water. The latter option in particular, not only cleans out the system, but also has an anti--- corrosive effect by promoting formation of a protective skin on metal surfaces and neutralising gases present in the water. We recommend the use of a suitable universal inhibitory to protect the c.h. system from corrosion.
6.2
For the installation proceed as follows: --- The boiler must be fixed to a strong wall. --- The dimensions for the exhaust fume duct detailed in section 6.7 and the correct procedures for installing the duct, depicted in the instruction leaflet included with the flue kit, must be complied with during installation. --- To allow maintenance procedures it is necessary to leave the minimum gaps indicated in Fig. 6.1.
6.3
Precautions Before mounting the bracket, check that the dimensions for fitting the exhaust fume duct are complied with (refer to the leaflet included with the flue kit, packed separately).
24
Installation
Utilise the paper template supplied with the boiler to determine the fixing position for the bracket and boiler. Securely mount the bracket to the wall using appropriate fixings suitable for the type of wall construction and capable of supporting the total (wet) load. Refer to the weight given in the technical data tables specific for each model.
6.6
6.4
C
Overall dimensions
95 B A
250
35 165 101 20
193
A and B 147
20
85
561
703
C G
D F C
65 52 64 65 400 325
B E A
* not present on c.h. only boilers A --- air intake/flue outlet pipe 100 (co--- axial) B --- flue outlet pipe 80 (twin kit) C --- air intake pipe 80 mm (twin kit)
Fig. 6.3
6.5
Joints
Pipe sizes 22 15 15 15 Fig. 6.4 H
Functions Gas, c.h. return, c.h. flow D.c.w. inlet D.h.w. outlet Pressure relief valve Tab. 6.1 (sizes in mm o.d.)
25
INSTALLATION
237
1 Take the protective caps off the boiler pipework. 2 Thoroughly clean the connections. 3 Mount the boiler on its bracket. 4 Fix the c.h. valves A and gas cock B () to the boiler using the gaskets (Fig. 6.3) 5 Fix the 22 mm pipes C (c.h. circuit) to the c.h. valves A and the 22 mm pipe D (gas) to the cock B using the gaskets. 6 Repeat the above procedure for the d.c.w. inlet utilising the cold water inlet valve E, the 15 mm copper tail F with its connection nut and two gaskets. 7 Fix the 15 mm copper tail G with the connection nut and a gasket. 8 Connect the pipe H (Fig. 6.4) from the pressure relief valve to the safety discharge pipework.
6.8
Flue restrictors
INSTALLATION
Two restrictors with different size are supplied with the boilers M90E.24S and M90E.28S. A 44 mm size is fitted to the boiler and a 47 mm size is supplied in a separate bag. Two restrictors with different size are supplied with the boiler M90E.32S. A 47 mm size is fitted to the boiler and a 50 mm size is supplied in a separate bag. The size is marked on the restrictor body. For the correct use of the restrictors with co---axial pipes 60/100 mm refer to: Tab. 6.2 for models M90E.24S and M90E.28S Tab. 6.3 for model M90E.32S For the correct use of the restrictors with vertical roof kit 80/125 mm refer to: Tab. 6.4 for models M90E.24S, M90E.28S Tab. 6.5 for the model M90E.32S For the correct use of the restrictors with twin pipes refer to Fig. 6.8 for the models M90E.24S; and M90E.28S, refer to Fig. 6.9 for the model M90E.32S. Model M90E.24S, M90E.28S Equivalent length ( 60/100) Between 0,3 and 1 m More than 1 m up to 2 m More than 2 m up to 3 m Restrictor 44 mm 47 mm no restrictor
Tab. 6.4 FOR VERTICAL ROOF KIT Model M90E.32S Equivalent length ( 80/125) Between 0,5 and 4 m More than 4 m up to 6 m Restrictor 47 mm no restrictor
Tab. 6.5 FOR VERTICAL ROOF KIT The appropriate restrictor, when necessary, must be fitted in the flue outlet elbow as indicated in Fig. 6.5.
Fig. 6.5
6.9
Choice of flue
The following flue kits are available for connecting to the boiler: Standard horizontal flue kit (Fig. 6.6A) Co--- axial 60/100mm --- nominal length 1m This kit is normally supplied with the boiler and can be fitted to allow discharge to the rear or either side of the boiler via the flanged boiler adapter elbow. Minimum length required is 0.3 m. Maximum equivalent length of 3 metres for models M90E.24S, M90E.28S and 2,7 metres for the model M90E.32S can be achieved utilising extensions. This flue system can only be used to dis-
Tab. 6.2 FOR CO---AXIAL STANDARD FLUE Model M90E.32S Equivalent length ( 60/100) Between 0,3 and 1 m More than 1 m up to 2,7 m Restrictor 47 mm no restrictor
26
Installation
charge horizontally, it is not designed to enable termination in the vertical plane. Vertical kit with 90 elbow (Fig. 6.6B) Co--- axial 60/100 mm Supplied with a straight flanged adapter a co--axial elbow and a co--- axial pipe with terminal, this kit allows for a vertical rise of 0,3 m from the boiler. In all circumstances the flue terminal must discharge horizontally and the equivalent flue length must not exceed 3 metres for models M90E.24S, M90E.28S and 2,7 metres for the model M90E.32S. Elbows 45 & 90 (Fig. 6.6C) Co--- axial 60/100mm. Elbow kits enable the standard flue kits to be offset to overcome obstructions or ensure the correct clearances for the flue terminal. Each elbow used in addition to the standard flanged elbow reduces the overall acceptable length of the flue system as follows: 45 reduce length by 0,5 m. 90 reduce length by 1 m. B
60/100 See section 6.9
a location remote to an outside wall. These kits allow for separation of the air supply pipe from the pipe that discharges the exhaust gases. Consequently it is possible to extend the flue system to a greater distance than that provided by the standard horizontal co--- axial flue. If either an additional 45 or 90 accessory elbow is used then the maximum permissible length of either pipe must be reduced by 0.90 m or 2,75 m respectively.
90=--- 2,75 m
45=--- 0,90 m
Fig. 6.7 The graph in Fig. 6.8 demonstrates the allowable equivalent lengths for the air supply and flue exhaust pipes of models M90E.24S and M90E.28S.
Flue exhaust a 32 30 28 26 24 22 20 18 16 14 12 10 Restrictor 8 47 mm 6 4 2 0
M90E.24S M90E.28S
Allowed values
A
60/100 90=--- 1 m 45=--- 0,5 m
No Restrictor
C Fig. 6.6 Twin pipe kits 80 mm (Fig. 6.7) Various twin (split) pipes kits and optional accessories (elbows) are available to assist in the termination of the flue where the boiler is installed in
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Air intake b
27
INSTALLATION
Installation
The graph in Fig. 6.9 demonstrates the allowable equivalent lengths for the air supply and flue exhaust pipes of model M90E.32S
Flue exhaust a 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
M90E.32S
Allowed values
INSTALLATION
No Restrictor
Vertical flue kit --- condensation When fitting the 80/125 l flue kits where the equivalent flue length exceeds 3 m a condensate collector and syphon are required. If the appliance normally operates at minimum output power at very low temperatures (e.g. 40 C return / 60 C flow), the above equivalent length should be reduced to 1 m. The syphon must also be connected to a suitable drain. Please, see the boiler accessory leaflet available from your Supplier for details or contact Biasi UK Technical Helpline.
Fig. 6.9 Vertical--- roof kit (Fig. 6.10) This kit allows vertical termination of the flue pipe through the roof. The kit is 1.2 m in length. Extension pieces (Co--- axial) are also available which allows the flue system to be extended to a total overall maximum permissible length. Optional 45 and 90 elbows can be used to offset the flue route.
J I J K
Max length See Tab. 6.4 for 24 and 28 kW models) See Tab. 6.5 for 32 kW model
Fig. 6.11 4 Remove the side panels or move the lower part of the side panels as indicated in Fig. 6.12 and pull the control panel. When completely pulled out, the panel can rotate 45 downwards to facilitate the operations on the internal parts.
Fig. 6.10
28
Installation
which the room thermostat must be connected. 7 Connect the earth wire (yellow/green). Connection of a room thermostat The room thermostat must be connected to the terminal block situated next to the control panel. When connecting any type of external control, the link M in Fig. 6.14 must be removed.
M Fig. 6.12 5 Loosen the screws L and remove the service panel (Fig. 6.13). L
1
External controls terminal block
Fig. 6.14 8 Connect the room thermostat between terminals 1 and 3 as shown in Fig. 6.15. Do not connect live wires to terminals to which the room thermostat must be connected.
Room thermostat Power supply terminal block
L
T
Fig. 6.13 For the electrical connection to the boiler use electric wires which conform to the current regulations, with flexible cord, each core having a cross section area not less than 0,75 mm2. 6 Connect the electrical supply flexible cord coming from the fused spur isolation switch to the power supply terminal block of the boiler (Fig. 6.14) keeping the same connections for the live (brown wire) and the neutral (blue wire). External 3 A fuse or fused plug with same current rating is recommended. Do not connect live wires to terminals to
Fig. 6.15 9 Route the electrical supply flexible cord and the external control flexible cord as illustrated in Fig. 6.16.
29
INSTALLATION
Installation
Lock the flexible cords in place with the flexible cord clamps Do not connect live wires to terminals to which the room thermostat must be connected.
Frost thermostat Room thermostat
L
To the external control device To the fused spur isolation switch T T
INSTALLATION
2 3
Fig. 6.16 Fig. 6.17
1External controls
terminal block
30
COMMISSIONING
3 Slowly open each draw--- off tap and close it only when clear water, free of bubbles, flows out.
Ensure that the Benchmark Log Book is satisfactorily commpleted during the commssioning process. The Log Book is located at the end of this manual. This manual should be handed to the User following completion of the installation and commissioning process. Failure to comply with these requirments may invalidate the manufacturers guarantee. For Ireland (IE), it is necessary to complete a Declaration of Conformity to indicate compliance to I.S.813.2002.
7.4
7.1
Electrical installation
Preliminary electrical system checks to ensure electrical safety shall be carried out by a competent person. i.e. polarity, earth continuity, resistance to earth and short circuit. If a fault has occurred on the appliance the fault finding procedure should be followed as specified in the service manual.
21
7.2
20
1 Inspect the entire installation including the gas meter, test for soundness and purge, all as described in BS 6891. For Ireland (IE), refer to I.S.813.2002. 2 Open the gas cock 13 (Fig. 7.1) on the appliance and check the gas connector on the appliance for leaks.
Fig. 7.2 5 Open each radiator air vent starting at the lowest point of the system and close it only when clear water, free of bubbles, flows out. 6 Purge the air from the pump by unscrewing the pump plug 20 (Fig. 7.2); release the pump shaft by turning in the direction indicated by the arrow on the information plate. 7 Replace the pump plug. 8 Continue filling the system. The actual reading should ideally be 1,3 bar and not less than 0,3 bar. 9 Close all air release valves on the c.h. system. 10 Inspect the boiler and the system for water soundness and remedy any leaks discovered. 11 Cold flush the system to remove any loose particles and any system debris before starting the boiler for the first time
13 Fig. 7.1
12 Open position
7.3
1 Close all hot water draw--- off taps. 2 Open the cold water inlet valve 12 (Fig. 7.1).
31
INSTALLATION
1 Open the c.h. flow and return valves. 2 Remove the front panel of the case (see the section 9.2 in this manual. 3 Unscrew the cap on the automatic air purgervalve 21 (Fig. 7.2) one full turn and leave open permanently. 4 Gradually open stopcock at the filling point connection to the c.h. system until water is heard to flow; do not open fully.
Commissioning
The flushing procedure must be in line with BS7593 Treatment of Water in d.h.w. c.h. Systems. When the installation and second filling are completed turn on the c.h. system and run it until the temperature has reached the boiler operating temperature. The system must then be immediately flushed through. This procedure must be repeated twice more. Fig. 7.3 The boiler will now go through an ignition sequence and the burner will light. If during the ignition attempt period the boiler fails to light, the full sequence control p.c.b. will go to lockout and the lock--- out signal lamp 6 will appear. To reset the boiler press and release the boiler reset button 7 (Fig. 7.3). 10 8
INSTALLATION
During this operation we highly recommend the use of a c.h. flushing detergent in the quantities as specified by the appropriate manufacturer, whose function it is to dissolve any foreign matter which may be in the system. The above operation could save the invalidation of your boilers guarantee and will also prevent problems which you may experience in the future if an inhibitory is not used.
7.6
7.5
Some products incorporate an anti cycling time delay. It is normal when first switching the boiler on for the boiler to operate on heating for a few seconds then switch off. After 3--- 4 minutes has elapsed the boiler will then re ignite and operate perfectly normally. The ignition delay cycle does not prevent normal operation of the boiler to provide d.h.w.. If external controls are fitted (e. g. Timeclock, room thermostat) ensure they call for heat. 1 Turn on the electricity supply to the boiler, switching on the fused spur isolation switch. The appliance operation light 10 will flash every 4 seconds. 2 Turn the function selector 8 as in Fig. 7.3. The appliance operation light 10 will flash every 2 seconds.
This boiler has been tested to the highest quality control standards. The maximum and minimum gas pressures are already set during this quality control process however the checking procedure must be followed to ensure maximum operating efficiency from the boiler. 1 Remove the front panel of the case (see section 9.2 in this manual). 2 Loosen the internal screw 37 (Fig. 7.4) on the Outlet Pressure Test Point of the Gas Valve and connect a pressure gauge using a suitable hose. 3 Set the d.h.w. and c.h. temperature control knobs to their maximum position.
32
Commissioning
4 Switch on the boiler and open at least one hot water tap fully. 5 Check the maximum gas pressure and compare the value on the gauge with the value indicated in the sections 4.5, 4.6 or 4.7 (gas pressures at the burner), accordingly with the model of boiler installed. 6 Check the maximum gas flow at the gas meter and compare the value indicated in the sections 4.5, 4.6 or 4.7 (gas rate), accordingly with the model of boiler installed. 7 Switch off the boiler. 8 Disconnect the gas modulator coil by removing the electrical connector A (Fig. 7.4). 15 Switch off the boiler, turn off the hot water tap(s) and disconnect the pressure gauge. If the maximum and minimum gas pressures measured above are not in accordance with the technical data (sections 4.5, 4.6 or 4.7 ) then adjustment will be necessary. A full explanation of the gas pressure adjustment procedure is given in the Gas Valve section of the service manual. If maximum and/or minimum gas pressures are adjusted then the ignition gas pressure must be checked and adjusted if necessary. Important: after the gas pressure checks and any adjustment operations, all of the test points and adjustment devices must be sealed.
37
7.7
Fig. 7.4 9 Switch on the boiler. 10 Check the minimum gas pressure and compare the value on the gauge with the value indicated in the sections 4.5, 4.6 or 4.7 (gas pressures at the burner), accordingly with the model of boiler installed. 11 Switch off the boiler and re--- connect the electrical connector A to the modulator coil. 12 Access the main control panel (see section 6.10, follow steps 2 --- 5) 13 Switch on the boiler. 14 Check the ignition gas pressure by setting dip --- switch 3 (NO TAG) to the OFF position. Compare the value on the gauge with the value indicated in the sections 4.5, 4.6 or 4.7 (gas pressures at the burner), accordingly with the model of boiler installed. If the ignition gas pressure is not set correctly see section 7.7 in this manual for the adjustment procedure. If ignition gas pressure is correct switch dip --- switch 3 to the ON position.
1 Turn off the boiler by means of the fused spur isolation switch provided adjacent to the appliance. 2 Open the gas valve outlet pressure test point 37 (Fig. 7.4) and connect the gauge. 3 Turn the boiler ON positioning the control selectors 8 in the positions as shown in as in Fig. 7.5 and ensure that the timer selector switch and room thermostat, if fitted, are set to heat demand. 8
Fig. 7.5 4 Watch the gauge and check to see if the ignition pressure registered corresponds to the values as given in the Technical Data. Turn off the boiler and reignite it by turning the function selector 8 to the OFF position and then back to that indicated in Fig. 7.5 5 Repeat this process two to three times leaving 30 second intervals between each ignition. Check the ignition pressures and visually
33
INSTALLATION
Commissioning
check that the burner lights uniformly and in a controlled manner. If the burner ignition is not uniformly controlled then checks should be made to: the flue installation and termination. that the burner and injectors are clean. that the boiler is set for the correct gas used (see Section Gas Conversion of this manual) If the ignition pressure recorded is not as indicated in the Technical Data then refer to section Ignition gas pressure adjustment of the Service Manual for the necessary adjustment procedures. 4 Rotate the knob 9 as in Fig. 7.7 5 Turn the boiler ON positioning the function selector 8 as indicated in Fig. 7.7 and ensure that the timer selector switch and room thermostat, if fitted, are set to heat demand. Run the boiler in c.h. mode (do not open any d.h.w. tap). 10 8 9 7 6
6 ------7
INSTALLATION
Important: after the gas pressure checks and any adjustment operations, all of the test points must be sealed and replace the adjustment protection cap.
Fig. 7.7 6 Keep pressed the reset button 7 for about 10 seconds until the lock--- out signal lamp 6 blinks (Fig. 7.7).
ON
7.8
The following procedure allows the output of the boiler for central heating to be adjusted to meet the system requirement. Adjusting the useful central output does not prevent the boiler firing at maximum rate for domestic hot water production. Refer to Fig. 7.13, Fig. 7.14 and Fig. 7.15 (depending on the gas used) and determine the correct burner pressure appertaining to the output required for the central heating requirement. 1 Remove the front panel of the case. 2 Loosen the screws B and remove the service panel (Fig. 7.6). B
LD1
LD2
LD3
10 Fig. 7.8 7 The lamps 10 should give the indication as in Fig. 7.8 --- Fig. 7.9. If not, press the reset button 7 (Fig. 7.7) repeatedly to obtain it. Where: Lamp OFF Lamp ON Fig. 7.9
Fig. 7.6 3 Open the gas valve outlet pressure test point 37 (Fig. 7.4) and connect the gauge.
8 Keep pressed the reset button 7 (Fig. 7.7) for about 5 seconds. The boiler runs in C.h mode and the lamp 6 (Fig. 7.7) is switched OFF.
34
Commissioning
The lamps 10 give the indication as in Fig. 7.8 --- Fig. 7.10 Where: Lamp OFF Flashing lamp, alone or simultaneously with an other lamp Fig. 7.10 9 Rotate the knob 9 in Fig. 7.7 to obtain the pressure to the burner to meet with the central heating system requirements. Refer to the diagrams shown in Fig. 7.13, Fig. 7.14 or Fig. 7.15 By rotating clockwise the pressure increases. 10 Make a note of the position of the knob 9 and recorded this in Fig. 7.11 below with an *. 10 8 9 7 6 By turning the knob 9, the lock--- out signal lamp 6 blinks quickly (2 per second) indicating that the setting has changed and must be memorised by keeping pressed the reset button 7 for about 5 seconds until the lamps 10 all briefly simultaneously blink. 14 To reset the boiler to the normal operation turn it OFF and ON by the function selector 8. In any case, the boiler automatically resets to its normal operation after 10 minutes. Natural (G20) kW 32 30 28 26 24 22 20 18 16 14 12 10 2 3 4 5 6 7 M90E.24S M90E.28S M90E.32S 8 9 10 11 12 mbar
Fig. 7.13 Fig. 7.11 11 Keep pressed the reset button 7 for about 10 seconds until the lock--- out signal lamp 6 blinks. Note: during the adjustment the boiler doesnt operate. 12 Press the reset button 7 repeatedly (2 times) until the lamps 10 give the indication as in Fig. 7.8 --- Fig. 7.12 (useful c.h. output adjustment mode). Where: Lamp OFF Lamp ON Fig. 7.12 13 Set the knob 9 on the position corresponding to the position obtained on step 9. Fig. 7.14 kW 32 30 28 26 24 22 20 18 16 14 12 10 6 Butane (G30)
18
21
24
27 mbar
35
INSTALLATION
Commissioning
Propane (G31) kW 32 30 28 26 24 22 20 18 16 14 12 10 8 11 14 17 20 23 26 29 32 35 M90E.24S mbar M90E.28S M90E.32S Fig. 7.15 To carry out a combustion check refer to the instructions given in the section 9.5 of this manual. Reference figures are given in the sections 4.5, 4.6 or 4.7 of this manual (Flue gas figures).
INSTALLATION
7.9
With the burner on high flame close the gas cock. About 10 seconds after, the lock--- out signal lamp 6 (Fig. 1.3 on page 1) must appear. To reset the boiler press and release the boiler reset button 7 (Fig. 1.3 on page 1).
36
8
8.1
GAS CONVERSION
Warnings
8 Loosen the screws C and remove the service panel (Fig. 8.2). C
The commissioning of this boiler and system must only be undertaken by a professionally qualified person in accordance with the requirements of the Gas Safety Installation and Use Regulations and be approved by C.O.R.G.I. Components used to adapt it to the type of gas available must be genuine parts only.
8.2
Procedures
Fig. 8.2 9 Switch on the appliance at the mains isolating spur. 10 Turn the boiler OFF positioning the function selector 8 as indicated in Fig. 8.3 10 8 9 7 6
1 Check that the gas cock (13 in Fig. 8.1) fitted under the boiler is turned off and the appliance is is switched off at the mains isolating spur.
13 Fig. 8.1
Closed position Fig. 8.3 11 Disconnect the C.h. temperature probe NTC 25 in Fig. 8.4
2 Remove the front and side panels of the case (see the section General access and emptying hydraulic circuits in the service manual). 3 Take off the lid of the sealed chamber. 4 Take the front panel of the combustion chamber off and remove the burner (29 on page 11). See section Ignition and detection electrodes in the service manual for detailed instructions. 5 Carry out the conversion for the type of gas, replacing the burner injectors correctly. 6 Re--- assemble the burner, the front panel of the combustion chamber and the lid of the sealed chamber. 7 Extract the control panel as explained in the section 6.10 of this manual.
25
Fig. 8.4 12 Keep pressed the reset button 7 for about 10 seconds until the lock--- out signal lamp 6 blinks. 13 Connect the C.h. temperature probe NTC 25 in Fig. 8.4
37
MAINTENANCE
Gas conversion
ON
LD1
LD2
LD3
10 Fig. 8.5 14 Press the reset button 7 (Fig. 8.3) repeatedly (4 times) until the lamps 10 give the indication as in Fig. 8.5 --- Fig. 8.6 (gas type mode). Where: Lamp OFF Lamp ON
15 To change the setting turn the knob 9 on a position corresponding to the gas used as shown in Fig. 8.7. By turning the knob 9, the lock--- out signal lamp 6 blinks quickly (2 per seconds) indicating that the setting has changed and must be memorised. 16 To memorize the setting keep pressed the reset button 7 for about 5 seconds until the lamps 10 briefly blinks simultaneously. 17 Open the gas cock (13 in Fig. 8.9)
MAINTENANCE
Fig. 8.6 At this step it is possible to visualize the current setting by keeping the reset button 7 pressed for more than 5 seconds. The lamps 10 will flash a number of times corresponding to the setting of the knob 9 in Fig. 8.7. L.P .G. Gas type 4 Setting No. Fig. 8.9
13
Open position
NATURAL GAS
9 Fig. 8.7 Gas supply Position of knob 9 Approx. Max current through the modulator device 125 mA 165 mA
18 To reset the boiler to the normal operation turn it ON by the function selector 8 on the desired operation and checking the ignition pressure and that the burner lights up uniformly. In any case, the boiler automatically resets to its normal operation after 10 minutes. Factory setting = Natural gas (as illustrated) 19 Calibrate the gas valve according to the instructions given in the service manual, section Modulating gas valve --- Adjustment. 20 Set the correct gas pressure for central heating output required, see section 7.8 in this manual. 21 Stick on the inside of the left hand side panel adjacent to the data badge the self--- adhesive label (included with the conversion kit) indicating the type of gas, and the gas pressures to which the appliance has been set. 22 Replace the service panel, the front and side panels of the case.
9
9.1
MAINTENANCE
Warnings
Side panels 3 Loosen the screws B. Bring the bottom of the panels away from the boiler and lift them, freeing them from the top hooks (Fig. 9.2).
The procedures detailed in this chapter must be carried out only by a professionally qualified person. Thus you are advised to contact an Authorised Service Agent. For Ireland (IE), the servicing work must be carried out by a competent Person For efficient and continuous operation of the boiler you are advised to have, at least once a year, maintenance and cleaning done by an Approved Service engineer. Isolate the appliance from the electricity supply by turning off the fused spur isolation switch adjacent to the appliance and turn off the gas cock, before carrying out any procedures, whatsoever, for cleaning, maintenance, opening or dismantling boiler panels.
B Fig. 9.2
9.2
Front panel 1 Loosen the two screws A (Fig. 9.1). 2 Lift and remove the panel.
1 Turn off the d.c.w. inlet isolating valve (12 in Fig. 9.3) and turn on the hot water taps and any drain cocks.
11
15 Fig. 9.3
12
13
Closed position
9.4
Fig. 9.1
1 Close the c.h. isolating valves (11 and 15 in Fig. 9.3). 2 Open the central heating drain cock (17 in Fig. 9.4).
39
MAINTENANCE
9.3
Maintenance
17 Fig. 9.4 3 A small quantity of water will remain in the d.h.w. heat exchanger after draining. If the boiler is being drained to prevent freezing, the d.h.w. heat exchanger must be removed and inverted to drain fully or an antifreeze solution added.
MAINTENANCE
9.5
To carry out a combustion analysis: 1 remove the front panel of the case (see the section 9.2 in this manual). 2 Remove the plugs indicated in Fig. 9.5.
Fig. 9.5 Reference figures are given in the sections 4.5 or 4.6 of this manual (Flue gas figures).
9.6
1 Take off the front of the case. 2 Take off the removable front of the air--- tight chamber and the front panel of the combustion chamber. If you notice dirt on the fins of the primary heat exchanger (31 on page 11): 3 cover the sloping surfaces of the burner (29 on page 11) entirely in a protective layer (sheets of newspaper or similar). 4 Brush out the primary heat exchanger (31 on page 11) with a bristle paintbrush. NOTE --- When removing the airtight chamber cover it is not necessary to remove the screws located at the top edge on either side.
40
Maintenance 9.7 Checking the pressurisation in the expansion vessel 9.9 Checking the flue
Have the integrity of the flue outlet pipe (45 on page 12) air intake pipe (46 on page 12), checked periodically, the venturi device* (42 on page 12) cleaned and the efficiency of the flue safety circuit checked at least once a year. * For details see the section Fan, venturi device and air pressure switch in the service manual. For all the above maintenance operations it is advisable to call an approved Service Engineer.
Empty the central heating system as described in section 9.4 of this chapter and check that the pressure in the expansion vessel is not less than 1 bar. See also section 4.4 page 13 of this manual. If the pressure is lower, take steps to correct the pressure level.
9.8
Check appliance for gas soundness. Recheck operational pressures and adjust as necessary as described in section 7.6 page 32 of this manual.
41
MAINTENANCE
The sloping and multi--- gas type burner (29 on page 11) does not need special maintenance, but it is sufficient to dust it with a bristle paintbrush. To reach the burner: 1 Take off the front of the case. 2 Take off the removable front of the air--- tight chamber and the front panel of the combustion chamber. 3 Brush out the burner with a bristle paintbrush. NOTE --- When removing the airtight chamber cover it is not necessary to remove the screws located at the top edge on either side.
*1796209158*
17962.0915.8 1908 52A5 UK
Biasi UK Ltd Newman Park, Western Way Wednesbury, WS10 7BJ Sales Tel No: 0121 506 1340 Sales Fax No: 0121 506 1360 Service Tel No: 0121 506 1350 Service Fax No: 0121 506 1370 www.biasi.co.uk
07/05 2008