WOOD GASIFYING BOILER

ATTACK DP

TECHNICAL MANUAL

ATTACK DP - Wood gasifying boiler


- Assembly, pre-heating and training of the attendance is perfomed by an assembly technician trained by the manufacturer, who also fills in a document on the installation of the boiler -During wood gasifying, tar and condensates (acids) are created in the fuel bin. Therefore behind the boiler the mixing appliance regumat or temperature-responsive valve must be installed, to keep the minimum temperature of return water of 65C into the boiler. - Operation temperature of water in the boiler must be of 80-90C. - The boiler must not be permanently operated with the output lower than 50%. - When a circulation pump is used, it must be controlled by a separated thermostat in order to keep the prescribed minimum temperature of return water. - Ecological operation of the boiler is during nominal output. - We recommend to install the boiler with storage reservoirs and Regumat which guarantees economy in fuel in 20 a 30% and longer service life of the boiler as well as comfortable attendance. - If the boiler cannot be attached to the accumulation, we recommend to connect it at least with one equalisation basin with the volume of about 25l for 1 kW of the boiler output. - During the mode with decreased output (summer mode and water heating) it is necessary to star t burning daily. - Fuel must be used only dried of 12 - 20% moisture content (with a higher moisture content of fuel the output of boiler decreases and its consumption increases) - The choice of the right boiler size, that is its heating output, is a very important condition for economic operation and right function of the boiler. The boiler must be chosen so that its nominal output responds to heat loss of the heated object. The guarantee does not apply for the boiler if: - it is operated with wood exceeding 20% moisture content or with fuel not prescribed by the manufacturer. - If a proper mixing appliance Regumat is not installed in the system, whch provides for return water the temperature of 65C. - a functional thermostatic valve (WATTS STS20) is not installed on the cooling circuit of boiler and connected to the source of cooling water.

Content:
2. Important 3 Content 4 Introduction, general description 5 Technical parameters 6 Dimensions of boilers 7,8 Control board of ATTACK DP STANDARD, PROFI 9 Purpose of use, technical paramaters, operational rules 10 Warning 11 Technical description of DP PROFI 12 Overheating of the boiler, the ways of regulation, displaying faults 13 Maintenance of heating system, Prescribed fuel 14 Chimney, exhaust pipe, connecting boiler to the mains 15 Protection of boiler against corrosion 16 Recommended connection 17 Protection of boiler against overheating 18 Defects and their remedy

Introduction:
Dear customer,
Thank you for confidence that you showed us by purchasing our product - ATTACK wood gasifying boiler. We wish you long and reliable operation. Proper attendance of the boiler is one of the conditions for reliable and right operation, so please read this instruction for use carefully. The manual is written in the way to respect the right operation of the boiler in central heating system. The conditions of right operation of the boiler: - to choose the right type and output of the boiler - impeccable putting into operation - sensitive attendance - regular technical maintenance - reliable service

General description:
ATTACK DP wood gasifying boiler is designed for economic and ecological heating of family houses, bungalows, small plants, workshops and similar objects. Specified fuel for ATTACK DP boilers is dry wood, e.g. logs of lengths, depending on the type of boiler. The wood gasifying boiler is the holder of 101 5 certificate.

Description of ATTACK DP brand:

ATTACK D P 25 35 45
Wood gasifying boiler

Standard

Boiler output Version

ATTACK D P 25 35 45
Wood gasifying boiler

Profi

Boiler output Version

Technical parameters:
Type of boiler
Boiler output ( STANDARD version)

DP25
kW kW m2 dm3 mm Pa kPa kg mm mm mm mm IP W % C kg/s dB kgh
-1

DP 35
35 14-35 2,70 140 235x445 23 250 390 152 1100 600 1250 21 50 80-85 2 250 0,018 65 10,5 1kW = 1m 650 3 78 625 230/50 65-90 10-27 1,5 / 230
3

DP45
45 18-45 3,10 180 235x445 23 250 420 152 1100 600 1350 21 50 80-85 2 250 0,021 65 13,5 750 3 92 750 230/50

25 10-25 2,30 100 235x445 23 250 350 152 1100 600 1150 21 50 80-85 2 250 0,015 65 7,5 550 3 65 500 230/50

Output range ( PROFI version) Heating surface Feed hopper capacity Dimension of feeding openning Specified chimneyt Max. working water overpressure Boiler weight Diameter of flue connection Boiler height Boiler width Boiler depth Shielding of electric parts Electrical input Boiler efficiency CO emision class Temp. of flue gas in nominal output Flow of flue gas in nominal output Maximum noise level Specified fuel Average fuel consumption Consumption for season Max. length of logs Burning time in nominal output Water volume in boiler Min. volume of equalisation basin Voltage
Range of temperature of heating water Range of room temperature ( PROFI version) Current carrying capacity of boiler regulator contacts (PROFI version)

Dry wood of 15-17 Mj/kg-1 calorificvalue,water content min. 12% - max. 20% diameter 80-150mm

mm hod. l l V/Hz C C A/V

Specified min.temperature of returnable water in operation is 65C. Specified temperature of water during operation in the boiler is 80-90C. 5

Dimensions of ATTACK DP boilers


152 G 1/2" 80 225

depth
ATTACK

83 width
DP25 DP35 DP45 C.H.flow connection G6/4" G6/4" C.H.return connection G6/4" G6/4" G2" G2"

9, 10,11,12,13,14,15,22 21

15

16

17

18 5

20

19

1 8 1. Boiler body 2. Control board 3. Feeding door 4. Ash door 5. Sucking fan 6. Flue 7. Heatproof shaped piece - jet 8. Heatproof shaped piece - ash pan 9 Boiler thermostat 10. Reset 11. Flue gas thermostat

17 12. Control thermostat of ventilator 13. Switch 14. Thermometer 15. Regulator of output 16. Cooling down circuit against overheating of water in boiler 17. Cover of cleaning hole 18. C.H.flow connection 19. C.H.return connection 20. Control door 21. Pull rod of chimney flap 22. Boiler regulator (PROFI version)

Control board

ATTACK DP Standard
Wood gasifying boiler "ATTACK DP Standard" is controlled by a boiler and flue gas thermostat.

1. Reset 2. Fuse 3. Main switch 4. Flue gas thermostat 5. Boiler thermostat 6. Thermometer 7. Pull rod control

Description: 1. Reset - protection of the boiler against overheating (in case the temperature is higher than 110 degrees C, the boiler is disconnected from the power net) 2. Fuse - protection of the boiler against short circuit 3. Main switch - switching on of the boiler,switching off if necessary 4. Flue gas thermostat - when the temperature of flue gas decreases under set up value, the fan is switched off 5. Boiler thermostat - serves for setting up maximum temperature of water in the boiler (after exceeding set up temperature the fan is switched off and the boiler works with minimum output. After decreasing set up temperature the fan is switched on again and the boiler works with maximum output. 6. Thermometer - indicates outlet temperature of water from the boiler 7. Pull rod control - serves for opening and closing of fuel cut-off flap

ATTACK DP Profi
The asset of Profi version of ATTACK DP boilers comparing with Standard version is in more comfortable service and the possibility of heat output modulation and addition of control elements. The boiler temperature is kept at the level set by the user, by setting up number of revolutions of the flue gas fan. ATTACK PROFI boiler regulator measures the temperature of water in the boiler continuously and depicts its value on the display, controlling the pump of central heating at the same time. There is a possibility to connect a room thermostat to the boiler regulator. The room thermostat provides thorough regulation of temperature of heated rooms. The control of drive of the four-way mixing valve is possible as well.

10

1 - Main switch 2 - Display showing the boiler temperature 3 - Control light of burning up process 4 - Control light of boiler overheating 5 - Control light of room thermostat 6 - Turning button of boiler thermostat

7 - Control light of circulating pump operation 8 - Control light of lack of fuel 9 - Turning button of room thermostat 10 - TEST button (by pressing the button the temperature set up by the turning button 6. appears and at the same time flue gas fan switches off for a moment)

Backward view of electronic regulator:

Setting of post purge time of fan after reaching set up temperature of heating water Setting of flue gas fan speed during burning up mode Fuse 2A

Connecting of mixing valve (12 V) Connecting of room temperature sensor or thermostat

Purpose of use Ecological hot-water boiler Attack DP is designed for heating of family houses and similar objects. The boiler is designed for burning wood only. Any dry wood can be used for burning, mainly logs. Also wood of bigger diameter, blocks, can be used, which reduces nominal output but prolongs burning time. The boiler cannot be used for burning filedust and small wooden debris. This can be burnt only in small amount together with logs (max. 10%). Due to its large feed hopper you can avoid the most demandable operation of preparation and cutting the wood into smaller pieces. Location of the boilers in living spaces (including halls) is inadmissible! Technical description The boiler is designed for combustion of wood on the principle of wood gasifying using a flue gas fan sucking flue gas from the boiler. The body of the boiler is a weldment of metal steel plates of 6 mm thickness. It includes a feed hopper with a heatproof shaped piece that has an oblong opening for transition of flue gas and gas. Under it in the after-combustion space there is an ash pan. In the rear part of the boiler there is vertical flue channel with a fuel cut-off flap in the upper part. There is also a suction branch for connection to the flue. In the front wall in the upper part there is a feeding door and in the bottom part there is an ash door.In the front part of the upper cover there is a pull rod of fuel cut-off flap. The body of the boiler is from the outside insulated by mineral fleece put under the covers of outside jacket. In the upper part of the boiler there is a control board for electromechanical regulation. In the rear part of the boiler there is a channel for inlet of primary and secondary air with a regulation flap where the air is heated to a high temperature. Description:- STANDARD version - Thermometer indicates outlet temperature of the boiler - If it is necessary, the boiler can be switched off by main switch - Electric circuit is protected by a fuse - Fan can be switched off by a flue thermostat after burning down fuel. ATTENTION! For heating up, set this thermostat to 0C. After fuel starts burning, set the flue thermostat to "Operation". If the temperature of flue gas drops under set up temperature, the flue thermostat is switched off. If you want the fan start again, you have to set up a lower temperature.The optimum condition for operation must be tried. - Regulation thermostat controls the operation of the fan by the outlet temperature of water from the boiler. - Safety non-returnable thermostat serves as protection against overheating in case of breakdown of the regulation thermostat or as signalization device for overcoming safety temperature. After overcoming the temperature it is necessary to press it. Operation rules Preparing the boiler for operation Before putting the boiler into operation make sure whether the system is filled with water and deareated. The boiler can be operated only in accordance with these instructions in order to work properly.It can be operated only by an adult. When installing the boiler, lay something under the rear part to elevate it in 10 mm for better flushing and deareating. 9

Warning After the first heating up, there can be condensation and condensate may leak. This is not a defect Condensation disappears after longer heating. When burning smaller wooden waste it is necessary to check the temperature of flue gas which must not overcome 320C. Otherwise the fan can be damaged. Creation of tar and condensate in the feed hopper is a phenomenon accompanying wood gasifying. If the boiler was out of order for a longer time (switched off,broke down), it is necessary to use extreme caution when putting into operation again. In not working boiler , the pump can be blocked, water can leak or the boiler could get frost in winter. Heating up and operation Before burning the fuel open the fuel cut-off flap pull the pull rod of the flap and set the flue thermostat to 0C. Through the upper door put dry wood chips on the heatproof shaped piece perpendicularly to the channel to leave 2-4 cm gap between the fuel and channel for transition of flue gas. Put paper or wood wool on the chips, then chips again and a bigger amount of dry wood. After burning the fuel switch on the fan and close the fuel cut-off flap.On the thermoregulation valve set the demanded temperature of water (80- 90C). After proper start fill in the whole fuel bin and set up the fuel thermostat into operation position. CAUTION: During the operation the pull rod of fuel cut-off flap must be shifted in otherwise the fan can be damaged.. To gasify wood, there must be a reduction zone in the boiler (a layer of charcoal on the ceramic shaped piece in the feed hopper). The layer can be created by combustion of dry wood of proper size. When wet wood is burned, the boiler is not working as a gasifying boiler and the consumption of wood rises, output is lower than demanded and the service life of boiler as well as that of flue is shortened. If the draft is as specified, the boiler works up to 70% of output even without a fan. Electromechanical output regulation Output regulation is conducted with a flap on the rear side of the boiler wich is controlled by a thermoregulation valve. The valve opens or closes the flap automaticly by set up outlet temperature (80 - 90C) of water. Pay special attention to setting up the thermoregulator as this except of regulation has another important function - protection the boiler against overheating. For setting up follow the instructions for aseembly and set up of the regulator.Check the protection against overheating by verifying the function of regulator with 90C water. For this temperature the regulation flap must be almost closed. Set up of the regulator must be tested. The position of the regulation flap can be watched from the back side of the fan. With the boiler thermostat located on the panel of the boiler you can control the fan by outlet temperature of water. The temperature on the regulation thermostat should by in 5C lower than the one on the thermoregulator. On the panel there is also a flue thermostat serving to stop the fan after burning out of the fuel. For heating up, set it up to 0C. After proper heating up set it up to operation position so that the fan is working and is not stopped until burning out of fuel. The optimum position of the flue thermostat must be watched by the kind of fuel, draft and other conditions. Check the temperature of outlet water on the thermomanometer. On the panel there is also a safety non-returnable thermostat. Refueling For refueling first open the fuel cut-off flap by the pull rod, do not stop the ventilator. Wait for some 10 seconds, then slowly open the feeding door so as accumulated flue gas can be draught to the flue. During heating keep the feed hopper always full. To prevent smoke, stoke other fuel only after the original charge is burnt out at least to 1/3 of the content. Then cover live coal with a broad log and fill in as usually. The fuel must not be pressed over the jet as this could cause extingiushing the fire. CAUTION! During operation the pull rod of fuel cut-off flap must be shifted in, otherwise the fan can be damaged.

10

Technical description of ATTACK DP PROFI: During the operation, the display is showing the current temperature of outlet heating water. Speed of the fan are controlled in this way: - if during burning up proces the boiler temperature is lower than 45 C, the fan works with the output set up by the turning of burning up button situated in rear side of regulator in the range of 40 - 100 %. (on the display you can see r4 = 40% do r9 = 90 %, rF=100%), for boiler temperature higher than 45C the fan works up to 100%. - if the temperature of heating water during the operation is more than 10C lower than the one set up by the turning button, the fan works in 100 % output. - if the temperature of heating water is lower than 10C from the temperature set up by the turning button of the boiler thermostat, the regulator decreases the output of ventilator according to the difference between these temperatures but only to the output not lower than 40%. - if the boiler temperature is higher or equal to the temperature set up by the turning button of the boiler thermostat, the fan switches off. - the ventilator switches on again after decreasing the boiler temperature in o 5C comparing to the set up temperature. The regulation of boiler ensures that the pump for central heating switches off when the temperature of oulet water in the boiler decreases under 60C. The pump switches on again by the temperature higher than 65C. To prevent explosion of accumulated gas during ignition, the boiler regulator ensures purging of gas in the boiler in 5 seconds and then each minute until 9 minutes according to the position of the turning post-purge time button in the rear part of the regulator. During the set up there is always information on the display which lasts 2 seconds (P1,...., P9, P-). In case you do not wish purging of gas in the boiler, it is necessary to set up (P--).. To make the process of burning up the boiler stable, there is a burning up system installed in the regulator. After plugging in or stopping the alarm the regulator is set up to the process of burning up and this mode is signalled by a shining dot on the display. The process of burning up is finished when the dot stops shinig and the boiler temperature reaches the value set up by the thermostat. In case the temperature in the boiler does not exceed 65 C in 2 hours of burning up time,the regulator stops the waste-gas ventilator and switches on the control light - missing fuel. In the time of burning out the boiler when the temperature falls under 65 C and this condition lasts for more than 30 minutes, the regulator stops the flue-gas fan and the control light of missing fuel shines on. Missing fuel When the temperature of heating water in the boiler falls under 65 C and this condition lasts for more than 30 minutes, the regulator stops the flue-gas fan and the control light of missing fuel shines on. If in the burning up process the boiler temperature does not raise to more than 65C, missing fuel will be shining on the display after 2 hours. To start the regulation again, it is necessary to: - refuel the boiler; - burn the boiler up - turn the turning button of the boiler thermostat into the maximum left position and thus stop the alarm -wait until the control light of missing fuel flickers, - by turning button of the boiler thermostat set up the required temperature of the boiler and the regulator starts the process of burning up

11

Overheating of the boiler


If the temperature of the boiler raises to more than 95 C, the regulator stops the flue-gas fan and the control light of boiler overheating shines on. For new start it is necessary to: - wait until the boiler temperature falls - remove the cause of boiler overheating (e.g. refill missing water into the central heating circuit) Warning! Water can be refilled only after the boiler temperature falls under 40C. - Turn the button of the boiler thermostat into the maximum left position ad thus stop the alarm - wait until the control light of boiler overheating starts flickering; - to start the regulator again, set up the required temperature of the boiler by the turning button of the thermostat; If the temperature falls under 60 C, the regulator comes into the burning up mode.

The ways of boiler regulation


The boiler enables regulation of room temperature as well as connecting the sensor of room temperature. If the room temperature is lower than the set up one, the control light near the button of thermostat shines on, which means that the boiler must keep the set up temperature. After reaching the required temperature the control light switchces off, the circuit pump of central heating switches off and the boiler starts burning at the temperature of 65 C. For the regulation by room temperature it is possible to connect with the terminals for the sensor of room temperature any room thermostat that can be programmable.In this case the turning button of the room thermostat is not working. If you do not wish to use the room thermostat nor the room sensor, the inlet terminals must be short-circuited. In this case only the boiler thermostat is working. To the boiler regulator can be also connected a mixing valve with an 12V electric drive. (This system is not delivered with the boiler).

Displaying faults:
The boiler regulator constantly verifies the functions of internal systems and of the sensor of boiler temperature. After finding out the defect, the regulator switches off the flue-gas fan, the central heating pump and at the same time the defect shows on the display. In the case of failure it is necessary to switch the boiler off by the main switch. Continuous operation of the central heating pump must be assured by plugging into the mains. Fuel must be burnt thoroughly and the contract service company contacted. If E1 fault appears on the display, it means the damage of the sensor of boiler temperature.

12

Permanent-heat operation Permanent-heat operation of the boiler means fire can be kept during the night without heating up daily, but only in winter. This way of operation shortens the service life of the boiler. For permanent-heat operation prepare the boiler this way: - Put a few bigger logs (4-6)on theglowing layer - Get themixing valve ready.After closing the valve the temperature of water rises to 80- 90C. - Regulation flap controlled by the thermoregulator is closedautomaticly and the fanis switched off. In the boiler prepared like this burning is kept for more than 12 hours. During permanent-heat operation the temperature of water in the boiler is 80 - 90C. Cleaningthe boiler The boiler must be cleaned regularly and properly every 3-5 days because ash settled down in the feed hopper together with condensates and tar decreases output and service time of the boiler and isolates heatexchanging surface. When there is too much ash, there is not enough space for burning out of fuel and a holder of ceramic jet as well as the whole boiler can be damaged. When cleaning the boiler, firstly turn the ventilator on, open the feeding door and wipe the ash through a slot into bottom space. Leave long unburnt logs in the feed hopper. Open the upper cleaning cover and clean inside with a brush. After opening the bottom cleaning hole take ash and soot out. After opening the bottom door clean the bottom space. Cleaning interval depends on the quality of wood (moisture content), heating intensity, draft of the flue and other circumstances. We recommend to clean the boiler once a week. Do not pull the fireclay shaped piece out when cleaning. Once a year minimally clean the moving wheel of the fan and check through the cleaning hole fouling of regulation of primary and secondary air flowing into feed chamber and clean with a screwdriver if necessary. It influences the output and quality of burning. . WARNING Regular and proper cleaning is important for permanent output and service life of the boiler. In case of insufficient cleaning the boiler can be damaged and guarantee expires. Maintenanceof heating system and boiler At least once in fortnight check or fill up water in the heating system. If the boiler is out of operationduring winter, water can be frost in the system. Therefore it is better to discharge water of the system or fill in with antifreeze agent.Otherwise discharge water only in critical situations and for the shortest time possible. After heating season is finished, clean the boiler thoroughly, replace damaged parts. Twice a year clean the moving wheel of the ventilator and its air chamber. Changing the packing cordof the door Dismantle the old packing cord with a screwdriver and clean the rabbet where it was placed. Take the new packing cord and put its begining on the horizontal parts of the rabbet. With your hand or light knock of the hammer press it into the rabbet on the circumference of the door. Adjustment of hinges After some time the packing cord in the door gets deformed. To repack the door, it is necessary to change the position of the door. The position is changed by tightening the hinges of thedoor. Feeding door and bottomdoor are joined to the body with two hinges which are attached to the door with a long pin. If we want to change the adjustmnent of hinges, it is necessary to remove the pin and screw the hinge by turning it. Fit the door on and insert thepin into the hinge. Exchange of the nozzle body The body of nozzle is placed in the boiler body in a nozzle holder. In the lower part is the nozzle body sealed by boiler lute and in the upper part by a packing cord. When exchanging the nozzle, remove the packing cord from the rabbet by a screwdriver. Remove the nozzle body and clean the holder thoroughly from the tar and old lute. On the cleaned surface put the nozzle body insulation. Take the nozzle and put it on the holder so that the shorter wall was in the rear part of the boiler pushed to the stop. The lateral clearance must be the same. Take the new set of packing cords of the nozzles and with a light knock press it into the gap so as to be at the same level with the nozzle. Prescribed fuel Specified fuel is dried cut wood and logs of 80-150mm diameter, with min. 12% and max. 20% moisture content andcalorific value of 15 - 17MJkg-1 . It is alsopossible to burn big pieces of wooden waste with thicklogs.

13

Note Logs of bigger dimensions is necessary to cut into halves or quarters (because of the requirement of operation to nominal output). You can burn hard as well as soft wood. Wood must be dried! Boiler output depends on the moisture content of wood. Output and function of the boiler is guaranteed for maximum moisture content of 20%.

Chimney Attachment of the appliance to the flue must be always done with approval of authorized chimney-sweeping company. There must always be sufficient draft in the flue and flue gas must be draught to the atmosphere in all possible operation conditions. For the right operation of the boiler the independent flue must be dimensioned in the right way, because combustion, output and service life of boiler depends on the draught. The draught is influenced by the section of flue, height and roughness of the internal wall. Into the flue where the boiler is attached, no other appliance can be attached. The flue diameter must not be smaller than the outlet on the boiler. Flue draught must have the specified values. But it must not be too high so as not to decrease the efficiency of boiler and interrupt burning. If the draught is too strong, install a throttle valve between the flue and boiler.. Informative values of flue section: 20 x 20cm O 20cm 15 x 15cm O 16cm min.height 7m min. height 8m min. height 11m min. height 12m

Exact dimensions of flue are specified by the standard STN 73 42 10. Flue draught is specified in technical parameters. Exhaust pipe Exhaust pipe must have the outlet into the chimney.If the boiler can not be attached to the chimney directly, the exhaust pipe must be as short as possible and not longer than 1m without heating surface and it must rise to the flue. Exhaust pipes must be tight and resistant against flue gas leakage and cleanable from inside. Exhaust pipes must not come through home and utility spaces and the internal section of the exhaust pipe must not be narrowing to the flue. Using of bents is not suitable. Connecting the boiler to the mains net The boiler is connected to the mains of 230 V, 50 Hz by a supply cord and plug. The voltage is of M type and when replaced, the same type must be used by a service oragnization.The appliance must be located in such a way that the plug was within the reach of the attendance. (according to STN EN 60 335-1 +A11:1997). 14

Attachment of regulation and control elements The boiler is delivered to a consumer equipped with basic regulation and control elements. Attachment of these elements is indicated on the chart of connection. We recommend to extend the regulation of boiler with other regulation elements which enable more comfortable and economic operation. Each pump in the system must be controlled by an individual thermostat so as the boiler was not undercooled on the inlet of returnable water under 65C. Attachment of these elements can be suggested by a designer due to specific conditions of the heating system. Electric installation together with the proper equipment of the boiler must by done by a specialist in compliance with valid standards. The basic version of boiler (Standard) does not have a thermostat for pump built. Protection of boiler against corrosion Suitable solution to this problem is mixing appliance (Regumat ATTACK-OVENTROP) or a thermoregulation valve which enables separated boiler and heating circuit. This way you can prevent undercooling of boiler under 65C and also decrease condensation of steam, acids and tars in the feed hopper. With a flap of three-way valve you can regulate the temperature of heating water independently on temperature of water in the boiler. Water in the boiler must be permanently of 80-90C. Section cross boiler - combustion chamber

Standards for design and assembly of boilers: STN EN 303-5 - Heating boilers using solid fuel STN 73 42 10 - Production of flues and exhaust pipes STN 92 03 00 - Fire safety of local appliances STN EN 60 335-1 +A11 - Safety of domestic electrical appliances STN 06 10 00 - Local appliances of solid, liquid and gaseous fuels 15

Recommended connections Recommended connection of boiler with 4-way thermoregulation valve

Heating system

4-way thermoregulation valve

Expansion vessel BOILER ATTACK DP

Recommended connection of boiler with REGUMAT ATTACK-OVENTROP

Heating system Pump

Expansion vessel

Regumat ATTACK-OVENTROP

Check valve

BOILER ATTACK DP

16

Recommended connection of boiler with accumulation tank


D.H.W Tank Heating system Regumat ATTACK-OVENTROP
ACCUMULATION TANK

BOILER ATTACK DP Expansion vessel

Protection of the boiler against overheating CAUTION: Cooling circuit against overheating must not be used by STN EN 303-5 Water supply for other use than protection against overheating. STS 20
DRAIN

From water piping Pressure 2-6 bar 10 - 15C

STS 20 valve which has a sensor placed in the rear part of the boiler protects the boiler against overheating. If the temperature of water in the boiler overcomes 95C, the valve lets water into a cooling circuit which overtakes excessing heat and discharges it into the drain. Instructions for liquidation of the product after its lifetime The product should be liquidated by selling to a scrap-material dealer or to a dump managed by a local authority. Liquidation of wrapping .The wrapping should be liquidated by selling to a scrap-material dealer or to a dump managed by a local authority. 17

18

WIRING DIAGRAM OF GASIFYING BOILER DP25, DP35, DP45 WITH CAPACITOR Fluegas thermostat Main switch Boiler thermostat Highlimt thermostat

thermostat pump 95C

Fuse 2A/250V

Capacitor

WIRING DIAGRAM OF GASIFYING BOILER DP25, DP35, DP45 "PROFI" WITH CAPACITOR

230V/50Hz

Capacitor

red

RECORD ON PUTTING THE BOILER TO OPERATION Data on the customer (llegible)


Production number.............................. Name and surname: Date of putting to operation................ ......................................... Service organization: Street: ............................. ............................ Post code, town:. .Stamp, signature ........................................ ........................................................ Tel. No. ..........................

Obligatory service examination after the 1st year of operation


Date : .................................... Stamp, signature of service organization. : ................................................

Obligatory service examination after the 2nd year of operation


Date : .................................... Stamp, signature of service organization. : ................................................

Obligatory service examination after the 3 rd year of operation


Date : .................................... Stamp, signature of service organization. : ................................................

DOCUMENT on testing and completness of ATTACK gasifying boiler

DP25
Boiler production No.: N

DP35

DP45

STANDARD

PROFI

The product delivered with this certificate suits to technical standards and technical conditions. The product was manufactured by its drawing design in requested quality and is approved by SZ Brno under the No. of certificate Technical inspection In Vrtky, date: ..................................................................................... Stamp and signature of the final inspection: ........................................

The country of delivery of the appliance :

SK CZ AT CH DK ES FI FR GB GR IE IT NL NO PT SE
Producer:

ATTACK, s.r.o. Dielensk Krun 5 038 61 Vrtky SLOVENSKO

Tel:operator 043/ 4003 101 Fax: 043/ 4003 106 Tel./fax: infoline 043/ 4003 104 Tel: service 0905 410 204 E-mail: [email protected] http: www.attack-sro.sk

You might also like