0% found this document useful (0 votes)
61 views21 pages

Earth Work Qty

The document contains detailed records of quantities of materials used and paid for various activities in segments of a road construction project. It includes tables with quantities of clearing, excavation, embankment construction, subgrade preparation, sub-base, base course and asphalt concrete laying works in different chainages of the project road. The tables compare the contract scheduled quantities, previously paid quantities and balance quantities for each activity in each segment.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views21 pages

Earth Work Qty

The document contains detailed records of quantities of materials used and paid for various activities in segments of a road construction project. It includes tables with quantities of clearing, excavation, embankment construction, subgrade preparation, sub-base, base course and asphalt concrete laying works in different chainages of the project road. The tables compare the contract scheduled quantities, previously paid quantities and balance quantities for each activity in each segment.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 21

2.1.

1 Clearing and grubbing


Chainage

CS Qty.

Previous Paid
Qty.(IPC)

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

1,235.93

1,235.93

1,235.93

37+000

37+500

1,289.72

1,289.80

1,289.80

(0.08)

37+500

38+000

995.60

1,344.66

1,344.66

(349.06)

38+000

38+500

1,076.12

1,076.18

1,076.18

(0.06)

38+500

39+000

1,360.52

1,360.52

1,360.52

5,957.89

6,307.09

6,307.09

(349.20)

TOTAL

3.1.4 Roadway excavation, unsuitable soil


Chainage

CS Qty.

Previous Paid
Qty.(IPC)

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

300.38

276.61

58.72

217.89

82.49

37+000

37+500

291.03

141.94

5.69

136.25

154.78

37+500

38+000

280.34

390.22

48.30

341.92

(61.58)

38+000

38+500

264.89

273.14

10.82

262.32

2.57

38+500

39+000

280.31

280.31

280.31

1,416.95

1,362.22

TOTAL

123.53

1,238.69

178.26

3.1.5 Roadway excavation, sub grade replacement


Chainage

Previous Paid
Qty.(IPC)

CS Qty.

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

37+000

37+500

37+500

38+000

38+000

38+500

38+500

39+000

TOTAL

3.1.7 Prepare sub grade in cut areas


Chainage

CS Qty.

Previous Paid
Qty.(IPC)

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

1,597.93

853.75

853.75

744.18

37+000

37+500

1,732.46

835.82

835.82

896.64

37+500

38+000

1,187.57

1,227.05

1,227.05

(39.48)

38+000

38+500

1,137.23

916.74

916.74

220.49

38+500

39+000

1,190.58

1,190.58

1,190.58

6,845.77

5,023.94

5,023.94

TOTAL

1,821.83

3.3.12 Trim, level and compact roadbed


Chainage

CS Qty.

Previous Paid
Qty.(IPC)

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37,000.00

1,219.89

1,322.89

1,322.89

(103.00)

37+000

37,500.00

1,334.96

1,248.82

1,248.82

86.14

37+500

38,000.00

976.88

960.02

960.02

16.86

38+000

38,500.00

1,064.17

1,064.17

1,064.17

38+500

39,000.00

1,327.36

1,327.36

1,327.36

5,923.26

5,923.26

5,923.26

(0.00)

TOTAL

3.3.13 Embankment construction, Type 1


Chainage

CS Qty.

Previous Paid
Qty.(IPC)

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

962.57

866.96

58.72

808.24

154.33

37+000

37+500

913.58

969.75

5.69

964.06

(50.48)

37+500

38+000

580.62

402.54

48.30

354.24

226.38

38+000

38+500

803.89

577.69

10.82

566.87

237.02

38+500

39+000

663.67

599.96

599.96

63.71

3,924.33

3,416.90

3,293.37

630.96

TOTAL

123.53

3.3.14 Embankment construction, Type 2


Chainage

CS Qty.

Previous Paid
Qty.(IPC)

Deductions
(Ppckets &
Others)

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

82.18

39.88

39.88

42.30

37+000

37+500

176.18

116.13

116.13

60.05

37+500

38+000

16.52

16.52

38+000

38+500

68.68

68.72

68.72

(0.04)

38+500

39+000

53.65

47.08

47.08

6.57

397.21

271.81

271.81

125.40

TOTAL

4.1.1 Sub base as compacted in position


Chainage

CS Qty.

Previous Paid
Qty.

Balance Qty.

36+500

37+000

929.69

928.68

1.01

37+000

37+500

993.88

989.76

4.12

37+500

38+000

929.13

929.13

38+000

38+500

944.63

944.63

38+500

39+000

857.96

857.96

TOTAL

4,655.29

1,918.44

2,736.85

4.1.4 Dense graded aggregate base


Chainage

CS Qty.

Previous Paid
Qty.

Balance Qty.

36+500

37+000

648.00

648.00

37+000

37+500

648.00

648.00

37+500

38+000

648.00

648.00

38+000

38+500

648.00

648.00

38+500

39+000

648.00

648.00

3,240.00

3,240.00

TOTAL

4.3.6 Earthen shoulder as compacted in position


Chainage

Previous Paid
Qty.

CS Qty.

Balance Qty.

36+500

37+000

127.92

127.92

37+000

37+500

2.56

2.56

37+500

38+000

38+000

38+500

38+500

39+000

130.48

130.48

TOTAL

4.4.13 Bituminous Prime Coat


Chainage

CS Qty.

Previous Paid
Qty.

Balance Qty.

36+500

37+000

3,950.00

3,950.00

37+000

37+500

3,950.00

3,950.00

37+500

38+000

3,950.00

3,950.00

38+000

38+500

3,950.00

3,950.00

38+500

39+000

3,950.00

3,950.00

19,750.00

19,750.00

TOTAL

4.4.15 Bituminous Tack Coat


Chainage

CS Qty.

Previous Paid
Qty.

Balance Qty.

36+500

37+000

3,950.00

3,950.00

37+000

37+500

3,950.00

3,950.00

37+500

38+000

3,950.00

3,950.00

38+000

38+500

3,950.00

3,950.00

38+500

39+000

3,950.00

3,950.00

19,750.00

19,750.00

TOTAL

4.5.21 Asphalt concrete


Chainage

CS Qty.

Previous Paid
Qty.

Balance Qty.

36+500

37+000

3,950.00

3,950.00

37+000

37+500

3,950.00

3,950.00

37+500

38+000

3,950.00

3,950.00

38+000

38+500

3,950.00

3,950.00

38+500

39+000

3,950.00

3,950.00

19,750.00

19,750.00

TOTAL

2.1.1 Clearing and grubbing


Chainage

CS Qty.

Actual
Previous Paid
Qty.

3.3.12 Trim, level and compact roadbed


Balance Qty.

Chainage

CS Qty.

Actual
Previous Paid
Qty.

36+500

37+000

1,235.93

1,235.93

36+500

37+000

1,219.89

1,322.89

37+000

37+500

1,289.72

1,289.80

(0.08)

37+000

37+500

1,334.96

1,248.82

37+500

38+000

995.60

1,344.66

(349.06)

37+500

38+000

976.88

960.02

38+000

38+500

1,076.12

1,076.18

(0.06)

38+000

38+500

1,064.17

1,064.17

38+500

39+000

1,360.52

1,360.52

38+500

39+000

1,327.36

1,327.36

5,957.89

6,307.09

(349.20)

5,923.26

5,923.26

TOTAL

TOTAL

3.1.4 Roadway excavation, unsuitable soil


Chainage

CS Qty.

Actual
Previous Paid
Qty.

3.3.13 Embankment construction, Type 1


Balance Qty.

Chainage

CS Qty.

Actual
Previous Paid
Qty.

36+500

37+000

300.38

217.89

82.49

36+500

37+000

962.57

808.24

37+000

37+500

291.03

136.25

154.78

37+000

37+500

913.58

964.06

37+500

38+000

280.34

341.92

(61.58)

37+500

38+000

580.62

354.24

38+000

38+500

264.89

262.32

2.57

38+000

38+500

803.89

566.87

38+500

39+000

280.31

280.31

38+500

39+000

663.67

599.96

1,416.95

1,238.69

3,924.33

3,293.37

TOTAL

178.26

TOTAL

3.1.7 Prepare sub grade in cut areas


Chainage

CS Qty.

Actual
Previous Paid
Qty.

3.3.13 Embankment construction, Type 2


Balance Qty.

Chainage

CS Qty.

Actual
Previous Paid
Qty.

36+500

37+000

1,597.93

853.75

744.18

36+500

37+000

82.18

39.88

37+000

37+500

1,732.46

835.82

896.64

37+000

37+500

176.18

116.13

37+500

38+000

1,187.57

1,227.05

(39.48)

37+500

38+000

16.52

38+000

38+500

1,137.23

916.74

220.49

38+000

38+500

68.68

68.72

38+500

39+000

1,190.58
6,845.77

1,190.58
5,023.94

1,821.83

38+500

39+000

53.65
397.21

47.08
271.81

TOTAL

TOTAL

4.1.1 Sub base as compacted in position


Chainage

CS Qty.

Actual
Previous Paid
Qty.

Balance Qty.

36+500

37+000

929.69

928.68

1.01

37+000

37+500

993.88

989.76

4.12

37+500

38+000

929.13

929.13

38+000

38+500

944.63

944.63

38+500

39+000

857.96

857.96

TOTAL

4,655.29

1,918.44

2,736.85

pact roadbed
Balance Qty.

(103.00)
86.14
16.86
(0.00)

uction, Type 1
Balance Qty.
154.33
(50.48)
226.38
237.02
63.71
630.96

uction, Type 2
Balance Qty.
42.30
60.05
16.52
(0.04)
6.57
125.40

length
Chainage

m
a

as per cs
area
lhs
rhs
b
c

avg.area
lhs
rhs
(b1+b2)/2 (c1+c2)/2

as per c/s
area
lhs
f=axd

30

500

1.98

1.98

30

520

20

3.95

3.95

3.95

3.95

79.00

30

540

20

3.95

3.95

3.95

3.95

79.00

30

560

20

3.95

3.95

3.95

3.95

79.00

30

580

20

3.95

3.95

3.95

3.95

79.00

30

600

20

3.95

3.95

3.95

3.95

79.00

30

620

20

3.95

3.95

3.95

3.95

79.00

30

640

20

3.95

3.95

3.95

3.95

79.00

30

660

20

3.95

3.95

3.95

3.95

79.00

30

680

20

3.95

3.95

3.95

3.95

79.00

30

700

20

3.95

3.95

3.95

3.95

79.00

30

720

20

3.95

3.95

3.95

3.95

79.00

30

740

20

3.95

3.95

3.95

3.95

79.00

30

760

20

3.95

3.95

3.95

3.95

79.00

30

780

20

3.95

3.95

3.95

3.95

79.00

30

800

20

3.95

3.95

3.95

3.95

79.00

30

820

20

3.95

3.95

3.95

3.95

79.00

30

840

20

3.95

3.95

3.95

3.95

79.00

30

860

20

3.95

3.95

3.95

3.95

79.00

30

880

20

3.95

3.95

3.95

3.95

79.00

30

900

20

3.95

3.95

3.95

3.95

79.00

30

920

20

3.95

3.95

3.95

3.95

79.00

30

940

20

3.95

3.95

3.95

3.95

79.00

30

960

20

3.95

3.95

3.95

3.95

79.00

30

980

20

3.95

3.95

3.95

3.95

79.00

31

20

3.95

3.95

1.98

1.98

39.50

Total Qty
Previous Paid Qty

Balance Qty

as per c/s
area
rhs
g=axe

up to this month
area
lhs
rhs
f=axd
g=axe

Remarks

50%

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

10

79.00

79.00

79.00

50%

79.00

11

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

79.00

79.00

79.00

50%

79.00

39.50

39.50

39.50

50%

39.50

1,935.50
3,000.00

(1,064.50)