RANA ASHRAf
RANA ASHRAf
RANA ASHRAF
S/O RANA AKRAM
House # 83/B, Block - B,
Unit # 02, Latifabad, Hyderabad.
Phone 022-3812733
Cell # 0332-7502358
E-mail: [email protected]
OBJECTIVE
I want to utilize my abilities, skills and expertise to the maximum and grow professionally as
well as financially at the same time.
PROFESSIONAL EDUCATION:
B.E (Electrical/Power) from Mehran University of Engineering and Technology,
Jamshoro in 1st division (2004)
Joined Siemens as an Electrical Engineer (E&I) in Nov 2007. In Siemens, I worked as Site
Engineer on different projects performing following activities:
1. 11 KV Panels.
2. LT Panels, MCCs and Distribution Boards.
3. Power and distribution transformers.
4. External and internal lighting systems
5. HT, LT & Control cables
6. HVAC systems.
7. Instrumentation
8. Cable trays.
9. Supervising the installation of above equipment.
1.1 Century Paper Mills Bhai Pherro (Nov 2007 to Dec 2007)
Working as an Electrical Engineer (E & I) PLC’s, DCS with the Korian based consulting
company (Daewoo International Corporation Ltd) at Century Paper Mills (PM7) project.
Responsible for,
1.2 Bulleh shah Paper Mills & Power Plant (Unit of Packages Limited) (Dec 2007 to Still
Up to Date)
Presently Working as Electrical Engineer (E & I) PLC’s, DCS with the Canadian based
consulting company (Jaakko Poyry & Flowtronix) at Bulleh Shah Paper Mills and Power
plant, (A unit of Packages Pvt. Ltd.).
Packages Limited (www.packages.com.pk) is one of the Pakistan’s Largest Paper & Board
Producer & Converting Company with a production capacity of 100,000 tons of paper per
year. In year 2004 Packages decided to enhance its production capacity & install a BULLEH
SHAH PAPER & Board Mill at Kasur, Pakistan with a production capacity of 300,000 tons per
year. Second phase of the project is continue, second phase includes following areas
Coating, PM7, DIP (De-inking Plant) and 41MW Power House.
Responsible for,
• BASIC OPERATION
• TOPOLGY DESIGN
• DESIGN AND CONFIGURATION ABB DCS SYSTEM
DCS Panels/Suctional Derives, VFD’s Power Transformer, cables Tray works, Cables laying and
termination, Materials Inspection, Prepared progress reports of on going projects besides
reviewing pending works, besides maintaining economic utilization of the resources and
manpower. Scrutinized fault reports of the system and progress reports of the projects on daily
basis, Supervision, Erection, Installation of all type of Pressure, Differential Pressure, Flow,
Level & Temperature Transmitters. Pressure & Temperature gauges
1.3 D.G Cement Factory Distt. Chakwal (Feb 2006 to April 2006)
1.2 ICI Soda Ash Khewra (50 KTPA Extension Project) (May 2006 to July 2006)
1.3 SEPCOL Power House Raiwand (Aug 2006 to Dec 2006)
1.4 Bulleh shah Paper Mills & Power Plant (Unit of Packages Limited)(Jan 2007 to Nov
2007)
Working as Electrical Engineer (E & I) PLC’s, DCS with the Canadian based consulting
Company (Jaakko Poyry & Flowtronix) at Bulleh Shah Paper Mills and Power plant, (A unit
of Packages Pvt. Ltd.). During my stay in Flowtronix I worked in phase one of the project and
performing in these area PM6, OCC, SPP, CTMP, Slush Pulp, Straw Handling, ETP and
Lighting of whole project.
Working as a Trainee Engineer (Power House) of 10.058MW. Indus Dyeing & MFG Co.
Ltd. S.I.T.E Hyderabad from 5th January 2005 to 3rd February 2006.
Work on Waste Heat Recovery Boiler Duplex D.D.F.C Engineering of 1.6 tons / Hr Steam
consume for Dyeing Section and also hot Water from J/Water (Engines) 70oc – 80oc for
washing and vessels use.
Installation of Heat Recovery system for Boiler Hot Water and waste heat Recovery Boiler.
Knowledge about cooling towers and their related chemicals and also the chemical use in
boiler.
COMPUTER:
Window XP Professional
S5/S7 Software
MCSE-2000
VISUO SOFT
Window NT Operating Sys.