PUBLIC WORKS DEPARTMENT

Government of Uttar Pradesh, India

UTTAR PRADESH STATE ROADS PROJECT Under IBRD Loan No. 4684-IN

Technical Assistance for Implementation of Institutional Reforms in the Road Sector of Uttar Pradesh

INTER-AGENCY WORKING GROUP STUDY TO FACILITATE GOUP DECISIONS, LEGISLATION AND OTHER ACTIONS ON AN EFFECTIVE LONG-TERM OWNERSHIP AND FUNDING FRAMEWORK FOR NON-CORE UP ROADS, ADDRESSING SUSTAINABLE DEVOLUTION OF VILLAGE ROADS AND ORPHAN ROADS RESPONSIBILITIES AND GANG LABOUR MANAGEMENT (FINAL)

Report No. 3

August 2007

LEA International Ltd.,

Canada India

in joint venture with

LEA Associates South Asia Pvt. Ltd., Ministry of Transportation of Ontario,

in association with

Canada

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

TABLE OF CONTENTS
1. INTRODUCTION.............................................................................................................................. 1 1.1. 1.2. BACKGROUND .................................................................................................................. 1 ROAD CLASSIFICATION ................................................................................................... 1

PART A: OWNERSHIP AND FUNDING FRAMEWORK FOR THE 'NON-CORE' ROADS OF UTTAR PARDESH..................................................................................................................................... 3 A.1 CURRENT ROAD NETWORK IN UTTAR PRADESH AND RESPONSIBILITIES............. 3 A.1.1 A.2 Road length of the Network and Responsibility ..................................................... 3

AGENCIES INVOLVED IN ROAD CONSTRUCTION AND MAINTENANCE .................... 3 A.2.1 A.2.2 A.2.3 Primary Road Sector Agencies.............................................................................. 3 Secondary Road Sector Agencies ......................................................................... 4 Other Department Roads....................................................................................... 5

A.3

PREVIOUS ATTEMPTS TO DEFINE CORE ROAD NETWORK ...................................... 7 A.3.1 A.3.2 A.3.3 Strategic Options Study by CES, 1996.................................................................. 7 The Techno-Economic Feasibility Study and Road Maintenance Management Study by DHV, 2000 and 2001 ............................................................................. 8 The 'Non-Core' Core Road Network ...................................................................... 9

A.4

CORE ROAD AND NON-CORE ROAD NETWORK ........................................................ 10 A.4.1 A.4.2 A.4.3 Core Road Network ............................................................................................. 10 Non-Core Road Network...................................................................................... 10 Road length by classification ............................................................................... 11

A.5

ESTIMATION OF FUNDING REQUIREMENT FOR UP-GRADATION / STRENGTHENING AND MAINTENANCE OF ROAD NETWORK.................................. 12 A.5.1 A.5.2 A.5.3 A.5.4 Present Funding Framework................................................................................ 12 Problem areas...................................................................................................... 13 Funding Estimates ............................................................................................... 14 Recommendations with respect to funding framework ........................................ 17

A.6

OWNERSHIP OF THE NON-CORE ROAD NETWORK .................................................. 17

PART B : GANG LABOUR MANAGEMENT ............................................................................................. 20 B.1 B.2 B.3 B.4 REVIEW OF IDS REPORT AND RECOMMENDATIONS................................................ 20 CURRENT STATUS OF GANG LABOUR AND AGE PROFILE...................................... 21 PRESENT PWD POLICY REGARDING GANG LABOUR ............................................... 22 OPTIONS REGARDING EMPLOYMENT OF GANG LABOUR ....................................... 23

PART C : PRESENTATION TO PROJECT STEERING COMMITTEE ..................................................... 25

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

LIST OF TABLES
Table A.1: Uttar Pradesh road network managed by PWD (km) .................................................................. 3 Table A.2 : Strategic Core Road Network of Uttar Pradesh (As per DHV)................................................. 11 Table A.3 : Distribution of Road Length (km).............................................................................................. 11 Table A.4 : Renewal Cycle by Road Classification..................................................................................... 14 Table A.5 : Approximate lengths of roads to be renewed per year) ........................................................... 14 Table A.6 : Per kilometre Costs for Village Roads (2007 Prices) ............................................................... 16 Table A.7 : Annual Funding Requirements for Non-Core Road Network ................................................... 16

ANNEXURES Annexure A : Government Order to establish the Inter Agency Working Group Annexure B : Road length details of Other Road Agencies Annexure C : Secondary Organisations involved in road construction Annexure D : List of Core Road Network Annexure E : Maintenance Budget Annexure F : Guidelines for Maintenance Management of Primary, Secondary and Urban Roads: MORTH, 2004 Annexure G : Gang Labour Details Annexure H : Work Profile of Gang Labour

August 2007

ii

Glossary
ADB ADT AE BC CE CEO CRF CRN CBR DBM DBC DPR DRDA EE E-in-C GO GOI GoUP GSDP HDM HQ HR IDS IDSP IRC IT ISAP JE MDR MLA MIS MOST Asian Development Bank Average Daily Traffic Assistant Engineer Bituminous Concrete Chief Engineer Chief Executive Officer Central Road Fund Core Road Network California Bearing Ratio Dense Bituminous Macadam Dense Bitumen Concrete Detailed Project Report District Rural Development Authority Executive Engineer Engineer in Chief Government Order Government of India Government of Uttar Pradesh Gross State Domestic Product Highway Design Model Head Quarter Human Resource Institutional Development Strategy NREP ODR OD O&M PC PCC PCI PCU PMS P1 PSP PWD RES RIDF RMMS SDBC SE SH SHA SPV SRF SRP-II TA National Rural Employment Programme Other District Road Origin and Destination Operation and Maintenance Premix Carpet Project Coordinating Consultant Pavement Condition Index Passenger Car Unit Pavement Management System First Coat Painting Private Sector Participation Public Works Department Rural Engineering Services Rural Infrastructure Development Fund Road Maintenance Management System Semi Dense Bitumen Carpet Superintending Engineer State Highway State Highway Authority Special Purpose Vehicle State Road Fund State Road Project-II Technical Assistance Terms of Reference Uttar Pradesh

Institutional Development And Strengthening Plan ToR Indian Road Congress Information Technology Institutional Strengthening Action Plan Junior Engineer Major District Roads Member of Legislative Assembly Management Information System Ministry of Surface Transport UP

UPRNN Uttar Pradesh Rajkiya Nirman Nigam UPSBC UPSRP UPSHA VOC VR WB WBM WMM Uttar Pradesh State Bridge Corporation Uttar Pradesh State Road Project Uttar Pradesh State Highway Authority Vehicle Operating Cost Village Roads World Bank Water Bound Macadam Wet Mix Macadam

MoSRTH Ministry of Shipping, Road Transport & Highways MoRTH M&E MIS MSS MSA MRN MMS NABARD NITHE NH NHAI Ministry of Road Transport and Highways Monitoring and Evaluation Management Information System Mixed Seal Surface Multi Standard Axle Major Road Network Maintenance Management System National Bank of Agricultural and Rural Development National Institute for Training of Highway Engineers National Highway National Highways Authority of India

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

1.

INTRODUCTION

This Report is split into Part A and Part B. Part A relates to the Ownership and Funding Framework for the 'Non-Core' Road Network. Part B relates to aspects of Gang Labour Management. 1.1. BACKGROUND

An Inter-agency Working Group Study1 was established by GoUP dated 9th April 2002 to facilitate GoUP decisions, legislation and other actions on an effective long-term ownership and funding framework for 'non-core' roads, addressing sustainable devolution of 'Village Roads' and 'Orphan Roads" responsibilities and gang labour management. However it is not clear if the Working Group met, and in any event no report was ever published. In the absence of that Working Group Report this Report attempts to set out some of the issues involved with respect to facilitating "GoUP Decisions, Legislation and Other Actions on an effective Long-Term Ownership and Funding Framework for Non-Core UP Roads, addressing Sustainable Devolution of Village Roads and 'Orphan Roads' Responsibilities, and Gang Labour Management. Objectives of this Report are: To suggest a definition of core and non-core road network Describe the present situation regarding the ownership of core and non-core road network Ownership and sustainable devolution of Village Roads and Orphan Roads Funding framework of non-core road Gang Labour Management ROAD CLASSIFICATION

1.2.

Road classification is primarily based on a variety of criteria, such as, traffic volume, road-width and surface type and also on links between specific locations. If warranted, the roads are reclassified to the next higher category keeping in view the traffic density, tourist usage, and industrial importance.

In April 2002, a Government Order (GO) 856/23/12/02-10GI96TC-3 (Annexure A), established the Inter Agency Working Group to examine the issues of the ownership and maintenance of Village Roads (VR) and Other District Roads (ODR) constructed by other Departments in the State of Uttar Pradesh. These roads are not only constructed by Public Works Department (PWD) but also by other departmental agencies like Rural Engineering Services (RES), Mandi Parishad and DRDA. The Inter Agency Working Group was to submit a Report to the Government at the end of four months which would address the above issues and formulate a work plan for the same. As far as could be ascertained no such report was ever written. August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

The roads in the State of Uttar Pradesh are classified into the following five categories based on functional and administrative criteria: National Highways (NH) State Highways (SH) Major District Roads (MDR) Other District Roads (ODR) Village Roads (VR)

The Public Works Department (PWD) is the major department dealing with the State Highways, Major District Roads, Other District Roads and a part of the Village Roads in the state.

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

PART A:

OWNERSHIP AND FUNDING FRAMEWORK FOR THE 'NON-CORE' ROADS OF UTTAR PARDESH

A.1

CURRENT ROAD NETWORK IN UTTAR PRADESH AND RESPONSIBILITIES

A.1.1 Road length of the Network and Responsibility The entire network for which the PWD is responsible is shown in Table A.1.
Table A.1: Uttar Pradesh road network managed by PWD (km) Road Category National Highway * State Highway Major District Road Other District Road Village Road Total 31-3-2002 4,860 9,098 7,291 25,702 67,978 114,929 31-3-2003 4,931 9,138 7,251 25,702 71,041 118,063 31-3-2004 4,931 9,138 7,339 26,015 71,041 118,464 31-3-2005 5,583+ 8,546 7,274 28,400 77,363 127,166 31-3-2006 3,825* 8,553 7,345 29,179 78,011 126,913

Source: Performance Budget 2006-2007 and secondary data as received from SE Planning, PWD +In the year 2005, after entrustment the road length for National Highways was 5,583 km. After the road sections were handed over to National Highways measurements were taken at site, where chainages were recalculated which led to the reduction in road length i.e. 5,570.271 kms as mentioned for the year 2006. Hence there is no reduction in road length. * Length maintained by UP PWD with the funds from NHAI. Another 1,745 km is maintained by NHAI itself.

A.2

AGENCIES INVOLVED IN ROAD CONSTRUCTION AND MAINTENANCE

Other than the PWD, several other departments are also engaged in the construction of roads within the State under different schemes launched by the State Government/Government of India. The other agencies involved in road construction are as follows: A.2.1 Primary Road Sector Agencies Road building and maintenance is the prime objective of the agencies like PWD, MOST and NHAI. In case of UP, PWD is the main agency as the other two play a marginal and indirect role. Rural Engineering Services (RES) is another agency which undertakes rural road construction as one of its main objective. RES, however, does not maintain any roads, not even what they build, and have no funds for maintenance operations. The only exception is that under PMGSY they do maintain the roads they have constructed but only for a period of 5 years following their construction, since this is part of the PMGSY contract undertaken by the various Contractors.

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

Rural Engineering Services (RES): The Department was created by GoUP in 1972 to augment and execute rural construction works in UP. It is administratively under the Ministry of Rural Development. Roads constructed by RES include earthen roads, roads with soling and painted roads. Up to 2006, about 71,438 kms of earthen roads and 12,946 km of painted roads were constructed by RES. The details are given in Annexure B. RES does not have a budget of its own and undertakes works for different government agencies as 'deposit works'. Roads are constructed under different schemes like (RAGP). From the year 1980-1987 road construction was done under National Rural Employment Programmme (NREP), Rural Landless Employment Generation Programme (RLEGP) and flood relief. From 1987 onwards roads were constructed under local development schemes like Purvanchal Vikas Nidhi and Bundhelkhand Vikas Nidhi. Under Pradhan Mantri Gram Sadak Yojana (PMGSY) scheme and Vidhayak Nidhi road construction was started from the year 2000. Under PMGSY construction works in 40 districts have been assigned to PWD and those in the remaining 30 districts to RES. The construction of roads under PMGSY was started in 2002 and continues till 2007 and carries a maintenance guarantee for 5 years after the completion of construction. The organisation is involved only in the construction of new works and its role is to supplement the development works in the rural areas.

A.2.2 Secondary Road Sector Agencies There are many other agencies in UP involved in road construction but whose objectives vary. For example: Urban Development Authorities and Nagar Nigams: Major towns and cities in the State have urban development authorities to undertake various developmental works. The provision of urban infrastructure in these towns is the responsibility of these authorities. Planning and development of the road network, and meeting the transport demand of these towns and cities is amongst their primary task. Accordingly such agencies undertake various works related to the construction of new roads and maintenance of the existing road network in urban areas, besides the development and upkeep of road infrastructure. Mandi Parishad: Mandi Parishad was established in 1964: today it has 36 divisions and 757 employees. There are 247 Mandi Samitis in Uttar Pradesh. A Mandi Samiti is constituted for a group of villages and is headed by the District Magistrate who submits development proposals to the Mandi Parishad/Board. Depending on the money earned by the individual Mandi the projects are sanctioned after selection by a Committee. The main activity of Mandi Parishad is construction and development, besides the operation and management, of agricultural markets or Mandis. This is achieved by constructing Mandis where required and, in some cases, constructing link roads from villages to these Mandis. In an attempt to ensure better rural connectivity to the Mandis, so that farm produce reaches the collection centres faster and so that farmers get the right price for their produce, State agricultural produce marketing committees (Mandi Parishad) are also involved in road construction.
August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

The Mandi Parishad does not receive any financial assistance from the Government and operates on the collection of Mandi tax on the sale of agricultural produce in the markets. The Mandi tax levied is 2.5% on the sale value of the agricultural produce out of which 0.5% is Development Cess. The road construction activities of the Mandis are funded by the revenue collected through sale of the agricultural produce at their marketing centres. From 2001 to 2006, 5,513 km of roads have been constructed by the Mandi Parishad. No information could be made available prior to 2001. Mandi Parishads claim that they own the roads and are responsible for their maintenance. Thus, these roads are not orphan roads. Uttar Pradesh Awas Vikas Parishad: Uttar Pradesh Awas Vikas Parishad works only in urban areas. They usually construct roads for linking colonies to the main roads. After construction they transfer same to the concerned local body like Nagar Nigam, Nagar Palika and Nagar Panchayat after approximately a third of the property has been sold off. The local body then maintains the roads transferred to them. However, severe resource constraints facing the municipal agencies often force the Government to direct the Housing Board to undertake maintenance of these roads. Such maintenance activities are through private contractors. Funds for maintenance and upkeep are often channelled from the money received by the housing board as royalty towards property development. The royalty component is 1% of the property registration fees. Details of road sector activities of some of these organisations are given in Annexure C. They do not have any information about the total road network constructed by them, as no records are maintained. A.2.3 Other Department Roads These include Zila Parishad (Zila Panchayat), Village Panchayats (Village elected Committees), Municipal Authorities, Forest, and Irrigation Departments, Military Engineering Services (Border Roads), Cane Development Department and Railway Department. Local Development Authority: Local Development Authority roads are assumed to be public roads open to the general public and are not funded from PWD budget, but funded from a different source. If PWD were to undertake works and services of any kind on these roads the costs incurred would be charged to the Authority concerned. In case the local authorities do not have the technical skills to manage their roads, the PWD might manage these roads (charging a small fee of say 6%). This will be carried out as Deposit Works and for this service a small fee (centage charges) but for some special projects Government of UP may waive the centage charges. The funds allocation would belong to the road owner with PWD as a service provider and free to conduct operations via contractors and, in exceptional cases, via PWD in-house resources for some of the works. The main PWD role, in such instances, would be to manage the roads and the works/services so required.

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

Forest Department: Forest Department roads are constructed primarily for the purposes of creating and maintaining managed forests and their command area equipped with the means of irrigating the area concerned. There might be a small element of public roads but access to the general public would not apply. The main access and use of these roads would be by the Department concerned and other authorised users. Under such circumstances the roads belong to the Department concerned and are the responsibility of the Departments in respect of both funding and maintenance. In the event that a forest, or Command Area, is allowed (by the Department concerned) to become partly or totally open to the public, and the road(s) concerned is carrying a reasonable quantum of public traffic (i.e. not just traffic internal to the area development concerned), then PWD might agree to adopt the road (and bring it into PWD ownership - on behalf of the state) and maintain it thereafter under the PWD Budget.

Border Roads: If roads built and managed by the Border Roads Organisation become public roads then, under such circumstances, ownership would pass to the PWD who in turn would be responsible for their maintenance. Cane Development Department: Roads constructed by the Cane Development Department are for the use of that organisation to facilitate efficient transportation of sugarcane produce to sugarcane factories and their marketing yards. As the road owners concerned are commercial entities, and the roads are designed to provide access between crop land and processing plant for cane development and between station, engine shed, signal boxes etc (for railways), it is unlikely that the public would use such roads on a regular basis. The roads constructed by this Department are owned by them. Some of these roads connect to the Nepal border. From year 1972 to 2007 a total of 5,590 km of surfaced road and 95.25 km of border roads have been constructed. The budget for the construction of roads other than border roads, comes from two sources, that is, 50% from government sponsored schemes and 50% from beneficiaries (Sugar Mills, Cane Growers and Cane Development Council). The funds for border roads come from Central Government. The roads that are being constructed under both of the above these schemes are not maintained due to paucity of funds. As the need arises these roads are being reconstructed after 7 years, and in special cases, reconstruction is carried after 5 years.

Uttar Pradesh State Bridge Corporation [UPSBC]: UPSBC was formed in the year 1973, with the prime objective of constructing bridges and other civil works. The primary objective of creating this Corporation was to able to construct all the bridges in the state on its own without giving any work on contract. The pattern of working in the Company is broadly known as Departmental Construction System. The construction works are normally done departmentally by technical and other staff, including skilled labour, etc., of the Company. The necessary machines and equipment, tools and plant, centering and shuttering and material like steel, cement, coarse and fine aggregates, and sand, etc. are procured by the Company. The work is executed directly through UPSBC skilled labour, and also by engaging required labour on a piece rate working system.
August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

UPSBC are not engaged in any maintenance activity. After a road or a bridge has been constructed the ownership is transferred to the PWD. All the above data was obtained from various sources, such as Institutional Development Study Review Report (by TCE), and GoUP website (http://upgov.up.nic.in/engspatrika/zspmenu.asp). Data from these sources is at variance with each other. Therefore, it is difficult to arrive at a reliable data regarding the ownership and maintenance of roads by other agencies. The only definite information in this regard is from the RES, who construct roads and are able to give the total length constructed by them. It is also certain that RES does not own or maintain any road. Thus the roads they construct are truly orphan roads.

A.3

PREVIOUS ATTEMPTS TO DEFINE CORE ROAD NETWORK

Several studies to define the road network have been undertaken in the past, such as; the Strategic Options Study by CES in 1996, followed by the Techno-Economic Feasibility Study by the DHV Consultants in 2000/2001 for the improvement of the road network and prioritisation of the same. Mandates for the above mentioned studies are mentioned below: A.3.1 Strategic Options Study by CES, 1996 The Government of Uttar Pradesh initiated a Strategic Options Study for improvement of the road network of the State. The objective of the study was to enable PWD to prioritise the roads which need upgradation in terms of widening, strengthening and providing shoulders etc., based on: Traffic Capacity Road condition Importance of road with respect to Traffic stream on the road Connectivity Economic development Backward area linkages Environmentally sensitive areas

Criteria for selection of roads/parameters for identifying core or strategic /identify road network: a set of criteria was applied to identify roads which are important and which need upgrading. Road link capacity was calculated, based on the relationship of passenger car units compared to pavement width. A traffic density map was generated [1990/1 updated with selective 1996 counts]. Origin-destination surveys were performed to identify traffic patterns in terms of major traffic generators and destinations, and flow of commercial traffic, including major truck routes.

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

The presence of local traffic was quantified as a percentage of the local traffic stream. Inputs were solicited from various government bodies responsible for development of infrastructure, industry and tourism in the State, to include parameters relating to road access to targeted backward areas, emerging settlements, tourist centres, pilgrimage sites and industrial growth nodes.

During the Strategic Options Study in 1996, out of approximately 10,000 km of National Highways, State Highways and Major District Roads considered in the study; 2,551 km of roads were identified for upgrading and approximately 8,000 km were identified for maintenance. A.3.2 The Techno-Economic Feasibility Study and Road Maintenance Management Study by DHV, 2000 and 2001 The Uttar Pradesh State Roads project financed under World Bank, followed on earlier work done under Strategic Options Study. The entire road network of UP was studied, with the exception of the hill areas, and the important roads were identified. The resultant core road network comprised 10,000 km, of National, State Highways and Major District Roads. The omission of the hill regions in the Strategic Options Study was the most significant change in this study. A broad regional approach to road network planning was adopted in order to link major road maintenance projects to the road function in regional context and to support regional development policies. At the commencement of this project the two lists of roads were slightly changed by the PWD, increasing respectively the total length of roads to 2,655 km for upgrading and 8,126 km for maintenance. In the interim period certain roads had been reclassified to National Highway status, and it was necessary to leave out roads which overlap in function with other roads, specifically National Highways. The core road network was built up as follows: Parameters used for identifying the core road network: National Highways were automatically included in the core road network of the State. State Highways which link UP with adjacent states or neighbouring countries were then added to the core road network, to provide external economic linkages. Subsequently, it was deemed important that every district capital should have access to the national road network with at least one good road link. Where this criterion was not met by the National and State Highways mentioned above, a local road was selected which fulfilled this function. Adjacent district headquarters also have to be linked to each other by means of a road link of sufficient capacity to accommodate the prevailing traffic. Major industrial centres, like Kanpur, which are district headquarters, were subsequently linked to the core, road network, by inserting the roads that link these centres to the national road network and markets. Likewise, major truck routes have been added to the strategic road network on the assumption that commercial traffic is a major road user, with economic significance for the State.
August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

Roads with current traffic volumes exceeding 2,000 fast moving vehicles a day (according to the traffic model for this study) were added to the network, if not already in one of the categories above. Routes that supply the only road connection to a remote area were included on the grounds of connectivity.

Finally, access to prominent tourist and pilgrimage centres was added as part of the core road network. A.3.3 The 'Non-Core' Core Road Network All the above comments apply to the definition and selection of a core road network which inevitably omits village roads from consideration. However a similar exercise can, and should, be carried out with respect to village roads. In this respect one of the requirements would be for the PWD to determine a definition of what constitutes the 'Non-Core' Core Road Network.

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

A.4

CORE ROAD AND NON-CORE ROAD NETWORK

A.4.1 Core Road Network The Core Road Network2 concept was developed by the Techno-Economic Feasibility Consultants i.e., DHV in order to focus budget allocation of resources for road maintenance. Another part of the exercise was to simplify maintenance management practices, with a view to enhance the chances of their sustainability. Their definition of a Core Road Network is: The minimum road network required to support the economic and social development of Uttar Pradesh by providing good quality road linkages between the major population, industrial and culturally valuable locations in the state. The Core Road Network most influences the economic well-being of the state, therefore has to be maintained at all times. It has also been suggested that the 'core road' network should be that length of road which can be regularly maintained at an acceptable standard using the available budget provisions from the State. In Report No. 23: Report on Implementation of core roads - strategic planning functions and processes in PWD the core road network was defined as the total length of: 1. 2. 3. State Highways Major District Roads Other District Roads

The total length amounts to some 44,000 kms. It was appreciated that for various reasons, political, economic, military, and other, some of these roads would be more vital than others. These were defined as the 'Strategic Core Network'. Throughout the rest of this Report these terms have been used to define core roads and strategic core roads. A.4.2 Non-Core Road Network By inference, the non-core road network is those roads not included in the Core Road Network. However, as previously commented, there are no doubt excellent reasons for defining a 'core network' based on the non-core road network. This is similar to, but obviously different from, the 'Strategic Core Road Network' which is based on the entire Core Road Network.

Procedures for Selection of Roads for Major Maintenance, by DHV Consultants September 2001,Pg.2 August 2007

10

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

A.4.3 Road length by classification A.4.3.1 Road Length of Strategic Core Network A certain road network was identified by the Techno-Economic Feasibility Consultants i.e., DHV Consultants as the 'Strategic Core' Road Network see Table A.2 below:
Table A.2 : Strategic Core Road Network of Uttar Pradesh (As per DHV) Road Category State Highway Major District Road Other District Road Total Length (km) 6,213 466 52 6,730

Such a 'Strategic Core' Road Network, consists of 6,730 kms. The detail of each road category with their length is given in Annexure D. A.4.3.2 Length of Strategic Core, Core, and 'Non-Core' Road Network It is suggested by the TA Consultants that the Core Road Network should consist of all roads which should be maintained based on condition and traffic surveys. The resulting data should be analysed using a road maintenance management system linked to HDM 4. This would produce a robust maintenance budget based on 'need'. These proposals would include all State Highways, Major District Roads and Other District Roads. The length of the Strategic Core (as defined by DHV), Core Road Network and Non-Core Road Network are given in Table A.3.
Table A.3 : Distribution of Road Length (km) Road Category State Highway Major District Road Other District Road Village Road Total Responsibility of PWD 8,553 7,345 29,179 78,011 126,913 Core Road (as per DHV) 6,213 466 52 0 6,730 Suggested Core Road 8,553 7,345 29,179 0 45,077 Non-Core Road 0 0 0 78,011 78,011

Details of the Non Core Road Network would be maintained on an MS Access type data base. Simplified condition surveys, traffic counts, etc. would be carried out, possibly every two years, and these would be used to determine appropriate maintenance work and budgets for same. Unlike the Core Road Network, where maintenance work etc may be out-sourced, it is anticipated that maintenance of the Non-Core Roads would be carried out using in-house resources.
August 2007

11

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

A.5

ESTIMATION OF FUNDING REQUIREMENT FOR UP-GRADATION / STRENGTHENING AND MAINTENANCE OF ROAD NETWORK

A.5.1 Present Funding Framework The funds received for up-gradation, strengthening and maintenance are spent under the following heads: 1. Maintenance a. b. 2. a. b. 3. 4. 5. Routine Maintenance Periodic Maintenance Special repairs Emergency repairs

Repairs

Widening Strengthening Rehabilitation

In the first year of Tenth Five year plan (2002-2003), Rs 1,000 crore funds of Planned Budget were spent for construction of roads. In the year 2006-2007, the budget allocation for construction was Rs 4,000 crores. For the Non Planned budget, the maintenance component for the year 2006-2007 was estimated and requested at Rs. 3,600 crore, but only Rs. 1,658 crore was allotted. The details are presented in Annexure E. For the financial years 2001-02, 2002-03, 2003-04, PWD received 30% of the funds requested, whilst for the financial years 2004-05, 2005-06, and 2006-07, they received 35%, 40%, and 50% respectively. During the year 2005-06 the funds available from the State Road Fund and Annual Maintenance Budget were Rs.630 crore and Rs.120 crore respectively. For the year 2006-07 an amount of Rs. 600 crore from the State Government and a matching amount of Rs.600 crore from other sources giving a total of Rs.1,200 crore, was received. Routine maintenance covers ordinary repairs undertaken by departmental labour, while periodic maintenance is carried out by contractors. Routine maintenance is done using labour intensive methods. Emergency repairs, are also, carried out by departmental labour, but special repairs are undertaken both departmentally and by contractors. PWD is not currently practicing standard methods for planning and monitoring road maintenance activities like adopting a maintenance interventions based on pavement condition, traffic etc. Allocation of the routine maintenance budget is based on fixed percentages for different activities such as patching, shoulders, drainage, roadside clearance, signs, guard rails, slip clearance, bridge maintenance, diversions, etc. The actual need may be considerably different based on local conditions and maintenance status.
August 2007

12

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

A comparison of the maintenance practices adopted in the States of Gujarat, Maharashtra, Uttar Pradesh and Uttranchal are discussed in detail in Annexure F, where comparisons of deficiencies in the systems are identified. A.5.1.1 Maintenance Funding for the Core Road Network According to the Techno-Economic Feasibility Consultant, DHV (Report on Programme for Major Maintenance) the planning of road works and compilation of budgets in the PWD is centralised in Lucknow with the execution of works being undertaken at the Zonal, Circle or Divisional levels. The World Bank, in their Aide Memoire of April 2006 stated that: The Bank financed project is upgrading or rehabilitation about 50% of core State Highway network. In addition the GoUP have increased the budget for road development and maintenance significantly to about Rs. 5,200 crores for the current year to take care of the backlog. This backlog should substantially improve highway conditions, but the impact of this project and other road improvements being made by GOUP will be transitory unless accompanied by an effective road maintenance regime. The ISAP consultants will be providing necessary help in its application. Unless a regular road maintenance regime is introduced, the development objectives of this project will not be achieved. A.5.2 Problem areas The fund requirements are not split between core and non-core roads. Condition data for the year and the length of roads where periodic maintenance was carried out previously is not available and so the selection of roads for maintenance is not based on condition and traffic. The criteria for identifying roads for maintenance should be based on condition, traffic volumes and axle loads. It is understood that such surveys are not currently being conducted although they may have been conducted in the past. The budget estimates should also consider the sub-grade strength and drainage conditions. However, again such information is not collected by PWD. Fund allocations are unpredictable. Year-on-year allocations for projects are often interrupted.

August 2007

13

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

A.5.3 Funding Estimates A.5.3.1 Maintenance Cycles The maintenance cycle for the various categories of road have been fixed by the PWD as shown in Table A.4.
Table A.4 : Renewal Cycle by Road Classification Road Category State Highway Major District Road Other District Road Village Road Length 1/4th 1/4th 1/5th 1/8th

This policy does not consider traffic and the actual condition of the road and impact of any changes. In practice, due to lack of funds, inadequate information, etc., even these rules are not always followed. Maintenance based on cyclical interventions and which are not 'needs based' should be discontinued. Effective and economic maintenance interventions can only be 'needs' based. Based on the cyclical maintenance criteria shown in Table A.4 above, the approximate lengths of total road network that should be subjected to renewal or periodic maintenance per year is given in Table A.5 below.
Table A.5 : Approximate lengths of roads to be renewed per year) Road Category State Highways Major District Roads Other District Roads Village Roads Total Responsibility of PWD 8,553 7,345 29,179 78,011 126,913 Suggested Core Road 8,553 7,345 29,179 0 45,077 Non-Core Road 0 0 0 78,011 78,011 Length to be Maintained per Year 2,140 1,840 5,830 9,750 19,560

A.5.3.2

Estimate of Maintenance Funding Requirements for the Non-Core Road Network

The current budget does not identify the core roads and non-core roads separately. It is assumed that the renewal / upgradation / strengthening is carried out for the above lengths of roads in accordance with the cycle times given in Table A.4. The estimates for the funding requirement for up-gradation / strengthening of the road network have been calculated by multiplying the per kilometer costs, as discussed below, by the length of road given in Table A.5.

August 2007

14

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

Assumption made for the determination of costs: The crust thickness of the existing pavement, on an average, is 23 cm

The annual cost of major maintenance, i.e., renewal, upgrading, strengthening has been calculated using the following maintenance intervention assumptions. The normal practice of PWD to upgrade/strengthen the road is to add 2 layers of WBM, one coat of Painting called P1 and 20 mm of premix carpet. This treatment is applied irrespective of the present strength of the pavement, sub grade type and the traffic it is expected to carry. We have assumed this to be a bare minimum treatment and have identified it as the conventional PWD treatment. Rationally, the pavement structure should be designed based on the sub-grade strength, and the traffic it is expected to carry during its design life. The governing component of the traffic that is taken into account in the design of pavement is the volume of commercial traffic during the design life of the pavement and the axle load spectrum of the commercial traffic. Unfortunately this data is not available for roads in U.P. A basic examination of sporadic traffic volume data on some roads was used to obtain an estimate of overall average of equivalent single axle loads (ESAL or MSA) for State Highways and Major District Roads. The following assumptions were made to calculate the ESAL or million standard axles (MSA) over 20 year design life: Initial Commercial Traffic State Highway Major District Road Annual increase in traffic Average vehicle damage factor (VDF) = = = = 4,000 vehicles/day 500 vehicles/day 7.0 percent 5.0

The above assumptions resulted in the following average design traffic values: State Highway Major District Road = = 150 msa 20 msa

The standard pavement design for the above traffic values for an average sub-grade CBR value of 5 percent was selected from IRC- 37: 2001 Guidelines for Design of Flexible Pavements (second Revision). The strengthening required was obtained by deducting the assumed existing crust thickness of 23 cm from the above designs. This was considered to be the desirable value for strengthening purposes. In the absence of condition surveys and reliable traffic data the standard PWD treatment described above as normal practice was considered to be applicable for the Village Roads. However this is an average treatment and does not take into account the severity of the road condition.
August 2007

15

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

It should be borne in mind that all the above calculations, albeit approximate at best, are based on the following assumptions for the existing road: 1. 2. 3. The road is not subjected to submergence The sub-grade of the road is not saturated except for brief periods of rain. There is positive internal drainage of the existing pavement and proper surface drainage to drain water away from the pavement.

If the above conditions are not met then remedial measures must be undertaken to rectify the situation. This will result in additional costs over and above those given in Table A.6.
Table A.6: Per kilometre Costs for Village Roads (2007 Prices) Costs (Lakhs Rs. per km) for 2 Lane configuration Routine Maintenance 0.60 Periodic Maintenance 1.84 Treatment Type (Lakhs Rs. per km) based on standard 7 metre width 25 mm PC 10.00 P1 5.00 150 mm WBM 14.00 Treatment Total Cost 29.00

Source: 'Report of the Committee for norms for Maintenance of Roads in India' published 2001, provided by the PWD.

It cannot be overemphasized that an inadequate pavement, in terms of strength, is not maintainable and money spent on its maintenance will be wasted. The utmost importance should be given to bringing the pavements up to the required strength as part of the rehabilitation process. The costs in Table A.6 relate to the year 2000. Applying an inflation rate to these 2000 based costs, enabled the cost estimates for the year 2007 to be calculated. An estimate of the annual costs for routine, periodic, strengthening and widening of Non-Core Roads is given in Table A.7.
Table A.7: Annual Funding Requirements for Non-Core Road Network Road Category Length Operation Routine Maintenance Periodic Maintenance Strengthening Widening Total Cost 7.0 74.0 2 Lane 168 kms Cost/km 0.0060 0.0184 0.290 Cost 1.0 0 6.0 Intermediate Lane 2,222 kms Cost/km 0.0045 0.0138 0.2175 Cost 10.0 4.0 60.0 Single Lane 75,621 kms Cost/km 0.0030 0.0092 0.1450 0.2950 Cost 222.0 85.0 1,343.0 2,731.0 4,381.0 Total Cost (Crore Rupees) 233.00 89.0 1,409.0 2,731.0 4,463.0

August 2007

16

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

The values in the above mentioned table do not include. 1. 2. Improving the road due to geometric deficiencies The road user costs / benefits which would be very significant

A.5.4 Recommendations with respect to funding framework

The following recommendations relate to the Non-Core Road Network.


During the preparation of budget for maintenance, the PWD should prepare this under separate heads of core and non-core roads. Condition surveys for the road pavement, including shoulders and drainage, and structures should be undertaken on a regular basis. This would probably be done on a two year cycle. It may be necessary to develop simple survey procedures which capture the data necessary to prepare a maintenance budget based on need. Traffic surveys and axle load surveys as well as pavement strength should be conducted to identify and prioritise roads for maintenance and upgradation. Establish a database of survey, inventory and condition data for each road. All maintenance work should be 'needs based' and not carried out on a time based cycle. The road condition data should be used in the development of a prioritised budget for maintenance, upgradation, strengthening, and rehabilitation work. New roads should only be constructed in accordance with the overall road Network Master Plan. Piece-meal and 'ad hoc' road construction should cease. Only roads which fit in with the overall Road Network Master Plan should be considered, and even then they must have been subjected to a rigorous and supportable socio-economic appraisal. Impact on PWD organisation structure. During work on the PWD organisation structure the proposal to split the management of the Core Road Network and the Non-Core Road Network has been discussed but as yet no firm decision has been taken.

A.6

OWNERSHIP OF THE NON-CORE ROAD NETWORK

The current system whereby village roads are constructed by various agencies, some of whom maintain the roads they have constructed but others do not, should be discontinued. For the Central or State Government to provide funds for the construction of such roads, and then fail to provide the means whereby the roads can be maintained is a profligate waste of money. There may well be a desire to construct specific non-core roads but if these roads do not fall within the overall Road Network Master Plan the roads should not be constructed using public funds. In any planning mechanism the costs of road maintenance must be included and provision included to ensure that the roads are managed and maintained by a reputable Government body.

August 2007

17

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

In that context the PWD is the one Government body charged with the responsibility to maintain the road network. As such no roads should be constructed where, after their construction, ownership is left is doubt. The current problem arises where roads are constructed and their future ownership is in doubt. Such roads are termed 'orphan roads'. At present these roads are not maintained and fall into disrepair until such times as they are re-built. This procedure represents a lack of management planning and gross mis-use of public funds. It is understood that roads constructed under PMGSY are provided with funding for the first 5 years of their life. Where the roads are constructed by the PWD the question of ownership is not a problem. Roads constructed under this programme by the RES do present a problem. It is understood that construction is carried out by external Contractors who are also funded to maintain the roads during the first 5 years of their life. It is not clear if the Contractors comply with thee requirement, or who checks up on their work. The real problem is what happens to them at the end of the 5 years. It has been proposed that the management and maintenance of the non-core road network is undertaken by the PWD. To that end, and in accordance with the proposals regarding the PWD re-organisation structure, that the PWD Engineering functions are split between the Core Road Network and the Non-Core Road Network. This aspect is still under discussion, and no firm decision has yet been taken. Since the PWD has been given the mandate from the State Government to manage the State road network it would seem logical that they should manage the whole of the road network, and that includes the non-core road network. These roads should all be constructed in accordance with the specifications and design standards laid down by the PWD. This will ensure that they can be maintained and will perform as anticipated. Any new construction would be required to comply with the Road Network Master Plan and thus prevent ad hoc, or ill designed schemes that do not meet any basic economic criteria from being constructed. The PWD must maintain control over the development of the road network. One of the tasks of the Policy and Planning Unit is to establish the Road Network Master Plan as well as to develop a coordinated policy with respect to its expansion. The roles and responsibilities of this Unit can be summarised as follows: To formulate policies, plans and programmes; To suggest tools and methods for managing the roads as assets; To assess and allocate the necessary budgets; To formulate projects and programmes, and mandate the responsibilities; and To develop, adopt and maintain appropriate tools and procedures that will be needed with time.

As part of their tasks the Policy and Planning Unit would develop a strategic non-core road network in the same way as the strategic core has been developed for the core road network. This would at least ensure that there was some relationship or coordination between the two sets of strategic networks.
August 2007

18

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

One other alternative is to give the management of these roads over to the Districts or Municipalities who may, or may not, be equipped to undertake such a task. It would seem logical that the PWD continue to manage and maintain these roads as part of their duties. Even if parts of the non-core road network are hived off to other agencies the basic problems of funds for their maintenance will remain. Much better for one organisation, the PWD, to be responsible for this than to spread the problem over a number of un-related agencies. In any event, one of the crucial requirements relates to budget provision. It is essential that the PWD is provided with sufficient budget to manage and maintain the non-core road network as well as the core road network. If the maintenance budget is insufficient then further expansion of the non-core road network should be suspended and the available funds used to maintain the existing network. One of the tasks of the Policy and Planning Unit is to prepare maintenance budgets for both the core road network and non-core road network. These should be considered as separate entities although the objective is to maintain the road network.

August 2007

19

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

PART B : GANG LABOUR MANAGEMENT B.1 REVIEW OF IDS REPORT AND RECOMMENDATIONS

The IDS Consultant (TCE) in their Review Report of October 2000, mentioned that the norms for deputing gangs suggest that for every 20 km of roads, there are 7 Beldars3 and 1 Mate. The strength of gang labour in UP during the year 1999-2000 was 62,370. Comparison of labour in Highway Departments/PWDs in other states is as follows:
States Uttar Pradesh Andhra Pradesh Tamil Nadu Gujarat Strength of Gang Labour 62,370 4,000 10,000 12,000 Gang Labour for every 100 km of road length 50 3 25 16

Discussions with PWD officials indicate that besides being surplus to requirements. Gang labour productivity has been decreasing over time. The Key Concerns of the IDS Consultant (TCE) The Department is perceived to have a large gang labour work force (62,370 in all, when the study was conducted during the year 2000) leading to a large wage bill. Moreover, their productivity is a matter of concern. The reported age of the gang labour is suspect as some of the employed may actually be working much beyond their normal age of retirement. Old age severely undermines physical capacity to perform strenuous work.

The recommendations of the IDS Consultant (TCE) were: Gang Labour in the State has been entrusted with the task of carrying out routine maintenance and handling emergency works. Enhancing their productivity shall require a two pronged strategy as below: Hardware support: to enable them to do work well through better tools/equipment. The inventory of tools and equipment to be procured should be prepared and partly sourced under SRP II. Managing Software: provide incentive/motivation to deliver. Setting up of micro enterprises is one such method. Under the SRP II implementation programme, PWD proposes to undertake a pilot project involving setting up of micro-enterprises. The success of these enterprises shall be encouraged through involvement of NGOs at different levels.

Mate supervises the work done by the Beldars. August 2007

20

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

PWD should organise data on the gang labour properly, to understand the age profile and attrition rate among them. This shall equip the Department to assess the severity of the situation over the next few years and formulate the steps required to address the situation. Different proposals (including retraining and redeployment) may be focussed on the gang labour falling under different socio-demographic categories. Attempts should be made to absorb the new gang labour on compassionate grounds in other Government departments. If required, reassessment of the age of those in the over-fifty age group should be made for proper categorization. Such an exercise should be conducted with a condition that there shall be no immediate removal from the job for those found beyond retirement age. This shall be essentially a negotiating process and demands some socio-economic sensitivity on the part of the decision makers.

B.2

CURRENT STATUS OF GANG LABOUR AND AGE PROFILE

Current Status: The data available for the strength of gang labour for the year 2004, was 42,947 (Annexure G), while for the year 2007 the strength is 43,418 (regular is 28,268, and work charge & daily wages is 15150). There are three types of gang labour; 1) regular staff, 2) work-charged staff and 3) daily wage staff. Regular gang labour is permanent staff of PWD and is entitled to various employee benefits like dearness allowance, provident fund, retirement benefits and other benefits as per Government Service Rules. Work charged labour are those permanently attached to Works and entitled to lump sum monthly salary as payment, but do not receive any other benefits. Daily wage staff is paid wages as per employment terms according to number of days with PWD. However, they are employed through out the year and get paid accordingly.

The recruitment for gang labour has now stopped. However, at the time of their regularisation, gang labour was asked to provide their birth certificates, which they obtained from the Chief Medical Officer (CMO). These certificates may have falsified ages. Hence, a number of persons who were past normal retirement age may still be employed on gangs. In reality, there is a large workforce of gang labourers which have over the time become unproductive. The IDS Consultant (TCE) made an attempt to determine the age profile of gang labour within PWD. There was and is no centralised database available for it at the Headquarters. Data regarding gang labour is maintained only at Division level. Data for one district comprising 3 divisions was collected and extrapolated to cover the entire State. The analysis indicates that the average age is 47 years. Only 18% of gang labour are below 35 years of age and more than 40% are above 45 years. An analysis of the education profile reveals that about 80% of the labour is illiterate. Only 3% are educated above high school, and 17% below high school.

August 2007

21

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

Regular and Work-Charged gang labour are paid as per pay scales fixed by the Government. Daily workers are paid at minimum wage rate levels. Promotion criteria for gang labour are based on seniority and fulfilment of the following eligibility criteria based on Government Order (GO) dated March 1997. These are: From Muster-Rolls to Work-Charge From Work-Charge to regular : : 10 years service 5 years service

The work profile of the gang labour as per the Maintenance Manual of Roads is given as Annexure H. The Review of Road Maintenance Management Study by the DHV Consultants in August 2000, mentioned that numerous complaints have been received that the labour gangs (force account PWD staff) are unproductive. Many complaints in the Divisions relate to the productivity of the current labour whose salaries are protected by employment contracts. The study also mentioned that, What is probably unique in PWD is the fact that when there is important or urgent work to be performed, the Divisions favour contract labour above the full-time staff. The fulltime staff is seen as an unproductive overhead and nuisance, and no attempt is made to change that. No saving is to be had from ignoring the full-time labour, since the gang labour has long term security of employment. Only with real exception are the gangs expected to produce productive work for the Rs. 3,000 to Rs. 5,000 paid to individuals per month. This is a very expensive and wasteful situation but managers perceive the alternatives to be limited. The study also brought out the fact that the departmental gang labour employed by PWD is currently a source of great frustration to the engineers in the Divisions, who feel that productivity is unacceptably low. A permanent employee has a right to his monthly wage and this amount cannot be reduced, regardless of how little production is delivered.

B.3

PRESENT PWD POLICY REGARDING GANG LABOUR

The PWD, since 1992, has not been recruiting gang labour and is following a policy of natural attrition to reduce full-time gang labour, the exception being a family member of someone (casualty Beladar/Mate) in service who died.

August 2007

22

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

B.4

OPTIONS REGARDING EMPLOYMENT OF GANG LABOUR

The World Bank Paper on How a Road Agency Can Transform Force Account Road Maintenance to Contracting June 2006, mentions that, Recent international trends in the reform of road management, point to the need to transform road maintenance service. There are several reasons for such a policy change. With Force Account, funding tends to be erratic; management of equipment and its support facilities inadequate, planning, supervision and execution require high standards of staffing, quality control may be poor; and reporting systems weak. Contracted out works have the advantages that payment of work is done to specification, rates are known making budgeting and planning easier, risk is transferred from the Public Sector to the Private Sector, and the profit motive tends to promote efficiency and reduce unnecessary waste. In this context the options regarding employment of gang labour are discussed below: Options from PWD: 1. Gang labour should be retained but should be given adequate training to continue as successful support to the PWD. During emergency, for example, when the roads get blocked or damaged in times of flood etc, the Mates or the Work Agents have the capacity to organise the gangs to remove the blockage and restore the road for the congestion to get diluted and smooth traffic flow.

Options from TA Consultants: In addition to the above option of PWD, the TA Consultants considered several other options to utilise the existing gang labour. These are: 1. 2. 3. The training of gang labour to change their function to that of a contractor. Transfer staff to other road contractors. Use contractors for maintaining core roads (performance based contracts) and gang labour for non- core (i.e. village) roads. Upgrade the skills of qualified gang labour through training Provide aged and inefficient gang labours with good retirement schemes and pensions.

4. 5.

An in-depth review of the above options that a combination of the above options, as detailed below, would result in the most effective and efficient use of the present gang labour which would optimally benefit both i.e., the PWD and the gang labour. 1. The training of gang labour to change their function to that of a contractor: Training has to be imparted to the gang labour in addition to their present skills for becoming a contractor like they need to know how a project can be made cost-effective, efficient and streamlined. After being given training, it is to be kept in mind that new contractors are
August 2007

23

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

unlikely to be successful unless strong commercial skills are developed and staff with experience of the private sector employed to work along side the transferred staff. The key lesson is that a systematic approach is required that not only develops an enabling environment for developing small and medium scale contractors, but fully caters for the government employees that remain or need to be retrenched or redeployed. 2. Transfer staff to other road contractors: The transformation from gang labour to private contracting can have negative impacts on workers because of the need for redundancy or retrenchment, but these impacts should be anticipated and can be mitigated. Such transformation also provides numerous opportunities for poverty alleviation through labour based techniques and gender mainstreaming, the use of social and environmental clauses in contracts. Use contractors for maintaining core roads (performance based contracts) and gang labour for non- core (i.e. village) roads: Performance based contracting / outsourcing are possible ways to tackle the core road network. Performance based road maintenance is becoming more common, not only in developed but also in developing countries. However for performance based maintenance contracts it is essential that detailed and accurate data regarding the pavement structure; existing as well as projected traffic volume, type and, vehicle classification, axle loads are available. Targets should be measurable and auditing arrangements have to be in place in order to assess the extent to which the individual performed his functions in comparison to the objectives. On the other hand, roads of lower classification, such as, MDR and ODR which have low traffic and shorter stretches can be outsourced to smaller contractors formed out of gang labour. Task size, materials and tools are important topics, and it is essential that the supervisory staff be familiar with prescribed processes and end products in the specifications. Upgrade the skills of qualified gang labour: According to the data from the year 2000, 17% of the gang labour have a qualification below high school and 3% are educated above high school. Hence, depending on the qualification and aptitude, gang labourers might be trained in other areas depending upon the requirement. Improved output of labour gangs could be achieved by the strengthening of both their knowledgebase and supervision capabilities. Provide aged and inefficient gang labours with good retirement schemes and pensions: Voluntary Retirement Schemes to be introduced and good pension amount should be given to the gang labours. This will decrease the amount of inefficient gang labours.

3.

4.

5.

August 2007

24

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

PART C : PRESENTATION TO PROJECT STEERING COMMITTEE

August 2007

25

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

PWD Focus Group - A


Sri Krishna Kumar Mittal Sir S.K. Guni Sri Govind Prasad Sharma Sri Vinod Kumar Bansal Sri Vasudev T Gulwani Sri Sanjay Gupta Sri R.P Yadav Sri Yogesh Mathur Sri Anay Kumar Srivastava E-in-C Development and HOD SE World Bank Circle, Faizabad EE Health System Development Project, Lucknow EE, PMGSY Cell, Lucknow EE RSD- 5, Lucknow AE W, B-1, Lucknow AE P.D. Kanpur Nagar SE, IDS Cell AE, IDS Cell

LEA International Ltd. and LEA Associates South Asia Pvt. Ltd.
Mr Alan Stanbury Team Leader

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

In April 2002, a Government Order (GO) established the Inter Agency Working Group to examine the issues of the ownership and maintenance of Village Roads (VR) and Other District Roads (ODR) constructed by other Departments in the State of Uttar Pradesh The Inter Agency Working Group was to submit a Report to the Government at the end of four months which would address the above issues and formulate a work plan for the same. No such Report, however, was written.

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

The Report addresses the concept of core, non-core and orphan roads present in Uttar Pradesh (UP), the funding and gang labour management. Objectives are: To suggest a definition of core and non-core road network Ownership and sustainable devolution of Village roads and Orphan roads Funding framework of non-core roads Gang Labour Management

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

Other Road Agencies Involved in Construction and Maintenance


Rural Engineering Services (RES) Urban Development Authorities and Nagar Nigams Mandi Parishad Uttar Pradesh Awas Vikas Parishad Local Development Authority Forest Department Border roads Cane Development Department Uttar Pradesh State Bridge Construction Corporation

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

Definition of Non-Core Road Network The non-core road network is those roads not included in the Core Road Network Length of Road Network Strategic Core, Core and Non-Core

Strategic Core Road Network

: 6,730 kms : 45,077 kms : 78,011 kms

Suggested Core Road Network Non-Core Road

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

Estimation of Funding requirement for Up-gradation / strengthening and Maintenance of Road Network Problem Areas a) Fund requirements not split between core and non-core roads b) Selection of roads for maintenance not based on condition and traffic c) Criteria for identifying roads for maintenance to be based on condition, traffic volumes and axle loads d) Budget estimates to consider sub-grade strength and drainage conditions, which is not done in present

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

Ownership of the Non- Core Road Network Responsibility for the Management and Maintenance of the Non-Core Road Network should be vested in PWD Non-Core Road to be constructed in accordance with specifications and design standards laid down by PWD Essential that PWD is provided with sufficient budget to manage and maintain non-core road network and core road network. If maintenance budget is insufficient then further expansion of non-core road network should be suspended and the available funds used to maintain the existing network.

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

Recommendations with respect to funding framework PWD maintenance budget should be prepared under separate heads of core and non-core roads. Maintenance funding of Non-Core Roads by State Government. All maintenance work should be 'needs based' and not carried out on a time based cycle. The road condition data be used in the development of a simple prioritised budget for maintenance, upgradation, strengthening, and rehabilitation work. New roads only be constructed in accordance with the overall road Network Master Plan. Piece-meal and 'ad hoc' road construction should cease. Only roads which fit in with the overall Road Network Master Plan should be considered, and even then they must have been subjected to a rigorous and supportable socio-economic appraisal.

UPSRP

IDS
actions on an effective long-term ownership and funding framework for non-core UP roads, addressing sustainable devolution of village roads and orphan roads responsibilities and Gang Labour management

Report No. 3: Inter-agency Working Group study to facilitate GoUP decisions, legislation and other

Gang Labour Management - Options 1. Gang labour to be retained but be given adequate training to continue as successful support to the PWD. 2. The education / training of selected gang labour to change their function from employee to that of independent Contractor. As such they bid for work but are guaranteed some work for the next two to three years 3. Use contractors for maintaining core roads (performance based contracts) and gang labour for non- core (i.e. village) roads. 4. Upgrade the skills of qualified gang labour through training 5. Provide aged and inefficient gang labours with good retirement schemes and pensions.

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE A: GOVERNMENT ORDER TO ESTABLISH THE INTER AGENCY WORKING GROUP

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE B : ROAD LENGTH DETAILS OF OTHER ROAD AGENCIES


1. Rural Engineering Services: Details of Road Length
RURAL ENGINEERING SERVICE FROM YEAR 1980-81 TO 2005-06 Physical Target Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Year Earth Work 3 700 1165 2325 5900 3570 3455 5347 4865 3117 2034 2987 2242 2446 4723 4033 3756 4674 5771 4509 2710 4010 2592 2841 2411 2523 84706 Culver t No. 4 5034 6598 4886 6527 10537 7940 5560 6160 6025 4447 2739 3347 3784 3523 5373 6109 4568 4966 7543 7534 5119 6104 5372 4500 7446 9094 150835 Soling 5 1712 1950 1075 1446 2876 2226 1345 1770 1502 1285 840 766 969 1428 1983 2594 1845 2005 2335 2841 2124 3226 2503 2634 2242 2362 49884 Intercot/ Painting 6 262 315 287 349 428 245 444 531 542 1328 1141 1157 1704 2052 2088 1837 2591 2677 2703 4269 6031 32981 Earth Work 7 528 876 1808 5023 2917 2834 4656 3782 2550 1803 2268 1943 1960 3916 3444 2959 4154 4851 4092 2408 3678 2269 2483 2049 2187 71438 Physical Achievement Culver t No. 8 3282 4692 4016 4421 7038 5490 4439 4593 5125 3325 1669 2075 2958 2423 2863 4324 2985 3257 4740 5692 3816 4066 4045 3316 5795 4164 104609 Soling 9 877 1444 860 976 1838 1619 1037 1145 1203 921 641 588 777 1153 1324 1978 1286 1454 1672 2391 1697 2611 1923 2018 1658 1895 36986 Intercot/ Painting 10 166 159 149 153 235 173 257 321 340/11 400 621/12 732/3 948/2 962/93 1242/34 1197/75 1330/111 1231/283 1285/516 551/1459 494/2646 12946/52 45 Expenditure [Rs. Lakhs] 11 1316.522 1343.517 1392.117 1887.031 3690.104 3140.277 2835.691 3564.911 3651.602 2490.361 2390.000 3103.560 4309.210 4321.150 7611.100 10294.700 9063.600 13292.430 19083.000 22759.200 18514.000 24600.400 27737.800 30845.600 50265.400 52950.900 326454.183

2 1980-1981 1981-1982 1982-1983 1983-1984 1984-1985 1985-1986 1986-1987 1987-1988 1988-1989 1989-1990 1990-1991 1991-1992 1992-1993 1993-1994 1994-1995 1995-1996 1996-1997 1997-1998 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005 2005-2006 Total

Source: Rural Engineering Services

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

2.

Mandi Parishad : Details of Road Length


Maintenance Financial Year Target [Physical] Km 600 150 1200 600 375 2925 Achievement [Physical] Km 567 359 710 807 120 2563 Cost [Rs. Lakhs] Target 3750 3181 4700 3600 3524 18755 Achievement 1990.34 1735.00 2501.71 3143.29 662.23 10032.57

2002-2003 2003-2004 2004-2005 2005-2006 Since December 2006 Total

Road Construction Financial Year 2001-2002 2002-2003 2003-2004 2004-2005 2005-2006 Since December 2006 Total Target [Physical] Km 600 800 350 1110 1110 765 4735 Achievement [Physical] Km 1208 850 385 1238 1377 455 5513

Cost [Rs. Lakhs] Target 20950 11650 9545 15300 25425 17134 100004 Achievement 11658.40 6863.37 6280 15559.87 17454.07 6149.38 63965.09

3.

Cane Development Department : Details of Road Length


Sl. No. 1. 2. 3. 4. 5. 6. Financial Year 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005 2005-2006 Grand Total Road Construction under District Plan [In. Km] 52.230 62.510 134.791 189.880 163.769 285.152 888.332 Road constructed as part of Border Roads [In. Km] 11.390 1.450 9.760 23.500 20.82 13.30 80.22 Expenditure [ In Rs. Lakhs] 580.050 524.130 1127.388 1904.540 1934.559 3325.292 9395.959

Source: Cane Development Department

August 2007

ii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

4.

Uttar Pradesh State Bridge Construction Corporation : Details of Road Length


Financial Year 2004-2005 2004-2005 2005-2006 2005-2006 2005-2006 2005-2006 2006-2007 Place Rai Bareilly Mainpuri Etawah Etawah Etawah Etawah [Jessore Road] Etawah Total Road Length [In. Km] 90 21 30 12.5 5.28 43 7.4 209.18 Source of Fund Central Road Fund Scheme [CRF] Taritarthik Vikas Yojana State Road Fund [SRF] State Road Fund [SRF] State Road Fund [SRF] State Road Fund [SRF] State Plan Scheme Budget Allotment [Rs. Crore] 2914.58 21.29 19.07 1.21 0.74 20.12 10.62 2987.63

Source: UPSBC

August 2007

iii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
ANNEXURE C
Table 1: Secondary Organisations Involved in Road Construction

Organisation 1. Zila Parishad

Primary Activity Promote the growth and developments of districts by undertaking developmental works and ensure that resources allocated to each District are optimally utilised. Participate in the governance and infrastructure development to promote the overall growth and development of each village Development and upkeep of both social and physical infrastructure in towns and cities Execution of civil and engineering tasks for the Armed Forces Jurisdiction extends only to Military Cantonments Some works may also be undertaken in border areas Operation, maintenance and management of the Indian Railway Network

Road Related Activity Construction of roads for Village Connectivity under Minimum Needs Programme

Relevant Statistics Construction of 10,721 kms of roads Surfaced Roads-3,561 kms Un-Surfaced Roads-7,160 kms

2. Village Panchayats

Construction of 31,993 kms of roads Construction of village link roads Construction and maintenance of roads, sidewalks, drains, road markings, signs and signals, road furniture etc. Surfaced Roads-5,853 kms Un-Surfaced Roads-26,140 kms

3. Nagar Nigam/Municipal Authority

Construction of 48,014 kms of roads Surfaced Roads-36,614 kms Un-Surfaced Roads-9,400 kms

4. MES Roads 5. Indian Railways

Construction and maintenance of roads, sidewalks, drains, road markings, signs and signals, road furniture etc.

Construction of 1,661 kms of roads Surfaced Roads-1,653 kms Un-Surfaced Roads-8 kms

Construction and maintenance of roads and related infrastructure within railway estates and on railway land Construction and maintenance of roads and related infrastructure within forests areas and on forest land

Construction of 1,661 kms of roads Surfaced Roads-1,653 kms Un-Surfaced Roads-8 kms

6. State Forest Department Roads

Promote growth and manage the forest assets of the State

Construction of 20,765 kms of roads Surfaced Roads-476 kms Un-Surfaced Roads-20,289 kms

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Primary Activity Road Related Activity Construction and maintenance of roads and related infrastructure on land with the State Irrigation Department and that related to irrigation projects such as Canal embankment roads, Tracks along canals (patris) Construction and maintenance of roads and related infrastructure on land with the State Electricity Undertaking Construction of roads to facilitate efficient transportation of sugarcane produce to sugarcane factories and their marketing yards Relevant Statistics

Organisation

7. Irrigation Department Roads

Operation, maintenance and management, besides growth of irrigation facilities in the State

Construction of 24,169 kms of roads Surfaced Roads-2,249 kms Un-Surfaced Roads-21,875 kms

8. Electricity Department Roads

Generation, Transmission Distribution of the electricity in the State Promote the cultivation of sugarcane and make available infrastructure for its efficient transportation to Sugarcane factories

Construction of 240 kms of roads Surfaced Roads-212 kms Un-Surfaced Roads-28 kms

9. Sugarcane Department Roads

Construction of 3,970 kms of roads Surfaced Roads-3,970 kms

Source: Policy Support and Institutional Development Study, Review Report, TCE, October 2000.

August 2007

ii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE D : LIST OF CORE ROAD NETWORK


Sl. No. Name of the Road portions on the Core road network Category/Road Number Length (km)

State Highways/Major District Roads 1 2 3 4 5 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Andra-Ramsanehighat Road Katra-Jalalabad - SH 38 Junction ODR/MDR 06- Junction NH2 Road Chandon Chanki (Nepal Border) - Dudhwa - Paliya Road Sheesma - Manpur - Bazpur Road Mathura - Vrindavan-Naujheel Road Gomat - Naujheel - Chatta Muzaffarnagar - Jansath - SH47/Bijnor Road Gorakhpur - Sikari Sonbhadra - Sakti Nagar Buddanpur - Ambari Pratapgarh (Bela) - Dhakwa Junction (NH 56) Jagdishpur - Pratapgarh Sikari - Bellghat - Kamariaghat - Buddanpur Bakewar - Junction MDR 06 Road (Sonali/Nepal) - Nautanwa - Gorakhpur - Deoria Deoria - Ballia Road Ram Nagar - Gonda Road Lumbini (Nepal) - Nuagarh - Basti - Akbarpur - Jaunpur - Mirzapur Robertganj - Dudhi Road Varanasi - Robertganj Road Bahraich - Ram Nagar - Barabanki Road Barabanki - Andra - Haidergarh Road Haidergarh - Bacharawan Road Bacharawan - Fatehpur Road Fatehpur - Banda Road Varanasi - Mohammadpur - Sarai Rani - Azamgarh Road Garh Mukteswar - Meerut Road Meerut - Bagpat - UP Border Road Faizabad - Raibareilly Road Meerut - Bulandshahar - Narora Road MDR-03 MDR-05W MDR-06 MDR-06 C MDR- 10/49/65 MDR-123 W MDR-139 MDR-14W MDR-49 MDR-73 MDR-97 MDR-98 MDR-154 E ODR ODR SH-01 SH-01 SH-01A SH-05 SH-05 A SH-13 SH-13 SH-13 SH-13 SH-13 SH-13/ 66A/34 SH-14 SH-14 SH-15 SH-18 17.25 35 1.3 25 42.15 45.3 44 30.66 32.2 40 29.72 45 78.5 40.61 11 138.4 109.6 48 425 55 80 50.25 28 72 76.5 85.9 42 48 108.6 146

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Category/Road Number SH-18 SH-21 SH-21 SH-21 SH-21 SH-21 SH-25 SH-25 SH-26 SH-26 SH-26 SH-29 SH-29 SH-29 SH-29 SH-29 SH-29 SH-30 SH-30 SH-33 SH-33 SH-34 SH-34 SH-34 SH-36 SH-36A SH-37 SH-38 SH-38 SH-38 SH-40 SH-40 SH-41 Length (km) 101 52 43.57 135.6 144.4 60 42.2 250 72.4 191 217 25 83 20.4 19.6 24 132 105.85 138 50 187.8 13.1 215 100.3 286 30 57 23 14 230 95.5 104 43.57

Sl. No. 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

Name of the Road portions on the Core road network Gunnaur - Utjahani Road Belraya (UP Border) - Nighasan - Lakhimpur Road Lakhimpur - Sitapur Road Sitapur - Benjganj - Hardoi - Kannauj Road Kannauj - Auraiya - Jalaun - Orai Road Orai - Panwari Road Pallia - Khutar Road Khutar - Shahjahanpur - Hardoi - Lucknow Road Pilibhit - Puranpur - Khutar Road Khutar - Lakhimpur - Nanpara - Bahraich Road Bahraich - Balrampur - Utraula - Basti Road UP State Border South of Khatima - Pilibhit Road Pilibhit - Shahjahanpur Shahjahanpur - Jalalabad Jalalabad - Allahganj Allahganj - Farrukahabad Farukahabad - Etawah - Bhind (State Border) Bahraich - Gonda - Nawabganj Road Faizabad - Akbarpur - Azamgarh Road Bareilly - Budaun Road Budaun - Sikandra Rao - Mathura - UP Border Road Ambari - Shahganj Raibareilly - Sultanpur - Azamgarh Road Azamgarh - Mau - Phepnah Road Lucknow - Raibareilly - Pratapgarh - Jaunpur - Saidpur Road Raibareilly - Jagatpur - Unchahar Road Bareilly - UP State Border South of Kitcha Bilgram - Mallawan Road Mallawan - Bangarmau Road Bangarmau - Unnao - Unchahar - Kunda - Allahabad Road Lucknow - Mohan - Bangarmau - Nanamau - Bilhaur Road Bilhaur - Rasulabad - Bela -Etawah Road State Border Sout of Kashipur - Moradabad Road

August 2007

ii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Category/Road Number SH-43 SH-46 SH-47 SH-47 SH-51 SH-55 SH-57 SH-57 SH-59 SH-64 SH-65 SH-66 SH-67 SH-70 SH-85 SH-12 Length (km) 195 70.6 65 63 194.25 32 160 50 52.6 168.6 50.5 39.5 53 31 53 115 6730.28

Sl. No. 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78

Name of the Road portions on the Core road network Chandauli - Budaun - Allahganj Road Bhognipur - Ghatampur - Jahanabad- Bakewa Road Meerut - Bijnor Road Bijnor - Nazibabad Road - Kotware (upto UP Border) Bijnor - Gajraula - Bahjoi - Budaun Road Fatehpur - Clement Town (State Border) (Delhi) - Bagpat - Saharanpur Road (Junction with NH 73) Saharanpur - State Border (South of Timli) Road Muzaffarnagar - Saharanpur Road Basti - Mehndawal - Rawatganj - Padrona - Tamkuhi Road Bulandshahar - Siangarh - Garhmukteshwar Road Azamgarh - Dohrighat Ghazipur - Azamgarh Road Jalaun - UP Border (near Bhind) Road Etah - Shikehabad Road Panipat (UP Border) - Muzaffarnagar & Haldaur Dhampur Road

August 2007

iii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE E : MAINTENANCE BUDGET


Estimated Demand for Maintenance Budget
Sl. No. 1. 2. 3. Details of Works Pot hole and Patch Repairing of State Highways, Major District Roads, Other District Roads and Village Roads. [80% of total road length] Renewal of State Highways, Major District Roads, Other District Roads and Village Roads on the basis of cycle. [25000 km of renewal] Repair of damaged culverts on State Highways, Major District Roads, Other District Roads and Village Roads and for works of additional culverts [Reconstruction of 2000 culverts] Upgradation of damaged State Highways, Major District Roads, Other District Roads and Village Roads which have a large population and wherever markets which have damaged roads and also drainage works Special Repair and Strengthening of damaged portions of State Highways, Major District Roads, Other District Roads and Village Roads Widening and Strengthening of State Highways [2000 km in length] Total
Source: State Level Management Committee Meeting, 12 February 2007, PWD

Fund Requirement [In Rs. Crore] 250 650 100

4. 5. 6.

300 1500 800 3600

Non-Plan Budget: Maintenance


Non-Plan Financial Year 2001-02 2002-03 2003-04 2004-05 Maintenance [3054] 111.00 163.00 125.00 120.00 State Road Fund [3054+ 5054] Demand Head-3054: 169.00 Demand Head-3054: 227.00 Demand Head-3054: 229.00 471.00 [Demand Head 3054: 371] [Demand Head 5054: 100] 730.00 [Demand Head-3054: 530] [Demand Head-5054:200] 1458.00 [Demand Head-3054: 1000] [Demand Head-5054: 458] Total [In. Rs. crore] 280.00 390.00 354.00 591.00

2005-06

120.00

850.00

2006-07

200.00

1658.00

Source: Secondary Data, Communication Division, PWD

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE F: GUIDELINES FOR MAINTENANCE MANAGEMENT OF PRIMARY, SECONDARY AND URBAN ROADS: MORTH, 2004
Maintenance Practices for Road Networks of Different Categories in some States Road maintenance has, thus, far been considered unpredictable and therefore very little effort is made towards planning or scheduling of maintenance works. As discussed earlier, the expectations and functions from different categories of roads are different and so are the construction and maintenance levels. The maintenance of primary roads, apart from routine maintenance may demand regular renewals and strengthening, whereas, in case of urban roads routine maintenance along with thin resurfacings may be done frequently required. The condition of roads in India, in general, is far below the satisfactory mark. Road maintenance plays an important part by serving the two fold purpose, i.e. i) immediate improvement in condition and ii) retardation in the rate of deterioration. The current maintenance practices are adhoc and not based on the results of nay scientific study and are depending on personal experiences and judgements, and thus are subjective. Funds given for maintenance grants are meagre and far short of the requirements. The periodic upkeep of existing roads assumes considerable importance in the context of shortage of funds. Maintenance being a cost-effective option, prolongs the life of pavements and reduces the vehicle operation costs. Recently, awareness towards maintenance roads, based on logical and scientific systems, is increasing, and agencies involved are looking out for Pavement Management Systems that are either developed or adopted for their conditions. Some of the States are having major corridors connecting to most of the other parts in the country. These States also have geographically a key position and possess good resources, thereby resulting in faster development of industrial and commercial activities. In such cases the service expected by the road user is to construct and maintain the roads in a scientific manner. Efforts made in this direction by certain States, like, Maharashtra, Gujarat are worth mentioning. On the other hand, some other States, like, UP and Bihar are not able to cope up with the situation because of resource constraints and other problems. The maintenance practices adapted in the States of Gujarat, Maharashtra, Uttar Pradesh and Uttranchal are discussed in the following sections. Gujarat: The existing road maintenance norms in Gujarat, are in general, governed by a resolution No. MNR-1183/D 18.12.86 adopted by the Govt, of Gujarat. The maintenance norms are based on per km length of road to be maintained which are derived from the recommendations of the 8th Finance Commission Report and are, however, subject to availability of funds. The rates adopted including the amounts needed for ordinary repair and periodic repairs [known as current repairs and special repairs respectively, in Gujarat] are given below.
Category of Roads I. Highways - BT a) Single Lane b) Double Lane Other Roads 18,500-00 23,500-00 Rate

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Rate 6,500-00 11,500-00 16,00-00

Category of Roads a) Earthen b) Gravel c) WBM d) BT

While both State R&B Divisions and Panchayat Divisions are responsible for road maintenance, the former look after maintenance of the majority of State Highways and the latter take care of bulk of Major District Roads, Other District Roads and Village roads. The budget requirements are formulated by the divisions taking into consideration the lengths and respective norms for different categories of road. These are then compiled for making projections in the budget estimates for the State roads a while. However, the actual budget allocations depend upon the overall financial conditions are resources available for the year. The total amount allocated for maintenance of roads are commended to be broken as under, as per 8th Finance Commission:
Repair Types Ordinary Repairs Surface Renewals Special Repairs damage repairs and minor flood Percentage 35% 50% 15%

However, in normal practice, in Gujarat, the maintenance allocation is divided into only two parts, viz., 35% for ordinary repairs and remaining 65% for periodic repairs. In general practice of ordinary repairs, engineers at various levels make road inspections at different intervals and work instructions are given by concerned DEE/SO to work assistant and is carried out using labour gangs. The work or tasks attended by gang labour force are: Patch Repair Pavement edge repair Removal of excess vegetation Repair of shoulder Cleaning of culvert and bridge opening and minor repairs Painting of structures and street furniture Traffic surveys

Though, many of the maintenance and repair works are the responsibility of departmental task force-in-charge of ordinary repairs, the permanent labour gang constituting the task force is reportedly less productive and highly costly. Thus, the allocated maintenance funds, may not expected to be efficiently and effectively utilised for a meaningful purpose. The periodic renewal works are, however, normally carried out through contracting by qualified contractors who have required expertise and equipment.

August 2007

ii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

A detailed inspection of the road for works to be done in the following year is completed by prior to year end by the AE and then by the year end by EE/SE. In the following financial year the list of roads is prepared by April, taking into account the work done till March for the previous financial year and their liability spread beyond and April for the current financial year. The calculation for sanction given for periodic renewals is made as following:
Grant available in the financial year Liability of previous financial year Amount available for fresh work during the financial year Sanction given for periodic renewals in the financial year =X1 =X2 = X1- X2 2 (X1- X2)

The periodic renewal works are invariably carried out using material from hot mix plant located within a reasonable haulage distance. Maharashtra: In the State of Maharashtra, the norms for maintenance and repairs of roads are adopted in 1978, based on the recommendations of a Committee set-up for the purpose by a resolution No. RDS/1978/52/DSK-5/ 11.02.76. The rates in the norms are approved per km length of the road. The various items of works which are required to be considered include ordinary repairs, periodic renewals, special repairs, flood damage repairs, maintenance and repair of major bridges. For ordinary repairs the expenditure are made on three items., viz., road gangs for maintenance, patch repairs and side shoulder repairs. However, some maintenance works of bridges that may fall under special repairs, but need extra attention are put under separate norms. Ordinary repairs are of the nature of routine maintenance and are got executed generally through the departmental labour. The present norms and the norms proposed for ordinary repairs, by a group set up the Govt. of Maharashtra for the purpose, in 1989 are given below:
Category of Road SH MDR ODR VR Unsurfaced Road Present Norms Rs. Per km 4,500-12,450 4,350-6,100 3,700-5,000 3,000-4,150 4,150-8,000 Proposed Norms Rs. Per km 25,600-38,200 21,050-30,100 20,300-20,650 19,125-20,300 10,450

The suggested minimum maintenance norms are relevant only if the road to be maintained is of required structural adequacy which unfortunately is not so in many cases. Inadequate crust may lead to failure. Strengthening such stretches through original works is recommended. The norms for periodical renewals and special repairs are as follows:
Category of Road State Highway [BT] MDR ODR VR Periodic Renewals 17330 13798 7970 Special Repairs 6000 3000 800

August 2007

iii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

These norms are the approved norms of MOST, in 1988 for consideration of 9th Finance Commission. The rates for single-lane carriageway, as given, are to be appropriately increased for intermediate and double-lane roads, as per suggested guidelines of the MOST. However, the maintenance works are taken-up depending upon funds allocation. Uttar Pradesh and Uttaranchal: Uttar Pradesh, now divided into two parts politically and geographically, viz., U.P. and Uttaranchal, has been following the guidelines for maintenance of roads as stipulated under para 407 (a) of PWD Manual of Orders. Accordingly, A.R. estimates are prepared in each division by 15th January to cover next financial year vide GOI No. 2922C/23 Sa-Ni-Annual-102C/74/26.12.75. The distribution of maintenance expenditure on different parts of a road, by type of its surface is shown in the following table.
Sl. No. A B C D E F G H Item A travelled way surface [Patch repair work will not exceed 10% of grant] Shoulder-parties Drainage-Ditches, culverts Roadside-Jungle clearance erosion, vegetation footpath etc. Traffic service guard rails signals Clearance of ships-fallen trees and other obstruction Bridges, superstructure, sub-structure, stream bed signs Special services; load limitations, detours, diversions, public relation, etc. Water Bound Macadam [WBM] 75 10 2 3 2 2 5 1 100 Painted 70 (60+10) 10 3 2 2 2 10 1 100 Cement Concrete 20 60 7 3 2 2 5 1 100

Note: Effort should be made to repaint 25% of the total kilometerage in the division if funds are available. Above distribution is subject to the instructions issued by Engineer-in-Chief from time to time.

In the maintenance of roads, with reference to travelled way, the repairs to large and extensive surface failures by scarifying, reshaping and adding new materials if necessary and is varied to soil, climate, location, materials and traffic. The shoulder or parties are suggested to be covered for patches, properly dressed and rammed for proper slope and if required a stabilisation is also suggested. The drainage items are viewed as preventive measures for safety and convenience. Hence, periodical cleaning of ditches and culverts is recommended. Also, adequate cross-drainage is suggested to prevent the damage caused by water logging. The roadside maintenance stipulates prevention of erosion of slopes, embankment and roadside area by rounding and flattening of affected areas, seeding, sowing and planting tress and vegetation. The other important maintenance measures include safety services, clearing of slips, repairing of bridges etc. and special service.

August 2007

iv

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

Because of hills roads in some districts having Irish bridges/causeways, special attention is recommended. Safety signs, use of lanterns and flags for signalling, etc. are suggested. Deficiencies in Current Maintenance Practices The current maintenance and rehabilitation measures for pavements are based on subjective judgement and past experience of the road engineers only. Even if the engineer responsible for making decisions has a significant experience base to draw up the maintenance strategies, there are no available analytical tools for use by the highway agencies to assist the practicing highway engineers in selecting the best strategy based upon economics of life cycle cost. The principal causes of pavement deterioration are left uninvetsigated due to lack of data on design, construction and maintenance aspects of pavements. Because of limited resources availability at a given point of time, the practice of stage construction is adopted. The pavements are normally designed for an initial service life of about 10 years and then strengthening is provided as the traffic demand increases. Allocation of funds for maintenance does not, exceed 50% of the normal requirements of roads. Consequently, the gap between the allocation and requirements has been accumulating over the years. Apart from funds, weak planning, poor scheduling and monitoring of maintenance operations, inherent deficiencies in the crust thickness and lack of attention to drainage have contributed much towards accelerated deterioration of road networks. Lack of proper coordination between different components of road maintenance work and different organisations. The specifications laid for materials and machinery are seldom followed. Bituminous materials/mixes are not properly designed and produced for maintenance. The surface is not checked and corrected for cross slope and undulations to make-up the same.

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE G : GANG LABOUR DETAILS


Total Strength of Gang Labour TOTAL STRENGTH OF FIELD WORKERS CLASS IV STAFF AS ON 31.03.2004
Regular Sl. No. Zone Sanctioned Strength 2191 2230 1956 1551 2870 2475 2195 1599 2637 1962 1531 2332 25529 Work Charge Working 2083 2135 1774 1509 2737 2380 2023 1522 2494 1952 1518 2279 24406 Balance 108 95 182 42 133 95 172 77 143 10 13 53 1123 1620 2626 1188 734 1279 311 1123 890 1128 476 246 493 12114 406 669 769 234 1088 465 316 765 574 428 160 553 6427 Daily Wages

1 2 3 4 5 6 7 8 9 10 11 12

Agra Allahabad Azamgarh Bareilly Faizabad Gorakhpur Jhansi Kanpur Lucknow Meerut Moradabad Varanasi Total

1 2 3

No. of regular working employees No. of working work charge employees No. of daily wages working employees Total

24406 12114 6427 42947

Source : Establishment "C" Section, PWD

Strength of Field Workers in details


Total Sl. No. Designation Sanctioned 1 2 3 4 5 6 7 8 9 10 11 12 Unit Manager Roller Foreman Roller Driver Truck Driver Geep Driver Tractor/Tanker Driver Work Supervisor Lab Assistant Heavy Machine Operator Mechanic Heavy Machine Paver Driver Mechanic 12 11 0 0 0 0 102 94 8 2 0 72
August 2007

Regular Working 11 11 0 0 0 0 106 91 11 2 17 75 Balance 1 0 0 0 0 0 -4 3 -3 0 -17 -3

Work Charge 0 0 0 0 0 0 25 25 1 0 9 8

Daily Wage Worker 0 0 0 0 0 0 32 7 0 0 1 5

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Total Regular Daily Wage Worker 18 26 0 4 0 0 1 21 15 3 26 7 3 1451 0 2 6 3 0 0 1 0 1 0 0 2 221 0 3277 122 10 141 92 0 20 865 0 3 0 0 0

Sl. No.

Designation Sanctioned

Working 95 108 7 12 0 7 1 101 82 25 923 61 23 4195 0 38 45 52 4 0 4 3 15 0 1 10 821 9 14992 217 126 234 92 5 71 1547 0 7 0 0 0

Balance -2 17 2 -2 0 -1 0 10 -3 0 144 18 5 111 0 5 6 4 1 1 -1 1 -1 0 6 2 -7 -3 680 -7 39 57 1 -1 1 81 0 -1 0 0 0

Work Charge 37 26 4 3 0 1 2 31 49 1 62 4 0 2280 0 3 6 6 1 1 3 0 19 0 0 14 747 0 7205 209 12 86 32 2 22 1050 0 7 0 0 0

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Wire Man/Electrician Amin Surveyor Ghat Daroga Junior Lab Assistant Head Mechanic Assistant Roller Foreman Photo Assistant C.C.M. Operator Pump Operator Fitter/Turner Work Peon/Agent Work Mechanic Iron Smith Mate Dock Mate Mason Carpenter Plumber Compressor Operator Head Boatman Medium Size Machine Operator Warge Operator Assistant Mechanic Driller Heavy Machine Operator Carpenter Cleaner Fireman Mate Helper/Coolie Gardener Boatman Sweeper Painter Lab Boy Watchman Pattern Maker Store Peon Forestguard Switchman Polisher

93 125 9 10 0 6 1 111 79 25 1067 79 28 4306 0 43 51 56 5 1 3 4 14 0 7 12 814 6 15672 210 165 291 93 4 72 1628 0 6 0 0 0
August 2007

ii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Total Regular Daily Wage Worker 1 0 0 1 1 0 0 0 0 1 0 4 0 0 0 0 0 0 0 1 1 1 1 2 0 0 0 0 0 6400 0 2 2 5 3 13 2 27 6427

Sl. No.

Designation Sanctioned

Working 13 2 2 2 2 0 0 3 13 33 5 1 7 0 1 3 1 0 0 0 0 7 20 2 0 0 4 1 3 24382 13 0 5 1 4 1 0 24 24406

Balance 2 0 0 -1 0 0 0 -1 -2 13 -3 1 0 0 -1 0 0 0 0 0 0 -1 -16 0 0 0 -3 0 -2 1126 0 0 -2 -1 0 0 0 -3 1123

Work Charge 2 0 14 0 1 0 0 1 8 6 0 9 1 0 0 1 0 0 0 1 0 1 36 8 0 0 0 0 1 12083 4 0 6 2 5 11 3 31 12114

54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82

Toll Guard Gateman Hammerman Care Taker Helper Chainman Vote Mechanic Vote Driver Welder Cook Lift Attendant Generator Operator Telephone Attendant Assistant Driller Regular Attendant Time Keeper Washerman Museum Boy Gas Mechanic Dock Runner Marker Waiter Hot Mix Plant Operator Mechanic Fire Mechanic Assistant Mechanic Loader Operator Mashalchi Crane Operator Total Roller Cleaner Dresser Mixal Operator Assistant Operator Bitumen T. Operator Tractor Utensils Cleaner Total Grand Total

15 2 2 1 2 0 0 2 11 46 2 2 7 0 0 3 1 0 0 0 0 6 4 2 0 0 1 1 1 25508 13 0 3 0 4 1 0 21 25529

August 2007

iii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

ANNEXURE H : WORK PROFILE OF GANG LABOUR


Work Profile of Gangs as per Maintenance Manual of Roads [1984]: As per C.Es Circular no 24 PW/1116/C/1201c/74 dt. 4-3-1977 the strength of maintenance gang shall be as under: [Page 71]
Sl. No. 1 2 3 4 5 Type of Road 3.7 m and 7.3 m wide painted road 3.7 m wide W. B. M or unmetalled Hill motorable roads 2.7 m or 3 m wide painted or C. C. tracks Bridle [Hill] roads Unmetalled roads in plains Mate/km 1/20 1/16 1/20 1/20 1/20 Beldar/km 9/20 9/16 9/20 9/20 9/20 For only 9 months in a year Remarks

Source: Maintenance Manual of Roads, 1984, Page 70 & 71

For the watch and ward of stores on the roads, services of beldars from permanent gang or chowkidars are allowed leave, regular beldars should be deputed in their places. As per E-in C letter no. 5433/WC/WC dt. 5-8-1980 same number of beldars on daily wages should be employed for the period for which regular beldars from the gang work as chowkidars so that the maintenance work doe not suffer. Page 80: Maintenance Gangs: these have to be very busy during the rains in clearing slips and keeping the road open to communications. The slips have to be cleared with the least possible delay and temporary walling provided in case of damage to the retaining walls. An efficient system of patrolling should be adopted otherwise the Junior Engineer would hardly know of the road blockade in his charge in the time with the result that the traffic will be held up. Causes of slips: - The causes of slips should be investigated. In most of the cases it is due to underlying bearing starta consisting of shale, sand stone, soap stone or clay getting lubricated by the seepage water. In such cases catch water drains must be provided immediately above the cracks. The cracks or fissures should be filled in with clay. Strength of gang: - Generally the strength of the gang is increased during the rains to attend to emergent works but there are times when there are no slips to be cleared. This is the time when improvements can be effected by just supplementing the gang strength by one or two masons if necessary. Maintenance gangs (a) Strength and beat: - The strength of gangs as fixed vide C.Es letter No. 19216C/120C/74 dated 31.8.1974 should be 9/16 beldar per km. and the beat is to be kept 16 km. Programme for repairs: - The Junior Engineer should prepare a programme for the season and get it approved by the Assistant Engineer. It should be entered in the gang book and the Junior Engineer should see that the approved programme is stuck to.

(b)

August 2007

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

(c)

Working of gangs: - A lot of improvement can be done if the gangs are trained in the maintenance work and kept carefully employed. The road should be patrolled every day by a reliable beldar and the rest of the gang should work on one place. The gang should not be split up unless it is essential to do so. Checking of gang work: - The work of the gang should be checked as often as possible by the Assistant Engineer and Executive Engineer. For detailed instructions regarding gang work appendix 49 may be referred.

(d)

Part II - Maintenance: Details of Gang Labour: This is intended to show in detail how the monthly cost of the various types of gangs is arrived at. It may cover the whole of a district or the whole of a division as may be considered best. By describing each type of gang by a distinguished letter, repletion in the detailed estimates latter is avoided. This should also include temporary gang required for rainy season, as a separate item. Part II Maintenance: Miscellaneous stores: This will include such items as the renewal of km. and hectometer stones and repair to pucca drains or any other such works not peculiar to the metalled surface. Circular No 3, dated 12.01.1989, stated that the standard decided for labours for maintenance of roads of different types are as follows:
Sl. No. 1. 2. 3. 4. 5. 6. 7. Type of Roads 7m or above widen road- B.M. & S.D.C. / mix has been sealed Painted road 3-7m widen painted road 3-7m widen water bound road Non surfaced hill roads Hill Horse roads Non surface (earthen ) single roads Mate / km 1/20 1/20 1/20 1/15 1/15 1/20 1/20 Beldar / km 5/20 7/20 7/20 8/16 8/16 5/20 9/20 For 9 months in a year only The soling is on which road will be known as un-paved. Remarks

It has been observed that the number of workers and labours who are working on daily basis are more than the requirement of Department. As a result major parts of the grants received for maintenance and repair are being spent on payment of their salaries. So it is ordered that to make a list of workers appointed before 1988 and avail it to office of Executive Engineers for utilizing them in new roads project and contingencies. The practice for appointing mate, peon, Munshi and Executive agent etc on daily basis by Sr. Engineers is here by stopped and these orders are become in force immediately. Beldars and mates are fourth class field staff for maintenance of roads. Recruitment is totally stopped from 1.1.1990.

August 2007

ii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3
Mate / k.m 1/20 1/20 1/20 1/15 1/20 Beldar / k.m 5/20 7/20 7/20 8/16 9/20

Types Double Lane (B.M/S.D.C) Double Lane (Painted) Single Lane (Painted) Single Lane W.B.M Single Lane Earthen

Maintenance Manual of Roads, 1984 APPENDIX 49

Circular No. 5 PW.

Dated: Lucknow June 15, 1944 Road Gang Order book

It is one of the most important duties of the subordinates to see the road gangs do work to the extent they are paid. 2. Monthly programme :- To ensure this the subordinate should write in the gang book, task for the whole month a little in excess of the wages earned by the gang. Gang should be made to go over the whole of his beat every month, devoting more time to bad miles but not neglecting the new miles. Ordinarily a gang should not be told to use more than 500-700 eift of metal each month otherwise the metal is likely to be wanted. Dates of visits: - Dates of visit will vary in different season and in hills and plains. Supposing that the subordinate visits the road on 10th ,20th and30th on every month, taks should given as in the attached sample sheet, i.e. for 10 days at a time i.e. till his next visit. Tasks between visits: - When the subordinate comes on the 30th he should tell the mate what to do from 1-10. When he comes on 10th he checks what the mate has actually done and how for he has obeyed order. Further the subordinate should tell the mate what to do between 11th and his next visit on the20th as per entries in the order book and so on. It is found that if a gang is set a definite taks for 10 days or so, the out turn is very much better both in quality and quantity than when such taks are not set. A systematic constant gentle pressure on the gang will produce good result. Namunas: - On every visit the subordinate must get a certain amount of work done in his presence and it will be found that gangs will do better quality of work. The Namunas given should be noted in the order book, as shown in the sample sheet. Value of work done to be noted: - At the end of the month the total Value of work done should be measured up as usual and noted in the order book as soon on the sample sheet. If a gangs work is minus, he should be fined but if it is continuously plus be should be rewarded. A regular system of punishment and reward will improve the efficiency of the gang.

3.

4.

5.

6.

August 2007

iii

Technical Assistance for Implementation of Institutional Reforms in Road Sector of Uttar Pradesh

Report No. 3

7.

Assistant Engineers to watch quality of gang work :- The Assistant Engineer should fix the rate for each type of work in each season. The actual rate in each month will depend on the nearness of P.R. Metal and water from the situation of the patch work. He should make a point to see and sign road gang books, issue orders for repair as may be required and get namunas made for the benefit of subordinate. Plenty of P.R. When they come on the road, Assistant Engineer should see that bad miles with potholes have P.R. Metal. Otherwise he should arrange for it and not delay repairs for want of P.R. Metal.

8.