BILLS OF QUANTITIES

PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

1.0

Packaged Air Cooled Rotary Screw Water Chillers Supply, Installation and setting to work including all required field wiring in rigid metal conduit from Chiller panel to local isolators, condenser anti corrosion coatings, spring vibration isolators, electrical isolators temperature controllers, testing and commissioning etc. as per equipment schedule Refrigerant : R- HFC 134 A ACWC-01 capacity 00 ton / 00 GPM ACWC-02 capacity 00 ton /00 GPM (STD BY) Chilled Water AHU Supply, Installation and setting to work including all required field wiring in rigid metal conduit from AHU panel to local isolators, condenser anti corrosion coatings, spring vibration isolators, electrical isolators temperature controllers, testing and commissioning etc. Complete (modulating 3 way valve temperature controls) as per equipment schedule AHU-1 capacity 25 ton AHU-2 capacity 30 ton Chilled Water Pump Set Supply, installation and setting to work including all required field wiring, galvanized rigid metal conduit from Pump panel to local isolator & from Pump to Pump panel, electrical isolator, pump control panel, controls, spring type vibration isolators testing and commissioning etc., as per equipment schedule No. No. -

1.1 1.2 2.0

No. No.

2.1 2.2 3.0

3.1 3.2

CWPP-01 to 00 capacity 00 GPM @ 00 meter head (00 duty + 01 std by) CWSP-01 to 00 capacity 00 GPM @ 00 meter head (00 duty + 01 std by)

No. No.

To Bill Summary 09/24/2010 40655422.xlsHVAC Page 1of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

4.0

Roof Top Package Units: Supply, lift into position, install, test, set to work, and commission weatherproof Package Units, Units shall be complete with internal & external. Anti vibration mounts, and a spare set of filters shall be installed after commissioning. Installation shall include all required field wiring, power wiring from an adjacent disconnect switch (supplied and installed by others), weatherproof cables, galvanized rigid metal conduits, condensate drain, complete. operating at 380/3/60 Hz power supply including thermostat and as specified in the equipment schedule. Package unit time delay to be adjusted by the contractor.

4.1 4.2 4.3 4.4 4.5 5.0

Capacity Capacity Capacity Capacity Capacity

30 25 20 15 10

ton ton ton ton ton

/ / / / /

12000 CFM 10000 CFM 8000 CFM 6000 CFM 4000 CFM

No. No. No. No. No.

820,000.00 73,000.00 60,000.00 45,500.00 30,000.00

DX Type Air Conditioning Unit Supply, lift into position, install, test, set to work, and commission DX type (mini-split A/C unit & ducted-split A/C unit) complete with thermostat with ACU outside, Installation shall include all required field control wiring, power wiring from an adjacent disconnect switch (supplied and installed by others), weatherproof cables, galvanized rigid metal conduits, refrigerant pipes and insulation, support for ACCU, etc, complete to set to work (as specified in the drawing). Out door refrigerant pipe shall have canvas with two coats of foster paint and supported by cable trays. All units to be suitable for externally locating and Nominal capacities indicated.

5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6

Ducted Split Air Conditioning Unit Capacity 5 ton Capacity 4 ton Capacity 3 ton Capacity 2.5 ton Capacity 2.0 ton Capacity 1.5 ton

No. No. No. No. No. No.

22,500.00 18,600.00 14,500.00 12,000.00 9,500.00 7,300.00

09/24/2010

40655422.xlsHVAC

Page 2of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

To Bill Summary

5.2 Ducted Split Air Conditioning Unit 5.2.1 Capacity 2.0 ton 5.2.2 Capacity 1.5 ton 5.3 Window AC 5.3.1 1.5 Tons 6.0 Extract Air Fans Supply, lift into position, install, test, set to work and commission Extract Air Fans. The Fan Units shall have Anti-back draught shutters & internal Anti vibration mounts. Installation shall include all required power wiring from an adjacent disconnect switch weatherproof cables, galvanized rigid metal conduits, etc., complete. All fans are centrifugal and roof mounted and wall fans are wall mounted.

No. No. No. No. No.

6,000.00 5,000.00

3,500.00

6.1 6.2 6.3 7.0

EF-01 capacity 00 CFM @ 00" static (Roof top) EF-02 capacity 00 CFM @ 00" static (Inline) EF-03 capacity 100 CFM (wall mounted) Air curtains Supply, lift into position, install, test, set to work and commission air curtains operating at 230/1/60 Hz power supply, capacity 00 CFM as per equipment schedule, from Mars or equal manufacturer

No. No. No.

No.

8.0 8.1

Duct Works Supply, installation and setting to work ductwork as per SMACNA Standards including full sealing of all joints, Rectangular volume control dampers, galvanized hangers and supports, leak testing, air balancing and testing and commissioning etc., complete For Air Conditioned Air & Exhaust air. m2 m2 m m
2 2

8.1.1 20 GAUGE 8.1.2 22 GAUGE 8.1.3 24 GAUGE 8.1.4 26 GAUGE 8.2 Supply and installation Aluminum cladding 0.6 mm thickness to exposed supply & return ducts including full sealing of all joints

185.00 160.00 145.00 140.00 125

m2

09/24/2010

40655422.xlsHVAC

Page 3of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

To Bill Summary

09/24/2010

40655422.xlsHVAC

Page 4of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y m2

8.3

Supply and installation Supply and installation Acoustic lining fiber glass 25mm thick to supply and return duct up to 5 meter length and of density 24 kg / m3 from AFICO or equal Supply and installation Fiber glass Insulation 50mm thick 48 kg / m3 density from AFICO or equal to exposed supply & return ducts Supply and installation Fiber glass Insulation 25mm thick 24 kg / m3 density from AFICO or equal to indoor supply & return duct Supply, installation and setting to work Flexible duct1.2m long as per SMACNA Standards including full sealing of all joints, Round volume control dampers, galvanized hangers and supports, leak testing, air balancing and testing and commissioning etc., complete For Air Conditioned Air & Exhaust air. as per drawings. from SAFID or equal manufacturer

50

8.4

m2

65

8.5

m2

40

8.6

8.6.1 250 mm (10 Inch) diameter 8.6.2 200 mm (8 Inch) diameter 8.6.3 150 mm (6 Inch) diameter 9.0 9.1 Air Distributing Equipment Supply and install Supply air Ceiling Diffuser SCD with internally insulated plenum boxes as per drawings. from GGC or equal 600 450 300 225 150 x x x x x 600 450 300 225 150 mm mm mm mm mm (24 x 24) Inch (18 x 18) Inch (12 x 12) Inch (9 x 9) Inch (6 x 6) Inch

No. No. No.

135 125 115

9.1.1 9.1.2 9.1.3 9.1.4 9.1.5 9.2

No. No. No. No. No.

650 500 350 300 250

Supply and install Return air Ceiling Diffuser RCD, with internally insulated plenum boxes unless it is not connected to return duct, as per drawings. from GGC or equal 600 450 300 225 150 x x x x x 600 450 300 225 150 mm mm mm mm mm (24 x 24) Inch (18 x 18) Inch (12 x 12) Inch (9 x 9) Inch (6 x 6) Inch No. No. No. No. No. 450 350 225 175 150 -

9.2.1 9.2.2 9.2.3 9.2.4 9.2.5

To Bill Summary 09/24/2010 40655422.xlsHVAC Page 5of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

09/24/2010

40655422.xlsHVAC

Page 6of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

9.3

Supply and install Exhaust air Ceiling Diffusers ECD with plenum boxes internally insulated, as per drawings. from GGC or equal No. No. 275 210 -

9.3.1 225 x 225 mm (9 x 9) Inch 9.3.2 150 x 150 mm (6 x 6) Inch 9.4 Supply and install Supply Linear Slot Diffusers LSD including plenum boxes with internally insulation, as per drawings. from GGC or equal

9.4.1 2 slot x 1 m 9.4.2 3 slot x 1 m 9.5 Supply and install Linear Bar air Supply Grill LBSG including plenum boxes with internally insulation as per drawings. from GGC or equal

No. No.

9.5.1 1000 x 150 mm 9.5.2 1500 x 200 mm 9.6 Supply and install Return Linear Slot Diffusers RLSD including plenum boxes with internally insulation unless it is not connected to a return duct, as per drawings. from GGC or equal

No. No.

9.6.1 2 slot x 1 m 9.6.2 3 slot x 1 m 9.7 Supply and install Linear Bar air Return Grill LBRG including plenum boxes with internally insulation unless it is not connected to a return duct, as per drawings. from GGC or equal

No. No.

9.7.1 1000 x 150 mm 9.7.2 1500 x 200 mm 9.8 Supply and install Intake air Sand Trap Louver STL as per drawings. from GGC or equal

No. No.

9.8.1 2000 x 600 mm 9.8 Supply and install Exhaust air Sand Trap Louver ESTL as per drawings. from GGC or equal

No.

9.8.1 2000 x 600 mm

No.

To Bill Summary

09/24/2010

40655422.xlsHVAC

Page 7of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

09/24/2010

40655422.xlsHVAC

Page 8of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

10.0 Chilled Water Pipe works 10.1 Supply, installation and setting to work chilled water pipes and fittings including galvanized hangers and supports, vibration isolators, expansion joints, thrust block, pressure testing, system testing and commissioning all necessary accessories to finalize work 10.1.1 10.1.2 10.1.3 10.1.4 10.1.5 10.1.6 10.1.7 10.1.8 10.1.9 10.1.1 0 10.1.1 1 300 mm (12 Inch) dia. black steel sch. 40 ERW 250 mm (10 Inch) dia. black steel sch. 40 ERW 200 mm (8 Inch) dia. black steel sch. 40 ERW 150 mm (6 Inch) dia. black steel sch. 40 ERW 100 mm (4 Inch) dia. black steel sch. 40 ERW 75 mm (3 Inch) dia. black steel sch. 40 ERW 65 mm (2 Inch) dia. black steel sch. 40 ERW 50 mm (2 Inch) dia. black steel sch. 40 ERW 40 mm (1 Inch) dia. black steel sch. 40 ERW 32 mm (1 Inch) dia. black steel sch. 40 ERW 25 mm (1 Inch) dia. black steel sch. 40 ERW m m m m m m m m m m m -

10.2 Supply, installation and setting to work exposed chilled water pipes and fittings including galvanized hangers and supports, vibration isolators, expansion joints, thrust block, pressure testing, system testing and commissioning and all necessary accessories to finalize work 10.2.1 10.2.2 10.2.3 10.2.4 10.2.5 10.2.6 10.2.7 10.2.8 10.2.9 10.2.1 0 10.2.1 1 300 mm (12 Inch) dia. black steel sch. 40 ERW 250 mm (10 Inch) dia. black steel sch. 40 ERW 200 mm (8 Inch) dia. black steel sch. 40 ERW 150 mm (6 Inch) dia. black steel sch. 40 ERW 100 mm (4 Inch) dia. black steel sch. 40 ERW 75 mm (3 Inch) dia. black steel sch. 40 ERW 65 mm (2 Inch) dia. black steel sch. 40 ERW 50 mm (2 Inch) dia. black steel sch. 40 ERW 40 mm (1 Inch) dia. black steel sch. 40 ERW 32 mm (1 Inch) dia. black steel sch. 40 ERW 25 mm (1 Inch) dia. black steel sch. 40 ERW m m m m m m m m m m m -

To Bill Summary

09/24/2010

40655422.xlsHVAC

Page 9of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

09/24/2010

40655422.xlsHVAC

Page 10of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

Supply and install Thermal insulation to chilled water pipework. minimum density 64 kg/m3 preformed rigid fiber glass Thermal Insulation with 10.3 factory applied foil reinforced Kraft laminate facing & 0.6 mm thick aluminium cladding for the external pipes 10.3.1 300 mm (12 Inch) dia. black steel sch. 40 ERW 10.3.2 250 mm (10 Inch) dia. black steel sch. 40 ERW 10.3.3 200 mm (8 Inch) dia. black steel sch. 40 ERW 10.3.4 150 mm (6 Inch) dia. black steel sch. 40 ERW 10.3.5 100 mm (4 Inch) dia. black steel sch. 40 ERW 10.3.6 75 mm (3 Inch) dia. black steel sch. 40 ERW 10.3.7 65 mm (2 Inch) dia. black steel sch. 40 ERW 10.3.8 50 mm (2 Inch) dia. black steel sch. 40 ERW 10.3.9 40 mm (1 Inch) dia. black steel sch. 40 ERW 10.3.10 32 mm (1 Inch) dia. black steel sch. 40 ERW 11.0 Chilled Water Valves and Accessories 11.1 Supply, install, set to work and commission all necessary sundries, supports, etc., complete 11.2 Supply, install, set to work and commission chemical dosing pot assembly (00 litres) including 1" dia. ball valves for filling, inlet line, outlet line, and drain. Filling funnel with cap, automatic air vent with cock, and all other accessories needed to finalise the work as per drawings. From METITO or equal m m m m m m m m m m -

Item

Item

11.3 Air Separator including gate valves for inlet, outlet and by-pass, automatic air vent with cock, drain valve, and othe accessories needed to finalise the work as per drawings. From TACO or equal 11.3.1 250 mm dia inlet/outlet connection 11.3.2 Expansion tank 00 liters, bladder type similar or equal to TACO 11.4 Valves and Pipeline Ancillaries 11.4.1 Supply, install, set to work and commission all valves and pipeline ancillaries etc. complete. From Nibco/Crane/Bell & Gossette 11.5 32 mm dia. water supply isolation valve for make-up water 11.6 25 mm dia. Isolating gate valves - for dosing pot 11.7 15 mm dia. drain valve for dosing pot No. No. -

Item

No. No. No.

To Bill Summary 09/24/2010 40655422.xlsHVAC Page 11of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

09/24/2010

40655422.xlsHVAC

Page 12of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y No. No. No. No. No. No. No. No.

11.8 11.9 11.10 11.11 11.12 11.13 11.14 11.15

25 mm dia. drain valve 100 mm dia. check valves 100 mm dia. butterfly valve 50 mm dia. pressure relief valve 150 mm dia. facia pressure gauge & gauge ports 100 mm dia. pipeline Y - Strainer 15 mm dia. Automatic air vent 100 mm dia. flexible connectors for the pump (to be pump connection size) Chilled water pump valves and accessories 15 mm dia. drain valve 150 mm dia. triple duty valve 50 mm dia. pressure relief valve 150 mm dia. butterfly valve 100 mm dia. check valves 150 mm dia. Y-Strainer 150 mm dia. fascia pressure gauge 100 mm dia. flexible connectors for the pump (to be pump connection size)

12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8

No. No. No. No. No. No. No. No.

13.0 Flushing and Water Treatment Chemicals Supply, installation and setting to work including all necessary sundries, water requirement and proper waste water disposal, laboratory test, etc., complete. From Metito or equal 14.0 Supply, installation, test and setting to work condensate drain piping of AC machines connected to nearest drain point with fittings and accessories completely AA Mechanical Identification: Supply and install approved services identification tags, markings and flow direction arrows. Civil Works Provide for associated civil works required for the Mechanical Services Installation as described and listed in this B of Q and as shown on the drawings. The works shall include the formation of all holes for the services to pass through etc., and the sealing of the holes once the services have been installed. Provide structural supports / framing for the WU, EU & ACU, EF at height such as to allow for the installation of P- trap for condensate drain lines.

Item

item

item

BB

job

To Bill Summary 09/24/2010 40655422.xlsHVAC Page 13of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

BILL SUMMARY 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 1 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 2 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 3 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 4 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 5 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 6 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 7 of 8 00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 8 of 8

09/24/2010

40655422.xlsHVAC

Page 14of15

BILLS OF QUANTITIES
PROJECT NAME LOCATION BUILDIONG NAME SAK ENGINEERING CONSULTANTS Bill No. - 00 (Rev. 0) DIVISION - 15 - Mech. Works (HVAC) Unit Price SR Amount SR

Ref.

DESCRIPTION

Quantit Unit y

To General Summary

09/24/2010

40655422.xlsHVAC

Page 15of15