0% found this document useful (0 votes)
125 views8 pages

Okoporo/Ubaleme Pipeline Engineering Design Project Relief Load Summary & Calculation

This document provides a relief load summary and calculations for an oil pipeline engineering project in Nigeria. It describes the project which involves designing flowlines to transport crude oil from wells to a flow station. The objective is to calculate the required sizes of pressure safety valves to relieve overpressure along the pipeline system. References listed at the end include industry standards for pressure relief device sizing and pipeline engineering. An index lists the pressure safety valves required with their identification numbers and selected orifice sizes.

Uploaded by

Ebby Onyekwe
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views8 pages

Okoporo/Ubaleme Pipeline Engineering Design Project Relief Load Summary & Calculation

This document provides a relief load summary and calculations for an oil pipeline engineering project in Nigeria. It describes the project which involves designing flowlines to transport crude oil from wells to a flow station. The objective is to calculate the required sizes of pressure safety valves to relieve overpressure along the pipeline system. References listed at the end include industry standards for pressure relief device sizing and pipeline engineering. An index lists the pressure safety valves required with their identification numbers and selected orifice sizes.

Uploaded by

Ebby Onyekwe
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Seplat Petroleum Development Company

Security Classification: Restricted

OKU-IES-XXXXXX

OKOPORO/UBALEME PIPELINE ENGINEERING DESIGN PROJECT RELIEF LOAD SUMMARY & CALCULATION
JUNE, 2013

Rev

Date

Description

Issued by

Checked by

Approved by

R01

26-06-13

Issued for IDC

E.Onyekwe

F.Taylor

M.Omotoso

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 2 of 8

ADDITIONAL APPROVAL / REVISION HISTORY TABLE


Party Name Sign Date

Revision Philosophy All draft documents for review will be issued at R01, with subsequent R02, R03, etc as required. All revisions approved for issue / implementation will be issued at A01, with subsequent A02, A03, etc as required. All revisions approved for design will be issued at D01, with subsequent D02, D03, etc as required. Documents approved for Construction will be issued at C01, C02, and C03 respectively. Documents or drawings revised as As built will be issued as Z01, Z02 Z03 etc. Narrative sections revised from previous approved issues are to be noted in the table below and/or highlighted in the RH margin (using the appropriate revision status) thus: | A02 Previous revision highlighting to be removed at subsequent issues. Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected areas and by the use of a triangle containing the revision status.

Revision History Revision No. Date of issue Reason for change

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 2 of 8

Relief Load Summary & Calculation

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 3 of 8

TABLE OF CONTENTS

1.0 ABBREVIATIONS/DEFINITIONS...........................................................................5 2.0 INTRODUCTION....................................................................................................6 2.1 Project Description........................................................................................6 2.2 Objective........................................................................................................6 3.0 REFERENCES ......................................................................................................7

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 3 of 8

Relief Load Summary & Calculation

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 4 of 8

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 4 of 8

Relief Load Summary & Calculation

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 5 of 8

1.0 ABBREVIATIONS/DEFINITIONS
API API STD API RP BARG BOPD P&ID PSV American Petroleum Institute American Petroleum Institute Standard American Petroleum Institute Recommended Practice Bar Gauge Barrel of Oil Per Day Piping & Instrumentation Diagram Pressure Safety Valve

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 5 of 8

Relief Load Summary & Calculation

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 6 of 8

2.0 INTRODUCTION
2.1 Project Description
This project involves the engineering design of flowlines needed to transport crude from the Ubaleme and Okoporo wells to Sapele-West flowstation. The project is phased in two (2) parts, the first of which involves routing the Okoporo dual completed wells (CQFF 1S & 1L) to run straight into the flowstation at Sapele-West. The second phase of the project involves re-routing the flowlines of the dual completed well (CQFF 1S & 1L) via a new manifold system at Okoporo to Sapele-West Flowstation. It also involves the installation of flowlines from other newly proposed wells at Okoporo into the new manifold system. The bulklines from the new manifold system is to handle 6000 BOPD. The flowline from the Ubaleme wells (ODP 2, ODP 3, ODP, 4, ODP 5) is to be designed to run straight to the Sapele-West flowstation. The new manifold is rated for 1500# with 4 headers and 6 ligaments and is manifold is to be connected to the two lines initially conveying crude from the dual completed well via rerouting, and then both lines would convey commingled crude from the new manifold at Okoporo to the existing Flowstation at Sapele-West.alongsides the newly proposed flowlines at Okoporo.

2.2

Objective

The purpose of this document is to provide the pressure safety valves relief load calculations for Okoporo-Ubaleme Pipeline Engineering project. Relieving rates which are presented in this calculation note result from various causes of overpressure. Calculations are based on equations in API RP 520 part1 and API STD 521. Also PSV orifices have been selected in accordance with API Standard 526. The following index is PSV list which shows the relevant P&ID numbers and the calculated PSV sizes. However, the orifice size shall be confirmed later by PSV vendor.

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 6 of 8

Relief Load Summary & Calculation

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 7 of 8

3.0 REFERENCES
DOCUMENT OKU-IES-OKOUB-G04-00005-001 OKU-IES-OKOUB-G04-00005-002 OKU-IES-OKOUB-G04-00005-003 OKU-IES-OKOUB-G04-00006-001 OKU-IES-OKOUB-G04-00006-002 OKU-IES-OKOUB-G04-00006-003 TITLE PIPING & INSTRUMENTATION DIAGRAM PIG LAUNCHER (HP HEADER) PIPING & INSTRUMENTATION DIAGRAM PIG LAUNCHER (LP HEADER) PIPING & INSTRUMENTATION DIAGRAM PIG LAUNCHER (TEST HEADER) PIPING & INSTRUMENTATION DIAGRAM PIG RECEIVER (HP HEADER) PIPING & INSTRUMENTATION DIAGRAM PIG RECEIVER (LP HEADER) PIPING & INSTRUMENTATION DIAGRAM PIG RECEIVER (TEST HEADER) SIZING, SELECTION AND INSTALLATION OF PRESSURE-RELIEVING DEVICES IN REFINERIES GUIDE FOR PRESSURE-RELIEVING AND DEPRESSURING SYSTEMS FLANGED STEEL PRESSURE RELIEF VALVE

API RP 520, Part I API STD 521 API STD 526

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 7 of 8

Relief Load Summary & Calculation

Document No. Document Title

Document No Relief Load Summary & Calculation

Rev. Page

R01 8 of 8

No 1 2 3 4 5 6

Tag PSV-001 PSV-002 PSV-003 PSV-004 PSV-005 PSV-006

Quantity 1 1 1 1 1 1

P&ID Number OKU-IES-OKOUB-G04-00005-001 OKU-IES-OKOUB-G04-00005-002 OKU-IES-OKOUB-G04-00005-003 OKU-IES-OKOUB-G04-00006-001 OKU-IES-OKOUB-G04-00006-002 OKU-IES-OKOUB-G04-00006-003

RV Size & Orifice Type 1.5 D 2 1.5 D 2 1.5 D 2 1.5 D 2 1.5 D 2 1.5 D 2

{Doc Number} Security Classification: Restricted This Document is Controlled Electronically and Uncontrolled if Printed Page 8 of 8

Relief Load Summary & Calculation

You might also like