Recommendations (113 in 15 key areas) of the Expert Group are really a call to action. It is time to act and implement these recommendations now.
Shri M.S.Verma,
Member
Shri G. Raghuram,
Member
Table of Contents
S. NO. Contents 1. 2. 3. 4. 6. Introduction .................................................................................................. Methodology ............................................................................................... Strategy ...................................................................................................... Recommendations ...................................................................................... 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 Track & Bridges .......................................................................... Signaling .................................................................................... Rolling-stock ............................................................................... Stations & Terminals .................................................................. PPP Initiatives ............................................................................ Land & Airspace ......................................................................... Dedicated Freight Corridors (DFCs) ........................................... High Speed Passenger Train Corridors....................................... Review of Projects ...................................................................... Information and Communication Technology (ICT) ..................... Indigenous Development ............................................................ Safety .......................................................................................... Funding ....................................................................................... Human Resource ........................................................................ Organization ............................................................................... Pages 1 2 2 4 4 5 5 6 6 7 7 8 8 9 10 10 11 14 14 17 19 21
7. 8.
Methodology
The Expert Group first met with the Honble Railway Minister Mr. Dinesh Trivedi and the Railway Board to understand the current status, objectives, challenges and opportunities. The Group also reviewed the Indian Railways Vision 2020 document as well as previous reports and recommendations on Railway reform including the Prakash Tandon Committee Report (1994) and the Rakesh Mohan Committee Report (2001) etc. This was followed by a review of the financial status and opportunities of the railways with the Finance Commissioner and other Board Members. The Group also had detailed discussions with Advisers, Domain Experts, individually and collectively, as well as interactions with the Safety Committee, Industry leaders, labour leaders, representatives of the Planning Commission and other stakeholders. Based on many discussions, perception, priorities and programs, 11 Working Groups consisting of domain experts from Railways were organized to analyze specific verticals. This was followed by the review and discussion of presentations submitted by the Working Groups to integrate into the overall modernization plan. Based on the five-pronged strategy 15 focus areas were identified and selected as illustrated in Exhibit 1 to drive Modernization:
Core Assets
Signaling
Rolling Stock
(Terms of Reference and composition of the 11 Working Groups is provided in Annexure II and the detailed whitepapers and presentations of the Working Groups are compiled in Vol. II of the report hereof)
Revenue Models
PPPs
Land
Strategy
To recommend ways and means to modernize Indian Railways the Group focused on two fundamental drivers SAFETY and GROWTH and a five-pronged strategy: a) Modernize Core Assets: There is an urgent need to modernize the key revenue generating assets of the railways such as tracks and bridges, signaling, rolling stock and stations and terminals. b) Explore New Revenue Models: To meet the funding needs for modernization and growth it is important to look at opportunities related to PPPs, land and airspace utilization, dedicated freight corridors, and high speed trains. c) Review Projects: To ensure financial viability, social benefits and timely implementation it is imperative to review and assess capital projects sanctioned and work-in-process and suggest necessary priorities and appropriate actions. d) Focus on Enablers: For a holistic and long term approach to modernization and execution there is a need to focus on key enablers such as ICT, indigenous development and safety. e) Mobilize resources: For railways to capitalize on this timely opportunity it is important to mobilize substantial additional funding, strengthen human resources and revamp organizational structures.
Projects
Enablers
ICT
Indigenous Development
Safety
Resources
Funding
Human Resource
15.0 Organization
Recommendations
To modernize Indian Railways, we submit the following 15 sets of recommendations:
2.0 Signaling
2.1 2.2 2.3 2.4 2.5 Implement Automatic Block Signaling on A and B routes with Train Management System Provide communication based train control like Moving Block System on C class routes of Central and Western Railways Deploy on-board train protection system with cab signaling on A & B routes Introduce GSM-based mobile train control communication systems on A, B & C routes Establish Centralized Maintenance Control Centers
1.0
1.2
This would substantially improve the safety of workers and passengers as well as generate a 30% increase in capacity and associated revenue potential. The cost is estimated as Rs. 25,000 crores and should be completed within 5 years.
3.0 Rolling-stock
Modernize Rolling stocks with investments in the following: 3.1 New generation locomotives: 3.2 3.3 3.4 3.5 3.6 3.7 3.8 Electric locomotives (9,000 & 12,000 HP) High horse power diesel locomotives (5,500 HP)
Traction development for improvement in fuel efficiency, emission & reliability High speed potential LHB coaches (160/200 kmph) Upgraded suburban coaches Train sets for high speed inter-city travel Modern high pay to tare ratio wagons Green toilets on all passenger trains Heavy haul freight bogies
1.3
1.4
We feel that these measures will increase throughput capacity of freight trains by 10% as well as increase the net revenue per freight train by 30%. This would also enhance the life of rails from 525 GMT to 800 GMT and ensure strong and robust track for heavier freight trains at higher speeds. The cost of the above mentioned initiatives is estimated as Rs. 33,046 crores and should be completed in 5 years.
These investments would substantially increase revenue potential and improve safety, efficiency and passenger comfort. The above efforts will also lead to capacity enhancement, enhanced asset utilization and increased productivity. The cost of the above mentioned initiatives is estimated at Rs. 72,571 crores (refer Annexure IV for detailed break up of each item) and should be completed within 5 years.
above mentioned initiatives excluding stations & terminals and Dedicated Freight Corridors is estimated as Rs. 97,000 crores (refer Annexure V for detailed break up of each item). This cost estimate does not include costs of stations redevelopment, logistics parks and dedicated freight corridors.
The above efforts would lead to substantial revenue generation, improved management & customer services as well additional traffic due to new logistic parks & modern terminals. The estimated funding requirements would be approximately Rs. 1,10,000 crores for redeveloping the proposed 100 stations (estimated as Rs. 2,000 crores per station for the top 30 stations; Rs. 1,000 crores per station for the next 30 stations and Rs. 500 crores per station for the remaining 40 stations) and Rs. 17,000 crores for development of 34 multi-modal logistics parks and modernization of existing freight terminals. The time period for completion should be 5 years.
6.7
This would generate additional resources, lead to efficient utilization of land and airspace as well as ensure speedy development, growth and improved customer service. Monetization of surplus land and airspace could mobilize Rs 50,000 crores for IR. (at a conservative estimate of Rs 5 crores per acre for 10,000 acres of surplus land which has been identified in urban centres for commercialization). A part of this can be received as an upfront payment and the rest through periodic lease revenues.
5.11 Merchandizing The above initiatives should provide significant additional resource mobilization, lead to speedy growth and augmentation of railway capabilities and improve collaboration and efficiency. The total cost of the
These initiatives would lead to segregation of freight and passenger traffic on trunk routes, improvements in service delivery, and generate additional freight carrying capacity of about 2,400 million tonnes through Eastern & Western DFC. It would also ensure higher average speeds of freight trains (expected to increase to a level of 60 kmph from the current average of 25 kmph).
The total cost of this is estimated at Rs. 2,04,000 crores for all the corridors. The proposed timeframe is 5 years for Eastern & Western DFC and 10 years for North-South, East-West, East-Coast and Southern Dedicated Freight Corridors.
9.6 9.7
Provide the first and last mile connectivity by creating appropriate policy framework. Identify and commission in a mini mission mode bypasses at junction stations and rail flyovers for grade separation.
The above initiatives would lead to increased access in remote areas, additional effective broad gauge rail trackage of nearly 24,000 track kms in 5 years and additional electrified tracks of 7500 RKM. The cost estimate is Rs. 53,827 crores for priority projects (refer Annexure VI for breakup of investments) and Rs. 1,00,000 crores for construction of new lines. The proposed timeframe is 5 years. (Both of these estimates are not included in the total estimates for modernization and need to be completely provided for under the 12th FYP.).
This would lead to increased connectivity, traffic and faster intercity travel. The cost of the high speed line between Ahmedabad & Mumbai is estimated as Rs. 60,000 crores. This cost has also been included under the PPP initiatives. The proposed timeframe is 10 years.
10.7 Use ICT to modernize Organization, Management, Development, Finance, Project Management, Research, Procurement, Payment etc. 10.8 10.9 Introduce e-file to computerize Railway files and expedite decision making Introduce Mobile ticketing & commerce for a variety of Railway applications
Sanction Project for-rail tracks: 15 new line/doubling projects covering a length 3,092 km (not sanctioned) Implement Electrification of 7,500 RKM in the next five years. Add 10,000 km of new lines in the next 5 years: These new lines are to largely achieve social inclusion and would not be remunerative. Provide funds for non-viable projects being implemented purely for social inclusion through a special fund set up by GOI for this purpose. Reimburse O&M deficit determined through transparent accounting and agreed to by the regulator.
10.10 Upgrade & Integrate Railway websites and use social media creatively for customer feedback, consumer education and social messages This would lead to improvement in wagon utilization and availability by 10%; efficient tracking of trains, locomotives and cargo; enhancement of communication services (voice, data & video services) and improvement in quality of passenger services. Further, it would provide across the board benefits to both customers and railways. Customers will benefit from improved on board information, station security, safety, services and facilities while railways will benefit from resource mobilization using innovative business models and safety and security of its passengers and assets. The total cost of these initiatives is estimated as Rs. 1,315 crores (refer Annexure VII for details) and should be completed in 1 to 4 years.
12.8 12.9
Upgrade disaster management facilities & related Services Upgrade Network Management Centers
12.10 Use Social networks/cameras/Videos and other new tools and technologies extensively for safety & Security The benefits of these measures would be enhanced safety and security for passengers and railway workers. Total cost of the above initiatives is estimated as Rs. 39,836 crores (refer Annexure IX for details). However this cost is not included in the total estimates for modernization since a separate committee on Safety has been set up by the IR under Dr. Kakodkar.
Establish Indian Institute of Railway Research with Centers of Excellence in: Safety Wagon prototyping Mechatronics Green toilets, etc
13.0 Funding
13.1 Mobilize total investment requirements of Rs. 5,60,396 crores for the proposed modernization initiatives.
Upgrade existing railway R&D facilities Strengthen RDSO to build local capabilities Upgrade indigenous manufacturing (foundry facilities for higher axle load bogies) Develop Indian Standards, critical vendors and protocols for Railways Enhance University Interface with Railway Laboratories in Academic Institutions
Railway sub-group of XIIth five year plan has estimated additional requirement of Rs. 4,42,744 crores for various other investments proposed to be undertaken during the 12th FYP and not covered under modernization initiatives. Table 2 below provides a summary of the total investment requirements (both for modernization and as recommended by the XIIth plan sub-group on Railways): 13.2 Outline an investment of Rs 8,39,000 crores, during the XIIth FYP, which includes Rs 3,96,000 crores of modernization plan investment recommended by us. It is a quantum jump from investment levels of Rs 2,03,000 crore in the XIth plan and Rs 84,000 crore in the Xth plan. Based on the discussion with various stakeholders the Committee recommend the funding pattern given in table 3 below - see page 13. [The main sources of funds for IR are internal generation (revenue surplus), gross budgetary support (on which IR currently pays an annual dividend of 5%) and extra budgetary resources comprising market borrowings, bonds and PPPs.] Follow the following funding pattern and bridge the gap of Rs. 16,469 crores from the following sources: a. Disinvestment in Railway PSUs. b. Re-densification/ commercialization of surplus land in existing railway colonies in different locations. A few pilot projects could be immediately explored. c. Commercial exploitation of railway schools and hospitals, without displacing any of the priorities from the point of view of IR employees. Management contracts (on the basis of revenue sharing) could be tried for some of the larger hospitals/ schools with a view to achieve significant upgradation of standards. d. Modernization surcharge from passengers on a per passenger km basis.
A focus on strengthening indigenous capabilities will increase local production and domestic manufacturing as well make India a hub for technology, equipment and services export globally. Total cost of these initiatives is estimated as Rs. 464 crores (refer Annexure VIII for details). Implementation could commence immediately and be scaled up on the basis of the results of the pilots. Research Design and Standards Organization (RDSO) is currently undertaking 100 R&D projects in rail related technologies under the proposed 12th FYP with estimated spending of Rs. 2,206 crores.
13.3
12.0 Safety
12.1 12.2 12.3 12.4 12.5 12.6 12.7 Deploy latest track machines for mechanized maintenance of track Install wheel impact load detectors Modernize and renovate railway workshops Equip trains with Train Protection Warning System (TPWS) Install vehicle borne digitized and recordable ultrasonic flaw detectors to cover the entire railway system Eliminate unmanned level crossings by manning, closure, merger, construction of over bridges and underpasses Upgrade coaching depots
10
11
Table 3: Sources of funds to raise the amount of Rs. 8, 39,140 crores required in the next 5 years:
Sources of Funds (Rs. in Crores) S. No. Sources of funds Gross Budgetary Support Internal Generation Leasing/Borrowings PPPs Dividend rebate Road Safety Fund Total Rs. in crores 250,000 201,805 101,000 229,024 24,000 16,842 822,671
500
97
400
204 17
1. 2. 3. 4.
300 110
1.3
0.45
200
100 33
Br id s ge g na lin g Sy st
72.5 25
em s l Ro lin g k oc rm Te in ) PP ti cs Pa rk ) PP I CT in s ve us v De el t en ri r do s (P ) PP e rP PP in s ve
0
ks &
5. 6.
St
Tr
ac
al
(P
(P
iti
at
op
ar
tP
iti
at
Si
St
at
io
&
Lo
s gi
In
di
o en
De
di
ca
ed
Fr
ei
gh
r Co
h Ot
1. 2.
13.4 Source through PPP the balance requirement of Rs 164,000 crore of the modernization plan to be included in the XIIIth plan. This makes the total PPP funding for the modernization plan as Rs 3,93,000 crores. Details of PPP investment and source of revenue through PPP are indicated in Annexure X. 13.5 Create a separate Modernization Fund on the lines of SRSF to fund these initiatives in a sustainable manner.
Modernization Requirement
12
13
15.2
Technology/ ICT & Signaling Freight Passenger Services Infrastructure Finance HR PPP
14.4 14.5
Create commodity wise Key Account Directors under Member Freight for major commodities like coal, iron ore, steel, foodgrain, fertiliser etc. Coal is 45% fo totalfreight traffic and needs special attention. Create Key Account Directors of suburban, long distance passenger etc. under Member Passenger.
15.4 Ensure autonomy, flexibility and accountability at all levels with clear P&L responsibilities 15.5 Make provisions for handling of all parliamentary functions (liaison functions with government, including handling of Parliament questions) by a Joint Secretary level officer in the Ministry, which would set the RB free to focus exclusively on business issues. Empower Zonal Railways along with accountability: The present system of seeking sanction for Capital investment to be included in the Works and Rolling Stock Programs of railways from the Railway Board/ Ministry should give way to a more decentralized decision-making in critical areas like safety, trafic facility, passenger amenity and other areas, by delegation of powers at the zonal level. GMs of Zonal Railways to be empowered to take decisions, within a framework of rules and investment limits. The Zonal Railways should also be made accountable for return on capital, transport output, profitability and safety.
15.0 Organization
Organizational reforms are essential to ensure that IR is able to achieve the goals set out for modernization. The structure of the IR has remained largely unchanged for decades and it remains a functionally oriented institution that is organized around its cadres instead of around its businesses or customers1. The following organizational reforms are recommended to empower officials, speed up the decisionmaking process and introduce professional project management systems in IR. 15.1 Re-organize Railway Board along business discipline to reflect Chairman as Chief Executive Officer and Members for Safety Business development/ Commercial 15.8 15.7
Revamp accounting systems so that separation between the cost of infrastructure services and the operational activities and rational pricing is achieved and trainwise, route-wise profitability analysis is available. This would help assess the usage charge of infrastructure and rolling-stock resources and also in accurate allocation of overheads. This would also help in computation of the cost of operation of trains and services and appraisal of profitability of various business lines. Re-engineer Business Processes to streamline the decision-making process to bring about accountability, result-orientation and responsiveness at all levels and develop IT tools with this objective in mind. Modernize procurement processes and benchmark products and suppliers
Report of the Expert group on Indian Railways, 2001 (under Dr. Rakesh Mohan)
15.9
14
15
15.10 Review the existing PPP policy framework in the light of hitherto poor response and PPP experience. 15.11 Create a post of Member (PPP) responsible for project development and processing of all PPP projects to facilitate their speedy sanction by the Government and award of concession. The Member should have a multi disciplinary team of officers, including finance, to deal with various railway projects. 15.12 Establish a Committee for approval of PPP projects to be headed by Chairman Railway Board with Financial Commissioner, Member (PPP) and the concerned member to whose area of responsibility the project belongs. The process and procedure followed should be similar to that of PPPAC followed in Government of India. The Board should decide and approve the projects and they should not be examined or referred back by the members to their respective directorates. The projects thereafter should follow the normal procedure of approval by PPPAC and CCI. 15.13 Appoint a PPP Ombudsman to resolve any disputes that may arise between the private sector and the government in interpretation and enforcement of provisions of the agreements. The Ombudsman should be a quasi judicial authority and should have the authority to give directions which are binding on all parties. 15.14 Constitute a Railways Tariff Regulatory Authority in order to provide a level playing field to all stakeholers. 15.15 Establish a separate Authority/SPV/Organization for implementation of Major Projects such as development of high speed corridors, redevelopment of railway stations etc. 15.16 Build capacity for the officers at the Zonal railways to manage PPP projects. A PPP cell should be constituted in each zone to identify, develop, implement and monitor projects at the zonal level. 15.17 Computerize all Railway business/ operations including financial management, inventory, HR and other assets 15.18 Implement Mission Mode approach for all 15 focus areas with clear objectives, measurable milestones, tangible deliverables, and well defined timelines. Each of the 15 Missions should be headed by a Mission Director for a three-year term, with autonomy to take decisions in their respective areas. All the Mission Directors and associated teams should report to the Railway Board. Each Mission should be provided with appropriate budget and operational autonomy to implement. Each Mission Director should use standard project management tools to manage and monitor.
Summary
In summary, we have tried to simplify as much as possible the complex task of modernizing the massive Indian Railways system with multiple priorities, many challenges and varied perceptions. We realize that the task is very complex and requires political will, organizational / management support, substantial funding, new direction, new thinking, mobilization of resources, innovative PPP and new business models, and a lot more. We strongly believe that through this modernization plan Indian Railways can add an additional 1.5 to 2% to national GDP and fuel growth and prosperity in the next decade. We also believe that at this time Indian Railways must keep clear focus on Safety and Growth with a five pronged strategy and multiple initiatives to capitalize on core assets, generate new revenue models, review current and new projects, focus on enablers and mobilize resources. We have made a total of 113 recommendations. Our recommendations in 15 areas are critical for the kind of generational change Railways require. To implement these recommendations, as suggested above, 15 individual Missions are required with substantial resources, leadership, plans, autonomy, freedom, flexibility and advance program management tools and technology to execute. It will also require several mini and micro Missions within each Mission Directorate to implement multiple tasks. Similarly, organizational reforms suggested by us are critical to mobilize resources, provide policy direction and ensure time bound implementation. Based on our analyses and interactions with the Planning Commission, we strongly believe that it is possible to mobilize financial resources to meet substantial growth needs in the Railways. To build consensus we have had a series of interactions with all key stakeholders and we thank each one of them for their support, input and advice, especially Railway Minister, Chairman Railway Board, FC, Members, Advisers, domain experts, industry leaders, labour leaders, Planning Commission etc. Our interactions with the Railway officers and experts have convinced us that generational change as proposed by the Expert Group is possible. DMRC has shown us that with the right leadership, autonomy, flexibility and accountability it can be done. We are individually and collectively available as an Expert Group to discuss these recommendations and provide our help and support in speedy implementation.
15.19 Set up a High Level Committee to facilitate co-ordination amongst the 15 missions, fast-track implementation and adderss bottlenecks, coming in the way of implementation.
16
17
Finally, we strongly recommend that the next Railway Budget should focus on the modernization plan with a vision for a generational change to take Indian Railways to new heights with commitment to Safety and Growth for all.
Shri M.S.Verma,
Member Former Chairman, State Bank of India
Member Chairman, HDFC Bank Shri M.S.Verma, Member Former Chairman, State Bank of India
Shri G. Raghuram,
Member Professor, IIM, Ahmedabad
18
19
Annexures
Annexure I
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD No.ERB-I/2011/23/39 New Delhi, dated 21.9.2011
ORDER
The Ministry of Railways (Railway Board) have decided to constitute an Expert Group for Modernization of Indian Railways consisting of the following:1. 2. 3. 4. 5. Shri Sam Pitroda, Adviser to Prime Minister of India Shri Deepak Parekh, Chairman, HDFC Bank Shri M.S.Verma, former Chairman, State Bank of India Shri G. Raghuram, Professor/IIM, Ahmedabad Dr. Rajiv Lall, Managing Director/IDFC Chairman Member Member Member Member
6. Shri Vinayak Chatterjee, Member Chairman, Feedback Infrastructure Services Ltd 7. Shri Ranjan Jain, Adviser(Infra.), Railway Board Secretary
1.
2.
The Terms of Reference of the group will be as under:I. Railway Modernization with a focus on: (i) Track
23
To provide capability for safe, secure and productive freight and passenger trains with a focus on expansion and excellence. (ii) Signaling Modern electronic signaling technologies for maximizing track utilization, and for providing high speed operations with safety. (iii) Rolling stock Expansion of new generation freight and passenger rolling stock with advanced technological features with capability for higher speeds and lower unit costs. (iv) Stations & Terminals Modernization of stations and freight terminals to provide comprehensive, state-ofthe-art infrastructure, services and facilities. Information technology Launch integrated initiatives for exponential improvement in operational efficiency, safety, flexibility and comfort. Indigenous Development Outline strategies for indigenous development, local R&D and local manufacturing to augment existing capacities of Indian Railways. Project Review Review and assess capital projects sanctioned and work-in-process and suggest necessary actions.
Copy to:
1. 2. The Prime Ministers Secretariat, New Delhi. The General Managers, All Indian Railways (including Metro & CORE) Construction and Production Units. 3. 4. 5. 6. The Director General, RDSO, Lucknow. The Director General, RSC, Vadodara. PS/MR, ED/MR, EDPG/MR, PS/MSR(M), PS/MSR(B), EDPG/MSR(B). PSOs/Sr.PPSs/PPSs/PSs to CRB, FC, MS, MT, ME, MM, ML, Secretary, DG/RPF, DG/RHS, All Additional Members/Advisers/Executive Directors, ADG/PR, JS(G), JS(E), JS, Director (Tele), Dir(P), DTC(G), DTC(G)II, DIP, DS(G), US(A), US(P), US(E)Spl., US(Protocol), Railway Board. 7. Cash-I, ERB-II, ERB-III, ERB-V, G, G(Pass), G(Acc), Library, Reception, Infra Cell, TG-I, SSE/Telecom, Railway Board. 8. 9. 10. 11. 12. 13. 14. 15. 16. The Pay & Accounts Officer, Railway Board. The Principal Director of Audit, Northern Railway. Dy. Comptroller & Auditor General of India (Rly.) R.No.224, Rail Bhavan, New Delhi. Commissioner of Railway Safety, 16th Ashok Marg, Lucknow. The Secretary General, FROA & IRPOF, Rail Bhavan, New Delhi. The Secretary General, AIRPFA, Rail Bhavan. The General Secretary, AIRF & NFIR, Rail Bhawan, New Delhi. The General Secretary, IRCA, New Delhi. The Chairman and Members of the Expert Group. Adviser(Infra)/Railway Board and Secretary to the Expert Group. SEE(Electrical), SSE (Works), O&M, Parl. Branches,
V. PPP Address issues related to PPP with a focus on process-management, bidding-out procedures, resource mobilization and enhancing value of unused railway assets.
3. 4.
The Headquarter of the Expert Group will be at Rail Bhavan, New Delhi. The Expert Group should submit its interim report in two months from the date of constitution of the Committee and the final report by 31.3.2012 with a clear focus on a Roadmap for speedy implementation.
(Shiv Dan Singh) Joint Secretary (Gaz) Railway Board
17.
24
25
Annexure II
III.
ROLLING STOCK:
(a) (b) (c) G.N. Asthana/GM/WCR. Ravinder Gupta, EDME Freight/RB; Shri P.K.Srivastava, Adv Electrical/RB-Coordinator
ToR
Present status of coaching and freight rolling stock in terms of class of travel, speed potential for passenger trains and pay load to tare ratio, axle load for freight trains. Installed manufacturing capacity for various types of rolling stock. Need to upgrade rolling stock keeping in view the requirement to raise speed, improved design and comfort level, provision of modern facilities, etc. Identification of technologies for modernisation of rolling stock. Local production status and need for import of technologies. Estimation of cost and time required for modernisation. Preparation of cost benefit analysis.
ToR
Present status of track, bridges, tunnels, rail overpasses on Indian Railways in terms of track structure, category of track, speed potential, axle load, route-wise, section-wise, summarised position.
Need to modernise track/route by way of expansion of network, raising of speed, increasing the axle load, fitness for running of double stack container trains and longer freight trains. Approximate cost estimate of modernisation, timeframe and cost benefit analysis of track modernisation framework. Examine the organizational design for carrying out modernisation.
IV.
II. SIGNALLING:
(a) (b) (c) Shiv Kumar Chowdhary; Mahesh Mangal, Sr ED/RDSO. R.C. Adwal/ED/Tele.Dev - Coordinator
ToR
Prepare a list of 500 passenger stations on IR for redevelopment, State-wise. Divide these stations in 3 categories in terms of size of the stations. Identify legal, policy and coordination issues requiring attention in redevelopment of station. Identify 50 locations requiring development of multi-modal logistics Parks. Estimation of cost and timeframe. Prepare cost benefit analysis. Work out a broad PPP model for station redevelopment and private freight terminal development.
ToR
Present status of electronic signalling at the stations, route-wise, section-wise. Need to modernise signalling for improving safety, augmenting capacity and increasing speed of trains. Identify specific signalling technology for modernization. Estimation of cost and timeframe for modernisation. Cost benefit analysis of modernisation of signalling. Identify associated requirements for fencing, elimination of level crossing and its impact on reduction in manpower.
V. ICT:
(a) (b) (c) (d) R. B Das, COM/ECoR R.C. Adwal/ED(Tele.Dev)/RB Ranjan Jain, Adv(Infra.)/RB Sobhit Bhatnagar Director(C&I S)-Coordinator
26
27
ToR
Present status and programme to implement various systems. Need to build a National Railway ICT platform. Implementation plan for SIMRAN, mobile ticketing, Web access on trains and platforms. Implementation of RFID for management of freight operation. Current status of electronic tendering, electronic payment in freight operation, Freight Operation Information System, Coaching Operation Information System, control charting, time tabling, capacity planning, ICT for safety, Track Management System, Loco Management System, etc. Status of accounting reform and plan for implementation of modern accounting system including full computerisation of accounts. Status of project management, human resource management, inventory management systems on IR.
Prepare a status of projects in terms of major cost over-run, time over-run and difficulty in delivery. Recommend organizational design to speed up the project implementation.
VIII. PPP:
(a) (b) (c) (d) (e) (f) (g) Mr Kanoria/FICCI; Representative of CII. Cherian Thomas, COO, IDFC Foundation Satish Mandhana, President, IDFC Private Equity Company Pvt. Limited Amrit Pandurangi, Sr.Director, Delloite; Charanjit Banerjee/DG/CII S.K. Mishra, ED/T/PPP-Coordinator
ToR
Review and recommend actionable PPP models for Railways in various areas to attract investment for win-win partnership. Understand and evaluate present approach and suggest solutions to un-lock bottlenecks. Outline lessons learned from other infrastructure sectors and related projects in India and abroad to attract latest technology and investment.
VI.
INDEGINOUS DEVELOPMENT:
(a) (b) (c) (d) DG RDSO; Director IIT Kanpur; Ved Mani Tiwari, Dir/EE(Dev.) Sanjiv Kishore/ EDME(Dev)-Coordinator
IX. LAND:
Shri H.K. Jaggi, Adv/L&A-Coordinator
ToR
Present status of import and export of equipment, plants and machinery in Railways. Present status of R&D in product development in Railways. Identification of the need to enhance role of R&D in certain specific areas. Identification of products requiring R&D. Assess export potential of railway equipment & rolling stock, track & signalling technology, etc. Present status of railway interface with industry, Universities and research Institutes.
ToR
Present total stock of surplus railway land and air space available for commercial use and the part which is available in the station area. Details of parcels of surplus land available in urban and semi-urban areas, location-wise.
X.
Passenger Amenities:
Shri M.K.Reddy, EDPM-Coordinator
ToR
Suggest measures for improvement of comfort, hygiene, cleanliness, catering, reservations and introduction of other modern amenities.
ToR
Review of existing and proposed projects from the standpoint of prioritisation to create capacity, financial viability and other tangible benefits.
ToR
Review of past reports and highlight of their recommendations
28
29
Route B
Kms 2334.00 710.00 1151.00 435.00 150.00 616.00 297.00 407.00 1021.00
30
31
* Committee has taken these figures from the report of Railway Sector sub-group of XIIth Plan. The XIIth Plan is yet to be finalized and approved.
32
33
*Investment in these projects has been covered in the respective initiatives listed separately in the modernization plan.
34
35
* Committee has taken these figures from the report of Railway Sector sub-group of XIIth Plan. The XIIth Plan is yet to be finalized and approved.
* Committee has taken these figures from the report of Railway Sector sub-group of XIIth Plan. The XIIth Plan is yet to be finalized and approved.
36
37
38
39
The investment through PPP is spread over XIIth and XIIIth plan period. Investment during XIIth plan is Rs 229,000 crores and during XIIIth plans Rs 164,000 crores. Rs. 20,000 crore of revenue though monetization of land and airspace is included in the internal genration. Hence, only Rs. 393,000 crores from PPP is shown as resource available for modernization.
40
41