LIGHTNING PROTECTION CALCULATION FOR PJ-TPP BUILDING ( REFERENCE : IS 2309 ) Symbol / Formulae / Description / Parameter References A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P ( Refer Fig. 1 of IS 2309 ) ( Refer Clause 8.1.2 of ( Refer Table 1A of IS 2309 ) ( Refer Table 1B of IS 2309 ) ( Refer Table 1C of IS 2309 ) ( Refer Table 1D of IS 2309 ) ( Refer Table 1E of IS 2309 ) = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = = = = = = = = = =
Value
Unit
m m m
b)
ii)
Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated
Rf-C
iii)
Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie
0.000001
1.000E-06
iv)
Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.
B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2
= = =
ii)
= P/30 = 6 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 6 Nos.
REVISION DETAILS
Rev.
R0
Date
Drg/Doc. No.
Remarks
First Submission
Prepared
Reviewed
Approved