1 Pinatubo Flooding
1 Pinatubo Flooding
1 Pinatubo Flooding
SAN CLEMENTE
MAYANTOC MASINLOC
ZARAGOSA
IBA
CAPAS CONCEPCION
JAEN
MAGALANG
CABIAO
MABALACAT
CABANGAN
BACOLOR SAN NARCISO STA. RITA STO. TOMAS SAN MARCELINO CASTILLEJOS FLORIDABLANCA GUAGUA MINALIN
APALIT
BALIUAG
LAHAR PRONE AREA FLOOD PRONE AREA AREA AT RISK DUE TO AVULSION
PULILAN
PLARIDEL
LAKE, SEA
SASMUAN HERMOSA
GUIGUINTO
ORANI
0
PAOMBONG
10km
1.20 million people affected by eruption and subsequent lahars 200,000 people entered evacuation centers (ECs) In May 1993, 72,335 were still residing in 54 ECs 38,000 others had relocated in official settlement sites 21 municipalities remained to be high risk from lahars over the next 5-10 years
MAYANTOC MASINLOC
ZARAGOSA
IBA
CAPAS CONCEPCION
JAEN
MAGALANG
CABIAO
MABALACAT ARAYAT ANGELES MEXICO STA. ANA CANDABA SAN FELIPE PORAC SAN FERNANDO SAN LUIS
CABANGAN
LEGEND:
PYROCLASTIC FLOW DEPOSIT 1991 LAHAR 1992 LAHAR 1993 LAHAR
BACOLOR SAN NARCISO STA. RITA STO. TOMAS SAN MARCELINO CASTILLEJOS FLORIDABLANCA GUAGUA MINALIN
APALIT
BALIUAG
LAHAR PRONE AREA FLOOD PRONE AREA AREA AT RISK DUE TO AVULSION
PULILAN
PLARIDEL
LAKE, SEA
SASMUAN HERMOSA
GUIGUINTO
ORANI
0
PAOMBONG
10km
Completed 26Jul2001 P2.303 Billion cost Restored reliability of Mac Arthur Highway (+Mabalacat/Bamban Bridges) Restored Concepcion by-pass/alternate road (+San Francisco Bridge) Contained lahar deposition in Sacobia-Bamban River
MAYANTOC MASINLOC
ZARAGOSA
IBA
CAPAS CONCEPCION
JAEN
MAGALANG
CABIAO
MABALACAT ARAYAT ANGELES MEXICO STA. ANA CANDABA SAN FELIPE PORAC SAN FERNANDO SAN LUIS
CABANGAN
LEGEND:
PYROCLASTIC FLOW DEPOSIT 1991 LAHAR 1992 LAHAR 1993 LAHAR
BACOLOR SAN NARCISO STA. RITA STO. TOMAS SAN MARCELINO CASTILLEJOS FLORIDABLANCA GUAGUA MINALIN
APALIT
BALIUAG
LAHAR PRONE AREA FLOOD PRONE AREA AREA AT RISK DUE TO AVULSION
PULILAN
PLARIDEL
LAKE, SEA
SASMUAN HERMOSA
GUIGUINTO
ORANI
0
PAOMBONG
10km
Completed March 2006 Cost of P4.524 Billion Rehabilitated & fortified megadike Widened Gapan-San Fernando-Olongapo (GSO) Road Reconstructed Mancatian Bridge across Megadike w/c re-established the Dinalupihan-Angeles Road Pilot dredged Pasac Delta & Third River areas
PHUMP, Phase 3 (Flood/Mudflow Control Works for Porac-Gumain River in Pasac Delta & San Fernando City (P4.132 billion)
MANGATAREM SAN CLEMENTE CAMILING RAMOS PANIQUI CANDELARIA PURA GUIMBA VICTORIA
MAYANTOC MASINLOC
ZARAGOSA
IBA
CAPAS CONCEPCION
JAEN
MAGALANG
CABIAO
MABALACAT ARAYAT ANGELES MEXICO STA. ANA CANDABA SAN FELIPE PORAC SAN FERNANDO SAN LUIS
CABANGAN
LEGEND:
PYROCLASTIC FLOW DEPOSIT 1991 LAHAR 1992 LAHAR 1993 LAHAR
BACOLOR SAN NARCISO STA. RITA STO. TOMAS SAN MARCELINO CASTILLEJOS FLORIDABLANCA GUAGUA MINALIN
APALIT
BALIUAG
LAHAR PRONE AREA FLOOD PRONE AREA AREA AT RISK DUE TO AVULSION
PULILAN
PLARIDEL
LAKE, SEA
SASMUAN HERMOSA
GUIGUINTO
ORANI
0
PAOMBONG
10km
Structural Measures Flood damage mitigation, channel improvement in Porac-Gumain River Drainage efficiency improvement in Pasac Delta & San Fernando River (link up w/ Third River) Non-structural Measures Study on extent of watershed degradation, its effects & causes Integrated plan for comprehensive nonstructural measures land use plan formulation rehabilitation options in upper Porac-Gumain River basins flood management plan & flood forecasting and warning system institutional set-up for sustainable O&M of PHUMP 2 & 3 works identifying other priority non-engineering subprojects`
Place: Sto. Tomas, Lubao Depth: 0.6m (ave.) Duration: (Still Inundated, as of July 19)
0.6 M Mon.
1.0
(HECTARE) 195,000/HECTARE 138 26,910,000 75 14,625,000 22 4,290,000 (3,000m2/Unit) 33 30 0 (5,000m2/Unit) 8 0 0 0 0 0 3,000,000/UNIT 100,000,000 90,000,000 0 2,000,000/UNIT 16,000,000 0 0
Source: Factor applied from the Study on Flood Control and Drainage Project in Metro Manila, Volume 1 Main Report, 1990, JICA
Objectives
The project is part of the over-all engineering intervention works whose ultimate aim is to rehabilitate affected areas devastated by the Mt. Pinatubo eruption, restore conditions at least to pre-eruption levels, and provide the necessary facilities to protect lives, properties, settlements, against lahar deposition and or flooding. Its objective/purpose is to improve drainage, reduce extent, & minimize the duration of flooding in Pasac Delta and Porac-Gumain river influence areas in the Province of Pampanga. Specifically, the project aims to: a) Reduce inundation depth from 1.5 1.8 meters to 0.60 0.90 meters in the affected areas during 20-year flood event; and b) Shorten inundation time from 45 days to 10 days, and 10 days to 2-3 days during 20-year and 2-year flood event, respectively.
Flooding was reduced in terms of area covered, duration and depth as follows 2-year flood Area (ha) Without Project With Project 47,100.00 29,000.00 Days 9 2 Depth 0.3-0.4 0.1-0.2 5-year flood Area (ha) 49,600.00 35,500.00 Days 18 4 Depth 0.6-0.3 0.2-.03 20-year flood Area (ha) 51,900.00 46,200.00 Days 45 10 Depth 1.5-1.8 0.6-0.9
a)
Properties
: P 198.96 M/Yr P 26.02 M/Yr - Roads & bridges P 119.68 M/Yr - Residential houses P 53.26 M/Yr - Commercial bldgs & establishments
b)
Agri-production : P 411.82 M/Yr. P 136.08 M/Yr - rice or 13,608 ton (P 10.0/kg raw rice/paddy) P 275.74 M/Yr - fish or 4,596 ton (P 60.00/kg)
c)
Income losses : P 1,127.07 M/Yr (35 days) or P 24,381 / HH / year or P 4,583 / person / year
Project Cost Investment cost : : : PhP 4,132 Mil. PhP 1,670 Mil. PhP 198 Mil. PhP 412 Mil. PhP 1,127 Mil. PhP 36 Mil. 31.84%
Avoided damage to agricultural production : Avoided losses to livelihood : O/M cost per year : :
(c)
Base
EIRR (%)Cost 28.81 Case 28.49 26.47 +10% 26.95 25.88 22.35
Increase
Investment costs increase by 10% Benefits decrease by 10% +10%C/ Case 1 plus Case 2 +20% -10%costs increase -20% by 20% 10%B Investment Benefits decrease by 20% Case 4 plus Case 5
IRR (%)
NPV (15%) B/C
31.84
3,245.8 4.97
29.64
3,025.2 4.52
27.72
2,804.6 4.14
29.31
2,678.5 4.45
26.64
2,111.2 3.94
27.23
2,457.9 4.05
23.02
1,669.9 3.28
Spoil disposal areas in construction stage : about 311 ha Possible free spoil site areas within the Mun. of Guagua, 125 has.(approx.)
Projected cost of ROW acquisition of about P 537 million is needed to undertake these activities. Acquisition of fishpond, rice field, and residential lots were estimated at P 100.00/m2, P 250.00/m2, and P 1,500.00/m2, respectively.
Affected Structures/Improvements
Estimated cost of residential structures ranges from PHP 4T/m2, PHP 6T/m2, PHP 7.5T/m2 and PHP 10T/m2.
Note: Cost of structures/improvements based on actual estimate. Valuation based on replacement cost method per Section 10, RA 8974 IRR