100% found this document useful (1 vote)
389 views43 pages

Earned Value Management

The document summarizes key concepts of Earned Value Management (EVM). EVM integrates work scope, schedule, and budget to objectively measure project performance and progress. It establishes a performance measurement baseline and tracks earned value, schedule variance, and cost variance to identify issues early. EVM has been used by the Department of Defense since the 1960s and provides project managers with decision-making data to manage projects on time and on budget.

Uploaded by

ralucastanescu
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
389 views43 pages

Earned Value Management

The document summarizes key concepts of Earned Value Management (EVM). EVM integrates work scope, schedule, and budget to objectively measure project performance and progress. It establishes a performance measurement baseline and tracks earned value, schedule variance, and cost variance to identify issues early. EVM has been used by the Department of Defense since the 1960s and provides project managers with decision-making data to manage projects on time and on budget.

Uploaded by

ralucastanescu
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

Earned Value Management

Presentation at the Utah Section of AACE 1 March 2011


Dave Muhlestein, CMA, EVP, PMP

Agenda
1. Intro 2. History of EVMS 3. How widespread? 4. EVMS ABCs 5. Something you havent ever seen-CPT 6. AACE EVP Certification 7. Recommended 1st Stops

What?

Earned Value Management (EVM)


Earned Value Management Systems (EVMS) = integrated project management It is the management tool that integrates work scope with schedule and budget resources A performance management baseline is established Work progress is measured as "earned value" (EV) - a yardstick Schedule and cost variances are isolated and reported to the project manager for corrective action Allows projects to be managed better - on time, on budget EVMS is not a specific system or tool set, but rather, a set of guidelines that guide a companys management control system EVMS best business practices documented in ANSI/EIA Std 748-98

EVMS = refers to internal mgmt ctrl systems that meet guidelines EVM = overall method of managing projects w/ EV processes

EV

= budgeted resources earned when work accomplished

How Widespread is EVM?

Used by DOD since the1965 with creation of Minuteman Earned Value:


Jim Morin (EV Pioneer): The DoD-wide C/SCSC was the third earned value system. The first was Minuteman Earned Value, which was the basis for the Air Forces Cost/Schedule Planning and Control System(C/SPCS), which, in turn, was the basis for C/SCSC. http://www.pmforum.org/library/secondedition/2009/PDFs/dec/SE-Morin-HowItAllBegan.pdf Interview with Jim Morin, Earned Value Pioneer-Fall2010 Measurable News pg25: http://www.pmi-pm.org/pages/measurable_news/documents/MN2010Issue4Final.pdf

Required per Govt OMB Circular A-11 part 7.......... NASA DOE EPA FAA Construction Industry first commercial adopters Internationally spreading across globe PMBOK 2004 helped advance EVM practice International EVM Standard - ISO/PC236->ISO21500?

EVM HISTORY

http://www.acq.osd.mil/pm/historical/Timeline/EV%20Timeline.htm 5

EVMS HISTORY

6 http://www.acq.osd.mil/pm/historical/Timeline/EV%20Timeline.htm

EVMS Defined

EVMS is: a management tool that integrates work scope with schedule and budget performance measurement and management how am I doing against my baseline plan? sound project management, useful to program manager contractor Customer (government, owner, etc....) early warning/identification of cost & schedule issues

Why do we need Early Warning?


Course corrections are easier when you have time to make small adjustments

Its too late when youre this close to the iceberg!

Essence of EVMS
All work scope for the project must be plannedinto a baseline plan to measure accomplishments. As elements of work are completed, their values are earned. Work progress is quantifiable as Earned Value, which measures both cost and schedule performance in financial terms. Variances from the plan require analysis and a corrective action.

Program Manager ultimately responsible for Earned Value (Performance) of Program


10

EVMS PRINCIPLES

Establish Formal Plan for Execution of Contract Establish Baseline Plan and Control Measure Performance Using Planned Value Earned Value Actual Costs Provide Data to Enable Variance Analysis, Trend Analysis, Corrective Action, and Estimates of Costs at Completion Provide Decision-Making Data to Management Indicate Work Progress Relate Cost/Schedule/Technical Accomplishments Provide Data in Detail and in Summary
11

Earned Value Terms


The following earned value terms can apply at program, WBS element, cost account levels & work package levels
Budget at Complete (BAC) Spend Plan Actuals Earned Value (EV) Cost Variance (CV) Schedule Variance (SV) Cost Perf Index (CPI) Schedule Perf Index (SPI) Estimate to Complete (ETC) Estimate at Complete (EAC) To Complete Perf Index (TCPI) Total budget for a program, WBS element or cost account Time phased budget (budget spread over time), also termed Budgeted Cost of Work Scheduled (formerly BCWS) Funds expended to date for a given budget, also termed Actual Costs of Work Performed (formerly ACWP) Value of work completed for a given budget measured in terms of $s, also termed Budgeted Cost of Work Performed (formerly BCWP) Earned Value - Actual Costs (difference between work completed and money spent, measure of cost performance) Earned Value - Spend Plan (difference between work completed and work planned to be completed, measure of schedule performance) Earned Value / Actual Costs (ratio of work completed to money spent, a cost productivity metric) Earned Value / Spend Plan (ratio of work completed to work planned to be completed, a schedule productivity metric) Estimate of costs remaining to complete the work, can be a grass roots estimate or can be calculated, one formula: (BAC-EV) / CPI Total costs expected for a given budget (Actuals + ETC) CPI for future work (work remaining / funds required or [BAC - EV] / ETC)

12

EVMS Benefits
Single, common performance measurement system Consistent management reporting on all programs Data which is timely, valid, and auditable which can be used to base management decisions Early identification of problems Practical level of summarization Isolation of problem areas Management of work progress Indication of work progress Cost, schedule and technical performance based on well defined performance measurement criteria Reduces performance subjectivity Good business sense

13

Organize Plan Authorize Measure Status Report Analyze The How EAC/LRE of EVMS Change Review

15

Budget Element Breakdown


Contract Price

NCC + AUW

TAB
= CBB + OVERRUN = OTB

Profit / Fee

PMB Control Accounts Work Packages

Management Reserve

Undistributed Budget

Planning Packages

ESTABLISH THE BASELINE AN ITERATIVE 3-STEP PROCESS


CONTRACT BUDGET BASE

1. DEFINE THE WORK

2. SCHEDULE THE WORK

Performance Measurement Baseline

3. ALLOCATE BUDGETS
100 40 60 15 25 30 30

TIME

Program Planning Defines Statusing


WBS

Each area of assigned work is then broken down into appropriate levels for detailed cost and schedule planning and tracking
Sufficient granularity must exist so that: cost and schedule statusing can accurately be accomplished Statusing type is selected, some are: % Complete 0 - 100% or 0-50-100% LOE (Level of Effort) Specific statusing criteria is established for each work package (what is done to earn what percentage)
OBS

Cost Account
Work Package Activity Activity Work Package Work Package Activity Activity

Work Assignments, Cost and Schedule Tracking Breakdown

17

18

How to do Performance Measurement


What was Planned? (BCWS) What was Accomplished? (BCWP) What was the Actual Cost? (ACWP) What will be the final cost? (LRE)

Schedule Variance
(BCWP-BCWS)

Variance at Complete

Cost Variance
(BCWP-ACWP)

(BAC-LRE)

Earned Value Example

A Program Task:

Has a $100 budget Has 40% of the work completed Has spent $50 to date Was planned to spend $30 as of this date

What is the status of this task ?

Cost Status ? Schedule Status ? What will happen in the future ?

19

Earned Value Example


$'s
$100 Task Budget

Actual Costs = $50 (from accounting ledgers)

Earned Value = $40 (40% work complete X $100 total work)


Spend Plan = $30 (your original plan of work & costs)

Time
Time Now Contract Completion

20

Actual Costs versus Earned Value


Tracking Actual Costs Actual Costs
$'s

Earned Value Reporting Earned Value Report


$'s

spend plan actuals

Same Project Same Status

spend plan actuals work completion or earned value


Time
Today

Time
Today

The program is under running planned costs and most of the work is complete

Different Conclusion

This program is overrunning costs and is significantly behind schedule

21

Cost Variance
CV = Earned Value - Actuals

Cost Variance provides visibility of cost performance of program work by comparing the value of work completed to the money spent to date. Example: A task is budgeted to cost $100. The task is underway, has been statused at 40% complete and shows cumulative to-date charges of $50. The cost variance is:
$40 - $50 - $10 Earned Value ( $100 budget x 40% work completed ) Actual Costs ( from accounting ledgers ) Cost Variance or CV

This task is overrunning, half the money is spent but only 40% of the work is completed
22

Cost Variance (CV) Example


$'s
$100
Task Budget

Actual Costs

$50

Earned Value

CV or Cost Variance = - $10 (overrun)


$40 $30

Spend Plan

Time
Time Now Contract Completion

23

Schedule Variance
SV = Earned Value - Spend Plan

Schedule Variance provides visibility of the schedule status of program work by comparing the spend plan (planned expenditures & planned work) to the value of work completed. Example: A task is budgeted to cost $100. The task is underway, has been statused at 40% complete and the spend plan shows that $30 of work was planned to have been completed by this date.
$40 - $30 +$10 Earned Value ( $100 budget x 40% work completed ) Spend Plan (work scheduled to be completed to-date) Schedule Variance or SV This task is ahead of schedule

24

Schedule Variance (SV) Example


$'s
$100
Task Budget

Actual Costs

$50 $40 $30

Earned Value

CV or Cost Variance

= - $10 (overrun)

SV or Schedule Variance = + $10 (ahead)

Spend Plan

What will happen Time Now at completion ?


25

Time
Contract Completion

Cost Performance Index (CPI)


CPI = Earned Value / Actual Costs

COST PERFORMANCE INDEX (CPI) provides visibility of demonstrated productivity relative to planned productivity. This is accomplished by tracking the ratio of the value of completed work (earned value) to actual costs. Example: A task is budgeted to cost $100. The task is underway, has been statused at 40% complete, and shows cumulative to date charges of $50. The CPI is:
$40 $50 Earned Value = Actual Costs Budget ($100) x % complete (40%) Actual Cost Accumulated To Date

In this example CPI = 0.80 meaning work is being performed at a productivity level which is 80% of the planned productivity level
26

Cost Performance Index - CPI


$'s
$100 Task Budget

Actual Costs $50 Earned Value $40 $30 Spend Plan

Cost Variance

= - $10

Schedule Variance = + $10

In this example we are consistently performing at a productivity level lower than planned ( plan = 1.00 ). Additionally, the Time trend looks negative. What is your assessment of costs for this work at completion ?

Time Now

CPI > 1.0

Contract Completion

CPI = 1.0
CPI < 1.0
Time Now

Time

27

Schedule Performance Index (SPI)


SPI = Earned Value / Spend Plan

SCHEDULE PERFORMANCE INDEX (SPI) provide gross visibility of schedule status by comparing the value of completed work (EV) to planned expenditures (spend plan) Example: A task is budgeted to cost $100. This task is underway, has been statused at 40% complete, and shows a cumulative to-date spend plan of $30.
$40 $30 Earned Value ( budget [$100] x % complete [40%] ) = Spend Plan Time Phased Budget as of statusing date

In this example SPI = 1.33 This task is being performed sooner than planned by about 33%
28

Schedule Performance Index - SPI


$'s
$100 Task Budget

Actual Costs $50 Earned Value $40 $30

Cost Variance

= - $10

Schedule Variance = + $10

Spend Plan

Time
Time Now

SPI > 1.0

Contract Completion

SPI = 1.0
SPI < 1.0
Time Now

Time

In this example, we started with a schedule performance less than plan and then performed work well ahead of plan. The trend looks slightly negative, but we clearly have a schedule productivity higher than planned. What is your assessment of future program schedule performance.

29

Basic Earned Value (EV) Metrics

Cost Variance

(CV = EV - Actual Costs)


Basic EV Metrics

Difference between work completed and costs expended

Schedule Variance (SV = EV - Spend Plan)


Difference between work completed and work planned

CV
Cost Variance

SV
Schedule Variance

CPI

SPI
Schedule Performance Index

Cost Performance Index (CPI = EV/Actual Costs)


Ratio of work completed to costs expended

Cost Performance Index

Schedule Performance Index


Ratio of work completed to work planned
30

(SPI = EV/Spend Plan)

IEAC - Independent EACs


(calculated EACs)

IEAC - Low Schedule Sensitivity - Optimistic

EAC = Actuals + (work remaining / CPI )

IEAC - Modest Schedule Sensitivity

EAC = Actuals + (work remaining / [ 0.8 CPI + 0.2 SPI ] )

IEAC - High Schedule Sensitivity - Pessimistic

EAC = Actuals + (work remaining / [ CPI * SPI ] )


31

Integrated Cost/Schedule Example

32

CLASSIFICATION Unclassified

COST PERFORMANCE REPORT FORMAT 1 - WORK BREAKDOWN STRUCTURE

DOLLARS IN

Thousands

Page 1 of 2

1. CONTRACTOR a. NAME xyz b. LOCATION (Address and ZIP Code) 6304 Spine Road Anywhere, USA 80301

2. CONTRACT a. NAME EMD_ALL b. NUMBER HS55E4300N c. TYPE CPAF c. EST. COST AUTHORd. TARGET PROFIT/ IZED UNPRICED WORK FEE $0 d. SHARE RATIO 100/0 100/0 e. TARGET PRICE $499,622

3. PROGRAM a. NAME abc Ground Segment

4. REPORT PERIOD a. FROM (YYYYMMDD) 980530 b. TO (YYYYMMDD)

b. PHASE (X one) X RDT&E f. ESTIMATED PRICE $499,622 PRODUCTION g. CONTRACT CEILING

980626

5. CONTRACT DATA a. QUANTITY b. NEGOTIATED COST 1/0/1 $444,426

h. ESTIMATED CONTRACT CEILING

6. ESTIMATED COST AT COMPLETION


MANAGEMENT ESTIMATE AT COMPLETION (1) CONTRACT BUDGET BASE (2) VARIANCE (3)

7. AUTHORIZED CONTRACTOR REPRESENTATIVE a. NAME (Last, First, Middle Initial) b. TITLE c. SIGNATURE d. DATE SIGNED (YYYYMMDD)

a. BEST CASE b. WORST CASE c. MOST LIKELY

$444,426 $444,426 $444,426 CURRENT PERIOD ITEM


(1) BUDGETED COST ACTUAL VARIANCE COST WORK WORK WORK SCHEDULED PERFORMED PERFORMED SCHEDULE COST (2) (3) (5) (6) (4)

$444,426 8. PERFORMANCE DATA

$0 CUMULATIVE TO DATE
BUDGETED COST ACTUAL VARIANCE COST WORK WORK WORK SCHEDULED PERFORMED PERFORMED SCHEDULE COST (7) (8) (10) (11) (9)

REPROGRAMMING ADJUSTMENTS
COST VARIANCE (12) BUDGET (13)

AT COMPLETION
BUDGETED ESTIMATED VARIANCE (14) (15) (16)

a. WORK BREAKDOWN STRUCTURE ELEMENT 3000 - GRD MSN EQUIP 3100 - IAT&C 3200 - MCS 3300 - MCS-B 3400 - SURV BACKUP 3500 - RGS b. COST OF MONEY c. GENERAL & ADMINISTRATIVE d. UNDISTRIBUTED BUDGET e. SUBTOTAL (Performance Measurement Baseline) f. MANAGEMENT RESERVE g. TOTAL a. VARIANCE ADJUSTMENT b. TOTAL CONTRACT VARIANCE

2 3 3 3 3 3

9,263 1,912 2,963 1,956 9 2,397 41 510

7,544 1,777 2,938 34 9 2,775 34 427

7,648 1,889 2,892 34 28 2,772 36 447

-1,719 -135 -30 -1,932 0 378 -7 -83

-104 -112 41 0 -19 3 -2 -20

128,195 28,277 64,625 3,093 1,933 29,865 552 7,100

125,357 28,062 63,400 2,060 1,929 29,504 540 6,949

129,885 29,914 66,291 1,864 1,725 29,791 554 7,129

-2,838 -215 -1,225 -1,033 -4 -361 -12 -151

-4,528 -1,852 -2,891 196 204 -287 -14 -180

318,858 71,590 127,029 14,634 11,623 90,077 1,534 20,245 924

324,819 75,440 129,158 14,490 11,352 90,621 1,534 21,173 924 437,148 7,278 444,426

-5,961 -3,853 -2,129 144 271 -544 0 -928 0 -4,724 4,724 0

9,871 9,871

8,155 8,155

8,260 8,260

-1,716 -1,716

-105 -105

146,360 146,360

143,253 143,253

146,663 146,663

-3,107 -3,107

-3,410 -3,410

432,424 12,002 444,426

9. RECONCILIATION TO CONTRACT BUDGET BASE -3,107 -3,410

444,426

444,426

DD FORM 2734/1, AUG 96


CLASSIFICATION Unclassified

Sample Variance Analysis Report (VAR)


Prgrm CA 63641 HCBA006 63641 HCCT221 BCWS 37,721 172,854 BCWP 37,344 19,203 ACWP CVInd 359,790 Red 29,315 Red CV -322,446 -10,112 CV% -863.4 -52.7 CPI SVInd 0.1 Green 0.66 Red SV -377 -153,651 SV% -1 -88.9 SPI TPhsd Bdgt %Spent %Comp 0.99 37,721 953.8 99 0.11 192,018 15.3 10

Variance Analysis Report (VAR) Program 63641 Cost Account Variance explanation (Root cause):

HCBA006

Variance

CV -322,446

CAM

John B. Good

Month End

May-01

Explain the cause of the cost and/or schedule variance. This explanation needs to be more than " the work was more than anticipated" or the "budget was insufficient for the tasks". A better explanation would be something similar to " the skill expertise available (or needed) to accomplish the task was much higher/more expensive than anticipated when bidding/budgeting" or the "schedule delay is due to late receipt of part number xxx ( or drawing xxx for yyyy)"

Impact of problem to task/program:

The schedule will be recovered in approximately two weeks ( see corrective action). There is/will be no impact to other tasks or the completions of XXXXXX.

Corrective Action ( Recover plan & when):

The schedule variance will be recovered by adding a additional individual for two weeks. There is/will be no impact to other tasks or the completions of XXXXXX. The additional individual will increase costs by approximately $4000, but since we are currently underrunning, it is still anticipated that the budget will be met.

Estimate at completion impact:

If a cost variance cannot be recovered, or a schedule variance will have a cost impact, the impact to the EAC should be quantified.

Approvals: Cost Account Manager: John B. Good Date: 20-May-01 Program Office Review by: Suzy R. Concerned Date: 21-May-01

34

36

The Cost Performance Trend (CPT)

The Cost Performance Trend metric is a simple formula for quickly seeing changes in the cumulative CPI:
CPI (now) + CPI (last month) + CPI (2 months ago) ago) 3 CPI (last month) + CPI (2 months ago) + CPI (3 months 3

CPT =

The resulting Metric indicates the change in performance efficiency over the past 4 months of the program Looking at changes in the 3 month moving average smoothes out spikes in the data and focuses on true trending

Data Example with the CPT Metric:

37

Adding the CPT to the earlier example gives us this:


Month 1 Month 2 $1,150 $1,045 1.10 Month 3 $1,300 $1,204 1.08 Month 4 $1,450 $1,394 1.04 -0.02 Month 5 $1,600 $1,584 1.01 -0.03 Month 6 $1,700 $1,735 0.98 -0.03

Earned Value (BCWP) Actual Costs (ACWP) CPI (BCWP / ACWP)

$1,000 $901 1.11

CPT (3-Month Average Comparison)

The CPI became an indicator of a problem in month 6, while the CPT revealed a trend issue in month 4.

IPIC Implementation of the CPT

38

Both the CPI and the CPT will be used to determine a programs cost status for internal reviews Display CPI and CPT for program bottom line summary information

PMs may elect to use CPI/CPT information for individual WBS elements or major summary WBSs at their discretion

Both metrics will use a color coding system to communicate status:


CPI Colors >= 1.00 BLUE <1.00 and >= 0.95 GREEN <0.95 and >=0.90 YELLOW <0.90 RED CPT Colors > +.005 BLUE <= +.005 and >=-.005 GREEN < -.005 and >= -.015 YELLOW < -.015 RED

We use consistent color-coding metrics for internal reporting

IPIC Implementation Examples


November 04 Add-On CLINs
A Lower risk - Category A programs

BCWS 7 7

BCWP 7 7

ACWP 7 7

Cumulative to Date SV % 0 0 0% 0%

CV 0 0

% 0% 0%

% Compl 11% 11%

Budget 64 64

At Completion LRE VAC 64 64 0 0

% 0% 0%

Cost Metrics CPI CPT 1.00 1.00 0.001 0.002

7281 ALCS E6B Blk 1 Mod Spt FY05 (Opt 1) Subtotal A Category CLINs
B Higher risk - Category B programs

7069 ISMP SDD B-Plug &RVA) 2450 SPP Motor Gen/ Voltage Regulator SDD 2451 SPP Capacitor Qual & Del. FY04/FY05 7258 PT APU Replacement Design & Dev. 7262 AN/GSM 315 Prod (GMATS) 7263 AN/GSM-315 ATS (GMATS) FY04 7298 Flt Ctrl Power Supply TPS Dev/Prod Subtotal B Category CLINs N/A Not CPAF - No Award Fee 2502 ECS Parts Replacement Study 7299 PT APU PRODUCTION Subtotal N/A CLINs GS CLINs Total

13,459 479 372 1,090 2,885 1,150 96 19,530

13,477 447 322 1,123 2,877 1,156 46 19,448

12,500 381 195 758 2,870 782 33 17,519

18 -33 -49 33 -8 6 -50 -82

0% -7% -13% 3% 0% 1% -52% 0%

977 66 127 365 7 374 13 1,930

7% 15% 39% 33% 0% 32% 29% 10%

62% 28% 20% 97% 95% 45% 21% 59%

22,113 1,653 1,654 1,292 3,121 2,790 230 32,853

22,113 1,653 1,654 992 3,121 2,790 230 32,553

0 0 0 300 0 0 0 300

0% 0% 0% 23% 0% 0% 0% 1%

1.08 1.17 1.65 1.48 1.00 1.48 1.40 1.11

0.003 0.002 0.006 0.007 (0.004) 0.006 0.009 0.006

Internal PMR Reporting Example Internal PMR Reporting Example

38 809 847 20,383

38 756 794 20,249

21 756 777 18,303

0 -53 -53 -134

0% -6% -6% -1%

17 0 17 1,946

44% 0% 2% 10%

11% 25% 24% 57%

347 3,081 3,428 36,345

347 3,081 3,428 36,045

0 0 0 300

0% 0% 0% 1%

1.78 1.00 1.02 1.11

0.010 0.005 0.011 0.007

CLIN Performance is Excellent CLIN Performance is Satisfactory CLIN Performance is of Concern CLIN Performance is Unsatisfactory

Award Fee Categories Cat. A - Low Risk Cat. B - Moderate to High Risk N/A - Not Applicable

CPI = Cost Performance Indice (Current Performance / Current Costs) CPT = Cost Performance Trend (Change In CPI Trend)

1.20 1.15 1.10 1.05 1.00

CPI CUM

SPI CUM

1.10

1.20 1.10 1.00 0.90 0.99

Cost History Example For Major Programs


(In Backup)

0.95 0.90 0.85 0.80


Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct

Current CPI = 1.10 Current CPT = +0.003

0.80
Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct

Management Reserve

22,000 20,000 18,000 16,000 14,000

BCWS BCWP ACWP

Program XYZ CPI CPT

Jul-04 1.14 0.006

Aug-04 Sep-04 1.11 1.11 0.005 0.003

Oct-04 1.11 -0.010

Nov-04 Dec-04 1.12 1.11 0.003 0.000

500 450 400 350 300 250 200 150 100 50 0


Dec Feb Apr Jun Aug Oct Dec MR Feb Apr Jun Aug

$179.9K

12,000 10,000 8,000 6,000 4,000

Oct

2,000 0 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov

39

BCWS CUM $19.8M

BCWP CUM $19.7M

ACWP CUM $17.9M

TAB $22.2M

BAC $26.1M

EAC $25.0M

MR $

NG 179.9

Boeing 1,243.0

Raytheon $ 93.2

Total $ 1,516.1

40

Case Study

Lets look at real data from an IPIC program to see how the CPT provides valuable data upon which PMs can act

SERV Test Equipment Monthly BCWP Monthly ACWP Cumulative BCWP Cumulative ACWP Cumulative CPI 3-Mnth Avg CPI CPT

Apr-02
158,713 130,430 158,713 130,430 1.22

May-02
258,305 119,926 417,018 250,356 1.67

Jun-02
360,278 262,481 777,296 512,837 1.52 1.47

Jul-02
288,142 228,806 1,065,438 741,643 1.44 1.54 0.073

Aug-02
326,389 180,881 1,391,827 922,524 1.51 1.49 -0.052

Sep-02
248,034 218,693 1,639,861 1,141,217 1.44 1.46 -0.026

Oct-02
285,803 200,953 1,925,664 1,342,170 1.43 1.46 -0.001

Nov-02
343,204 169,729 2,268,868 1,511,899 1.50 1.46 -0.003

Dec-02
269,113 228,001 2,537,981 1,739,900 1.46 1.46 0.007

Jan-03
358,738 314,415 2,896,719 2,054,315 1.41 1.46 -0.008

Feb-03
322,494 309,698 3,219,213 2,364,013 1.36 1.41 -0.046

Mar-03
346,530 453,128 3,565,743 2,817,141 1.27 1.35 -0.064

Apr-03
466,924 417,921 4,032,667 3,235,062 1.25 1.29 -0.055

May-03
408,188 435,074 4,440,855 3,670,136 1.21 1.24 -0.051

Jun-03
566,880 580,355 5,007,735 4,250,491 1.18 1.21 -0.029

Jul-03
657,018 419,462 5,664,753 4,669,953 1.21 1.20 -0.011

Aug-03
551,587 627,026 6,216,340 5,296,979 1.17 1.19 -0.012

Sep-03
560,447 578,651 6,776,787 5,875,630 1.15 1.18 -0.008

Oct-03
594,061 592,530 7,370,848 6,468,160 1.14 1.16 -0.024

Nov-03
548,288 703,709 7,919,136 7,171,869 1.10 1.13 -0.023

Dec-03
615,168 461,746 8,534,304 7,633,615 1.12 1.12 -0.012

Jan-04
627,298 535,580 9,161,602 8,169,195 1.12 1.11 -0.006

Feb-04
970,318 1,140,351 10,131,920 9,309,546 1.09 1.11 -0.005

Mar-04
901,987 997,433 11,033,907 10,306,979 1.07 1.09 -0.016

Apr-04
942,414 1,216,680 11,976,321 11,523,659 1.04 1.07 -0.027

May-04
891,079 1,564,382 12,867,400 13,088,041 0.98 1.03 -0.035

Jun-04
758,449 1,251,319 13,625,849 14,339,360 0.95 0.99 -0.040

Jul-04
802,416 1,318,644 14,428,265 15,658,004 0.92 0.95 -0.039

Aug-04
1,071,177 1,904,636 15,499,442 17,562,640 0.88 0.92 -0.034

Sep-04
894,260 1,690,801 16,393,702 19,253,441 0.85 0.89 -0.033

Oct-04
723,900 2,075,784 17,117,602 21,329,225 0.80 0.85 -0.040

Nov-04
561,994 1,389,897 17,679,596 22,719,122 0.78 0.81 -0.035

TOTAL SERV Monthly BCWP Monthly ACWP Cumulative BCWP Cumulative ACWP Cumulative CPI 3-Mnth Avg CPI CPT

Apr-02
1,703,603 1,317,932 1,703,603 1,317,932 1.29

May-02
2,011,908 1,619,179 3,715,511 2,937,111 1.27

Jun-02
2,625,249 2,188,294 6,340,760 5,125,405 1.24 1.26

Jul-02
2,625,249 2,311,172 8,966,009 7,436,577 1.21 1.24 -0.029

Aug-02
3,096,150 2,622,730 12,062,159 10,059,307 1.20 1.21 -0.022

Sep-02
3,222,654 2,883,077 15,284,813 12,942,384 1.18 1.20 -0.019

Oct-02
3,187,640 2,883,887 18,472,453 15,826,271 1.17 1.18 -0.013

Nov-02
3,295,791 2,872,306 21,768,244 18,698,577 1.16 1.17 -0.012

Dec-02
2,611,636 2,517,311 24,379,880 21,215,888 1.15 1.16 -0.011

Jan-03
3,057,407 2,853,791 27,437,287 24,069,679 1.14 1.15 -0.009

Feb-03
2,927,591 2,909,064 30,364,878 26,978,743 1.13 1.14 -0.013

Mar-03
3,249,846 3,161,875 33,614,724 30,140,618 1.12 1.13 -0.011

Apr-03
3,211,799 3,133,240 36,826,523 33,273,858 1.11 1.12 -0.011

May-03
3,280,894 3,202,496 40,107,417 36,476,354 1.10 1.11 -0.009

Jun-03
3,159,047 3,709,563 43,266,464 40,185,917 1.08 1.09 -0.013

Jul-03
3,936,064 3,665,234 47,202,528 43,851,151 1.08 1.08 -0.010

Aug-03
3,543,168 3,570,317 50,745,696 47,421,468 1.07 1.07 -0.010

Sep-03
3,314,675 3,193,597 54,060,371 50,615,065 1.07 1.07 -0.003

Oct-03
3,780,904 3,527,815 57,841,275 54,142,880 1.07 1.07 -0.003

Nov-03
4,167,568 4,533,366 62,008,843 58,676,246 1.06 1.06 -0.004

Dec-03
3,304,632 2,270,995 65,313,475 60,947,241 1.07 1.07 0.001

Jan-04
3,057,576 3,143,738 68,371,051 64,090,979 1.07 1.07 -0.001

Feb-04
4,562,586 4,497,124 72,933,637 68,588,103 1.06 1.07 0.002

Mar-04
4,017,691 4,018,785 76,951,328 72,606,888 1.06 1.06 -0.004

Apr-04
4,040,050 4,117,217 80,991,378 76,724,105 1.06 1.06 -0.004

May-04
4,757,562 5,695,288 85,748,940 82,419,393 1.04 1.05 -0.008

Jun-04
3,159,047 3,831,880 88,907,987 86,251,273 1.03 1.04 -0.010

Jul-04
3,595,982 4,217,824 92,503,969 90,469,097 1.02 1.03 -0.011

Aug-04
5,088,059 5,022,706

Sep-04
3,553,454 4,968,679

Oct-04
3,327,212 4,900,363

Nov-04
3,307,671 4,466,256

97,592,028 101,145,482 104,472,694 107,780,365 95,491,803 100,460,482 105,360,845 109,827,101 1.02 1.03 -0.006 1.01 1.02 -0.008 0.99 1.01 -0.010 0.98 0.99 -0.014

Recommended 1st Stops for EVM Info:


1.

PMI Earned Value Management Community of Practice http://www.pmi-cpm.org

2.

Department of Defense Earned Value Management Website http://www.acq.osd.mil/pm/


Dr. David Christensens (SUU!!!) Earned Value Bibliography http://www.suu.edu/faculty/ChristensenD/EV-bib.html AACE Web Site http://www.aacei.org

3.

4.

41

EVP Earned Value Professional

EVP Exam Structure The EVP examination consists of four parts (1 hour 45 min each).

Part I is Planning. It consists of multiple-choice questions concerning general earned value concepts, organization, planning, scheduling and budgeting. Part II is an Earned Value Professional Communications Memorandum. It requires the candidate to write the equivalent of a one-page typewritten memorandum, to a project manager, on a given project situation. The memorandum must explain the issues and propose a solution regarding a given problem on a project. Part III is applied Earned Value Applied.This part entails answering a series of complex applications. Part IV is Monitoring and Control. It consists of multiple-choice questions involving accounting, analysis and reporting.

Recommended Text to Study for EVP Certification: Most recommended texts, available in AACE Online Store: Earned Value Professional Certification Study Guide

Skills and Knowledge of Cost Engineering, 5th edition (4th if you already have it) Additional Reference Material, The ANSI 748-B Standard: ANSI Website NDIA Website DOD Earned Value Management Website Sponsored by the Office of the Under Secretary of Defense (Acquisition, Technology & Logistics)

Main Web site List of formulas and terms

42

EVM included in Ch9 of TCM Framework

43

You might also like