Drying Machine Manual
Drying Machine Manual
Operation Manual
ZhengZhou Amisy Trading Co. Ltd Address: 511A SoKeYuFa Building, NO.26 JingLiu Rd. ZhengZhou, China. Tel; 0371-65903478 Fax: 0371-65903401
I. Overview Hot air Cycling Drying Machine is domestic initiative products designed by our factory, after several upgraded, the dryer reachs to the domestic and international advanced level. The three Series products of CT and CT - C and medicinal GMP use the basic principle which is to use steam or electricity as a heat energy, via steam radiator or electric heating element to produce the heat energy. It uses the convection heat transferred by air motor, pass the heating to drying material, at the same time, input the fresh air and discharge the wet air, keep the proper temperature and humidity in the dryer of drying procedure.
The dryers biggest feature is the most of the hot aire in the case for circulation, to increase the mass transfer and heat transfer, save the energy, These three series products are
widely used in pharmaceutical, chemical, food, light and heavy industry materials and products of frontal heating dehumidification. GMP pharmaceutical medicinal oven will be designed and made according to the actual requirement.
II.
Technical Parameter
Mode l No. Drying Qty /batch 100 200 300 400 25 50 120 240 240 360 360 480 35 120 240 360 480 Po we r 1.1 1.1 2.2 2.2 0.4 5 0.4 5 0.4 5 0.9 0.9 1.3 5 1.3 5 1.8 0.4 5 0.4 5 0.9 1.3 5 1.8 Steam Consumpti on 20 40 60 80 5 10 18 36 36 54 54 72 8 18 36 54 72 HeatingAr ea AirVolu me /h 3400 5200 9800 9800 3450 3450 3450 6900 6900 10350 10350 13800 3450 3450 6900 10350 13800 Temperatu re Difference 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Tray/p c Dimension WxDxH Bak e car pc 2 4 6 8 0 1 2 4 4 6 6 8 0 2 4 6 8
Insdustr y standa rd no. RXH-14B RXH-27B RXH-41B RXH-54B RXH-5C RXH-7C RXH-14C RXH-27C RXH-27 ARXH-41C RXH-42 ARXH-54C
24301200 2370 24302200 2480 34302200 2620 44602200 2620 14801100 1750 14001200 2000 23001200 2000 23002200 2000 44601200 2290 23003220 2000 34302200 2000 44602200 2290 14801100 1750 23001200 2000 23002200 2000 34302200 2000 44602200 2290
CT-C-O(GMP medicinal ) CT-C-(GMP medicinal ) CT-C-(GMP medicinal ) CT-C-(GMP medicinal ) CT-C-(GMP medicinal )
III. Use Guidelines a), the three series drying machine is used steam heater and far infrared thermal energy as heating source. Steam heaters highest work pressure is 0.6 MPa, banned overpressure use; b), if the oven temperature requirements is in the range of 120-140, the steam pressure should be in 0.4-0.8 MPa range, if the temperature in the cabinet requirement achieves to 80-120 ,the steam pressure should be in 0.2-0.4 MPa range. c), these three series dryingm achine requires three-phase five wire 380/220v. d). The far infrared ray electric heater elements using 380V or 220V, current status is 220V. e), after connecting with the air motor electricity power, start air motor switch, the
direction of the air motor runs should be consistent with the marked direction symbols. f). after the steam pipeline of dryer connected with steam pipe of boiler, when using dryer, must open the valve of discharging water device, discharge the residual sundries and
condensate water, in order to protect traps works normally. Due to the pipe has residue, if find solenoid valves and traps are ineffectiveness at the same time, must dismantle them to clean, then can keep the normal g), the shutter on both sides of dryer in the reseting angle, operation.
large area, please pay attention not open the two pieces of blades at left bottom, from the third blade, let the open Angle becomes more and more bigger. As the shutter leaves
resets correctly or not, will effect the temperature in the cabinet. The leves on the right side
should decrease the air flow volume when high temperature, increase the air flow volume when lower temperature. h), The method to reset the temperature differnece Put the thermometer at three position of dryer, they are 200 under roof placement, 200mm up of bottom and middle position as center position. Close the door of dryer, open the steam valve and start the fan to proceed heat recycle, and remove thermometer after 30 mins. Observe the temperature of these up,middle and down thermometer is normal or not, if is in the standard range. If the temperate difference is big, should adjust the blade angle smaller at the place with high temperature, instead, adjust the blade angle bigger at the position with lower temperature. Till to the temperatuare difference become less, not need to adjust more. i). The wet institutions on the dryer is used to discharge the wet air from dryer. When the temperature up to desired setting, then can discharge the wet air. But can not open the wet valves angle too big, it should according to the moisture of drying material. j). Delivery as the dryer will be transported overall, in the transportation, some parts maybe will have shift phenomenon, so must adjust all parts before run the machine, to ensure the usage effect. k). CT series dryer must be wet protected in order to reduce the heating loss.
1. steam pressure too big 2. steam trap broken 3. electric heating voltage too low 4. discharge wet valve normally open 5.air fan with wrong runing direction 6. display meter not correct
2temperature note evenly in dryer 3.air fan with big noise 4.drying speed too slow
1. window shades not adjusted correct According I segment g) point toadjust 2.the door of dryer not close well 1.fan or motors screw loose 2. axle beraing wear and tear 3. motor runs in 2 phase 1.temperature too low 2.discharge wet not be suitable 3. air volume too small 1.SA contact undesirable 2. weldak core breker 3.power is not correct 4. light damage 1.Fan daed 2.automatic switch tripped 3. motor single-phase operation 4.main road contact undesirable 5.motor bearing damage 1, fans turn right Adjustment clearnace Closed automatically switch Check the power supply and voltage Strong each connecting terminals Replacement or refueling The motor any two phase power supply Check the wire and slove Adjust the discharge wet valve Check the air fan and air pipe if has air leakage or has some sundry sucked on the blade Open,check or change connect the electricity wire according the draft
7. no air in dryer
2, oven improper adjustment within Adjust the guide plate the shutters dredge 3, duct obstruction Check after prison According to the figure is lines meet
8.display meternot 1, hot air resistance fuses and meter correct connections is bad, contact resistance
increased 2, wrong wiring 1, solenoid valve, garbage out Check clearing 9. Oven temperature abuse 2, bypass valve leakage repaired change 3, instrument damage repaired change
V. Operating procedures (a), cycling warm air drying oven operation procedures Automatic control device, before it was put to use for the power supply voltage, must conform with this equipment use whether, pipeline leaks, the fan rotation, thermal relay is whether failure and other circumstances were using the appropriate adjustment, inspection, and then carefully, according to the following steps operation. 1, the control power switch SA dial in position, in open HL1 ever instructions. Attention lights 2, the controller XMTS - 7WJ4 / operating reference dryer special controller "S instructions. 3, turn off the globe valve (see figure 1-1) "3, 4" to open the by-pass, also open hydrophobic up bypass valve, off the sewage pipe trash, and in the reverse order, turn off the by-pass 1, open the globe valve 3, 4, and then will hand automatic switch in manual position, press heating button switches, and repeated many times, from traps bypass valve, check the electromagnetic valve work, such as the discovery of electromagnetic valve can't
open or close the undead, immediately check whether electromagnetic valve two ends garbage, welding slag. For the above experiment, clean again until no abnormal phenomenon, could put into use, and turn off the by-pass 2. XY
3 heater
Condensate water 2
Steam Trap 1
5, Set the electric actuators limit switches in open and close position limit. 6, in the use of steam electric heating in two, should first check the oven of electric heating tube attachment is firmly or not, each nuts are tight, have without loosening phenomenon, according to electric power into line selection. Note: no flammable and explosive substances, baking than 0.6 MPa steam pressure is strictly prohibited.