Design of Concrete Lined Flood Control Channels

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26
At a glance
Powered by AI
The key takeaways are that this manual provides guidance for the design of reinforced concrete lined flood control channels and considerations for different channel types, loading conditions, and structural elements.

The purpose of this manual is to provide guidance for the design of reinforced, concrete lined flood control channels which convey rapid and tranquil storm water flows to prevent flooding.

This manual provides guidance for trapezoidal and rectangular flood control channels lined with reinforced concrete. It does not provide guidance for channels lined with other materials like gabions or riprap.

CECW-ED

Manual No. 1110-2-2007

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000

EM 1110-2-2007

30 April 1995

Engineering and Design STRUCTURAL DESIGN OF CONCRETE LINED FLOOD CONTROL CHANNELS

1. Purpose. This manual provides guidance for the design of reinforced, concrete lined flood control

channels which convey rapid and tranquil storm water flows to prevent flooding. This guidance presents provisions for coordinating the disciplines involved in the design of channels, selecting channel type, and identifying the critical aspects of designs which require quality assurance inspection during construction. Channel design involves determining the overall channel configuration including appurtenant structures, designing reinforced concrete structures and pavement or concrete lining, determining type and location of joints, designing subdrainage systems, and designing appropriate safety features.
2. Scope. This guidance addresses trapezoidal and rectangular flood control channels lined with reinforced concrete. Guidance is not included for the design of channel linings formed by gabions, riprap, shotcrete, gunite, or grouted mattresses. 3. Applicability. This guidance applies to all HQUSACE elements, major subordinate commands,

districts, laboratories, and field operating activities having civil works responsibilities. FOR THE COMMANDER:

CECW-ED Manual No. 1110-2-2007

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000

EM 1110-2-2007

30 April 1995

Engineering and Design STRUCTURAL DESIGN OF CONCRETE LINED FLOOD CONTROL CHANNELS

Table of Contents
Subject Paragraph Page Subject Paragraph Page

Chapter 1 Introduction Purpose and Scope . . . . . . . . . . Applicability . . . . . . . . . . . . . . References . . . . . . . . . . . . . . . Design Philosophy . . . . . . . . . . Coordination . . . . . . . . . . . . . . Channel Section . . . . . . . . . . . . Safety Provisions . . . . . . . . . . . Aesthetic Provisions . . . . . . . . . Relationship between Design Assumptions and Construction Practices . . . . . . . . . . . . . . . . Computer Programs for Structural Design . . . . . . . . .

. . . . . . . .

. . . . . . . .

. . . . . . . .

. . . . . . . .

1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8

1-1 1-1 1-1 1-1 1-1 1-2 1-2 1-2

.... ....

1-9 1-10

1-2 1-2

Drainage Provisions . . . . . . . . . . Continuously Reinforced Concrete Paving . . . . . . . . . . . . . . . . . . Construction Joints . . . . . . . . . . . Expansion Joints . . . . . . . . . . . . End Anchorage . . . . . . . . . . . . . Cutoff Walls . . . . . . . . . . . . . . . Intersecting Channels . . . . . . . . . Deficiencies in Past Designs of Paved Trapezoidal Channels . . . Drainage Layer Construction . . . . Maintenance Considerations . . . . Repair of Damaged Paving . . . . .

. . . . . 3-3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 3-5 3-6 3-7 3-8 3-9 3-10 3-11 3-12 3-13

3-1 3-2 3-3 3-4 3-4 3-4 3-4 3-5 3-5 3-5 3-6

Chapter 2 General Design Considerations General . . . . . . . . . . . . . . . . . . . . . Selection of Channel Type . . . . . . . Reinforced Concrete Structures . . . . Drainage Provisions . . . . . . . . . . . . Vehicular Access Ramps . . . . . . . . Control of Water During Construction . . . . . . . . . . . . . . . . Maintenance During Operation . . . . . . . . . . . . . . . . . . . Protection of Private Property . . . . . . . . . . . . . . . . . . . .

. . . . . . . .

2-1 2-2 2-3 2-4 2-5 2-6 2-7 2-8

2-1 2-1 2-1 2-5 2-6 2-6 2-6 2-6

Chapter 4 Special Design Considerations for Rectangular Channels Lined with Retaining Wall Structures General . . . . . . . . . . . . . . . . . . . . . . . Retaining Wall Types . . . . . . . . . . . . . Channel Bottoms . . . . . . . . . . . . . . . . Joints in Retaining Walls . . . . . . . . . . Drainage Provisions . . . . . . . . . . . . . . Structural Design . . . . . . . . . . . . . . . . Special Considerations During Construction . . . . . . . . . . . . . . . . . . Chapter 5 Special Design Considerations for Rectangular Channels Lined with U-frame Structures General . . . . . . . . . . . . . . . . . . . . . Foundation Considerations . . . . . . . Joints in Concrete . . . . . . . . . . . . . Drainage Provisions . . . . . . . . . . . . Structural Design . . . . . . . . . . . . . .

. . . . . .

4-1 4-2 4-3 4-4 4-5 4-6

4-1 4-1 4-1 4-1 4-1 4-2 4-4

. 4-7

Chapter 3 Special Design Considerations for Paved Trapezoidal Channels Introduction . . . . . . . . . . . . . . . . . . Constructibility of Paving Slabs on Sloped Sides of Channels . . . . . . . .

3-1 3-2

3-1 3-1

. . . . .

. . . . .

. . . . .

5-1 5-2 5-3 5-4 5-5

5-1 5-1 5-1 5-1 5-1 i

EM 1110-2-2007 30 Apr 1995


Subject Paragraph Page Subject Paragraph Page

Special Considerations during Construction . . . . . . . . . . . . . . . . . Appendix A References . . . . . . . . . . . . . . . . . . Appendix B Computer Programs . . . . . . . . . .

5-6

5-2

Appendix C Drainage System Designs for U-frame and Trapezoidal Channels . . . . . . . . Appendix D Equations for Continuously Reinforced Concrete Pavement . . . . . . .

C-1

A-1

B-1

D-1

ii

EM 1110-2-2007 30 Apr 95

Chapter 1 Introduction

1-4. Design Philosophy Flood control channels are constructed for the purpose of conveying heavy storm water flows through and from areas which would otherwise be inundated, usually resulting in property damages and loss of life. Typically, these projects are owned and maintained by local sponsors. These channels usually: are the primary feature of local flood protection projects, extend for great distances, require significant construction costs due to their extensiveness, and present extreme consequences should failure occur. Therefore, channel design solutions should be developed in a logical and conservative manner which provides for economical construction and serviceability and ensures functional and structural integrity. 1-5. Coordination Although this guidance pertains primarily to the structural design aspects of flood control channel design, close coordination with other design disciplines and the local sponsor is required. Other disciplines involved in the design are hydrologic, hydraulic, concrete and materials, geotechnical, environmental, and construction. Some of the critical aspects of the design process which require coordination are: a. Estimates of design slope and runoff volumes, selection of channel cross-sectional area, and location of required energy dissipation and juncture structures. b. Design water surface elevations.

1-1. Purpose and Scope a. Purpose. This manual provides guidance for the design of reinforced, concrete lined flood control channels which convey rapid and tranquil storm water flows to prevent flooding. This guidance presents provisions for coordinating the disciplines involved in the design of channels, selecting channel type, and identifying the critical aspects of designs which require quality assurance inspection during construction. Channel design involves determining the overall channel configuration including appurtenant structures, designing reinforced concrete structures and pavement or concrete lining, determining type and location of joints, designing subdrainage systems, and designing appropriate safety features. b. Scope. This guidance addresses trapezoidal and rectangular flood control channels lined with reinforced concrete. Guidance is not included for the design of channel linings formed by gabions, riprap, shotcrete, gunite, or grouted mattresses. (1) Trapezoidal channels. Trapezoidal channels have sloped sides and are formed by excavating in situ materials. The sloped sides and channel bottom may require paving for protection, depending on the stability of the sides and the resistance of the in situ materials to erosion. (2) Rectangular channels. Rectangular channels have vertical or near vertical sides which are formed with reinforced concrete retaining walls, I-walls, or U-frame structures. The channel bottom may be paved or unpaved depending on the resistance of the in situ material to erosion. 1-2. Applicability This guidance applies to all HQUSACE elements, major subordinate commands, districts, laboratories, and field operating activities having civil works responsibilities. 1-3. References Required and Appendix A. related publications are listed in

c. Topography of area containing the channel alignment and existing elements, structures, utilities, etc. d. Preliminary estimates of geotechnical data, surface and subsurface conditions, and location of existing structures of utilities. e. Evaluation of technical and economic feasibility of alternative designs. f. Refinement of the preliminary design to reflect the results of more detailed site exploration, laboratory testing, and numerical testing and analyses.

1-1

EM 1110-2-2007 30 Apr 95 1-6. Channel Section The proper cross section for a reach of channel is one that provides adequate hydraulic capacity at the minimum cost. Economic considerations for selecting the channel section include the costs of design and construction, right-of-way, required relocations, and maintenance and operation. A trapezoidal channel is usually the most economical channel when right-of-way is available and is, therefore, the more commonly used channel section. A rectangular channel may be required for channels located in urban areas where the right-of-way is severely restricted or available only at a high cost. 1-7. Safety Provisions Channel designs should include safety provisions for the needs of the public and operations personnel. Local sponsors are responsible for the safe operation of channels, and designers should coordinate designs with the sponsor so that appropriate provisions are incorporated to ensure safe operation of the project. Railing or fencing should be provided on top of rectangular channel walls and walls of chutes or drop structures for public protection. Ladders should be provided on the sides of rectangular channel walls and steps provided on the sloped paving of trapezoidal channels to provide safe access for operations personnel. 1-8. Aesthetic Provisions The merits of incorporating environmental quality into channel design have been established. EM 1110-2-38 and EM 1110-2-301 provide guidance for channel alignment, landscaping, and aesthetic treatment of channel linings. 1-9. Relationship between Design Assumptions and Construction Practices The designer should identify the design assumptions, details, and specification requirements which are essential to design integrity. These items should receive assurance inspection during construction to assure that actual field conditions and construction practices are in compliance with the design assumptions and specification requirements. Some assurance inspection items for channels are listed below. These items should be adjusted as appropriate for the particular design. a. Subgrade preparation (materials, compaction, and finished grade). b. Reinforcing steel (materials and placement).

c. Concrete (materials, strength, mixing, placing, thickness, and other dimensions). d. Waterstops and joints (type and installation).

e. Subdrainage system (pipe material, valves types, filter materials, and other installation requirements). 1-10. Computer Programs for Structural Design A listing and description of some of the current computer programs which are suitable for the structural design of elements of rectangular channels are given in Appendix B. Corps programs and users guides describing program capabilities may be obtained from: U.S. Army Engineer Waterways Experiment Station ATTN: CEWES-IM-DS/ECPL 3909 Halls Ferry Road Vicksburg MS 39180-6199

1-2

EM 1110-2-2007 30 Apr 95

Chapter 2 General Design Considerations

protection will define the nominal elevation of the top of the channel. This elevation may be modified locally to account for flow disturbances from causes such as bridge piers, side channels, or channel bends. (2) Channel flow. Channel flow patterns and changes in the water surface at bends in the channel should be considered in determining the channel cross section and overall configuration requirements. (a) Pilot channels. Pilot channels are constructed in the bottom of flat bottom channels which carry low flows except during floods. These channels confine low flows thereby maintaining higher velocities which may decrease the amount of sediment and trash deposits. The success of pilot channels has been varied. Experience has shown that sediment deposits occur in a pilot channel when the channel slope is not sufficient to maintain the velocities required to transport the sediments. An alternate design to a pilot channel is a V-shaped channel bottom. These channel configurations are shown in Figure 2-1. (b) Channel linings. Channel lining requirements are dependent upon the maximum velocity of flows and the resistance of the in situ materials to erosion. The quality of contained waters may affect the design of concrete linings. The presence of salts, sulfates, industrial wastes, and other abrasive or scouring materials sometimes requires thicker concrete lining sections with increased reinforcement cover. Mix design revisions using appropriate admixtures should be considered as an alternative to increasing the lining thickness. (c) Supplementary structures. Supplementary or appurtenant structures such as weirs, tunnels, culverts, inverted siphons and chutes, sediment or debris basins, and drop structures are often required. These appurtenant features are designed to satisfy the channel flow conditions. (d) Terminal structures. When the downstream end of a channel lining project terminates in erodible material, some type of energy dissipation treatment, such as stilling basin, drop structure, or riprap, is needed. 2-3. Reinforced Concrete Structures a. Materials. Materials for the construction of the reinforced concrete structures of concrete lined flood control channels shall comply with current Corps of Engineers guide specifications.

2-1. General This chapter provides general considerations for selecting the appropriate channel type and defining the requirements for executing the selected design. 2-2. Selection of Channel Type Paragraph 1-6 identifies the hydraulic capacity as the primary functional consideration and the costs of right-of-way, relocations, construction, and operation as economic considerations for selecting channel type. Existing site developments, existing geophysical site conditions, and performance or service requirements impact the selection of channel type and the resulting construction costs. The construction cost of trapezoidal channel sections is less than that of rectangular sections. Generally, the lowest cost of erosion protection is sod, and the cost increases with riprap protection and even more when reinforced concrete paving is used. Typical trapezoidal channel types are shown in Figure 2-1. a. Existing site developments. Existing roads, bridges, and buildings in highly developed areas often dictate the channel type and channel configuration. The more expensive rectangular channel sections, discussed in Chapters 4 and 5, are commonly required in areas where the right-of-way is highly restricted. Typical rectangular channel types are shown in Figure 2-2. b. Geophysical site conditions. Existing geophysical site conditions including the characteristics of in situ materials, depth of frost penetration, ground water levels, subsidence potential, faulting, and earthquake potential impact design solutions. The strength and erodability of in situ materials usually dictate whether a channel lining is required. Reinforced concrete walls located in seismic zones should be designed and constructed to resist the earthquake forces. High ground water levels increase the requirements for subdrainage systems. c. Service requirements.

(1) Top of channel. The projects level of protection is selected by a comparison of hydraulic flow line calculations, construction costs for various channel sizes, and economic benefits. These calculations are based on risk and uncertainty principles. The selected level of

2-1

EM 1110-2-2007 30 Apr 95

Figure 2-1. Trapezoidal channel sections

2-2

EM 1110-2-2007 30 Apr 95

Figure 2-2. Rectangular channel sections

2-3

EM 1110-2-2007 30 Apr 95 (1) Concrete. Guidance for concrete materials and mixture proportioning is given in EM 1110-2-2000. Typically, a compressive strength of 25 MPa (3,000 psi) at 28 days is used. Higher strengths may sometimes be justified for retaining walls, I-walls, or U-frame structures. Air-entrained concrete should be used when freeze-thaw conditions are anticipated. Microsilica, fly ash, aggregate hardness, etc., should be considered as improvements in resistance to abrasion, when required. Type II cement should be used when sulfates are present in moderate concentration. (2) Reinforcement. Steel bars shall be American Society for Testing and Materials (ASTM) Grade 60, deformed, cut lengths, or fabricated mats. Steel welded wire fabric shall be deformed wire produced from rods or bars that have been hot rolled. Consideration should be given to the use of a lower-permeability concrete and epoxy coated or galvanized reinforcement steel in areas where channel linings will be subjected to highly corrosive constituents such as saltwater or sanitary and industrial wastes. (3) Joint filler. Joint filler shall be preformed sponge rubber. (4) Joint sealant. Joint sealant shall be cold applied, multicomponent, and elastomeric. The sealant is installed in joints to prevent weathering of joint filler and is subjected to cyclic tension and compression loading as the temperature changes. (5) Waterstops. Waterstops should be installed in joints of concrete sections when watertightness is desired. Guidance for use of waterstops is given in EM 1110-22102 and EM 1110-2-2502. Waterstops in joints which may experience appreciable movements should be rubber or polyvinyl chloride. b. Structural design loadings. The forces acting on the structures and the weight of structures should be defined to perform the stability analyses and the design of the reinforced concrete sections of the structures. Some of the applied forces may be indeterminate in nature, and the designer must assume their location, direction, and magnitude. Assumptions should be based on available criteria, loading conditions, and the application of engineering expertise and judgment. Unsymmetrical loading, resisted by sliding friction or passive pressure, should be analyzed. (1) Earth pressures. Earth pressures on walls of rectangular channels should be determined by using the criteria given in EM 1110-2-2502 and ETL 1110-2-322 for T-type retaining walls and EM 1110-2-2504 for I-walls. Free-draining granular materials should be used for backfill behind walls to reduce the lateral earth pressure, decrease pressures due to frost action, minimize pressure increases from in situ materials having expansive characteristics, and increase the effectiveness of the drainage system. (2) Hydrostatic pressures. Hydrostatic horizontal pressure behind walls and uplift pressure under paving slabs should be determined. Uplift pressures should be determined for the steady-state seepage and drawdown conditions. The magnitude of hydrostatic pressures may be reduced by installing drainage systems as discussed in paragraphs 2-4, 3-3, 4-5, and 5-4. (3) Earthquake forces. Seismic forces for vertical walls of rectangular channels may be significant and should be determined using criteria given in ER 1110-21806 and EM 1110-2-2502. Seismic forces cause only small increases in earth and hydrostatic pressures on paving slabs and should be ignored. (4) Wind. Reference should be made to EM 1110-2-2502 for wind loads on walls but these are usually negligible. Wind loads on paving slabs should be ignored. (5) Surcharge. Surcharge loads from construction, operations and maintenance equipment, and highway or street vehicles should be included as appropriate. Criteria for determining surcharge loads are given in EM 1110-2-2502. c. Constructibility. The dimensions of the concrete structures of flood control channels should be such that the reinforcement, embedded metal, and concrete can be properly placed. The thickness of the top of walls greater than 8 ft in height and footings supporting such walls shall not be less than 12 in. to facilitate concrete placement. The thickness of the top of walls less than 8 ft in height and containing only one layer of reinforcement may be decreased to 8 in. Walls should be designed for construction simplicity and maximum reuse of concrete forms. Dimensions of monoliths, independently stable units of concrete structures, should be selected to allow practical volumes of concrete placements. d. Joints in concrete. Joints are provided in the reinforced concrete structures of flood control channels to divide them into convenient working units and to allow for expansion and contraction. The number of joints

2-4

EM 1110-2-2007 30 Apr 95 should be kept to a minimum to reduce construction and maintenance costs. There are no exact rules for determining the number and location of joints required in structures. The structural design requirements, overall dimensions, and form requirements should be considered to efficiently locate the joints. Guidance on expansion and contraction joints of retaining walls is given in EM 1110-2-2502. The location of all joints should be shown in the drawings. (1) Construction joints. Construction joints are used to divide structures into convenient working units and to provide bonded joints where concrete pours have been terminated. Keys are not recommended for horizontal construction joints because they are difficult to construct of sound concrete and to adequately clean for good bonding. Reinforcement should be continuous through construction joints. (2) Contraction joints. Contraction joints are used to divide structures into independently stable, constructible monoliths to control cracking due to curing, shrinkage, and temperature differentials. The spacing of contraction joints is dependent upon the characteristics of foundation materials, climatic conditions, channel flow patterns, and other geophysical site conditions. Reinforcement should not be continuous through contraction joints. (3) Expansion joints. Expansion joints are used to prevent crushing or spalling of concrete at abutting surfaces due to thermal expansion or differential movement resulting from settlement or applied loads. Expansion joints are commonly located at changes or junctures in structures. Reinforcement should not be continuous through expansion joints. 2-4. Drainage Provisions Drainage systems should be provided to control excessive hydrostatic pressures acting on the concrete structures of lined flood control channels where the permanent water table is above the channel invert. These systems should also be provided where the temporary water table is expected to be above the channel invert due to local ponding or seasonal variations. a. Drainage systems. Drainage systems used in past designs include open, closed, and weep-hole systems. Open drainage systems consist of collector drains which drain through weep holes in the channel lining. The collector drains are encased with a graded filter to prevent blockage of the drain or removal of the foundation material. Closed drainage systems consist of drainage blankets, collector drains, collector manholes, and outlet drains which drain into the channels. The outlet drains are provided with check valves to prevent the backflow of water from the channels into the drainage system. Weephole systems have been used for paving on rock foundations and usually consist of a system of holes drilled in the rock and weep holes in the paving slab. These systems are subject to clogging and require routine maintenance. Channel water will tend to backflow into the system and deposit silt during high channel water levels. Open systems are obviously more susceptible to clogging because they do not restrict backflow and should only be used for noncritical channels, side channels, and small channels (about 3 m (l0 ft) maximum in bottom width and depth, respectively). Closed systems shall be used for critical and large channels of which the continuous relief of hydrostatic pressures is critical to channel performance.

b. System selection. The investigations, analyses, and conclusions made in the selection of a drainage system for a flood control channel should be thoroughly documented in the project design memorandum. This documentation should include, but not be limited to, analyses of the geological and geohydrological investigation data, suitability of the system type for the specific site, and suitability of the system type for the operational requirements. c. System design investigation. Design of a drainage system requires information on subsurface soils and/or rock and ground water conditions along the channel area and also information on the characteristics of streamflow. A general understanding of the geology and geohydrology of the area should be obtained. Specific project data include information on the extent, thickness, stratification, and permeability of subsurface materials along the channel and information on ground water levels, their variations, and the factors which influence the variations. Information is also needed on stream stage variations and related ground water fluctuations so that the design differential head condition can be developed. d. System design. The design of a drainage system should be based on the results of seepage analyses performed to determine the required discharge capacity of the system. The design includes determination of the drainage blanket permeability and thickness requirements, collector drain spacing and size, and manhole spacing and location. Appendix C provides example seepage analyses and drainage system designs. Contract plans and specifications should require modification of the drainage system to alleviate perched water conditions encountered during

2-5

EM 1110-2-2007 30 Apr 95 construction. Drainage systems for trapezoidal channels are described in paragraph 3-3 and illustrated in Plate 1. Drainage systems for rectangular channels are described in paragraphs 4-5 and 5-4 and illustrated in Plate 2. e. System effectiveness. As discussed in paragraph 2-4a, drainage systems require routine cleaning and maintenance to relieve clogging. The need for routine operation and maintenance activities such as the control of aquatic weeds and silt removal should be addressed in the design. Experience has shown that many local flood protection projects are not adequately maintained. Therefore, unrelieved clogging can be expected to occur, thereby decreasing the effectiveness of the systems and resulting in increased hydrostatic pressures. Presently, precise information on the extent of loss of effectiveness of drainage systems during the life of projects is not available. However, since it is known that some loss of effectiveness does occur, channel lining designs should reflect possible increased hydrostatic pressures resulting from some loss in effectiveness of the drainage system during the life of the project. Without supporting data, drains may be assumed to be 75 percent effective. The criteria used in the design for determining the extent of loss of drainage system effectiveness should be thoroughly documented. 2-5. Vehicular Access Ramps Vehicle access ramps are provided to permit vehicular access during the construction and maintenance of projects. These ramps should enter the channel from an upstream to downstream direction. The number of ramps should be held to a minimum and each ramp carefully located so that its effect on the hydraulic efficiency and flood surface profile is minimized. 2-6. Control of Water During Construction The channel flows which should be controlled during construction are primarily local runoff and a selected storm runoff. This flow must be controlled by diversion, pumping, or phasing of the construction. One side of the channel is often constructed while providing for diversion of the water on the other side of the channel. After completion of the first side of the channel, flows are diverted to the completed side while completing the opposite side. Contract plans and specifications shall define the level of flood protection for which the construction contractor is responsible. The contractor should be responsible for the means of controlling the water, subject to approval by the government contracting officer. 2-7. Maintenance During Operation Proper maintenance of flood control channels is essential to satisfactory performance. This requires periodic inspection of the channels, including the concrete linings, appurtenant concrete structures, and the subdrainage system. Current Corps Operations & Maintenance (O&M) provisions require that flood control projects be inspected periodically. The frequency of project inspections and other operation and maintenance requirements shall be identified in the project O&M Manual. Any deficiencies critical to the function of the project should be corrected with urgency. Broken concrete and cracks in the concrete which are wide enough to cause concern should be repaired. Subdrain systems that are clogged shall be cleaned. 2-8. Protection of Private Property Certain reaches of the channels often require protection or underpinning of private property during channel construction. Shoring concepts often include drilled tangent pier walls or steel H-pile (soldier pile) walls with lagging. The wall system must control lateral deflections and prevent loss of ground. These wall systems are sometimes designed with anchor ties or struts. Other less expensive methods of shoring may be acceptable, depending upon the closeness and criticality of the property to be protected. The effects of construction vibrations and the removal or loss of lateral resistances should be evaluated. The effects of construction vibrations may be evaluated using the criteria developed by Woods and Jedele (1985) in Appendix A.

2-6

EM 1110-2-2007 30 Apr 95

Chapter 3 Special Design Considerations for Paved Trapezoidal Channels

3-1. Introduction a. Background. Corps practice, prior to the 1960s, was to employ concrete pavement with expansion and contraction joints for paved trapezoidal channels. Typically, the channel pavements contained light reinforcement. Many types of joints and a wide variety of joint spacings were used. The experience with these channels shows that substantial joint maintenance is required. Routine cleaning and replacement of the joint sealing compounds and expansion joint materials is needed. Pavement blowups result from improperly constructed joints and an infiltration of incompressible materials into the joints. Some of these jointed pavements have also developed uncontrolled cracks away from the joints that require repair. Many states were eliminating transverse joints and constructing continuously reinforced concrete highway pavements during the 1950s. By the 1960s, continuously reinforced concrete pavement was no longer considered experimental, and the Corps began to use this type pavement for trapezoidal channels. b. Pavement type. When concrete paving is used for trapezoidal channels in soil, it should be continuously reinforced concrete pavement (CRCP). CRCP is concrete pavement with continuous longitudinal and transverse reinforcement achieved by lapping the reinforcing bars. There are no control joints, and the continuous reinforcement is used to control cracks which form in the pavement due to volume changes in the concrete and foundation friction. Construction joints must be provided in CRCP at ends of construction pavements. Slab continuity is provided by continuing the reinforcing steel through the construction joints. Special measures are required when the continuity of the CRCP is terminated or interrupted with fixed structures or other pavements. The procedures provided in this chapter for the design of CRCP have been developed from observed performances of Corps flood control channels and the research of the design criteria used for continuously reinforced highway paving. 3-2. Constructibility of Paving Slabs on Sloped Sides of Channels The characteristics of the in situ materials and the level of the water table are considered in determining the slopes of

channel sides. Small trapezoidal channels with depths of 3 m (10 ft) or less may be constructed with side slopes of 1 vertical on 1.5 horizontal. Slopes between 1 vertical on 3 horizontal and 1 vertical on 2 horizontal are commonly used for the sides of larger channels. Vibrating screeds are commonly used in constructing paving slabs on sloped sides within this range of steepness. Cylinder finishing machines are available for finishing paving slabs with slopes up to 1 vertical on 3 horizontal in steepness. Control units should be mounted at the top or bottom of sloped sides to provide the capability of finishing upgrade to eliminate slump in the finished slab. Machines are available for trimming and slipforming the entire cross section of channels with bottom widths up to about 3.5 m (12 ft) in one pass. Paving construction procedures should provide for the curing protection of completed paving. 3-3. Drainage Provisions Drainage systems for channels formed in soil should be placed beneath paving slabs on bottoms of channels to relieve excessive hydrostatic pressures. The drainage system beneath the side slope paving typically does not need to extend higher than one-half the channel depth due to natural drawdown of the water table near the channel. The drainage system may need to extend higher than one-half of the slope height if the normal ground water is nearer the ground surface or a shallow perched ground water condition is encountered. Closed and open drainage systems have been used in past designs. Based on previous discussion in paragraph 2-4a, closed drainage systems should be used for large channels and where long-term performance of the drainage system is critical to channel life. Open drainage systems are sometimes sufficient for smaller channels and short channel sections, such as sections under bridges. The open drainage system can serve as an additional measure of protection for sections of channel where excessive hydrostatic pressures are not expected to develop. The design of channel paving slabs should reflect possible increased hydrostatic pressures resulting from some loss of drainage system effectiveness during the life of the project as discussed in paragraph 2-4e. a. Open drainage systems. Open drainage systems consist of collector drains which drain through weep holes in the sloped sides of the paving. The collector drains should be encased with a graded filter material to prevent the blockage of drains or the removal of foundation materials. The weep holes are commonly spaced not more than 3 m (10 ft) apart horizontally.

3-1

EM 1110-2-2007 30 Apr 95 b. Closed drainage systems. Closed drainage systems consist of drainage blankets, collector drains, collector manholes, and outlet drains as shown in Plate 1. Refer to Appendix C for a typical analysis of a drainage system for a paved trapezoidal channel. (1) Drainage blankets. A drainage blanket must retain the foundation soils, allow relatively free movement of water, and have sufficient discharge capacity to convey all ground water seepage which enters the blanket to the collector pipes. Therefore, the drainage blanket must satisfy the requirements for both a drain and a filter. An open-graded granular material with a relatively narrow range in particle sizes has a higher permeability and discharge capacity than a well-graded granular material. However, a well-graded granular material is generally required to meet filter criteria. A two-layer drainage blanket will often be required to satisfy both the drainage and filter requirements. Estimated quantities of seepage which will enter the drainage blanket should be determined by seepage analyses. EM 1110-2-2502, EM 1110-2-1901, and Cedegren (1987) provide guidance on design of the drainage blanket. The blanket should have a minimum thickness of 150 mm (6 in.) for a single layer system, and each layer for a multilayer system should have a minimum thickness of 150 mm (6 in.). (2) Collector drains. Collector drains should be 150-mm (6 in.) minimum diameter polyvinyl chloride pipe with perforations in the bottom half of the pipes circumference. Drains should be located at the bottom of the sloped sides, inverts of channels, and at intermediate locations, if required, to prevent development of excessive hydrostatic heads in the drainage blanket. Drains should be placed on top of the drainage blankets and should be encased with a coarse filter gravel. The coarse filter gravel should be covered with a material such as kraft paper to prevent clogging during placement of the concrete paving. Guidance on sizing the drain pipe is presented in TM 5-820-2 and Cedegren (1987). Guidance on sizing the perforations is presented in EM 1110-2- 2502, TM 5-818-5, and Cedegren (1987). (3) Collector manholes. Collector manholes should be of precast or cast-in-place concrete and should be provided with secured, watertight manhole covers for cleanout access. Manholes should be provided with adapters or blind flanges for connecting outlet and collector drains. The size and spacing of manholes should be determined by a seepage analysis. (4) Outlet drains. Outlet drains from collector manholes should be a minimum of 150 mm (6 in.) in diameter. The outlet drains should be provided with check valves to prevent the backflow of water from channels into the drainage system. However, it may be more practical to attach the check valves to the collector drains on the inside of the manholes where channels are subjected to heavy sediment. (5) Maintenance considerations. The design should provide for access to the drainage system to allow future maintenance and rehabilitation. Manholes should be sized and constructed to provide access to collector pipes for flushing, jetting, etc. Provisions should be made for cleanouts at locations where collector drains and laterals intersect, at intermediate points between widely spaced manholes, and at other locations as required to provide access to all segments of a drainage system for maintenance and rehabilitation. c. Pressure relief systems. Pressure relief systems should be developed for areas where perched ground water is encountered during construction. d. Monitoring. The most positive method of monitoring performance of the drainage system is to install piezometers in the drainage blanket to directly measure hydrostatic pressures acting against the channel paving. Piezometers are sometimes installed to monitor the effectiveness of the drainage system. When piezometers are not installed, the drainage system should be monitored for discharge during drawdown periods. The drainage system should be evaluated during the inspections discussed in paragraph 3-12a. 3-4. Continuously Reinforced Concrete Paving a. Concrete.

(1) Concrete strength. Concrete should have a minimum compressive strength of 25 MPa (3,000 psi). Channel paving is not normally designed for heavy vehicular loading as highway paving; therefore, the compressive strength is specified instead of flexural strength. Control of the concrete strength is important to the design since shrinkage increases as concrete strengths are increased. Concrete with nominal compressive strengths higher than 25 MPa (3,000 psi) will require greater percentages of reinforcement than those given in Tables 3-1 and 3-2. Therefore, CECW-ED approval should be obtained when the nominal concrete strength for continuously reinforced concrete channel paving exceeds 3,000 psi. (2) Concrete thickness. Based on past experience, the minimum thicknesses of main channel paving

3-2

EM 1110-2-2007 30 Apr 95
Table 3-1 Minimum Percentage of Reinforcing Steel For Continuously Reinforced Concrete Paving of Invert and Side Slopes of Trapezoidal Channels Longitudinal Reinforcing Steel fc <25 MPa 3,000 psi - reinforcement = 0.40% fc > 25 MPa 3,000 psi - reinforcement percentage as required by Equations D-1 and D-3 of Appendix D. Transverse Reinforcing Steel Widths* < 12 m (40 ft) = 0.15% Widths > 12 m (40 ft) - Same as longitudinal reinforcement * The total channel width should not be used, but instead, the width of the slab sections which extends between changes in slope or along the slope should be used.

the paving thickness, and the spacing of transverse bars should not exceed three times the paving thickness. (1) Minimum cover. Reinforcement should be placed in such a manner that the steel will have a minimum cover of 75 mm (3 in.). The thickness of paving subjected to high-velocity flows or heavy sand scouring should be increased to provide a 100-mm (4-in.) cover on the reinforcement. (2) Percentage of reinforcing steel. Reinforcing steel for CRCP slabs on soil foundations should comply with Table 3-1 or Table 3-2, whichever governs. The minimum percentage of reinforcing steel is given in Table 3-1, and the design percentage of longitudinal reinforcing based on the seasonal temperature differential is given in Table 3-2. Both longitudinal and transverse reinforcing steel in paving slabs on rock foundations should be in accordance with the longitudinal steel requirements of Table 3-1. (3) Splices in reinforcement. Splices in reinforcement should conform to American Concrete Institute (ACI) Building Code Requirements for Reinforced Concrete 318 (ACI 1989). Splices should be designed to develop the full-yield strength of the bar. Fifty percent of the splices should be staggered, and the minimum stagger distance should be 1 m (3 ft). (4) Bar size. Typically, bar sizes #10, #15, or #20 (#4, #5 or #6), are used for reinforcing CRCP. The bar size should be limited to a #6 to satisfy bond requirements and control crack widths. Reinforcing may be placed in two layers when a single layer would result in bar spacings that inhibit concrete placement. c. Pavement subject to vehicular traffic. Channel pavement designed in accordance with paragraph 3-4a. and 3-4b is adequate for light vehicular traffic. Pavement that will be subjected to heavy vehicular traffic, such as loaded dump trucks, should also be designed in accordance with TM 5-809-12. The modulus of subgrade reaction k, used in designing for the wheel loads, is dependent on the drainage blanket material and the in situ foundation material below the pavement slab and these values should be selected by the geotechnical engineer. 3-5. Construction Joints Construction joints should be placed in continuously reinforced paving to provide longitudinal joints between adjacent lanes of paving, where concrete pours are

Table 3-2 Longitudinal Reinforcing Steel Design Reinforcing Steel Percentage Based on Average Seasonal Temperature Differential (Equation D-2 of Appendix D, using fc < 25 MPa 3,000 psi ft < 2 MPa 230 psi and fy = 500 MPa 60,000 psi) Delta T, C (F) Steel Percentage 67 (120) 0.43 78 (140) 0.48 89 (160) 0.53

supported on soil foundations should be 200 to 250 mm (8 to 10 in.) for invert paving and 150 to 200 mm (6 to 8 in.) for slope paving, respectively. Thicknesses of pilot channel paving should be 250 mm (10 in.) or greater when flows carry scouring materials. The bottom slab and side slope paving thickness may be decreased to 150 mm (6 in.) for small side channels with the bottom slab less than 4.5 m (15 ft) wide and channel depths less than 3 m (10 ft). Paving of rock is usually not required; however, when required, the paving thickness should not be less than 13 mm (5 in). The designer should verify that the pavement is adequately designed for equipment loads which may occur during construction, maintenance, and operation of the channel. b. Reinforcement. Reinforcing steel should comply with paragraph 2-3a. Typically, a single layer of reinforcement should be used. The longitudinal steel should be located at or slightly above the center of the slab. The spacing of longitudinal bars should not exceed two times

3-3

EM 1110-2-2007 30 Apr 95 terminated at the end of the day or when delays in concrete placement would otherwise result in the formation of cold joints. The length of time for cold joint development depends on the severity of temperature, humidity, and other factors. Contract specifications should specify the maximum delay time permitted prior to the requirement for formed construction joints. Concrete should be placed alternately in lanes of channel with multiple lanes. Small channels may be constructed without longitudinal joints. Reinforcing steel should be continuous through all construction joints. In addition, the amount of longitudinal reinforcement through transverse joints should be increased 50 percent to accommodate stresses as the pavement gains strength near the joint. This is accomplished by the addition of a 2-m (6-ft) long bar, of the same size as the longitudinal bars, placed between every other longitudinal bar. 3-6. Expansion Joints Expansion joints should be provided in continuously reinforced paving at channel intersections and where paving abuts other structures such as box culverts, bridge piers, and bridge abutments. A 25-mm (1-in.) expansion joint is acceptable for concrete linings on soft ground when end anchorage is provided. When end anchorage is not provided, a 75-mm (3-in.) expansion joint should be provided for continuous paving on soft ground. Expansion joints in paving on rock will probably not function because of the interlock and bond between the concrete and paving. However, a 12-mm (1/2-in.) expansion joint should be provided in paving on rock where thinner paving sections abut thicker sections or structures. Expansion joints should be provided with a waterstop, smooth dowels, sponge rubber filler, and sealant. Expansion joint details for continuous concrete paving are shown in Plate 1. 3-7. End Anchorage There is not sufficient friction between the concrete pavement and the drainage blanket material or soft ground to prevent substantial movements at the ends of continuously reinforced concrete pavements due to temperature effects. End anchorage is typically used to minimize movement and damage at the ends of paving or where the continuity of paving is interrupted by other structures. An acceptable anchorage system consists of three structurally reinforced concrete anchorage lugs which are keyed into the foundation material. The lugs are usually 40 mm (15 in.) thick by 1 m (3 ft) deep, cast with dowels for anchoring the paving and spaced transversely at 3-m (10-ft) centers, beginning about 1.5 m (5 ft) from the end of paving. Lug depth may vary depending on soil and frost conditions. Anchor lugs should not be used in soils having poor resistance characteristics. Two layers of reinforcement should be provided in the pavement in the area of the lugs to develop the lug bending. Typical end anchorage details are shown in Plate 1. 3-8. Cutoff Walls a. Scour protection at ends of concrete paving. Cutoff walls should be provided at the ends of the main channel and side channel paving to prevent undermining or the transporting of foundation materials from beneath the paving. Reinforced concrete cutoff walls should be provided when their use is suited to the foundation materials. Sheetpile cutoff walls should be provided in pervious materials. Cutoff walls should be keyed into undisturbed foundation materials and should extend up the side slopes to the standard project flood elevation. The unpaved reaches of the channels immediately upstream of cutoff walls in side channels, immediately downstream of cutoff walls in side channels, and immediately downstream of cutoff walls in main channels should be protected by riprap as required. b. Cutoffs at top edges of paving. Cutoffs should be provided along the top edges of the channel paving. The depth of approximately 0.5 m (1.5 ft) is usually sufficient to prevent water from entering beneath the slab foundation due to minor amounts of scour or ground settlements. A typical detail of the cutoff at the top edge of paving is shown in Plate 1. 3-9. Intersecting Channels a. Configuration. The design configuration of channel intersections should be coordinated with hydraulic engineers. Channel intersections and interruptions such as access ramps should have smooth curves, tangent to the main channel when possible to minimize the interruption of smooth channel flow. Abrupt changes in the normal channel cross section can cause standing waves which overtop the paving or impinge on bridges crossing the channel. b. Intersection of side channel and main channel paving. Paving damage occurs when long lengths of intersecting side channel paving are made monolithic with the main channel paving. This damage occurs because of the jacking action during high temperatures. Therefore, an expansion joint should be placed in the intersecting side channel paving no more than 15 m (50 ft) from the intersection. When the intersecting side channel paving is more than 45 m (150 ft) long, the side channel

3-4

EM 1110-2-2007 30 Apr 95 subdrainage system should not connect with the main channel subdrainage system. c. Drop structures. Where the invert of the main channel is below the invert of the intersecting side channel, a drop structure may be necessary. A concrete or sheetpiling cutoff wall should be provided at drop structures to block transmission of pressure from the higher to the lower channel paving. d. Partially paved main channel. When channel side paving does not extend up to the standard project design flood elevation, provisions should be made at channel intersections to prevent undermining and scour which could cause failure and to prevent the occurrence of inflows which would increase the hydrostatic pressures beneath the paving. Channel side paving should be extended up to the standard project flood elevation or top of bank, whichever is less, for a distance of 15 to 30 m (50 to 100 ft) upstream and downstream of intersections. Consideration should also be given to increasing the depth of the cutoff at the top edge of the sides. 3-10. Deficiencies in Past Designs of Paved Trapezoidal Channels a. Jointed paving of partially lined channels. Significant changes in channel water levels, combined with the formation of water paths to and under paving, have permitted inflows greater than drainage systems were able to relieve. These heavy inflows resulted in excessive uplift pressures which have caused failures in jointed paving of partially lined channels. The excessive uplift pressures caused separations at the joints in the channel bottom paving and subsequent movement of the separated paving sections by flowing water. Paving on the sloped sides of channels usually failed after the failure of bottom paving. Paragraph 3-9b discusses solutions to alleviate this deficiency. b. Intersecting channels. Excessive expansion or elongation of paving due to high seasonal temperatures has caused jacking in paving at channel intersections. Jacking action causes the paving to lift off the supporting foundation and places its underside in compression. This compressive force causes localized cracking, popouts, and spalling. Expansion joints, similar to the details shown in Plate 2, should be provided at intersecting channel pavements to prevent damage. Reference is also made to paragraph 3-9b. c. Penetrations. In past designs stress concentrations have caused failures in continuous paving when the continuously reinforced paving was interrupted by large penetrations for drainage culverts or pipes. Reinforced concrete frames, structurally integral with the continuous paving, should be provided as a stiffening system around penetrations or openings greater than 0.6 m (2 ft) to prevent failure of the channel paving. Thrust stiffening members should be provided in the longitudinal direction with thickened members at each end to collect and distribute the loads into the paving slab. A typical detail of the stiffening system is shown on Plate 2. When the channel paving is penetrated by structures with an outside dimension greater than 1.2 m (4 ft) the paving should be separated from the drainage structure with expansion joints which extend completely across the channel paving. A typical detail for treatment at large penetrations is shown in Plate 2. 3-11. Drainage Layer Construction Major considerations during drain placement include: a. Prevention of contamination by surface runoff, construction traffic, etc. b. c. d. e. Prevention of segregation. Proper compaction. Proper layer thickness Monitoring of gradations.

EM 1110-2-1901, EM 1110-2-1911, and EM 1110-2-2300 provide guidance for the construction of drainage layers. 3-12. Maintenance Considerations A drainage system will be most effective when initially constructed and will deteriorate thereafter. Even with design precautions, deterioration of the system will occur. The system cannot be designed to prevent contamination throughout the life of a project without proper maintenance. Contamination of the drainage system can occur as a result of malfunctioning check valves, migration of foundation soils into the drainage blanket, growth of algae or bacteria, etc. Therefore, regular and routine maintenance is necessary for a drainage system. a. Inspection and maintenance. The frequency of project inspections is discussed in paragraph 2-7. The inspection should check for proper operation of check valves, sediment in manholes, obvious differential movements between joints, leakage through joints, discharge of

3-5

EM 1110-2-2007 30 Apr 95 sands from collector pipes, etc. Routine maintenance should include removal of sediment from manholes and collector drains. Repair of check valves, etc., should be performed as deficiencies are noted, and all deficiencies critical to performance of the project should be corrected with urgency. Additional guidance for inspection and maintenance of drainage systems is presented in EM 1110-2-1901. b. Rehabilitation. The majority of rehabilitation of drainage systems is in connection with contamination of the collector pipes and drainage blankets by the backflow of silt-laden channel water. Rehabilitation can also be required because of incrustation, growth of algae or bacteria, migration of fines in foundation soils into the drainage blanket, etc. Pumping, jetting, flushing, and treatment with certain chemicals or detergents can be used in rehabilitation. Guidance for the rehabilitation of drainage systems is presented in EM 1110-2-1901. 3-13. Repair of Damaged Paving Several concrete paving failures have occurred in the past which required the removal and replacement of the failed sections. In some cases, the repairs were made without evaluating the cause of damage which allowed future failures to occur. Therefore, when repair measures are necessary the cause of the failure should be determined and all provisions should be taken to prevent any recurrence of the damage. When such repairs are made the reinforcing steel along the edge of removed paving section should be preserved and lapped with the new reinforcement in the repair section. The area of the longitudinal reinforcing steel in small repaired areas is often doubled. This is done because the edges of the existing channel paving around the break-out move due to temperature changes, and the concrete in the repaired area shrinks during curing. High-early strength concrete is sometimes used to shorten the curing time of the repair concrete. For repairs requiring long periods of construction, sheetpile cutoffs should be installed beneath the existing paving at upstream and downstream limits of repaired area. These cutoffs are provided to prevent further damage to the paving should flood flows occur which are larger than those which can be controlled by the construction cofferdam and the bypass system.

3-6

EM 1110-2-2007 30 Apr 95

Chapter 4 Special Design Considerations for Rectangular Channels Lined with Retaining Wall Structures

paving. Guidance for continuously reinforced concrete paving is contained in paragraphs 3-4, 3-6, 3-7 and 3-8a. 4-4. Joints In Retaining Walls Vertical contraction joints should be placed in the wall stem at a spacing of approximately 5 to 10 m (20 to 30 ft). Wall base slabs may be designed as continuously reinforced slabs. Horizontal construction joints should be provided at the base of wall stems and at vertical lifts of 2.5 to 3 m (8 to 10 ft) in walls. Guidance for joints in retaining walls is contained in EM 1110-2-2502. 4-5. Drainage Provisions a. Drainage systems. Except for I-type walls, drainage systems should be provided behind channel retaining walls and beneath channel bottom paving slabs on soil foundations to relieve hydrostatic pressures whenever the permanent or fluctuating water table is above the invert of the channel. General information on the design of drainage systems is provided in paragraph 2-4. Since construction procedures do not permit the installation of a drainage system behind I-type walls, these walls should be designed for the unrelieved hydrostatic pressures which may occur throughout the life of the walls. (1) Retaining walls. EM 1110-2-2502 provides information for the design of drainage systems to relieve hydrostatic pressures on retaining walls. Details of the drainage systems for rectangular channels, including those formed with retaining walls, are shown in Plate 2. Backfill material placed behind channel retaining walls should be a pervious, free draining, granular material to ensure the lowest level of saturation and to minimize horizontal earth pressures. The pervious backfill material should be covered with a layer of impervious material to prevent surface runoff from entering the backfill. (2) Channel bottom paving slabs. When channel bottom paving slabs are placed on rock foundations, the drainage system usually consists of a system of holes drilled in the rock and weep holes in the slab. The depth of holes required to achieve the required drainage effectiveness is dependent on the type and condition of the rock. The geotechnical engineer should be consulted in this regard. If paving anchors are provided, the depth of drain holes should not be less than the depth of the anchors. When drainage is required for channel bottom paving slabs on soil foundations, a drainage system as discussed in paragraph 3-3 should be used.

4-1. General The stems of retaining walls used to line rectangular channels are vertical or nearly vertical. These walls must retain the surrounding soil and contain the channel flows. Although rectangular channels are more expensive than trapezoidal channels, they are sometimes justified in highly developed urban areas. Limitations on economical right-of-way may not allow for construction of excavations with stable slopes. In such cases, rectangular channels are required. 4-2. Retaining Wall Types Cantilever and I-type reinforced concrete retaining walls are commonly used to form the sides of rectangular channels. These walls are used with or without bottom channel paving as shown in Figure 2-2. a. Cantilever walls. Cantilever walls are usually the inverted T-type or L-type. The inverted T-type wall develops additional stability because of the weight of the backfill material resting on the heel of the base slab. The base slab of the L-type wall does not have a heel. Hence, stabilization is provided only by the weight of the wall itself. The L-type wall requires less excavation for construction. b. I-type walls. I-type walls are often used when right-of-way restrictions prohibit sloped excavations as discussed in paragraph 2-8. I-type walls often consist of driven piles or concrete drilled piers with attached concrete face wall. Concrete slurry walls are also an alternative. The walls should be designed to prevent movements which would result in settlements or loss of materials which would be detrimental to existing structures or essential environmental features. 4-3. Channel Bottoms Paving of channel bottoms is often required to prevent erosion of the in situ materials when subjected to channel flows or to satisfy other environmental factors. Joints in channel bottom paving slabs should be avoided, when possible, by the use of continuously reinforced concrete

4-1

EM 1110-2-2007 30 Apr 95 (3) Hydrostatic pressures. The intensity of the hydrostatic horizontal and uplift pressures on the structure is dependent upon the effectiveness of drainage system. The drainage system effectiveness is discussed in paragraph 2-4e. In past designs, it has been common to assume a 25 to 50 percent decrease in drain effectiveness. The design pressures must be based on these considerations. The design memoranda must provide adequate documentation to clearly show that the values used in the design are proper and result in an adequately conservative design. Appendix C provides methods for the design of the drainage system by the use of seepage analyses. b. Pressure relief systems. Pressure relief systems should be provided for those areas where perched water is encountered during construction. 4-6. Structural Design a. Loading conditions. The forces acting on rectangular channels should be defined to determine the design loadings as discussed in paragraph 2-3b. The following loading conditions are representative of the controlling conditions in which the design loadings are applied to cantilever and I-type retaining walls and the channel bottom paving slabs of rectangular flood control channels. Earth pressures on walls should be determined by using applicable criteria in EM 1110-2-2502, EM 1110-2-2504, and ETL 1110-2-322. (1) Case 1, Construction loading (unusual condition). Wall and backfill in place; earth pressure; channel empty; compaction effects and construction surcharge loadings. See Figure 4-1a. (2) Case 2, Design flood loading (usual condition). Wall and backfill in place; earth pressure; water level on the channel side at the design water level, plus freeboard; backfill saturated to normal-low ground water level, adjusted to reflect the design effectiveness of the drainage system. See Figure 4-1b. (3) Case 3, Drawdown loading (usual condition). Wall and backfill in place; earth pressure; channel empty; backfill saturated to highest ground water level, adjusted to reflect the design effectiveness of the drainage system. See Figure 4-1c. (4) Case 4, Earthquake loading (unusual condition). Wall and backfill in place; active earth pressure; water in channel to normal water level; backfill saturated to normal ground water level, adjusted to reflect the effectiveness of the drainage system; earthquake induced loads. See Figure 4-1d. b. Stability.

(1) Cantilever retaining walls. Stability analyses should be performed to determine the horizontal, vertical, and rotational equilibrium of these walls to ensure safety against sliding along the base or any foundation medium below the base, overturning, bearing, or excessive differential settlement of the foundation and flotation. The criteria for performing stability analyses of T-type and L-type retaining walls, including the factors of safety for sliding and overturning, are contained in EM 1110-22502. The flotation factors of safety and the criteria for performing the flotation analysis are given in ETL 11102-307. Computer program X0153, CTWALL, may be used for the analysis of these walls. (2) I-type retaining walls. Stability analyses for I-type walls should be performed using a model which depicts the loaded wall embedded in the foundation material. Stability is achieved by the resistive foundation pressures on the embedded portion of the wall. A pictorial description of the I-wall is shown in Figure 2-2c. Computer program X0031, CWALSHT, may be used for the analysis of these walls. (3) Channel bottom paving. Flotation stability of the channel bottom paving shall comply with criteria in ETL 1110-2-307. Pavement on rock may be anchored to resist flotation with reinforcing bars grouted into holes drilled into the rock. c. Reinforced concrete design. Criteria for design of reinforced concrete hydraulic structures are given in EM 1110-2-2104. For singly reinforced flexural members, the ratio of tension reinforcement provided should be 0.375pb. (1) Cantilever retaining walls. T-type and L-type walls should be designed for the loading cases described in paragraph 4-6a, as applicable, and the foundation pressures obtained from the stability analyses. (2) I-type retaining walls. I-type walls should be designed for the loading cases described in paragraph 4-6a and the resisting forces which develop on the embedded portion of the wall.

4-2

EM 1110-2-2007 30 Apr 95

Figure 4-1. Loading conditions, rectangular channels with retaining walls

4-3

EM 1110-2-2007 30 Apr 95 (3) Channel bottom paving. (a) Minimum reinforcing. The minimum percentage of reinforcing steel should comply with Table 3-1 or Table 3-2, which ever is greater. (b) Uplift loading. Channel invert paving should be designed for the maximum net uplift load. Pavement on rock which is anchored to resist flotation should be designed to span between the anchorage points. Anchors should be designed to provide a safety factor of 1.5 against the design uplift pressures. (c) Isolated or buttress action. Paving slabs used in conjunction with retaining walls may be designed and detailed to act independently or as a strut slab to provide horizontal support to the wall. 4-7. Special Considerations During Construction When retaining walls are designed for the paving slab to act as a strut to provide sliding stability, contract requirements should stipulate that the slab should be placed prior to the construction of walls. Contract specifications should define any restrictions on the backfill differentials required to comply with the design assumptions.

4-4

EM 1110-2-2007 30 Apr 95

Chapter 5 Special Design Considerations for Rectangular Channels Lined with U-frame Structures

possible increased hydrostatic pressures resulting from some loss of the drainage system effectiveness during the life of the project as discussed in paragraph 2-4e. a. Drainage systems. Open and closed drainage systems are discussed in paragraphs 2-4, 3-3, and 4-5. Refer to Appendix B for a typical analysis of a drainage system for a U-frame structure. b. Drainage of perched ground water. When ground water levels are below the channel invert and a drainage system is not provided, the designer should develop a pressure relief system for those areas where perched water is encountered during construction of the channel. This drainage system should be defined and included as a requirement of the construction contract. 5-5. Structural Design

5-1. General The U-frame structure is basically a U-shaped, open-top concrete section in which the walls and base slab of the structure are monolithic. U-frame structures may sometimes be more economical or functionally desirable than individual retaining walls and separate channel invert slabs. 5-2. Foundation Considerations U-frame channel structures may be designed for any type of foundation, provided the material strength is sufficient to provide adequate frictional and bearing resistance for structural stability. Pile foundations are sometimes used for localized sections founded on weak foundations. 5-3. Joints in Concrete a. Base slab section. The base slab of U-frame channel structures are often designed and constructed as continuously reinforced concrete paving. Expansion joints should be provided where the continuity of the structure is interrupted by other structures. Guidance on expansion joints is discussed in paragraph 3-6. Waterstops should be provided in expansion joints and should extend continuously across the base slab. When continuously reinforced concrete paving is not used, vertical contraction joints are provided at the location of wall joints. b. Wall section. Vertical contraction joints should be provided in walls of U-frame structures. The contraction joint spacing should be approximately 5 to 10 m (20 to 30 ft). However, the joint spacing should be limited to two or three times the wall height. Horizontal construction joints or vertical lift joints should be provided at the base of wall stems and in wall height at intervals of 2.5 to 3 m (8 to 10 ft). 5-4. Drainage Provisions A drainage system should be provided behind the channel walls and beneath the channel bottom paving to relieve hydrostatic pressures whenever the permanent or fluctuating water table is above the invert of the channel. The design of channel walls and bottom paving should reflect

a. Loading conditions. The primary loadings on the U-frame structure are weights of the structure and contained water and the geohydraulic pressures resulting from the restraint provided by the structure. The exact nature of the loadings or the physical parameters on which the loadings are based are not precisely known; therefore, the structure should be designed for conservative loadings. An analysis of the structural frame should be performed with the applied loading to determine the reactive foundation pressures and internal loads within the structure for each loading condition. (1) Case 1, Construction condition (unusual condition). Structure complete with backfill in place; at-rest earth pressure; channel empty; compaction effects and construction surcharge loadings. See Figure 5-1a. (2) Case 2, Design flood loading (usual condition). Water in channel at the maximum design water level; at-rest earth pressure; backfill saturated to the normal ground water level adjusted to reflect the design effectiveness of the drainage system. See Figure 5-1b. (3) Case 3, Drawdown loading (usual condition). Channel empty; at-rest soil pressures on walls; hydrostatic pressures reflecting the highest ground water level adjusted to reflect the design effectiveness of the drainage system. See Figure 5-1c. (4) Case 4, Earthquake loading (unusual condition). Construction complete; water in channel to normal level; active earth pressures; backfill saturated to normal ground water level adjusted to reflect the design effectiveness of the drainage system; seismic loadings. See Figure 5-1d.

5-1

EM 1110-2-2007 30 Apr 95 (5) Case 5, Other special load cases. Modify all of the previous load cases to include other special loads applied to the U-frame structure. Examples are maintenance vehicles and bridges or other permanent structures which are supported by the U-frame. b. Stability. The basic stability requirements for the U-frame structure require that the structure be safe against sliding, overturning, bearing failure (excessive differential settlement), and flotation. The criteria for satisfying these stability requirements and the safety factors required for usual and unusual loading conditions are contained in EM 1110-2-2502, Chapter 4, particularly Table 4-1. Resisting loads or foundation pressures on the base of structure are computed to satisfy vertical and rotational equilibrium. The distribution and intensity of base pressures should be determined by using a beam on elastic foundation model, or by use of a pressure pattern which approximates that which would exist beneath a flexible foundation. Excessive differential settlements are avoided by maintaining bearing pressures which are less than the allowable bearing pressure value furnished by the geotechnical engineer. Flotation stability criteria for concrete hydraulic structures is contained in ETL 1110-2-307. Anchors are sometimes necessary to satisfy the safety factor requirements. In rock foundations, anchors often consist of reinforcing bars grouted into drilled holes. The stiffness, strengths, and locations of anchors should be reflected in the structural analysis. c. Reinforced concrete design. (2) Minimum reinforcement. Reinforcement for continuously reinforced concrete slabs on soil foundations should comply with Tables 3-1 or 3-2.; except that the area of temperature reinforcement in thicker slabs need not exceed 2,200 mm2 per meter (1 in.2 per foot). Reinforcement should be placed in two layers, top and bottom of slab, when the slab thickness is 300 mm (12 in.), or greater. For thicker slabs it is common to place 2/3 of the reinforcement in the top face. Minimum temperature and shrinkage reinforcement provisions are discussed in EM 1110-2-2104. d. Computer programs. Computer programs suitable for the design or analysis of U-frame structures are discussed in Appendix B. 5-6. Special Considerations During Construction Construction procedures should be given consideration during the design process. Construction difficulties and complexities should be minimized or eliminated. For example, concrete working slabs are sometimes used to protect drainage blankets or to prevent weathering of the foundation materials before the main slab is constructed. When necessary for stability, the contract should include the requirement for the level of backfill behind opposite walls to be limited to a specified differential.

(1) General. Reinforced concrete design should comply with EM 1110-2-2104. For singularly reinforced flexural members the ratio of tension reinforcement provided should be 0.375pb.

5-2

EM 1110-2-2007 30 Apr 95

Figure 5-1. Loading conditions - rectangular channels with U-frames

5-3

EM 1110-2-2007 30 Apr 95

EM 1110-2-2007 30 Apr 95

You might also like