0% found this document useful (0 votes)
397 views17 pages

Benchmarking Project Schedules

This document discusses benchmarking project schedules for quality and accuracy. It introduces concepts for benchmarking structural integrity, estimated durations, and execution performance against standards or previous baselines. Benchmarking helps set targets to improve planning quality and execution. Structural integrity can be benchmarked using schedule metrics and thresholds. Estimated durations can be benchmarked against historical data or industry rates. Execution performance is benchmarked by comparing actuals to plans over time. The document provides examples of benchmark thresholds for schedule quality metrics and estimating best practices to facilitate objective benchmarking.

Uploaded by

Sidra Ahsan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
397 views17 pages

Benchmarking Project Schedules

This document discusses benchmarking project schedules for quality and accuracy. It introduces concepts for benchmarking structural integrity, estimated durations, and execution performance against standards or previous baselines. Benchmarking helps set targets to improve planning quality and execution. Structural integrity can be benchmarked using schedule metrics and thresholds. Estimated durations can be benchmarked against historical data or industry rates. Execution performance is benchmarked by comparing actuals to plans over time. The document provides examples of benchmark thresholds for schedule quality metrics and estimating best practices to facilitate objective benchmarking.

Uploaded by

Sidra Ahsan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

// Benchmarking Project Schedules

Dr. Dan Patterson, PMP


CEO & President, Acumen

March 2011

+1 512 291 6261 // [email protected]

www.projectacumen.com

Table of Contents
Introduction..................................................................................................................... 4 Benchmarking Overview .................................................................................................. 4 Uses of Schedule Benchmarking ......................................................................... 4 The Benchmark Basis .......................................................................................... 4 The Value of Schedule Benchmarking .................................................................. 5 Benchmarking Schedule Soundness................................................................................ 5 Schedule Benchmarks ......................................................................................... 5 Figure 1 Example DCMA Benchmark Thresholds ................................... 6 Figure 2 Additional Schedule Benchmark Thresholds ........................... 6 Establishing a Scoring System for Benchmarks .................................................. 7 Figure 3 Benchmark Analysis Using Weighted Scores ........................... 7 Benchmarking Estimated Durations................................................................................ 7 Introducing Duration Dictionaries for Benchmarking Estimate Durations ........... 7 Figure 4 Example WBS-Based Duration Dictionary ................................ 8 Figure 5 - Schedule and Duration Dictionary Merge ................................. 8 Using Rate Tables for Duration and Cost Estimation Benchmarking ................... 9 Figure 6 Rate-Based Benchmark Duration Calculation ......................... 9 Running Benchmark Metrics ............................................................................... 9 Figure 7 Duration Benchmark Analysis ............................................... 10 Figure 8 Checklist of Activities Requiring Duration Revisions ............. 11 Benchmarking Execution Performance .......................................................................... 11 Performance Relative to a Baseline ................................................................... 12 Figure 9 Example Schedule Performance Metrics................................ 12 Figure 10 Benchmarking Performance Over Time ............................... 13 Figure 11 Comparison Between Critical, Non-Critical Activities ......... 13 Earned Value ..................................................................................................... 13
+1 512 291 6261 // [email protected]

www.projectacumen.com

Figure 12 Two-Way Benchmarking Using Earned Value .................................. 14 Figure 13 Earned Value using Slice-Dice Analysis .......................................... 15 Earned Schedule .................................................................................................... 15 Figure 14 Earned Schedule Benchmarking ..................................................... 16 Figure 15 Earned Schedule Benchmark Metric Analysis ................................. 16 Conclusions................................................................................................................... 16

+1 512 291 6261 // [email protected]

www.projectacumen.com

Introduction
Benchmarking project schedules is a powerful means of managing and validating projects, programs and portfolios alike. However, the approach to conducting such benchmarking, whether it is determination of schedule quality/realism or execution performance, can be highly subjective. This paper introduces concepts that help provide a framework and repeatable approach to developing not only structurally sound schedules (based on accepted Critical Path/CPM techniques) but equally importantly, that bring realism to the schedule with regards to estimated durations, required resources and forecasted rates of execution.

Benchmarking Overview
Uses of Schedule Benchmarking
A benchmark is defined as a point of reference by which something can be measured. Schedule benchmarking can be used to determine quality and accuracy of: 1. Structural integrity of the schedule how well built is the schedule? 2. Estimated forecasts how accurate are the duration estimates? 3. Execution performance how well is the project performing? The first two categories together form the basis of a realistic forecast (planning). The third category is a measure as to how well is the project being executed relative to the given forecast (the plan). The basis against which benchmarking is conducted gives context to the results: is a project that is completed three months behind schedule but also three months earlier than any other similar project conducted to date, a successful project? The answer to this question is answered by firstly establishing an agreed upon benchmark basis.

The Benchmark Basis


With regards to the basis against which benchmarking is conducted, multiple sources can be selected: 1. Previous iterations or baseline(s) of the schedule: e.g. how is the plan quality or execution performance relative to last months update? 2. Similar projects within the portfolio: e.g. based on similar scope and operating environment, how is our project performing relative to our sister project? 3. Industry standards: often based on standard productivity rates or estimates for given types of work or industry, duration estimates can be benchmarked. 4. Historical performance of the project: a useful insight into how well the project is performing relative to the agreed upon forecast.

+1 512 291 6261 // [email protected]

www.projectacumen.com

The Value of Schedule Benchmarking


Schedule benchmarking helps set and achieve given targets so as to improve the (planning and/or execution) quality of a project. During the planning phase, schedule benchmarking is a valuable tool for ensuring realistic and achievable forecasts that represent the work required to achieve project completion. Basing a project on a poorly planned schedule only leads to project failure better to lead into the execution phase with confidence about the integrity of the schedule and its forecasts than to simply rely on the hope that the forecast is achievable. Performance tracking of a project is in itself also a form of benchmarking. By comparing the time, cost and resources used to achieve completed milestones and deliverables against the project plan or a baseline or some other basis is a means of deducing whether performance is acceptable or not. Execution remediation (or acceleration) is only possible once we have insight into where and when in the project are the performance bottlenecks again, a simple but effective use of benchmarking (plan V actual). Formal stage-gate process can also be driven by project benchmarking. Setting targets for schedule quality and estimates ensures that a project can only move forward once given targets are achieved. This not only increases the chance of project success but also helps increase the level of scheduling maturity within the project or organization. In summary, the process of schedule benchmarking is a highly effective means of both ensuring the establishment of realistic plans and the subsequent successful execution of them.

Benchmarking Schedule Soundness


Schedule Benchmarks
A quality schedule needs to be both structurally sound as well as realistic in its estimates. Validation of structural soundness is best achieved through the analysis of the schedule using schedule metrics. The topic of a separate white paper1, these metrics are warning indicators as to where shortcomings in the schedule lie (e.g. artificially constrained activities or networks paths with negative float). Tying these metrics back to the application of benchmarks, a further beneficial technique is to apply thresholds or tolerances to the metrics. As such, rather than failing a 5,000 activity schedule simply because of a total of 5 days negative float, instead consider setting a realistic target against which the total days negative float should not be surpassed. Various organizations have developed benchmarking standards for the quality of schedules. A recent example of this, is the development of the 14-Point Assessment by the DCMA (Defense Contracts
1 Dr Dan Patterson, Taming an Unruly Schedule with the 14-Point Schedule Assessment, 2010, www.projectacumen.com/resources/whitepapers

+1 512 291 6261 // [email protected]

www.projectacumen.com

Management Agency). As well as specific schedule metrics, the 14 Point Assessment also establishes specific benchmarks for schedule quality. Examples of these include: Schedule Metric Logic (open ends) Finish Start Relationships High Duration Negative Float Benchmark Threshold Should not exceed 5% of the schedule Should represent at least 90% of the logic links Should not exceed 5% of the schedule Zero tolerance

Figure 1 Example DCMA Benchmark Thresholds In a similar manner to the DCMA benchmarks, Figure 2 shows more involved examples of benchmarks that have been defined so as to improve the quality of project schedules. Schedule Metric Logic Density2 Milestone Ratio3 Activities Riding the Data Date Dangling (open start/finish) Lags Logic Hotspot Wrong Status Cost/schedule misalignment Benchmark Threshold Should not be less than 2 nor greater than 4 Should not be less than 1:10 Should not represent more than 10% of the schedule Should not exceed 5% of the schedule Should not exceed 25% of the activity duration Should not exceed 20% of the schedule Zero tolerance Zero tolerance

Figure 2 Additional Schedule Benchmark Thresholds

2 3

Logic density is defined as the average number of logic links per activity and is an indicator of quality of logic within a schedule Milestone ratio is the ratio of milestone and normal activities and is an indicator of level of detail within a schedule

+1 512 291 6261 // [email protected]

www.projectacumen.com

Establishing a Scoring System for Benchmarks


One challenge of using multiple benchmarks is the ability to summarize multiple (often competing) benchmarks into a single result. This can be overcome by combining failed benchmark tests into a single schedule quality score. There are multiple variations in scoring techniques including weightings, weighted averages, score by exception etc. all of these serve a common purpose: to provide a scoring mechanism that can be used in the benchmarking process.

Iteration 4 carries the highest schedule quality score

Figure 3 Benchmark Analysis Using Weighted Scores Figure 3 shows an example of four different iterations of a contractor schedule; each of which underwent various schedule revisions and updates. As part of the benchmarking exercise, the project owner established a benchmark pass/fail threshold of 70% based on a series of metrics. In all four iterations, the contractor consistently failed the logic density test but passed the other tests to varying degrees. As can be seen in figure 3, it took the contractor four iterations before achieving the target 70% score before passing the overall quality benchmark test.

Benchmarking Estimated Durations


Sound schedules also require realistic duration estimates hence the need to benchmark the realism of duration estimates. As described earlier, the basis of the benchmark comparison can be from multiple sources but the approach for each is consistent.

Introducing Duration Dictionaries for Benchmarking Estimate Durations


Consider a scenario where a project schedule has been developed using duration estimates provided by multiple discipline leads. The information from these leads is accumulated by the lead scheduler and integrated into the project schedule. The next step is to establish whether the plan is a realistic plan or not. The benchmark technique used in this example is based on a Duration Dictionary. A duration dictionary is a look-up list of benchmark estimates categorized by a meaningful grouping that can be related back to and applied as a benchmark test against the durations in the schedule. The grouping of elements in a Duration Dictionary can be simple groupings based on Work Breakdown Structures, type of work, contractor type, location etc. within the project. Alternatively, duration dictionaries can be based on more complex bottom-up estimating approaches taking into account quantities of material, labor rates and productivity factors.

+1 512 291 6261 // [email protected]

www.projectacumen.com

Figure 4 shows an example of a Duration Dictionary based on a corporate standard WBS Hierarchy. Three different benchmarks are referenced (Benchmark A, B and a historical reference project called Project B). These three sets of benchmarks can then be used as the basis against which to benchmark the accuracy of the duration estimates being developed.

Figure 4 Example WBS-Based Duration Dictionary

Once the Duration Dictionary has been established, the benchmark data can then be merged with the project schedule (in this example, based on WBS) and a subsequent metric analysis conducted. Figure 5 shows an example of the previously referenced Duration Dictionary merged with the project schedule. The next step is to run a benchmark analysis to validate the quality of the forecasted durations.

Benchmark Durations from the Duration Dictionary

Figure 5 - Schedule and Duration Dictionary Merge

+1 512 291 6261 // [email protected]

www.projectacumen.com

Using Rate Tables as the Basis for Duration and Cost Estimation Benchmarking
An alternate approach to developing benchmarking standards based on Duration Dictionaries is to adopt more of a bottoms-up approach using rates and quantities. By establishing rates and quantities (of resources and materials) against activities, a more detailed (and accurate) benchmark basis can be established. Further, availability of rates and quantities is generally commonplace within projects and so makes for easier benchmark basis development. Activity duration can be determined from assigned resource rates. For example if the daily rate for laying pipe is known and the quantity of pipe to be laid is also known, then the activity duration can be calculated through a simple quantity/rate calculation. By defining quantities in a schedule and applying rates to these quantities from a rate table, accurate benchmark durations can be established and subsequently used for the basis of a benchmark analysis Activity Pipeline Lay Concrete Pour Rate 100 ft/day 3 cubic yards/day Quantity 1000 feet 18 cubic yards Benchmark Duration 10 days 6 days

Figure 6 Rate-Based Benchmark Duration Calculation

Running Benchmark Metrics


Various metrics can be used for a schedule benchmark analysis including: Optimistic schedule duration is less than the suggested benchmark value Pessimistic - schedule duration is more than the suggested benchmark value Within Tolerance schedule duration is within a given percentage of the benchmark duration e.g. within 10% Outside Tolerance - schedule duration is outside a given percentage of the benchmark duration e.g. outside 10%.

+1 512 291 6261 // [email protected]

www.projectacumen.com

Benchmark analysis results

Activities requiring updates

Early activities falling outside of accuracy tolerance

Figure 7 Duration Benchmark Analysis Figure 7 shows the results from applying these metrics to our example project based on groupings of activities (by contractor). Multiple conclusions from the analysis can be drawn including: 1. The majority of the out of tolerance estimates fall in the early/mid phase of the project. 2. The majority of these out of tolerance estimates are as a result of Contractor Bs very pessimistic schedule. 3. Specific activities requiring schedule estimate reviews can be pinpointed using the heat map chart and the metric analysis results. From the analysis, those activities requiring duration updates can be quickly determined, reviewed and updated accordingly. Being able to conduct benchmark analysis on logical groupings of activities is a very effective means of determining trends and characteristics within a schedule, which in turn, leads to faster resolution.

+1 512 291 6261 // [email protected]

www.projectacumen.com

10

Figure 8 Checklist of Activities Requiring Duration Revisions Appropriate tolerance levels vary depending on where in the project lifecycle you are. Humphrey and Associates4 define four discrete types of estimate (conceptual, preliminary, detailed and definitive). These estimates vary in accuracy based on the amount of information available at the time: Conceptual: Preliminary: Detailed: Definitive -25% > +40% -15% > +25% -10% > +20% -5% > +10%

These thresholds should be taken into account when defining tolerance levels assigned to benchmark metrics. i.e. metric tolerances should be updated as the project lifecycle progresses. Using benchmarking to attain high levels of schedule quality and estimate accuracy are together two key drivers of project success. In a paper authored by Narayan Joshi, titled Benchmarking and best Practices for Effective Turnarounds5, it was found that the most competitive (successful) turnaround projects were those that had the most mature scope definition, best defined execution strategy and the best planning status. All three of these factors are based upon having a sound and realistic plan in place, a very compelling argument for conducting benchmark analysis as early in the project lifecycle as possible.

Benchmarking Execution Performance


Probably one of the most common uses for benchmarking is for performance analysis. Being able to compare a projects performance against given benchmarks gives objective and quantitative insight into the true performance of a project.
Humphreys and Associates, Project Management Using Earned Value, 2002, ISBN 0-9708614-0-0 Narayan Joshi, Benchmarking & Best Practices for Turnarounds, IQPC Turnaround Conference, London, UK, Sep 22 2003

+1 512 291 6261 // [email protected]

www.projectacumen.com

11

There are multiple techniques available for project execution performance benchmarking ranging from rudimentary metrics such as variance from a given baseline to true performance analysis using earned value and/or earned schedule techniques.

Performance Relative to a Baseline


Tracking project execution relative to a baseline involves straightforward cost and/or schedule performance metrics comparing actual performance with that forecasted in a given baseline or original plan. Useful metrics include:
Metric Completed Ahead of Schedule Completed Behind Schedule Accelerated Took longer than planned Started Ahead Started Delayed Riding the Data Date Description Activities that completed ahead of baseline irrespective of when they started. Activities that completed behind baseline forecast irrespective of when they started. Activities that started late but finished early. Irrespective of dates, the activity took longer to execute than originally planned Actual Start date of the activity was earlier than planned Actual Start date of the activity was later than planned Planned activities whose start dates get delayed along the project data date as a result of not starting on time.

Figure 9 Example Schedule Performance Metrics Schedule performance metrics are valuable for benchmarking execution relative to the plan. Figure 10 shows the metrics listed in figure 9 applied to a schedule grouped by contractor. As well as tracking the number of activities in a schedule that trigger a performance metric threshold, quantifying the actual number of days work, or effort or cost that these activities represents is a better means of actually quantifying the true impact of these performance variances. Knowing that 100 activities fell behind schedule is less valuable than knowing that this represented a total slippage of 250 labor days, for example.

+1 512 291 6261 // [email protected]

www.projectacumen.com

12

Track performance using days, work, cost rather than activity counts

Figure 10 Benchmarking Performance Over Time Another useful benchmark is to differentiate slipped duration based on whether or not the activities in question are on the critical path. Figure 11 shows the same example project with execution performance benchmark metrics applied to both the critical and non-critical activities. In this example, conclusions can be drawn as to the relative performance of the activities on and off the critical path giving additional insight above and beyond that of simply benchmarking at the project level as a whole.

Figure 11 Benchmark Comparison Between Critical and Non-Critical Activities In summary, schedule performance analysis gives valuable insight into how well a project is executing relative to a given baseline. Further value can be obtained from the analysis by focusing on actual quantities of duration and work involved rather than simply looking at activity counts and/or percentages.

Earned Value
One of the drawbacks of using traditional performance metrics is that the analysis doesnt take into account the effort expended in order to achieve the current status. This shortcoming is overcome through the use of Earned Value. Earned value is essentially a comparison of three variables: How much progress/work should have been completed (planned cost) How much progress/work actually has been completed (earned value) How much effort has it taken to achieve the current status (actual cost)

+1 512 291 6261 // [email protected]

www.projectacumen.com

13

By comparing the value of work achieved to how much it cost to achieve this progress relative to the expected progress is an excellent means of not only tracking progress but also efficiency of work. Being two weeks early on the completion of an activity but at the expense of being three times over budget is not insight that traditional performance-based benchmark analysis can provide.

Figure 12 Two-Way Benchmarking using Earned Value Figure 12 shows an example activity with a planned duration of 20 days and planned cost of #200. Ten days into the project, the assumption is that 10 of the 20 days of planned duration should be completed (at a cost of $100). In actuality, 12 days of progress has been achieved (ahead of schedule). However, when the actual cost of work performed is examined, it can be seen that it has cost $140 to achieve the 12 days worth of progress. Relating this back to benchmarking, consider Earned Value as a two-way benchmark test: Schedule Performance Index (SPI) is an indication of how much progress has been made relative to the expected progress at that point in time. In this example, the CPI is 1.2 reflecting a 20% improvement in efficiency than originally forecast. Cost Performance Index (CPI) is an indication of how much progress has been made relative to the cost of work. In this example the CPI equates to 0.85 indicating that for every dollar spent, only 85 cents of work has actually been achieved. Figure 13 shows our example project undergoing an earned value analysis being sliced and diced by both Contractor and phase. This two dimensional analysis gives insight into not only which contractor is causing the largest cost variance but also when in the project lifecycle is this variance occurring. +1 512 291 6261 // [email protected]

www.projectacumen.com

14

Earned Value Benchmarking pinpointing which period is suffering from cost performance overruns.

Figure 13 Earned Value using Slice-Dice Analysis Earned Value uses planned cost and duration as the basis for the benchmark comparison. This is all very well assuming that the planned values are accurate and realistic in the first place. This ties back to the importance highlighted in the initial two chapters of this paper discussing quality of schedule and accuracy of forecast. Earned value benchmark analysis is only as accurate as the plan/forecast basis. Further argument for spending as much effort as needed on ensuring that the basis of schedule and estimate is indeed realistic and defendable.

Earned Schedule
Earned value does however come with a price: that is, the effort involved in capturing the very detailed periodic status updates/actual costs tends to be much greater than simply capturing status in the form of percent complete. Further, not all projects directly tie their schedules with cost estimates. In such instances, it is not possible to combine schedule status with actualized costs and so earned value analysis is not possible. As an alternate solution, the concept of earned schedule has been developed. Earned schedule compares how much progress has been achieved with how much progress should have been achieved based on a given basis or baseline. Figure 14-shows an example of Earned Schedule analysis. Twelve days into the project, the activity in question has only achieved 10 days worth of progress therefore the Schedule Variance (t) or SV(t) is -2. In terms of a performance index, examining the Schedule Performance Index (t) SPI (t), reveals an efficiency of 0.83 (less work completed than expected). Extrapolating this past performance out to forecast an actual completion duration is achieved using a metric known as Independent Estimate at Complete IEAC(t). In this example the IEAC(t) produces a +1 512 291 6261 // [email protected]

www.projectacumen.com

15

completion forecast of 24 days (based on past performance) relative to the original forecast of 20 days.

Figure 14 Earned Schedule Benchmarking Figure 15 shows the same sample project as previously demonstrated for the Earned Value scenario. The Benchmark in this example is the schedule baseline which enables earned schedule analysis giving insight into not only which contractors are over or under performing but also when in time are the performance bottlenecks occurring.

Earned Schedule Benchmarking pinpointing which period is suffering from schedule performance slippage.

Figure 15 Earned Schedule Benchmark Metric Analysis

Conclusions
This paper has discussed applications of schedule benchmarking under different use-cases: Critiquing the structural integrity of a schedule
16

+1 512 291 6261 // [email protected]

www.projectacumen.com

A highly effective means of validating durations of activities A means of gaining true insight into project execution performance

While these three applications of benchmarking all are very valuable, they all are based on the assumption that the underlying basis for comparison (the benchmark basis) is sound and realistic. This is yet further proof that in the world of project management, a sound basis of schedule is king. The use of benchmarks to develop sound, realistic and ultimately more achievable, project plans is key to achieving such schedules. If achieved, this in turn leads to a much higher chance of on-time project execution and overall project success.

+1 512 291 6261 // [email protected]

www.projectacumen.com

17

You might also like